Home / Financial Firm (Unknown - Insurer) / Determination 205504

Determination 205504

Storm damage cash settlement amount disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2010-09-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$60,000
SourceAFCA PDF

Summary

The applicant sought $60,000 for storm damage to his home after the FSP offered a $44,052.05 cash settlement based on a builder quote and engineer's report. AFCA found the FSP entitled to its settlement, with pre-existing wall damage to be repaired first and bathroom tiles excluded.

The applicant bore the onus to show the settlement was insufficient and provided no supporting reports, while the FSP obtained multiple quotes and an engineer's report.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

205504 Determination 1 of 4 DETERMINATION CASE NO: 205504 Home – storm damage – claim settlement SUMMARY OF FACTS 1. The applicant held a home building and contents policy with the Financial Services Provider (FSP) since April 2002. 2. On 2 April 2009, the applicant contacted the FSP to lodge a claim for damage to the property following a severe storm on the previous day. The FSP accepted the claim, and appointed an external repairer to inspect and report on the damage and to provide a quotation to repair the building. 3. On 15 April 2009, the FSP’s builder reported that the damage was consistent with the insured event and supplied a scope of works and a quote of $31,231.25 to repair the damage. 4. The applicant was not satisfied with the FSP’s quote and obtained a quote from his repairer and provided a quotation of $70,580 to the FSP. The FSP then obtained a third quote of $52,780.75. 5. The FSP authorised repairs to the repairer who provided the first quotation. The applicant did not believe the damage could be repaired for the cost quoted by the first repairer. 6. The FSP appointed an engineer to provide a detailed report on the damage. The engineer reported that there was pre-existing damage that should be rectified prior to repairs commencing. The FSP decided to cash settle the applicant for $44,052.05 based on the engineer’s report and a revised quotation from the initial repairer. 7. The applicant refused to accept the settlement amount and disputed the FSP’s position arguing that the repairs could not be completed for the cash settlement amount offered and has requested a settlement of $60,000. ISSUES IN DISPUTE 8. Whether the applicant is entitled to receive a higher amount for repairs than the amount offered by the FSP. RELEVANT POLICY PROVISONS “Types of cover you can choose .... Home Cover When we insure your home, we will cover it for loss or damage which:  is caused by an Insured Event and  happens in the period of insurance .... How claims are paid Home, Contents, Personal effects or Landlord’s Fixtures and Fittings claims 205504 Determination 2 of 4 We choose how your claim is settled. If we agree to pay a claim for loss, theft or damage to your Home, Contents, Personal effects or Landlord’s Fixtures and Fittings, we will decide if we will:  repair damage new for old or  re place home, contents, personal effects, landlord’s fixtures and fittings new for old or  pay you what it would cost us to repair or replace home, contents, personal effects, landlord’s fixtures and fittings new for old.” REASONS FOR DECISION 9. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 10. The FSP’s builder (‘DW’) was authorised to repair the property because they provided the lowest quote at $36,000. An alternative quote was provided to the FSP by builder (‘WL’) at $70,580. 11. The FSP supplied a further quote from another builder (‘R’) for $58,352. Representatives from R and WL advised it would have been impossible to carry out the works for the amount quoted by DW. 12. A fourth quote was obtained by the FSP from (‘CCP’) , but was rejected because it was based on photographs reviewed ten months after the insured event. 13. The FSP obtained an engineer’s report which claimed that ground settlement had caused the slab movement. It was decided not to obtain an independent engineer’s report which would have cost over $2,000. However, the common belief from a number of people was that ground settlement did not cause the slab movement, but rather the weight of floodwaters caused the damage. 14. After complaining to the FSP‘s IDR department, the settlement amount was increased to $44,052. The FSP decided to offer a cash settlement, but the amount is insufficient to cover the costs of repairs. 15. The FSP should agree to a settlement amount of $58,352 which is the middle quote of the three builders. The FSP’s Submission 16. The offer of settlement made to the applicant is sufficient to fully reinstate the premises following the water damage. This is in accordance with the policy conditions, and is fair and reasonable in the circumstances. 17. The authorised builder has provided a written statement confirming their ability to complete the repairs for the quotation amount. A fourth builder has quoted a similar amount to the authorised builder which shows that the first quote is credible, and therefore is an adequate basis for settlement. 