Claim declined under flood exclusion for storm damage to farm driveway

FirmFinancial Firm (Unknown - Insurer)
Decided2010-08-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$16,700
SourceAFCA PDF

Summary

The applicant's farm driveway collapsed during a November 2009 storm and the FSP declined the claim under the flood exclusion, relying on a hydrologist's report. AFCA found the flood exclusion was not made out and ordered the FSP to indemnify the damage, with the amount to be assessed against the applicant's $16,700 quote.

The policy's flood definition requires water to overflow the normal confines of a watercourse onto normally dry land, and both experts agreed there was no overbank flow at the crossing.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

204764 Determination 1 of 13 DETERMINATION Case number: 204764 Farm – damage to driveway – storm – flood – event cover – exclusions SUMMARY OF FACTS 1. The applicant holds a Farm Insurance policy distributed by an Authorised Representative of the Financial Services Provider (FSP). The policy was incepted on 14 October 1996 and covered certain buildings, contents and farmers liability. 2. On 6- 7 November 2009 the district in which the applicant‟s farm is located was subject to widespread storm activity. During the storm, a section of the a pplicant‟s driveway constructed over a creek on the applicant‟s property collapsed. 3. The FSP subsequently engaged a hydrologist to attend the property and investigate the cause of the damage. The hydrologist reported that the damage was a result of floodwaters and associated debris from the creek. 4. The FSP declined the claim on the basis that the policy excludes cover for flood damage. 5. The applicant disputes the FSP‟s claim declinature on the basis of his own expert report which found that flooding did not occur in the vicinity of the damaged driveway and the damage was a result of storm water as well as impact from debris. ISSUES IN DISPUTE 6. Whether the FSP has correctly declined the claim RELEVANT POLICY PROVISIONS “Section 14 – Dwelling ... House means Your domestic building/s located within the domestic walls, gates and fences of Our property at the situation shown in the Certificate and includes domestic:  Paved paths, paved driveways, walls, gates, mailboxes, clothes lines, fences but not retaining walls or hedges; ... We will cover You for Accidental Loss to Your House unless the Loss is excluded. (Houseowners cover also includes Section Two). ... Your House is not covered for Loss by: Flood, as defined in Section 21 – General Definitions and explained in Section 20 – General Exclusions of this policy; ... Section 20 – General Exclusions ... 5. Flood 204764 Determination 2 of 13 There is no cover for any Loss or liability caused directly or indirectly in any way by Flood (as defined in Section 21 – General Definitions) under any of this policy except Private/Business Motor. The following are examples of several types of flood, which We do not cover: Riverine floods – these occur when rain falls or hail or snow melts (whether in the immediate region or elsewhere) and increases the water in: a) A river, creek, other natural watercourse or lake (whether they are in their original state or have been modified) ... Section 21 – General Definitions ... Flood Means the inundation of normally dry land by water overflowing the normal confines of any natural or artificial water course, lake, reserve, canal dam or pond. For examples of some of the type of flood We do not cover please refer to Section 20 – General Exclusions of this policy.” REASONS FOR DECISION 7. The Panel is satisfied that a full exchange of information has taken place between each party and each party has had the opportunity to address any issues raised. 8. The applicant has the onus of establishing that a loss or damage that gives rise to a claim results from an event for which cover is provided under the policy, whereas the FSP must establish any exclusion clause on which it relies. 9. This Determination will be made on a balance of probabilities, being the applicable onus of proof in this matter. The Applicant’s Submission 10. The applicant‟s relevant submissions are summarised as follows – (a) He contends that his driveway was damaged by water during a storm on the 6-7 November 2009. (b) He notes the FSP has declined the claim due to flood and disputes that flood caused the damage. (c) He seeks payment of the repairs to the driveway for which he quoted $16,700 (through what appears to be his building company). (d) He is critical of the FSP‟s IDR lett er which incorrectly listed section numbers from the applicant‟s policy product disclosure statement (PDS). (e) He notes the definition of Flood and considers that the damage done to the driveway was not caused by Flood. At no time did any water overflow the normal confines of any watercourse onto normally dry land. At all times water was travelling from high ground to low ground without pooling or ponding of water. Accordingly, the definition of Flood from the PDS is not applicable to this claim. (f) The culvert through which the driveway passes did not collapse; it was impacted by debris and washed away by storm waters. (g) The damaged culvert does not traverse Pine Brush Creek. The creek location as shown in the W report is incorrect. 