Home / Financial Firm (Unknown - Insurer) / Determination 205237

Determination 205237

Denial of storm damage claims for laundry slab, stumps, hot water system, air conditioner and loss of rent

FirmFinancial Firm (Unknown - Insurer)
Decided2011-02-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A landlord's storm claim was partly denied: the laundry slab, stumps, hot water system and lost rent were refused, but the air conditioner replaced after storm water inundation was ordered reimbursed. AFCA accepted that the slab and stump damage pre-dated the storm and that rent was not shown to be lost because of the damage.

The claimant bears the onus of showing a loss falls within cover, and the evidence showed long-standing slab and stump damage and that the property remained occupied, while the air conditioner failure was accepted as storm-related on balance.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

205237 Determination 1 of 8 DETERMINATION Case Number: 205237 Home Building – storm – loss of rent – gradual deterioration SUMMARY OF FACTS 1. On 9 May 2008, the applicant lodged a claim under his home and contents insurance policies for damage arising from severe storms in the area on 15 February 2008. The property was occupied by tenants who failed to inform the applicant of the damage at the time it occurred. 2. The Financial Services Provider (FSP) accepted liability for the claim and authorised repairs. The FSP excluded from the claim repairs to the concrete laundry floor and step, replacement of a hot water system, an air conducting unit, and loss of rent. The FSP considered the condition of the concrete floor and step was due to the initial construction of the floor, erosion and wear. The hot water service and air conditioner were not adversely affected by the stormwater and were operating after the storm and the applicant had not established any loss of rental income. 3. The applicant disputes the FSP‟s decision to deny payment for these items. ISSUES IN DISPUTE 4. Whether the FSP was entitled to deny payment for: – rectification of the concrete floor and stumps, and steps to the laundry, – the air conditioning unit and hot water service 5. Whether the applicant has discharged his obligations to show he suffered a loss of rent. RELEVANT POLICY PROVISIONS “ 1.12 Storm, Rain Or Flash Flood We will not pay for damage caused by:  …  erosion or earth movement … 3.2 Accommodation Costs Or Lost of Rent When we have accepted a claim following damage to your home and we agree that your home is not fit to live in we will:  …  If you leased out your home or you can show that you would have leased it out, pay the actual rent you lose or would have lost up to the time your home is built, repaired or replaced.” REASONS FOR DECISION 6. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 205237 Determination 2 of 8 The Applicant’s Submission Rent 7. The tenant left the premises to live in a property they had purchased. The applicant obtained a quote to repair the property. He undertook to include a substantially more expensive kitchen using stone bench tops. 8. The tradesmen offered to rent the property at a reduced rate so that the repairs could be worked around their current jobs even without a functioni ng kitchen and bathroom. The property manager handled the rental arrangements. There was no discount for rent offset in the cost of repairs. 9. The tradesmen were to pay $100 pw while removing the damaged kitchen and bathroom. They failed to do this and he arranged for the property manager to follow it up. The tradesmen agreed to pay $300 pw, but avoided signing a lease until December 2008. All documents in relation to the rent had been submitted to the FSP. He paid for all repairs and no rent was paid for work by the tradesmen. Repair to stair 10. He found the step was not rotted, but had loose nails which he rectified. Laundry floor 11. A plumber he had in to inspect the damage advised that storm water had undermined the slab. Other tradesmen had stated the damage was not due to erosion, poor maintenance or faulty workmanship. There was no sign of erosion runoff, and there was no maintenance issue. 12. A building report commissioned by him established that the problem is now much worse. The stumps have sunk due to the storm and may have contributed to a tiled shower recess which is now leaking. 13. The house stumps are now rotting and five will need to be replaced in a couple of years. 14. The movement of the slabs under the shouse have „popped‟ from around the stumps creating an opening for water to enter and rot the stumps. 15. The stump in the laundry area needs repairing including filling under the cracked concrete slab floor Air conditioner 16. The air conditioner recently failed due to storm damage and has been replaced at his expense. The electrician stated the reason both the hot water service and the air conditioner continued to operate after the storm was because a safety switch cut in when they went under water. Hot water system 17. The hot water system was less than 12 months old when it was inundated with sewage affected water. This voided his warranty. The electrician advised that all electrical components will deteriorate at an accelerated rate and the tenants should not have powered up the system until it was inspected. 205237 Determination 3 of 8 The FSP ’s Submission Rear concrete steps and laundry floor 18. It relies on the assessor‟s report which indicated that the concrete floor had no foundations or reinforced mesh. There were signs of old cracks in the concrete area. 19. A number of timber posts had rotted and sections of concrete had moved and sunk over time. 20. The damage to the step and concrete floor did not occur as a result of the storm, but was due to initial construction, erosion, and wear. Hot water system and Air-conditioning unit 21. Both the hot water service and air conditioning unit continued to function without fault after the storm so it cannot be classified as damaged. 22. If in the future these items cease to operate and the cause of the problem can be determined as partially or totally related to the storm, the claim will be considered. Loss of Rent 23. The original tenants remained in the premises until 23 June 2008. They had lived in the premises for about five months after the storm. The willingness of the tenants to continue living in the home is evidence that the property was liveable. 