Determination 204530
Building cracking claim refused as subsidence excluded
Summary
The applicant sought indemnity for cracking to his medical practice building, which the FSP refused as settlement or subsidence damage. AFCA found the expert evidence showed subsidence, not the 2007 flood or nearby construction vibration, and the applicant had not shown an insured event.
The onus was on the applicant to show an insured event caused the damage, and the expert evidence attributed it to excluded subsidence.
Subjects and remedies
home or building damagesmall businessno remedy
Text of the determination
204530 Determination 1 of 4
DETERMINATION
Case number: 204530
Small Business – flood – subsidence – extent of cover
SUMMARY OF FACTS
1. The applicant insured his medical practitioner office for a sum insured $310,000
and contents for $600,000 under the Financial Services Provider (FSP)
business insurance policy.
2. The applicant lodged a claim for cracking to the building in 2009 which he
believed was the result of flooding which occurred in the insured locality in
December 2007.
3. The FSP appointed an external assessor to assess the nature and extent of the
damage, and upon initial advice, appointed an engineer.
4. Upon reports from the engineer, the FSP informed the applicant that it would
not indemnify him for the damage to the surgery as it was caused by settlement
which is excluded by the policy.
5. The applicant seeks review of the determination as he submits the damage has
been caused by a combination of the flood and vibration from the nearby
building site and not settlement as determined by the FSP.
ISSUES IN DISPUTE
6. Whether the FSP was correct in determining that it was not required to
indemnify the applicant under the policy as the damage was not caused by an
insured event.
RELEVANT POLICY PROVISIONS
“General definitions
These definitions apply to and should be read in relation to each of the Policy Sections
unless they are defined differently in the relevant Section.
...
“Defined Event” means an event shown in the individual Section (which the Schedule says
is operative) under the heading “Defined Events applicable to this Section”, and for which
cover is available under that Section only.
...
“Flood” means the inundation of normally dry land by water overflowing from the normal
confines of any natural watercourse or lake whether or not altered or modified or any
reservoir, canal or dam.
...
Section One – Material Damage
The cover
Where this Section is shown as insured on the Schedule, We will settle Your claim in
accordance with the basis of settlement if any of the Property Insured:
1. is Damaged at the Situation;
2. by any sudden or unexpected or unforeseen occurrence which is not otherwise
excluded; and
204530 Determination 2 of 4
3. which occurs during the Period of Insurance.
...
Specific exclusions applicable to this Section
...
3. We will not pay for loss or Damage caused by or occasioned through:
a) wear and tear, fading, scratching or marring, gradual deterioration or developing
flaws, normal upkeep or making good;
...
c) normal settling, seepage, shrinkage, or expansion of Buildings or foundation
walls, pavements, roads and other structural improvements, creeping or heaving
or vibration;
d) faulty materials or faulty workmanship
...
f) erosion, subsidence, earth movement or collapse resulting therefrom;
...
t) (i) Flood, being the inundation of normally dry land by water overflowing from
the normal confines of any natural watercourse or lake, whether or not
altered or modified, or of any reservoir, canal or dam.”
REASONS FOR DECISION
7. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
The Applicant’s Submission
8. The applicant states that the building has stood for many years without severe
cracking that recently was experienced therefore it can be safely assumed that
the foundations had settled and stabilised and would not give rise to the
cracking that has occurred. The applicant also asserts that while some hairli ne
cracks have self-evidently been previously patched over, for cosmetic reasons,
this is not unexpected in a building of this age. However, the severe cracking,
now manifesting, is of a different hue altogether and further, their appearance
was sudden and aggressive in distribution.
9. Further the applicant submits complete disregard has been given to two
separate events which could have contributed to the cause of the damage,
namely the flooding and low frequency vibrations during the construction of the
shopping centre extension.
10. The applicant submits that several buildings in the street sustained flood
damage as a result of the event in 2007, and therefore on the balance of
probabilities, the damage to his property has been caused by the same event.
