Text of the determination
204764 Determination 1 of 13
DETERMINATION
Case number: 204764
Farm – damage to driveway – storm – flood – event cover – exclusions
SUMMARY OF FACTS
1. The applicant holds a Farm Insurance policy distributed by an Authorised
Representative of the Financial Services Provider (FSP). The policy was
incepted on 14 October 1996 and covered certain buildings, contents and
farmers liability.
2. On 6- 7 November 2009 the district in which the applicant‟s farm is located was
subject to widespread storm activity. During the storm, a section of the
a pplicant‟s driveway constructed over a creek on the applicant‟s property
collapsed.
3. The FSP subsequently engaged a hydrologist to attend the property and
investigate the cause of the damage. The hydrologist reported that the damage
was a result of floodwaters and associated debris from the creek.
4. The FSP declined the claim on the basis that the policy excludes cover for flood
damage.
5. The applicant disputes the FSP‟s claim declinature on the basis of his own
expert report which found that flooding did not occur in the vicinity of the
damaged driveway and the damage was a result of storm water as well as
impact from debris.
ISSUES IN DISPUTE
6. Whether the FSP has correctly declined the claim
RELEVANT POLICY PROVISIONS
“Section 14 – Dwelling
...
House means Your domestic building/s located within the domestic walls, gates and fences
of Our property at the situation shown in the Certificate and includes domestic:
Paved paths, paved driveways, walls, gates, mailboxes, clothes lines, fences but not
retaining walls or hedges;
...
We will cover You for Accidental Loss to Your House unless the Loss is excluded.
(Houseowners cover also includes Section Two).
...
Your House is not covered for Loss by:
Flood, as defined in Section 21 – General Definitions and explained in Section 20 – General
Exclusions of this policy;
...
Section 20 – General Exclusions
...
5. Flood
204764 Determination 2 of 13
There is no cover for any Loss or liability caused directly or indirectly in any way by Flood (as
defined in Section 21 – General Definitions) under any of this policy except Private/Business
Motor.
The following are examples of several types of flood, which We do not cover:
Riverine floods – these occur when rain falls or hail or snow melts (whether in the immediate
region or elsewhere) and increases the water in:
a) A river, creek, other natural watercourse or lake (whether they are in their original state
or have been modified)
...
Section 21 – General Definitions
...
Flood
Means the inundation of normally dry land by water overflowing the normal confines of any
natural or artificial water course, lake, reserve, canal dam or pond. For examples of some of
the type of flood We do not cover please refer to Section 20 – General Exclusions of this
policy.”
REASONS FOR DECISION
7. The Panel is satisfied that a full exchange of information has taken place
between each party and each party has had the opportunity to address any
issues raised.
8. The applicant has the onus of establishing that a loss or damage that gives rise
to a claim results from an event for which cover is provided under the policy,
whereas the FSP must establish any exclusion clause on which it relies.
9. This Determination will be made on a balance of probabilities, being the
applicable onus of proof in this matter.
The Applicant’s Submission
10. The applicant‟s relevant submissions are summarised as follows –
(a) He contends that his driveway was damaged by water during a storm on
the 6-7 November 2009.
(b) He notes the FSP has declined the claim due to flood and disputes that
flood caused the damage.
(c) He seeks payment of the repairs to the driveway for which he quoted
$16,700 (through what appears to be his building company).
(d) He is critical of the FSP‟s IDR lett er which incorrectly listed section
numbers from the applicant‟s policy product disclosure statement (PDS).
(e) He notes the definition of Flood and considers that the damage done to
the driveway was not caused by Flood. At no time did any water overflow
the normal confines of any watercourse onto normally dry land. At all
times water was travelling from high ground to low ground without pooling
or ponding of water. Accordingly, the definition of Flood from the PDS is
not applicable to this claim.
(f) The culvert through which the driveway passes did not collapse; it was
impacted by debris and washed away by storm waters.
(g) The damaged culvert does not traverse Pine Brush Creek. The creek
location as shown in the W report is incorrect.
204764 Determination 3 of 13
(h) The FSP alleged that the damage was caused by floodwaters and
associated debris from Pine Brush Creek. The applicant states this is
physically impossible.
(i) He notes the FSP has alleged that the floodwaters overtopping the road
embankment eroded the embankment material causing the roadway
surface to collapse. He contends that there was no erosion of the
embankment as can be seen from attached photographs.