24. Tradesmen associated with the builder occupied the premises for some months prior to December with rental offset against the cost of their labour. 25. The applicant has not provided documentation to substantiate what payments were received from the tradesman and no evidence has been provided to show the value of the work carried out by them, compared to the value that may have been obtained from a tenant not providing those services. 26. The rental payments on the property manager‟s ledger are inconsistent with and below the agreed rental level. 27. The property was clearly habitable and the applicant was requested to provide evidence of the reduction required to tenant the property. Consideration of each party’s submission 28. When making a claim under an insurance policy the responsibility rests with the policyholder to establish on the balance of probabilities that the loss claimed falls within the terms of the policy. An insurer relying on a clause in the policy to deny the claim has the burden of establishing on the balance of probabilities that the terms of the relevant clause applies to defeat the claim. 205237 Determination 4 of 8 Concrete floor to laundry and step 29. The assessor in his report of 21 October 2008 noted the following: - the concrete floor under the dwelling and under the rear toilet extension had no foundations or reinforcement mesh and was installed in square sections between timber posts. - There were signs of old cracks in the concrete areas that have existed for many years. - A number of timber posts have rotted away and sections of concrete have moved and sunk over a period of time. - It was possible the areas of concrete slabs have become worse as a result of the water inundation in February 2008. However, it is evident that cracks have existed for a long time and sinking has also occurred. 30. The applicant commissioned a plumber to report on the damage. The plumber‟s report of 31 December 2008 noted: - Inspection of the drainage revealed that the drainage system was not the cause for the concrete sinking/cracking. - He believed that the February 2008 floods caused the problem due to water erosion under the concrete floors of the laundry and outside path at the back of the house. 31. A p roperty maintenance contractor‟s report has been s ubmitted by the applicant; the report is undated, although it bears a fax transmission date of 02/09/2010. Included in the report are the following observations: - water was still leaking from the shower unit under the floor and into a cupboard. The water seemed to be coming from underneath the tiles in the shower unit and not the water trap. - Two stumps had sunk in both rear corners of the house. Rot was found around the base of five other stumps. - Concrete in the laundry area was cracked and lifted. Pavers outside the laundry had sunk and when lifted a considerable sized hole was found under the pavers. - He considers the amount of water during the February 2008 flood damaged the concrete and pavers and the extent of water under the concrete has damaged the timber stumps. 32. The assessor reported that the concrete floor under the dwelling and under the rear toilet extension had no foundations or reinforcement mesh. In addition, the cracks in the concrete slabs had existed for many years and had been sinking. While the applicant says tradesmen had advised him the slabs were of adequate construction, he has provided no evidence from a building professional to support this view. He does not dispute that they lacked foundations and reinforcing mesh, rather he has relied on advice that these slabs were not load bearing but were „like large pavers‟ and complied with council requirements at the time of building. 33. In the Panel‟s opinion, the condition of the concrete as described by the assessor is consistent with concrete having been laid without mesh reinforcing and without adequate foundation materials. The presence of long standing cracks in the slab is indicative that the slab had been subject to stress over the years and prior to the storm event. The lack of founda tion material having been installed to support the slabs has the potential of allowing movement. Hence it 205237 Determination 5 of 8 is reasonable to conclude that the failure to use reinforcing mesh in the slab and lack of foundations to support the slab have caused or significantl y contributed to the damage claimed. 34. It was also reported by both the assessor and the building maintenance contractor that rot was evident in a number of the timber stumps. 35. The Panel notes the assessor‟s inspection took place on 16 October 2008 being about six months after the February storm event. In these circumstances, the Panel finds it difficult to accept that rot would have manifest in the timber stumps in such a relatively short period of about six months following a single inundation event. 36. In these circumstances, the Panel is persuaded that the damage described has been ongoing for some time prior to the February 2008 storm and was not a direct result of it. Steps 37. The applicant advised that the stairs had not rotted and the problem was caused by rusted nails which he has since had repaired. 38. This matter has therefore been resolved and does not require consideration by the Panel. Air conditioner and Hot water system 39. The applicant asserts the items were inundated with water including sewage at the time of the storm event. The Panel has not been provided with any material which contradicts the applicant‟s assertion. 40. The FSP‟s denial of the claim for these items was based on the ground that they were operating after the storm event. There is no dispute that the items were functioning after the storm. However, the FSP agreed to reconsider the claim in the event that at any time in the future the items cease to operate , and the cause of the problem could be determined as either partially or fully related to the events of 15 February 2008. 41. The applicant states the air conditioner has since failed and contends that the failure was due to the storm event. 42. A copy of an invoice for replacement of an air conditioner provided to the Panel notes: “ To replacement of existing system (flood damage beyond economical repairs) with equal quality system” 43. The FSP has not provided any comment in relation to the information contained on the invoice. Although the invoice does not contain a detailed report on the effects of the water on the system‟s components, the Panel accepts on balance that failure of the unit, within 17 months of the inundation of storm water to the unit, was caused or contributed to by the storm event. 