The FS P’s Submission
11. The FSP submits that it has based its determination on the terms and
conditions of the policy and its engineer’s reports.
12. The FSP submits that the policy clearly excludes any damage caused by
subsidence and therefore based on its engineer’s report of 12 June 2009, it has
made the correct decision in refusing to indemnify the applicant for the loss in
this instance; in respect of the putative cause being attributable to low
frequency vibration associated with extension of the neighbouring shopping
204530 Determination 3 of 4
centre, their engineer’s report of 23 July 2010 concludes, on a balance of
probabilities basis, that the intervening distance between the subject property
and the shopping centre, renders it improbable for even low range peak particle
velocity of 50mm/sec, to have caused the claimed event of severe cracking.
Consideration of each party’s submission
13. The Panel has reviewed each party’s submission in accordance with the terms
and conditions of the policy.
14. The Panel notes that the policy specifically excludes damage caused by
settlement, subsidence, flood and vibration.
15. In determining that it was not required to indemnify the applicant, the FSP has
relied on its engineer which provided a number of substantive reports following
inspection of the property.
16. I n the engineer’s initial report dated 12 June 2009 the following comments are
made in relation to the cause of damage:
“In my opinion, the nature of the damage is consistent with that caused by
differential subsidence due to drying shrinkage of the soil. Furthermore, it is my
opinion that none of the damage can be attributed in any way to the storm and
possible flooding event which occurred in December 2007...”
17. In relation to the submission of the application that the damage could also be
attributed to the low frequency vibration from the building site, the engineer
commented in a report dated 2 August 2010:
“[Applicant] asserts that my second report ignored the effect of low frequency
vibration. My report stated that there were three types of vibrations and that it
was possible that the building was subjected, at various times, to all of these.
Based on my extensive experience in assessing damage resulting from
construction vibrations, I reiterate that it is simply impossible for any construction
vibration emanating from the shopping centre site to have caused any damage to
the building at all.
Furthermore, as I stated in my second report, the nature of the nature of the
damage was inconsistent with that caused by construction vibrations.”
18. The Panel accepts that the insured locality was subjected to a significant
weather event in December 2007 which caused localised flash flooding in the
area.
19. The Panel further accepts that the insured property may have had an
inundation of water for a short period of time as a result of the weather event. In
fact the FSP’s own externally appointed assessor, in its report to the FSP dated
4 April 2009, acknowledges same:
“ The damage, as sighted by our office, appears consistent with the claimed
event, (ie run-off of water from the torrential rainfall of late December 2007-
Panel addition) however, in view of the extent of damage to the premises and
delay in claim submission, we have arranged inspection by a consulting engineer
to confirm the cause and extent of damage.”
20. However the Panel notes that the onus is on the applicant to establish on the
balance of probabilities that damage has occurred to the property that is
covered by the policy terms and conditions.
204530 Determination 4 of 4
21. Whilst the applicant has provided a number of possibilities as to t he cause of
the damage, he has failed to provide any substantive evidence, of an objective
probative basis, to support his assertions.
22. Conversely the FSP has provided substantial expert evidence from a suitably
qualified engineer which provides substantive reasons as to why the damage
has not been caused as a result of the weather event and/or vibration from the
shopping centre building site.
23. The Panel is firstly persuaded by the expert’s reports which conclude that the
damage to the property has occurred as a result of subsidence, and neither the
December 2007 storm, nor vibration from the adjoining shopping centre were
the causes of the claimed damage; secondly, arising from this conclusion, it
follows the applicant has failed, on a balance of probabilities basis, to
demonstrate the claimed damage arose from an event(s) to which the policy
responds. For the sake of completeness, the Panel further observes both
putative causes identified by the applicant, more likely than not, would be
rendered null by exclusions identified within the policy by the FSP.
CONCLUSION
24. Therefore the Panel determines that the FSP was entitled to refuse indemnity
to the applicant under the terms and conditions of the policy.