(j) He is aware of the FSP‟s submission that according to mapping sources
the driveway does cross Pine Brush Creek. The applicant contends this is
incorrect and the access road crosses Pine Brush Creek before it reaches
his driveway and culvert.
(k) He notes the FSP‟s submission that the depth of water flow would have
exceeded 600mm over the roadway. He contends that even at a height of
600mm, the water would not have been high enough to exit the creek bed.
The photographs from W which have the estimated height of the water
level drawn in are within the confines of the creek bed.
(l) The FSP‟s suggestion that the driveway slab is only 70mm thick and
lightly reinforced is incorrect. In no place is the slab thinner than 100mm
thick and it has steel reinforcement with sheet metal which was tied into
the driveway on either side of the culvert.
11. He has enclosed a report from an expert civil and structural engi neer (“RJW”)
as to the cause of the damage. The report from RJW notes the following –
(i) The damaged driveway crosses an un-named tributary which flows to
Pine Brush Creek at a point approximately 10 metres downstream from a
culvert crossing of the Coffs Harbour City Council.
(ii) The culvert structure was seriously damaged in the 31 March 2009 storm,
depositing debris constituting large sections of pavement damaged. The
large sections of concrete debris remained in the bed of the un-named
waterway immediately upstream from the applicant‟s driveway.
(iii) The large sections of concrete would have significantly increased the
turbulence at the applicant‟s driveway crossing and could have caused
physical damage to the applicant‟s crossing.
(iv) The applicant‟s driveway was da maged on 6-7 November 2009 during a
storm which was of an intensity and duration critical for small catchments
and more severe than the 31 March 2009 storms.
(v) There are no rain gauge stations located in the vicinity of the applicant‟s
property but anecdotal evidence indicates that the intensity equated to
well in excess of a 500 year average recurrence interval (ARI).
(vi) The applicant‟s driveway is comprised of a 600mm diameter reinforced
concrete pipe culvert, reinforced concrete pavement slab and reinforced
concrete upstream and downstream headwall. This was seriously
damaged in the 6-7 November storms, with reinforced concrete pavement
being uplifted and deposited downstream of its original location. The
design of the original crossing is a „forded crossing‟ with flow over the
depressed driveway during moderate to severe storm events
(vii) A hydrological investigation and hydraulic analysis were conducted by
RJW. The expert notes that the catchment of the intermittent waterway
204764 Determination 4 of 13
contributing to flow at the site of the damaged driveway is relatively small
(0.29kilometres squared) compared to the catchment of Pine Brush creek
(5.4kilometres squared).
(viii) The tributary at the relevant location is well above the level of Pine Brush
Creek confluence and would not be affected by major floods in Pine Brush
Creek. Further, due to the different catchment areas, and „times for
concentration‟ the peak of the small local catchment runoff would have
passed the subject site well before the peak of the flood in the larger „Pine
Brush Cr eek‟ catchment.
(ix) Based on the anecdotal evidence of flows within waterways in close
proximity to the subject site, for similar relatively small catchments, it is
likely that stormwater flows over the applicant‟s driveway exceeded the
100 year ARI design flows, with flow depth over the roadway at a depth of
400mm and velocity of approximately 4 metres per second.
(x) RJW notes the evidence of high water marks following the 6-7 November
storm identified by the applicant confirms the flow over the roadway was
in excess of 400mm depth and an extremely high velocity was observed.
(xi) The blockage of the culvert caused by debris from the previously
damaged City Council culvert increased flow and velocity over the
applicant‟s driveway. This velocity combined with impact fro m large
concrete blocks and slabs from upstream could have contributed or
initiated damage to the causeway. The increased depth of flow and higher
velocity could be sufficient to cause uplift of the driveway slab through the
„suction effect‟ over the drive way.
(xii) The failure of the City Council to clean debris from the unnamed waterway
meant flow in the unnamed waterway was considerably higher in the
November 2009 storm, compared to the 31 March storm resulting in rapid
movement of concrete debris.
(xiii) RJW contends that the rapid movement of concrete debris could have
impacted the upstream concrete headwall to the causeway embankment
and approaches. Further, that without such impact damage the driveway
may well have survived the storm in November.