204764 Determination 3 of 13 (h) The FSP alleged that the damage was caused by floodwaters and associated debris from Pine Brush Creek. The applicant states this is physically impossible. (i) He notes the FSP has alleged that the floodwaters overtopping the road embankment eroded the embankment material causing the roadway surface to collapse. He contends that there was no erosion of the embankment as can be seen from attached photographs. (j) He is aware of the FSP‟s submission that according to mapping sources the driveway does cross Pine Brush Creek. The applicant contends this is incorrect and the access road crosses Pine Brush Creek before it reaches his driveway and culvert. (k) He notes the FSP‟s submission that the depth of water flow would have exceeded 600mm over the roadway. He contends that even at a height of 600mm, the water would not have been high enough to exit the creek bed. The photographs from W which have the estimated height of the water level drawn in are within the confines of the creek bed. (l) The FSP‟s suggestion that the driveway slab is only 70mm thick and lightly reinforced is incorrect. In no place is the slab thinner than 100mm thick and it has steel reinforcement with sheet metal which was tied into the driveway on either side of the culvert. 11. He has enclosed a report from an expert civil and structural engi neer (“RJW”) as to the cause of the damage. The report from RJW notes the following – (i) The damaged driveway crosses an un-named tributary which flows to Pine Brush Creek at a point approximately 10 metres downstream from a culvert crossing of the Coffs Harbour City Council. (ii) The culvert structure was seriously damaged in the 31 March 2009 storm, depositing debris constituting large sections of pavement damaged. The large sections of concrete debris remained in the bed of the un-named waterway immediately upstream from the applicant‟s driveway. (iii) The large sections of concrete would have significantly increased the turbulence at the applicant‟s driveway crossing and could have caused physical damage to the applicant‟s crossing. (iv) The applicant‟s driveway was da maged on 6-7 November 2009 during a storm which was of an intensity and duration critical for small catchments and more severe than the 31 March 2009 storms. (v) There are no rain gauge stations located in the vicinity of the applicant‟s property but anecdotal evidence indicates that the intensity equated to well in excess of a 500 year average recurrence interval (ARI). (vi) The applicant‟s driveway is comprised of a 600mm diameter reinforced concrete pipe culvert, reinforced concrete pavement slab and reinforced concrete upstream and downstream headwall. This was seriously damaged in the 6-7 November storms, with reinforced concrete pavement being uplifted and deposited downstream of its original location. The design of the original crossing is a „forded crossing‟ with flow over the depressed driveway during moderate to severe storm events (vii) A hydrological investigation and hydraulic analysis were conducted by RJW. The expert notes that the catchment of the intermittent waterway 204764 Determination 4 of 13 contributing to flow at the site of the damaged driveway is relatively small (0.29kilometres squared) compared to the catchment of Pine Brush creek (5.4kilometres squared). (viii) The tributary at the relevant location is well above the level of Pine Brush Creek confluence and would not be affected by major floods in Pine Brush Creek. Further, due to the different catchment areas, and „times for concentration‟ the peak of the small local catchment runoff would have passed the subject site well before the peak of the flood in the larger „Pine Brush Cr eek‟ catchment. (ix) Based on the anecdotal evidence of flows within waterways in close proximity to the subject site, for similar relatively small catchments, it is likely that stormwater flows over the applicant‟s driveway exceeded the 100 year ARI design flows, with flow depth over the roadway at a depth of 400mm and velocity of approximately 4 metres per second. (x) RJW notes the evidence of high water marks following the 6-7 November storm identified by the applicant confirms the flow over the roadway was in excess of 400mm depth and an extremely high velocity was observed. (xi) The blockage of the culvert caused by debris from the previously damaged City Council culvert increased flow and velocity over the applicant‟s driveway. This velocity combined with impact fro m large concrete blocks and slabs from upstream could have contributed or initiated damage to the causeway. The increased depth of flow and higher velocity could be sufficient to cause uplift of the driveway slab through the „suction effect‟ over the drive way. (xii) The failure of the City Council to clean debris from the unnamed waterway meant flow in the unnamed waterway was considerably higher in the November 2009 storm, compared to the 31 March storm resulting in rapid movement of concrete debris. (xiii) RJW contends that the rapid movement of