44. For these reasons, the Panel concludes the applicant is entitled to reimbursement for the cost of the replacement air conditioning unit. 205237 Determination 6 of 8 45. The Panel is mindful of the applicant‟s remarks that notwithstanding the hot water service was less than 12 months old at the time of the storm event, the warranty has been voided by the inundation of sewerage affected water. 46. However the Panel is of the opinion that should the system fail during the warranty period and the manufacture voids the warranty because the failure was due to the ingress of water, then if there is evidence supporting the reasons for the manufacturer‟s decision to void the warranty, the applicant has the grounds for a successful claim under his policy with the FSP. 47. Subject to this qualification, the Panel concludes the FSP has no liability for the hot water service at this time, but this issue may be reviewed on the basis as outlined above. Rent 48. The policy promises to pay the actual rent lost or would have been lost if the home would have been leased out, but for the insured event. I n the applicant‟s case, any payment is made up to the time the damage is repaired. However, the home must be unfit to live in before the policy will respond. 49. The Panel has been provided with the following relevant documentation:  Tenancy Agreement for tenants “CC” and “RP”. The period of the lease was from 29 November 2006 to 26 May 2007. Rent charged was $320pw.  A copy of the “Owner Ledger‟ which reveals transactions with these tenants continued up to July 2008.  Notice of Intention to Leave completed by tenants “CC” and “RP” The tenants confirmed the applicant would be given vacant possession of the property on 7 July 2008.  E- mail dated 3 February 2010 from the applicant‟s then managing agent “PR” who confirmed the property management papers were signed on 15 December 2008 and they had collected the rent. The managing agent also confirmed that according to their ledger the lease start date was 1 December 2008.  A copy of the Trust ledger which reveals the tenants were “WE” and MC”. Transactions for these tenants commenced on 11 February 2009.  A General Tenancy Agreement for tenants “WE” and “MC” revealing a starting date of 1 December 2008 with rent at $1,200 pm ($276.92 pw) . 50. Hence, it appears to the Panel, according to the documentary evidence, the applicant‟s premises were occupied up to 7 July 2008. The property was then formally tenanted from 1 December 2008. It follows that based on the documentary evidence the premises were unoccupied from 8 July 2008 to 30 November 2008. 51. The applicant says that the tradesmen “WE” and “MC” offered to rent the property at a reduced rent of $100 pw while they removed the damaged kitchen and bathroom. The applicant further states that he did not receive any discount for the building works carried out by the tradesmen. However, the applicant states the tradesmen failed to pay the rent and the matter of was placed in the hand of his property manager who arranged a formal lease at $300pw. 205237 Determination 7 of 8 52. The assessor in a report dated 10 March 2010 advised that she had spoken wit h one of the tenants “WE” who confirmed that he had occupied the premises for some months prior to December 2008. “WE” was not sure of the time when he commenced occupation but did not disagree that it may have been following the departure of the previous tenants in late June 2008. 53. The FSP argues that based on this information the premises were occupied on a continuous basis or near continuous basis prior to and subsequent to the February 2008 storm event. 54. The applicant (e-mail 18/3/08) states the condition of the kitchen, and the damage to the laundry floor rendered the property unsafe and according to his property manager was unable to be let the current rental rate. The applicant‟s property manager by letter dated 21 November 2008 discussed the rental rate which depended on the renovations being carried out but the property manager did not say the condition of the property prevented it from being leased. 55. The Panel has not been provided with any material from the applicant‟s managing agent confirming the property was unable to be leased as a result of the insured damage. 56. For the rent claim to succeed, the applicant must show that the premises were not fit to live in as a result of the storm damage. The evidence before the Panel does not assist the applicant in establishing this requirement. 57. The tenants occupying the premises at the time of the damage continued to reside in the premises for a further five months , notwithstanding the damage had not been repaired during that period of time. In fact the tenants continued to live in the property for some months prior to reporting that damage had occurred. According to the material, the tenants vacated the premises as they moved into their own home. Hence it appears to the Panel the reason for termination of their lease was not as a result of the damage. 58. Furthermore, although the precise date is not known, the premises were again occupied by the tradesmen soon after the original tenants vacated the premises. The work carried out by the tradesmen included work additional to the insured damage which the applicant undertook to have completed at the same time the insured damage was being repaired. A rental rate although less than the rate set out in the lease documents was agreed for this period of occupation. 59. It follows that although the rental income was reduced from July to December, the property was nevertheless lived in for most of that period. For these reasons, the Panel concludes the applicant has not discharged the onus to show that his claim for lost rent falls within the terms of cover provided by the policy. CONCLUSION 60. Accordingly the Panel determines: - The FSP was entitled to deny the claims for the concrete laundry floor and stumps the hot water service and lost rent. 205237 Determination 8 of 8 - The applicant is entitled to be indemnified for the cost of replacing the air conditioning unit.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.