(xiv) The time concentration for Pine Brush Creek catchment was calculated to
be approximately 50 minutes. The 100 year ARI flow for a one hour
duration storm with intensity of 104mm/hour would be approximately
80cubic metres per second and this flow would not result in the high
velocity flow within the un- named tributary on the applicant‟s property.
(xv) RJW contends that the damage to the driveway crossing was the result of
high flow in the intermittent waterway within the local catchment,
possibility initiated by turbulence caused by the debris blockage and
impact.
(xvi) Based on calculations, RJW submits that the overbank flow in the vicinity
of the damaged culvert could not have occurred, as the main channel and
„weir‟ flow across the applicant‟s driveway crossing (even with pipe
culverts blocked), would have had sufficient capacity to carry even a 100
204764 Determination 5 of 13
year or greater ARI flow from the local catchment without resulting in
overbank flows.
(xvii) RJW noted that the overbank flow and backwater flooding up the un-
named tributary to the applicant‟ s driveway would not occur even in a 100
year ARI event affecting the total catchment of Pine Brush Creek. Further
the one hour duration storms as recorded in the region in November 2009
equated to well below 100 year ARI storms with the closest rain gauges
recording precipitation equating to 8 years, less than 5 years and less
than 10 years. RJW concluded it would not be possible for flooding from
Pine Brush Creek to impact on the applicant‟s driveway crossing.
(xviii) RJW has reviewed the FSP‟s expert (W) report and considers it incorrect
on a number of grounds. RJW noted that W states that the water damage
to the culvert crossing along the concrete access road at the subject
property on 6-7 November 2009 was caused by floodwaters and
associated debris from Pine Brush Creek. Floodwaters overtopping the
road embankment eroded the embankment material causing the roadway
surface to collapse. RJW considers this incorrect due to the following: –
The crossing was not damaged by floodwaters
RJW notes the policy definition indicates a flood is defined as
inundation of normally dry land by water overtopping the normal
confines of a natural water course. There was no overbank flow on
6-7 November 2009 and stormwater flow in the intermittent waterway
did not rise above bank level.
The reference to debris from Pine Brush Creek is erroneous as it is
unlikely that water from Pine Brush Creek would have entered the
property during the November 2009 storm. Even if it did, it would be
passive, backwater flooding and would not have caused damage to
the insured‟s driveway crossing. The waterway at the applicant‟s
driveway is an intermittent waterway receiving water from a relatively
small catchment to the South and discharging water into Pine Brush
Creek approximately 50 meters downstream from the damaged
crossing.
Notwithstanding the fact that W claim damage was caused by
floodwaters and associated debris from Pine Brush Creek RJW
agrees that the debris referred to by WRM could have contributed to
the initial damage to the driveway crossing, allowing stormwater to
flow over and under the remaining driveway slab to lift the slab,
precipitating the eventual total failure of the crossing.
It is likely that the damage occurred through uplift of the driveway
slab rather than erosion of the supporting material underneath.
The W report refers to the waterway over which both the insured‟s
and Council‟s crossing passes as Pine Brush Creek which is
incorrect.
The W report presents rainfall data from the Bureau of Meteorology
(BOM) station 6kms south of the subject site despite there being 3
NSW State Government automatic rain gauging stations closer to
the subject site.
The one hour duration precipitation data referred to would be
relevant to the Pine Brush Creek catchment, but is not relevant to
204764 Determination 6 of 13
the smaller local catchment which contributed to stormwater flow and
damage at the subject site. The time of concentration for this site is
15 minutes.
Topographic influences affect rainfall at the various stations rain
gauging. RJW note that an example of this was given during 31
March 2009 storms which recorded in excess of 500 year ARI
around Coffs Harbour and yet only less than 1 year ARI for 1,3 and 6
hour duration storms and 2 years for 24 hour duration storms at the
BOM at Coffs Airport station
RJW considers that the conclusion drawn by W that the damage to
the driveway crossing was due to flood waters is not valid. RJW note
that flooding did not occur in the vicinity of the damaged culvert. The
overbank flow from Pine Brush Creek approximately 50 metres to
the north of the driveway over the un-named intermittent waterway
did not enter the subject property on 6-7 November 2009.
(xix) RJW does agree with W that the impact of debris left in the bed of the un-
named intermittent waterway by the City Council after the March 2009
storms is likely to have contributed to damage to the upstream headwall
and batter protection of the driveway crossing.
(xx) RJW attaches several maps, photographs and rain fall material to its
report.