concrete debris could have impacted the upstream concrete headwall to the causeway embankment and approaches. Further, that without such impact damage the driveway may well have survived the storm in November. (xiv) The time concentration for Pine Brush Creek catchment was calculated to be approximately 50 minutes. The 100 year ARI flow for a one hour duration storm with intensity of 104mm/hour would be approximately 80cubic metres per second and this flow would not result in the high velocity flow within the un- named tributary on the applicant‟s property. (xv) RJW contends that the damage to the driveway crossing was the result of high flow in the intermittent waterway within the local catchment, possibility initiated by turbulence caused by the debris blockage and impact. (xvi) Based on calculations, RJW submits that the overbank flow in the vicinity of the damaged culvert could not have occurred, as the main channel and „weir‟ flow across the applicant‟s driveway crossing (even with pipe culverts blocked), would have had sufficient capacity to carry even a 100 204764 Determination 5 of 13 year or greater ARI flow from the local catchment without resulting in overbank flows. (xvii) RJW noted that the overbank flow and backwater flooding up the un- named tributary to the applicant‟ s driveway would not occur even in a 100 year ARI event affecting the total catchment of Pine Brush Creek. Further the one hour duration storms as recorded in the region in November 2009 equated to well below 100 year ARI storms with the closest rain gauges recording precipitation equating to 8 years, less than 5 years and less than 10 years. RJW concluded it would not be possible for flooding from Pine Brush Creek to impact on the applicant‟s driveway crossing. (xviii) RJW has reviewed the FSP‟s expert (W) report and considers it incorrect on a number of grounds. RJW noted that W states that the water damage to the culvert crossing along the concrete access road at the subject property on 6-7 November 2009 was caused by floodwaters and associated debris from Pine Brush Creek. Floodwaters overtopping the road embankment eroded the embankment material causing the roadway surface to collapse. RJW considers this incorrect due to the following: –  The crossing was not damaged by floodwaters  RJW notes the policy definition indicates a flood is defined as inundation of normally dry land by water overtopping the normal confines of a natural water course. There was no overbank flow on 6-7 November 2009 and stormwater flow in the intermittent waterway did not rise above bank level.  The reference to debris from Pine Brush Creek is erroneous as it is unlikely that water from Pine Brush Creek would have entered the property during the November 2009 storm. Even if it did, it would be passive, backwater flooding and would not have caused damage to the insured‟s driveway crossing. The waterway at the applicant‟s driveway is an intermittent waterway receiving water from a relatively small catchment to the South and discharging water into Pine Brush Creek approximately 50 meters downstream from the damaged crossing.  Notwithstanding the fact that W claim damage was caused by floodwaters and associated debris from Pine Brush Creek RJW agrees that the debris referred to by WRM could have contributed to the initial damage to the driveway crossing, allowing stormwater to flow over and under the remaining driveway slab to lift the slab, precipitating the eventual total failure of the crossing.  It is likely that the damage occurred through uplift of the driveway slab rather than erosion of the supporting material underneath.  The W report refers to the waterway over which both the insured‟s and Council‟s crossing passes as Pine Brush Creek which is incorrect.  The W report presents rainfall data from the Bureau of Meteorology (BOM) station 6kms south of the subject site despite there being 3 NSW State Government automatic rain gauging stations closer to the subject site.  The one hour duration precipitation data referred to would be relevant to the Pine Brush Creek catchment, but is not relevant to 204764 Determination 6 of 13 the smaller local catchment which contributed to stormwater flow and damage at the subject site. The time of concentration for this site is 15 minutes.  Topographic influences affect rainfall at the various stations rain gauging. RJW note that an example of this was given during 31 March 2009 storms which recorded in excess of 500 year ARI around Coffs Harbour and yet only less than 1 year ARI for 1,3 and 6 hour duration storms and 2 years for 24 hour duration storms at the BOM at Coffs Airport station  RJW considers that the conclusion drawn by W that the damage to the driveway crossing was due to flood waters is not valid. RJW note that flooding did not occur in the vicinity of the damaged culvert. The overbank flow from Pine Brush Creek approximately 50 metres to the north of the driveway over the un-named intermittent waterway did not enter the subject property on 6-7 November 2009. (xix) RJW does agree with W that the impact of debris left in the bed of the un- named intermittent waterway by the City Council after the March 2009 storms is likely to have contributed to damage to the upstream headwall and batter protection of the driveway crossing. (xx) RJW attaches several maps, photographs and rain fall material to its report. 