Home / Financial Firm (Unknown - Insurer) / Determination 204417
Determination 204417
Escape of water damage claim denied as subsidence, weak footings and tree roots
Summary
The landlords claimed under their buildings policy for damage from a leaking sewer pipe, and the FSP denied it as caused by ground movement, weak footings and tree roots. AFCA found the leak caused part of the damage, ordered the FSP to pay $1,500 with interest, and rejected the argument that the exclusion applied to all the damage.
The insurer bears the onus of proving an exclusion applies, and damage caused by the covered leak can be separated from damage caused by excluded causes.
Issues
- Claim denial primary · upheld
“I am not satisfied that the engineer's report can be relied upon so, as the FSP asserts, to entirely defeat the applicants claim.”
- Inadequate claim investigation secondary · upheld
“I find it concerning that this is not a matter to which the engineer has apparently given much attention”
- Product terms interpretation secondary · not upheld
“the damage created by the leaking sewer pipe can be distinguished from the other damage”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
204417 Determination 1 of 4
DETERMINATION
Case number: 204417
Home Building – escape of water – subsidence
SUMMARY OF FACTS
1. On 7 August 2009 the applicants lodged a claim under their landlord’s
buildings insurance policy for damage caused by a leaking sewer pipe to
the rear landing of their tenanted property.
2. The Financial Services Provider (FSP) denied liability for the claim on the
ground that the damage was due to ground movement and incorrect
footings.
3. This matter has been the subject of a Recommendation. The Case
Manager who made the Recommendation recommended that the FSP had
discharged its onus to show that the claim should not succeed and that
accordingly the FSP was not liable for the damage claimed by the
applicants.
4. The applicants have declined to accept that Recommendation.
ISSUES IN DISPUTE
5. Whether the FSP was entitled to deny the claim on the ground that the
damage claimed was due to a combination of weak footings and ground
movement.
RELEVANT POLICY PROVISIONS
“What you are not covered for – general exclusions
We will NOT cover
- …
- Loss, damage, injury or death caused by, or arising from
…
faulty design or workmanship
…
subsidence or landslide…
…
tree roots”
REASONS FOR DECISION
6. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
The Applicants’ Submission
7. The collapse in the soil is in a straight line parallel to the house in line with
the sewer leak.
204417 Determination 2 of 4
8. The house was unoccupied for about three months be fore the engineer
carried out his test. Hence the ground would be expected to be dry at that
time of the tests.
9. The stormwater pipes were disconnected by the plumber when checking
the pipes.
10. A foundation expert had advised the leak had contributed to the problem.
11. When rejecting the Recommendation, the applicant also submitted that the
leaking sewer pipe might not be the major cause of the landing
foundations slipping, but it is undoubtedly a contributor to the problem as
is shown in the ground around the leak has sunken (sic).
12. The applicant also submitted that – “ the engineer reported that the down
pipes discharged directly on to the foundations, which I said were
disconnected by the plumbers when they were doing the CTV footage and
are not relevant to the damage caused by the sewer leak. The hole which
had been cut at the foot of the house down pipe is for the run off of water
from the car port which the previous tenant had removed. Regardless, it
has nothing to do with my claim, and the so called engineer had no reason
to report on this matter”.
13. The applicants again pointed to the fact that the report commissioned on
behalf of the FSP had suggested that the leak was not excessively moist,
but when the test was done, there was nobody living in the property for at
least three months, thus no discharge into the ground.
14. In response to my request that the applicants supply further detail as to the
time which had elapsed between the vacation of the property by their
tenants and the inspection of the property by experts on behalf of the FSP,
the applicants supplied somewhat confusing information. They stated that
the last payment received from the tenants was on 29 May 2009 and that
they had given a notice to vacate dated 16 April 2009 giving the tenant
until 20 June 2009, by which time; they did leave “after being summoned
to the Tenancies Tribunal”.
The FSP’s Submission
15. The expert evidence is that the landing had been built on very weak
footings and displayed considerable tree root interference.
16. There was no brickwork distress or footing movement in the area of the
leaking sewer.
17. Downpipes discharged water directly onto the foundations.
18. The consultant engineer concluded the leaking sewer was not the cause
of the damage claimed.
19. In response to the further submission made by the applicants, the FSP
submitted that:
“the applicants state his tenant vacated the property on 20/06/09. The claim
was lodged 07/08/09 at which time the applicant advised he had a plumber
attend who reported a broken sewer pipe.