12. The applicant has attached a quotation which appears to be from the
applicant‟s own building company for the cost of repairing the damaged
driveway. The quotation lists an amount of $16,700.
13. The applicant has enclosed a copy of the FSP‟s expert reports (which will be
dealt with below).
14. The applicant has enclosed copies of correspondence with the FSP.
The FSP ’s Submission
15. The FSP‟s relevant submissions are summarised as follows : –
(a) The FSP engaged W to investigate the origin of the water which caused
the damage to the applicant‟s driveway.
(b) The original report advised that the concrete access road, under which the
damaged culvert is located, runs parallel to the unmaintained Finlays
Road. Pine Brush Creek, which drains in an east south-easterly direction
at this location is crossed by both the concrete access road and the
unmaintained Finlays Road at the northern boundary of the subject
property. Pine Brush Creek has a significant catchment upstream of the
crossing and is a natural water course. The damaged culvert crossing
traverses Pine Brush Creek. The water damage to the culvert crossing
along the access road at the subject property was caused by flood waters
and associated debris from Pine Brush Creek Road. Floodwaters
overtopping the road embankment eroded the embankment material
causing the roadway surface to collapse.
(c) The findings of W therefore support the claim denial for the damage
arising out of flood.
204764 Determination 7 of 13
(d) W has responded to the criticism of RJW as follows –
(i) The RJW report states that the waterway crossed by the driveway is
not Pine Brush Creek, but a much smaller tributary stream. The
mapping data sources for the investigation indicate the driveway
does cross Pine Brush Creek.
(ii) RJW states that the flow conditions over the crossing at the peak of
the flow would have been 400mm deep with velocity of
approximately 4m/s. These observations are relatively consistent
with the high water mark indicated on the photographs attached to
W‟s own report. However, W maintains that the flow would have
exceeded 600mm over the roadway (driveway).
(iii) W‟s ass essment of the source of inundation is based on
observations of high water marks in the vicinity of the structure
(which it considers would not be visible at the time of RJW‟s
inspection) and not hydrological calculations. Further, the reliance of
RJW on t he water mark compared to RJW‟s interpretation of the bed
and banks in the reach of the waterway upstream of the crossing,
therefore the information produced on catchment area is of little
relevance.
(iv) RJW states the rainfall data presented by W is irrelevant and unlikely
to be representative of short duration rainfall intensities for the
insured property. W notes that the BOM could not provide rainfall
data for stations closer to the site, but the data is demonstrative of
rainfall intensity in the area.
(v) RJW states the overbank flow could not have occurred in the vicinity
of the crossing. In W‟s opinion the reach of the waterway upstream
of the crossing had overbank flow. This is highlighted by the height
of the debris/vegetation marks compared to the area of flow in the
photographs attached to its email of January 2010.
(vi) W believes that the depth and velocity of flow may have been well in
excess of 0.3m and 3m/s and the slab appears to be of the order of
only 70mm thick and lightly reinforced. It was therefore vulnerable to
damage.
(vii) RJW‟s report does not change relevant facts or findings presented in
W‟s original report. W remains of the opinion that the crossing was
damaged by floodwaters overflowing from a watercourse.
(e) The FSP therefore maintains that as its policy excludes damage arising
from flood that it was entitled to decline the claim.
16. The FSP has enclosed a report dated 19 May 2010 from W. The Panel notes
the following in relation to the report –
(i) The culvert crossing providing access from Finlays road to the property
was destroyed and washed away. However there was no water damage
to any of the building located on the subject property.
(ii) The report lists rainfall measures taken over the 4 day period by BOM.
The highest rainfall recorded was between the hours of 7.00pm and
8.00pm on 6 November when 98mm of rain was recorded. For the
duration 3 to 12 hours, the recorded rainfall intensities indicate that the
event had an ARI greater than 100 years at the Coffs Harbour BOM.
204764 Determination 8 of 13
(iii) The concrete access road, under which the damaged culvert is located
runs parallel to the unmaintained Finlays Road. Pine Brush Creek which
drains in an east south-easterly direction as this location is crossed by
both the concrete access road and the unmaintained Finlays Road at the
northern boundary of the subject property. Pine Brush Creek has a
significant catchment upstream of the crossing and is a natural
watercourse.