12. The applicant has attached a quotation which appears to be from the applicant‟s own building company for the cost of repairing the damaged driveway. The quotation lists an amount of $16,700. 13. The applicant has enclosed a copy of the FSP‟s expert reports (which will be dealt with below). 14. The applicant has enclosed copies of correspondence with the FSP. The FSP ’s Submission 15. The FSP‟s relevant submissions are summarised as follows : – (a) The FSP engaged W to investigate the origin of the water which caused the damage to the applicant‟s driveway. (b) The original report advised that the concrete access road, under which the damaged culvert is located, runs parallel to the unmaintained Finlays Road. Pine Brush Creek, which drains in an east south-easterly direction at this location is crossed by both the concrete access road and the unmaintained Finlays Road at the northern boundary of the subject property. Pine Brush Creek has a significant catchment upstream of the crossing and is a natural water course. The damaged culvert crossing traverses Pine Brush Creek. The water damage to the culvert crossing along the access road at the subject property was caused by flood waters and associated debris from Pine Brush Creek Road. Floodwaters overtopping the road embankment eroded the embankment material causing the roadway surface to collapse. (c) The findings of W therefore support the claim denial for the damage arising out of flood. 204764 Determination 7 of 13 (d) W has responded to the criticism of RJW as follows – (i) The RJW report states that the waterway crossed by the driveway is not Pine Brush Creek, but a much smaller tributary stream. The mapping data sources for the investigation indicate the driveway does cross Pine Brush Creek. (ii) RJW states that the flow conditions over the crossing at the peak of the flow would have been 400mm deep with velocity of approximately 4m/s. These observations are relatively consistent with the high water mark indicated on the photographs attached to W‟s own report. However, W maintains that the flow would have exceeded 600mm over the roadway (driveway). (iii) W‟s ass essment of the source of inundation is based on observations of high water marks in the vicinity of the structure (which it considers would not be visible at the time of RJW‟s inspection) and not hydrological calculations. Further, the reliance of RJW on t he water mark compared to RJW‟s interpretation of the bed and banks in the reach of the waterway upstream of the crossing, therefore the information produced on catchment area is of little relevance. (iv) RJW states the rainfall data presented by W is irrelevant and unlikely to be representative of short duration rainfall intensities for the insured property. W notes that the BOM could not provide rainfall data for stations closer to the site, but the data is demonstrative of rainfall intensity in the area. (v) RJW states the overbank flow could not have occurred in the vicinity of the crossing. In W‟s opinion the reach of the waterway upstream of the crossing had overbank flow. This is highlighted by the height of the debris/vegetation marks compared to the area of flow in the photographs attached to its email of January 2010. (vi) W believes that the depth and velocity of flow may have been well in excess of 0.3m and 3m/s and the slab appears to be of the order of only 70mm thick and lightly reinforced. It was therefore vulnerable to damage. (vii) RJW‟s report does not change relevant facts or findings presented in W‟s original report. W remains of the opinion that the crossing was damaged by floodwaters overflowing from a watercourse. (e) The FSP therefore maintains that as its policy excludes damage arising from flood that it was entitled to decline the claim. 16. The FSP has enclosed a report dated 19 May 2010 from W. The Panel notes the following in relation to the report – (i) The culvert crossing providing access from Finlays road to the property was destroyed and washed away. However there was no water damage to any of the building located on the subject property. (ii) The report lists rainfall measures taken over the 4 day period by BOM. The highest rainfall recorded was between the hours of 7.00pm and 8.00pm on 6 November when 98mm of rain was recorded. For the duration 3 to 12 hours, the recorded rainfall intensities indicate that the event had an ARI greater than 100 years at the Coffs Harbour BOM. 204764 Determination 8 of 13 (iii) The concrete access road, under which the damaged culvert is located runs parallel to the unmaintained Finlays Road. Pine Brush Creek which drains in an east south-easterly direction as this location is crossed by both the concrete access road and the unmaintained Finlays Road at the northern boundary of the subject property. Pine Brush Creek has a significant catchment upstream of the crossing and is a natural watercourse. (iv) W has taken a version of events from the applicant‟s wife (who is a co - insured). W considers that the version obtained is consistent with the recorded rainfall data. Further, the water damage to the culvert crossing along the concrete access road at the subject property on 6-7 November 2009 was caused by floodwaters and associated debris from Pine Brush Creek. Floodwaters overtopping the road embankment eroded the embankment material causing the roadway surface to collapse. 