18. An engineer’s report has been obtained which states there is pre -existing damage that needs to be rectified prior to repairs being completed. This is the basis for the cash settlement offer. 19. The applicants claim for payment for repairs to bathroom tiles was declined due to a qualified professional’s report that these tiles were replaced for matching/renovation purposes. 205504 Determination 3 of 4 Consideration of each party’s submission 20. I have reviewed the submissions of the parties in relation to the terms and conditions of the policy, and I have reviewed the quotations and the engineer’s report. 21. As a result of the applicant’s concerns regarding t he adequacy of the authorised repairer’s quote, the FSP instructed an engineer to provide a detailed report on the damage. On 20 November 2009 the engineer submitted a report which included the following statements: “External Brickwork Cracking We are of the opinion that the cracks in the eastern and western brickwork are because of the following:  We have given consideration to the swelling of the ground/soil as a result of the overflowing of the river that bounds the rear of the property. Soil saturation is defined as “the water content of a soil beyond which no more water is absorbed” . Essentially, it is a situation where all the soil pores are filled with water. This occurs below the water table and in the unsaturated zone above the water table after a heavy rainfall or irrigation event such as a flood.  We believe the localised cracking in this area is from ground settlement which has most likely occurred from water infiltration into the foundation soils supporting the footings. When such saturation levels occur to foundation soils, this allows the migration of soil particles which can then lead to foundation settlement. This would appear to have been occurring over a long period of time and is not as a result of a specific event. .... Concrete Slab Cracking It is generally accepted that houses of this age that have been built with strip footings will move and crack over a period of time due to the water seeping through the gap between the block wall and the brickwork at the eastern and western side of the house and is exacerbated by the garden bed planted so close to the footings. Floor coverings will hide such cracks until they are removed as happened in this case. It is our view that the cracking is due to minor foundation movement over a long period of time. The cause of the foundation movement is ground movement due to changes in the moisture content of the soil. ... The cracks are minor in nature and they do not affect the structural integrity of the building. The cracks can be readily repaired; however this is not considered necessary. If the owner decides to repair the cracks, it is likely some of the cracks will reappear at some stage in the future . In summary, it is therefore our opinion that the damage to the i nsured’s concrete floor is caused by mino r foundation movement over an extended period of time.” 22. Based on the engineer’s report, the FSP decided to cash settle the applicant for the amount of the authorised builder’s quotation. On 2 February 2010 , the builder reconfirmed his ability to complete the Scope of Works for the quoted amount. 23. The FSP has declined to cover the cost of bathroom tiling due to the works being as a result of a renovation/matching process. This has been verified by a qualified professional. 205504 Determination 4 of 4 24. The applicant’s belief that the FSP’ s approved builder cannot satisfactorily reinstate the building for the quoted amount is based on comments from various people including tradespeople, real estate agents, local residents and an engineer. Unfortunately, no reports have been provided to support that belief. CONCLUSION 25. The applicant has the onus to establish that the FSP’s settlement is insufficient and has failed to do so. The FSP has provided three separate quotations plus an engineer’s report to accurately assess the storm related damage a nd to scope the necessary repairs. 26. Accordingly, I determine that the FSP is entitled to offer the applicant a cash settlement of $44,052.05 being the revised quotation from the approved builder, provided this builder is prepared to do the work within a reasonable timeframe. If the applicant elects to appoint the FSP’s approved builder to carry out the repairs, and the builder finds there are additional costs associated with the work, then the FSP will be required to meet these costs. In accordance with t he engineer’s report, the pre -existing damage to the eastern and western walls needs to be repaired before work commences on rectifying the storm related damage. 27. Further, I determine that the FSP is not required to indemnify the applicant for the costs of replacing the bathroom tiles, as this work was part of a renovation/matching process.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.