(iv) W has taken a version of events from the applicant‟s wife (who is a co -
insured). W considers that the version obtained is consistent with the
recorded rainfall data. Further, the water damage to the culvert crossing
along the concrete access road at the subject property on 6-7 November
2009 was caused by floodwaters and associated debris from Pine Brush
Creek. Floodwaters overtopping the road embankment eroded the
embankment material causing the roadway surface to collapse.
17. A further report dated 19 May 2010 was provided by W to the FSP to respond
to matters raised by the RJW report. The Panel notes the following from this
report –
(i) The RJW report states the waterway crossed by the driveway is not Pine
Brush Creek, but a much smaller tributary stream. W relies on the
mapping data sources for the investigation to state the driveway does
cross Brush Creek according to the 1:250,000 mapping damage provided
by the Government. However, W concedes that the creek lines recorded
in maps of this scale are not always accurate in relatively steep
topography. It is possible that the channel of the Pine Brush Creek is
actually further to the north and that the crossing is on a small tributary
(although not the one identified by RJW). In any event W considers this of
little relevance.
(ii) RJW states that the peak flow would have been in the order of 400mm
deep with velocity of approximately 4m/s. Although W has not attempted
to quantify these flow conditions, it would be reasonably consistent with
the high water mark indicated by the photographs attached to W‟s email of
21 January 2010. However, W believes the depth of flow would have
exceeded 600mm over the roadway.
(iii) W‟s initial assessment of the source of inundation was based solely on
observations of high water marks in the vicinity of the structure and not
hydrological calculations. However, W‟s email of 21 January 2010 clearly
shows the high water mark compared to their interpretation of the bed and
banks in reach of the waterway upstream of the crossing. Therefore W
argues the catchment area is of little relevance.
(iv) W considers RJW has incorrectly identified the location of the subject
property in the catchment plan which may explain confusion regarding the
name of the waterway.
(v) W notes that at the time of preparing the report BOM was not able to
provide rainfall data for stations closer to the site. The data was included
to illustrate that significant rainfall intensities did occur in the region. W
maintains there was a likelihood that stream flow depths would have
exceeded bankfull conditions.
(vi) W considers that the flow was approximately at or possibly slightly below
bankfull at the crossing, however, in W‟s opinion in the reach of the
204764 Determination 9 of 13
waterway upstream of the crossing there was overbank flow. This is
highlighted by the height of the debris/vegetation marks compared to the
area of flow in the photographs attached to W‟s earlier email.
(vii) W notes that RJW suggests a number of possible failure mechanisms
include –
Turbulence, blockage of the culvert
Rapidly moving debris dislodged from the City council‟s culvert
upstream when it was damaged on 31 March 2009 (and not
removed)
Suction uplift from the very high velocities upstream
Unlikely to have been undermining of the structure
RJW considers the slab is approximately 120mm thick reinforced
concrete and could not have been uplifted by flows 0.3 deep at 3m/s
and the damage may not have occurred but for debris impact. W
considers the flows were above those recorded by RJW and the slab
was only 70mm thick and light reinforced and therefore vulnerable to
damage
W considers that all of the above mechanisms may have contributed
to the failure of the structure and it was not possible to determine a
primary cause. However, W submits that the lightweight concrete
flood ways such as the driveway is particularly vulnerable to suction
uplift at the downstream shoulder.
(viii) W was not persuaded by the information provided by RJW and maintains
the driveway was damaged by floodwaters overflowing the driveway
crossing.
18. The FSP has enclosed email from W dated 21 January 2010. The email
attaches photographs and makes the following points –
The damaged crossing is located in a watercourse and the damage was
caused by water flowing in the watercourse
The reach of Pine Brush Creek immediately downstream of the crossing is
relatively steep and has high banks. Based on the debris and erosion
marks on the banks the downstream water level was approximately bank
full.
As indicated by the debris marks just upstream of the crossing , it is clear
that the upstream water levels were elevated well above normal levels,
water overflowing the channel inundated the land either side.
The channel is not well defined in this area and the extent to which the
flooded land on either side of the lo w flow channel is outside the
watercourse is open to interpretation
Water in the upstream reach would have been flowing relatively slowly
due to the effect of the abandoned council road crossing creating
backwater and due to a wide flow path. W would not describe this as
pooling or ponding.
The email attaches photographs of the relevant areas and have lines
drawn in to indicate the height of the water level.