17. A further report dated 19 May 2010 was provided by W to the FSP to respond to matters raised by the RJW report. The Panel notes the following from this report – (i) The RJW report states the waterway crossed by the driveway is not Pine Brush Creek, but a much smaller tributary stream. W relies on the mapping data sources for the investigation to state the driveway does cross Brush Creek according to the 1:250,000 mapping damage provided by the Government. However, W concedes that the creek lines recorded in maps of this scale are not always accurate in relatively steep topography. It is possible that the channel of the Pine Brush Creek is actually further to the north and that the crossing is on a small tributary (although not the one identified by RJW). In any event W considers this of little relevance. (ii) RJW states that the peak flow would have been in the order of 400mm deep with velocity of approximately 4m/s. Although W has not attempted to quantify these flow conditions, it would be reasonably consistent with the high water mark indicated by the photographs attached to W‟s email of 21 January 2010. However, W believes the depth of flow would have exceeded 600mm over the roadway. (iii) W‟s initial assessment of the source of inundation was based solely on observations of high water marks in the vicinity of the structure and not hydrological calculations. However, W‟s email of 21 January 2010 clearly shows the high water mark compared to their interpretation of the bed and banks in reach of the waterway upstream of the crossing. Therefore W argues the catchment area is of little relevance. (iv) W considers RJW has incorrectly identified the location of the subject property in the catchment plan which may explain confusion regarding the name of the waterway. (v) W notes that at the time of preparing the report BOM was not able to provide rainfall data for stations closer to the site. The data was included to illustrate that significant rainfall intensities did occur in the region. W maintains there was a likelihood that stream flow depths would have exceeded bankfull conditions. (vi) W considers that the flow was approximately at or possibly slightly below bankfull at the crossing, however, in W‟s opinion in the reach of the 204764 Determination 9 of 13 waterway upstream of the crossing there was overbank flow. This is highlighted by the height of the debris/vegetation marks compared to the area of flow in the photographs attached to W‟s earlier email. (vii) W notes that RJW suggests a number of possible failure mechanisms include –  Turbulence, blockage of the culvert  Rapidly moving debris dislodged from the City council‟s culvert upstream when it was damaged on 31 March 2009 (and not removed)  Suction uplift from the very high velocities upstream  Unlikely to have been undermining of the structure  RJW considers the slab is approximately 120mm thick reinforced concrete and could not have been uplifted by flows 0.3 deep at 3m/s and the damage may not have occurred but for debris impact. W considers the flows were above those recorded by RJW and the slab was only 70mm thick and light reinforced and therefore vulnerable to damage W considers that all of the above mechanisms may have contributed to the failure of the structure and it was not possible to determine a primary cause. However, W submits that the lightweight concrete flood ways such as the driveway is particularly vulnerable to suction uplift at the downstream shoulder. (viii) W was not persuaded by the information provided by RJW and maintains the driveway was damaged by floodwaters overflowing the driveway crossing. 18. The FSP has enclosed email from W dated 21 January 2010. The email attaches photographs and makes the following points –  The damaged crossing is located in a watercourse and the damage was caused by water flowing in the watercourse  The reach of Pine Brush Creek immediately downstream of the crossing is relatively steep and has high banks. Based on the debris and erosion marks on the banks the downstream water level was approximately bank full.  As indicated by the debris marks just upstream of the crossing , it is clear that the upstream water levels were elevated well above normal levels, water overflowing the channel inundated the land either side.  The channel is not well defined in this area and the extent to which the flooded land on either side of the lo w flow channel is outside the watercourse is open to interpretation  Water in the upstream reach would have been flowing relatively slowly due to the effect of the abandoned council road crossing creating backwater and due to a wide flow path. W would not describe this as pooling or ponding. The email attaches photographs of the relevant areas and have lines drawn in to indicate the height of the water level. 