204417 Determination 3 of 4
Our builder attended the property on 11/08/09 followed by the engineer on
24/09/09. We maintain the view that the applicant is not entitled to
indemnity and rely on the information contained in the notice of response
and subsequent correspon dence, including the Recommendation.”
Consideration of each party’s submission
20. When making a claim under an insurance policy, the responsibility rests
with the policyholder to establish on the balance of probabilities that the
cause of the damage falls within the cover provided by the policy. An
insurer relying on clauses in the policy to deny the claim has the burden of
establishing on the balance of probabilities that the terms of the relevant
clauses apply to defeat the claim.
21. I conclude that the reports from the experts appointed by the FSP, and
particularly an engineer’s report lead to the conclusion that there have
been causes other than the leaking sewer (which is admitted) of the
damage which has been sustained to the applicants’ property. Importantly,
in the opinion of the engineer, the landing had been built on very weak
footing, further; the engineer concluded that the soil in the region of the
leaking sewer was not excessively moist. Further the engineers
commented upon two downpipes which had been disconnected.
22. On the other hand, the property service company appointed by the
applicants reveal that following investigation, it could be seen that the
sewer drain was broken at the first bend as it went below ground level. I
again refer to the fact that this breakage has not been denied by the FSP.
On balance, I accept the findings of the FSP’s engineer as to a large
proportion of the problems which have been sustained on this property. I
accept that the foundations are inadequate and, although the FSP has
indicated that it does not rely significantly on this point that there had been
some interference from tree root infestation.
23. To the contrary, the applicants assert that the down pipes referred to by
the engineer had been disconnected by the plumber who was conducting
investigations on behalf of the FSP, and, most significantly, the applicants
have consistently asserted that because the house had been occupied for
a considerable period of time, it was not surprising that there was no
“excessive moisture” in the region of the broken sewer pipe. It was for this
reason that I sought further information from the applicants as to the
precise time during which the property had been unoccupied, prior to the
FSP’s engineer conducting his report.
24. The information now supplied by the applicants, since their rejection of the
Recommendation does confirm the point which they have made
consistently throughout this dispute, notably that the property had
apparently been unoccupied for some three months at the time of the
engineer’s inspection. I find it concerning that this is not a matter to which
the engineer has apparently given much attention, and I also find it
surprising that, once the applicants had established the time lag, the FSP
has apparently not chosen to seek comment from the engineer as to
whether his findings need to be qualified.
204417 Determination 4 of 4
25. I accept the applicants ’ contention that over a period of three months,
there would be a vast difference between moisture levels in the region of
the broken sewer pipe in circumstances in which the sewer is no longer
being used at all, compared with the position up until 20 June 2009 when
the property was apparently being occupied by five people.
26. For these reasons, in the light of the further information now supplied by
the applicants, I am not satisfied that the engineer’s report can be relied
upon so, as the FSP asserts, to entirely defeat the applicants claim.
27. The FSP further asserts that if I am of the opinion that the leaking sewer
pipe has contributed to the damage being claimed, then the claim should
fail because the engineer has expressed the view that tree roots and rain
water discharging from disconnected down pipes are partly responsible.
What is asserted is that where damage has two proximate causes, one of
which is covered by the policy, and the other which is the subject of the
policy exclusion, the exclusion applies to the whole of the damage.
28. I accept that this is the correct analysis of the law. But in my view, the
damage which has been created by the leaking sewer pipe can be
distinguished from the other damage which has been caused by the
various factors referred to in the engineer’s r eport. Again, I note, that the
FSP has apparently not chosen to seek the engineer’s comment as to the
claims consistently maintained by the applicants that the down pipes
discharging directly onto the foundations, were disconnected by the
(FSP’s) plumbers when they were carrying out the CTV footage. In my
view, the applicants have adduced additional material in support of their
claims, and in my view that material has not been affectively rebutted by
the FSP.
CONCLUSION
29. It is extremely difficult to determine the precise cost of the damage which
has been created by the leaking sewer pipe, particularly because no one
has been able to furnish an opinion as to the moisture levels when the
house was operating at what might be described as “normal capacity”.
30. However, I am satisfied that certain parts of the damage which have been
referred to, have been caused by the leaking sewer pipe and I determine
that the FSP should pay to the applicants the sum of $1,500 together with
interest at the prescribed rate from 30 September 2009, being seven
weeks after the claim was originally brought.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.