19. The FSP has enclosed copies of its assessor report of the damage which
placed a reserve of $21,100 on the damage to the cement driveway. The report
204764 Determination 10 of 13
also attaches photographs. The Panel notes that the driveway slopes
downwards as it crosses the creek. The banks of the creek appear to slope and
are not particularly sharply defined.
20. The FSP has enclosed copies of correspondence between the parties.
21. The FSP has provided copies of the claim notification and insurance certificate.
Consideration of each party’s submission
22. The Panel has carefully considered each party‟s submissions and documents
together with the policy terms and conditions.
23. It is clear to the Panel that resolution of this matter centres on whether or not
the increased water level in the un-named tributary or Pine Brush Creek (the
exact watercourse is disputed) constituted floodwater, and if so whether such
flood caused damage to the driveway crossing.
24. The policy wording in relation to the exclusion of damage arising from flood is
clear and unambiguous, and the Panel considers there is no viable alternative
meaning for the exclusion relating to flood.
25. The policy defines flood as follows –
“the inundation of normally dry land by water overflowing the normal confines of
any natural or artificial water course, lake reserve, canal dam or pond.”
26. There is no dispute that the driveway crossing was damaged during the storm
and that damage occurred due to the increased water and velocity of water
together with other factors such as debris impact and turbulence.
27. The question before the Panel is whether the water height and velocity of water
was in fact a flood for the purpose of the policy terms and conditions rather than
a storm induced height fluctuation of the watercourse over which the driveway
traverses.
28. The Panel has considered the expert evidence in great detail to consider the
issue of which watercourse the driveway crosses and whether the damage
arose from flood or increase in water height due to storm.
29. The Panel notes it is difficult to reconcile the reports given the apparent
argument over the location of the driveway crossing. The driveway crossing is
either over Pine Brush Creek or an unnamed tributary.
30. The Panel has carefully reviewed the maps provided by each party‟s expert.
31. The Panel does not agree with W that RJW has placed the driveway away from
the location. The driveway is relatively distinctive on the maps provided, as it
bends almost 90˚ after it crosses a watercourse. Further, there appears to be a
smaller waterway with two ponding or lake type bodies in between the driveway
and the next major road which is labelled as a Council Road joining Finlays
Road on the maps.
32. The maps provided by both experts are quite similar and appear to match in
general features.
33. The only point in which the maps vary is the labelling of the watercourse
crossed by the driveway as either an un-named tributa ry (by the applicant‟s
expert RJW) or Pine Brush Creek (by the FSP‟s expert W).
204764 Determination 11 of 13
34. The Panel notes that RJW has the applicant‟s driveway crossing the un -named
tributary and then veering away from Pine Brush Creek to join Finlays Road.
RJW has drawn Pine Brush Creek in as running parallel to the driveway, but
never crossing same, further Pine Brush Creek then crosses Finlays Road and
runs north above Finlays Road. In contrast W‟s map has the applicant‟s
driveway crossing Pine Brush Creek and then joining Finlay s Road. In W‟s map
Pine Brush Creek runs south of Finlays Road. However, it should be noted that
there is a watercourse in W‟s map that does run parallel to the driveway and
then crosses Finlays road before continuing north of Finlays Road.
35. The Panel notes that RJW are local to the Coffs Harbour Region.
36. The Panel notes that W conceded that the creek lines recorded in maps of this
scale are not always accurate in relatively steep topography. W further noted
that it is possible that the channel of the Pine Brush Creek is actually further to
the north and that the crossing is on a small tributary (although not the one
identified by RJW).
37. On the balance of probabilities, the Panel accepts that the driveway crossing
traverses the un-named tributary and not Pine Brush Creek.
38. The Panel considers that the correct identification of the watercourse is
important in determining the catchment capacity of the watercourse during the
storm and whether flooding occurred. The catchment capacity of the un-named
tributary and Pi ne Brush Creek having been listed by the applicant‟s expert.
39. The Panel has noted that W‟s initial assessment of the source of inundation
was based solely on observations of high water marks in the vicinity of the
structure, and not hydrological calculations. W has provided rainfall data from
the BOM to evidence rainfall intensity. W considers that the rainfall intensity
suggests a likelihood that stream flow depths would have exceeded bankfull
conditions.