19. The FSP has enclosed copies of its assessor report of the damage which placed a reserve of $21,100 on the damage to the cement driveway. The report 204764 Determination 10 of 13 also attaches photographs. The Panel notes that the driveway slopes downwards as it crosses the creek. The banks of the creek appear to slope and are not particularly sharply defined. 20. The FSP has enclosed copies of correspondence between the parties. 21. The FSP has provided copies of the claim notification and insurance certificate. Consideration of each party’s submission 22. The Panel has carefully considered each party‟s submissions and documents together with the policy terms and conditions. 23. It is clear to the Panel that resolution of this matter centres on whether or not the increased water level in the un-named tributary or Pine Brush Creek (the exact watercourse is disputed) constituted floodwater, and if so whether such flood caused damage to the driveway crossing. 24. The policy wording in relation to the exclusion of damage arising from flood is clear and unambiguous, and the Panel considers there is no viable alternative meaning for the exclusion relating to flood. 25. The policy defines flood as follows – “the inundation of normally dry land by water overflowing the normal confines of any natural or artificial water course, lake reserve, canal dam or pond.” 26. There is no dispute that the driveway crossing was damaged during the storm and that damage occurred due to the increased water and velocity of water together with other factors such as debris impact and turbulence. 27. The question before the Panel is whether the water height and velocity of water was in fact a flood for the purpose of the policy terms and conditions rather than a storm induced height fluctuation of the watercourse over which the driveway traverses. 28. The Panel has considered the expert evidence in great detail to consider the issue of which watercourse the driveway crosses and whether the damage arose from flood or increase in water height due to storm. 29. The Panel notes it is difficult to reconcile the reports given the apparent argument over the location of the driveway crossing. The driveway crossing is either over Pine Brush Creek or an unnamed tributary. 30. The Panel has carefully reviewed the maps provided by each party‟s expert. 31. The Panel does not agree with W that RJW has placed the driveway away from the location. The driveway is relatively distinctive on the maps provided, as it bends almost 90˚ after it crosses a watercourse. Further, there appears to be a smaller waterway with two ponding or lake type bodies in between the driveway and the next major road which is labelled as a Council Road joining Finlays Road on the maps. 32. The maps provided by both experts are quite similar and appear to match in general features. 33. The only point in which the maps vary is the labelling of the watercourse crossed by the driveway as either an un-named tributa ry (by the applicant‟s expert RJW) or Pine Brush Creek (by the FSP‟s expert W). 204764 Determination 11 of 13 34. The Panel notes that RJW has the applicant‟s driveway crossing the un -named tributary and then veering away from Pine Brush Creek to join Finlays Road. RJW has drawn Pine Brush Creek in as running parallel to the driveway, but never crossing same, further Pine Brush Creek then crosses Finlays Road and runs north above Finlays Road. In contrast W‟s map has the applicant‟s driveway crossing Pine Brush Creek and then joining Finlay s Road. In W‟s map Pine Brush Creek runs south of Finlays Road. However, it should be noted that there is a watercourse in W‟s map that does run parallel to the driveway and then crosses Finlays road before continuing north of Finlays Road. 35. The Panel notes that RJW are local to the Coffs Harbour Region. 36. The Panel notes that W conceded that the creek lines recorded in maps of this scale are not always accurate in relatively steep topography. W further noted that it is possible that the channel of the Pine Brush Creek is actually further to the north and that the crossing is on a small tributary (although not the one identified by RJW). 37. On the balance of probabilities, the Panel accepts that the driveway crossing traverses the un-named tributary and not Pine Brush Creek. 38. The Panel considers that the correct identification of the watercourse is important in determining the catchment capacity of the watercourse during the storm and whether flooding occurred. The catchment capacity of the un-named tributary and Pi ne Brush Creek having been listed by the applicant‟s expert. 39. The Panel has noted that W‟s initial assessment of the source of inundation was based solely on observations of high water marks in the vicinity of the structure, and not hydrological calculations. W has provided rainfall data from the BOM to evidence rainfall intensity. W considers that the rainfall intensity suggests a likelihood that stream flow depths would have exceeded bankfull conditions. 40. In contrast, the ap plicant‟s expert, RJW, considers that the local rain gauges which are proximate to the property should be relied upon. Further, the one hour duration precipitation data referred to would be relevant to the Pine Brush Creek catchment, but is not relevant to the smaller local catchment which contributed to stormwater flow and damage at the subject site. The time of concentration for this site is 15 minutes. The rainfall intensity for the local area was equated to in excess of a 100 year ARI for short duration event. 41. The Panel accepts that a significant rainfall event occurred in the region and that Coffs Harbour experienced different rainfall measurements to the local region of the applicant‟s property. 42. The Panel notes that the FSP‟s expert considered the wate rs had risen 600mm above the „roadway‟ (presumably this refers to the driveway at its lowest point) and this was calculated on the visible watermarks. The FSP‟s expert has provided copies of photographs which indicate the height of the water, however the FSP notes the banks of the watercourse are not well defined and are open to interpretation. 43. The Panel notes that RJW considers the flow conditions over the crossing at the peak of the flow would be calculated at 400mm deep with velocity of approximately 4m/s. According to W, it considered these observations as 204764 Determination 12 of 13 relatively consistent with the high water mark indicated on the photographs attached to W‟s own report although it maintains the flow would have exceeded 600mm over the roadway (driveway). 44. The Panel finds it puzzling that the watermarks are said to be consistent with a flow of 400mm deep and 600mm deep. It has not been explained as to how both might be consistent e.g. surge or water turbulence. 45. The Panel notes that the allegation of flooding from W appears to be based on the waterway upstream of the crossing where there was overbank flow. However W states that the flow at the actual crossing was approximately at or possibly below bankfull. 46. RJW was of the opinion that overbank flow could not have occurred in the vicinity of the crossing. RJW did not observe overbank erosion or damage. The driveway crossing is designed as a low level „forded‟ crossing. Accordingly in storm conditions, the water flows over the lower depressed portion of the driveway with the headwalls and batters protected against erosion. 47. The expert ‟ s dispute whether there was an overbank flow upstream, however this is irrelevant as there appears to be agreement that there was no overbank flow at the site of the crossing. Whether or not the creek at this point also contained some water which may have been considered floodwater at some other site is not germane to the issue. 48. Further, the photographs of the crossing and the drawn in water line does not indicate that the water went over bank at the crossing. 49. The Panel considers that any upstream flooding is irrelevant to the matter as any water which proceeded to the applicant‟s driveway crossing did so within the confines of the normal watercourse and not as floodwater which was outside the confines of the normal watercourse. 50. The Panel has reviewed the policy definition of flood which states that the water must inundate normally dry land by water overflowing the normal confines of any natural watercourse. 51. As neither of the experts alleges that the water had overbank flow at the site of the crossing, the Panel does not find that the exclusion has been made out by the FSP. 52. The experts have suggested that the damage to the crossing has occurred due to a number of factors, and it was not possible to confirm the primary cause of damage. The factors noted were -  Turbulence, blockage of the culvert  Rapidly moving debris dislodged from the City council‟s culvert upstream when it was damaged on 31 March 2009 (and not removed)  Suction uplift from the very high velocities upstream  Undermining of the structure is an unlikely cause of damage  Council Culvert debris impacting with the crossing  Whether the structure was sufficiently sturdy (disagreement on this issue remains between W and RJW who have reported different slab thicknesses). 204764 Determination 13 of 13 53. On the balance of probabilities, the Panel accepts that the damage occurred due to fluctuation in the height of the creek due to storm water, water turbulence, suction uplift and debris impact. The Panel does not consider t he raising in height of the water of the watercourse due to storms without breaking the banks is sufficient to demonstrate flood under the policy terms and conditions. 54. The Panel has noted the applicant‟s quotation for damage which is below the reserve outl ined by the FSP‟s assessor. However, the Panel considers that the FSP should be given an appropriate opportunity to assess the quotation to determine whether this is fair and reasonable. CONCLUSION 55. The Panel determines that the FSP was not entitled to decline the claim, and is required to indemnify the applicant for the damage to the driveway. 56. The Panel determines that the FSP is entitled to obtain appropriate quotes in order to establish that the amount claimed is fair and reasonable. 57. Should there be any dispute with respect to quantum, either party may refer this to the Panel for a further determination.