40. In contrast, the ap plicant‟s expert, RJW, considers that the local rain gauges
which are proximate to the property should be relied upon. Further, the one
hour duration precipitation data referred to would be relevant to the Pine Brush
Creek catchment, but is not relevant to the smaller local catchment which
contributed to stormwater flow and damage at the subject site. The time of
concentration for this site is 15 minutes. The rainfall intensity for the local area
was equated to in excess of a 100 year ARI for short duration event.
41. The Panel accepts that a significant rainfall event occurred in the region and
that Coffs Harbour experienced different rainfall measurements to the local
region of the applicant‟s property.
42. The Panel notes that the FSP‟s expert considered the wate rs had risen 600mm
above the „roadway‟ (presumably this refers to the driveway at its lowest point)
and this was calculated on the visible watermarks. The FSP‟s expert has
provided copies of photographs which indicate the height of the water, however
the FSP notes the banks of the watercourse are not well defined and are open
to interpretation.
43. The Panel notes that RJW considers the flow conditions over the crossing at
the peak of the flow would be calculated at 400mm deep with velocity of
approximately 4m/s. According to W, it considered these observations as
204764 Determination 12 of 13
relatively consistent with the high water mark indicated on the photographs
attached to W‟s own report although it maintains the flow would have exceeded
600mm over the roadway (driveway).
44. The Panel finds it puzzling that the watermarks are said to be consistent with a
flow of 400mm deep and 600mm deep. It has not been explained as to how
both might be consistent e.g. surge or water turbulence.
45. The Panel notes that the allegation of flooding from W appears to be based on
the waterway upstream of the crossing where there was overbank flow.
However W states that the flow at the actual crossing was approximately at or
possibly below bankfull.
46. RJW was of the opinion that overbank flow could not have occurred in the
vicinity of the crossing. RJW did not observe overbank erosion or damage. The
driveway crossing is designed as a low level „forded‟ crossing. Accordingly in
storm conditions, the water flows over the lower depressed portion of the
driveway with the headwalls and batters protected against erosion.
47. The expert ‟ s dispute whether there was an overbank flow upstream, however
this is irrelevant as there appears to be agreement that there was no overbank
flow at the site of the crossing. Whether or not the creek at this point also
contained some water which may have been considered floodwater at some
other site is not germane to the issue.
48. Further, the photographs of the crossing and the drawn in water line does not
indicate that the water went over bank at the crossing.
49. The Panel considers that any upstream flooding is irrelevant to the matter as
any water which proceeded to the applicant‟s driveway crossing did so within
the confines of the normal watercourse and not as floodwater which was
outside the confines of the normal watercourse.
50. The Panel has reviewed the policy definition of flood which states that the water
must inundate normally dry land by water overflowing the normal confines of
any natural watercourse.
51. As neither of the experts alleges that the water had overbank flow at the site of
the crossing, the Panel does not find that the exclusion has been made out by
the FSP.
52. The experts have suggested that the damage to the crossing has occurred due
to a number of factors, and it was not possible to confirm the primary cause of
damage. The factors noted were -
Turbulence, blockage of the culvert
Rapidly moving debris dislodged from the City council‟s culvert upstream
when it was damaged on 31 March 2009 (and not removed)
Suction uplift from the very high velocities upstream
Undermining of the structure is an unlikely cause of damage
Council Culvert debris impacting with the crossing
Whether the structure was sufficiently sturdy (disagreement on this issue
remains between W and RJW who have reported different slab
thicknesses).
204764 Determination 13 of 13
53. On the balance of probabilities, the Panel accepts that the damage occurred
due to fluctuation in the height of the creek due to storm water, water
turbulence, suction uplift and debris impact. The Panel does not consider t he
raising in height of the water of the watercourse due to storms without breaking
the banks is sufficient to demonstrate flood under the policy terms and
conditions.
54. The Panel has noted the applicant‟s quotation for damage which is below the
reserve outl ined by the FSP‟s assessor. However, the Panel considers that the
FSP should be given an appropriate opportunity to assess the quotation to
determine whether this is fair and reasonable.
CONCLUSION
55. The Panel determines that the FSP was not entitled to decline the claim, and is
required to indemnify the applicant for the damage to the driveway.
56. The Panel determines that the FSP is entitled to obtain appropriate quotes in
order to establish that the amount claimed is fair and reasonable.
57. Should there be any dispute with respect to quantum, either party may refer this
to the Panel for a further determination.