Home / Financial Firm (Unknown - Insurer) / Determination 204120

Determination 204120

Refusal of indemnity for cracked swimming pool after storm

FirmFinancial Firm (Unknown - Insurer)
Decided2010-08-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$30,000
SourceAFCA PDF

Summary

Applicants claimed the cost of replacing a cracked in-ground pool after a severe storm and offered a 50/50 settlement. The FSP refused, relying on an expert report attributing the crack to backfill washaway or slumping from faulty workmanship. AFCA found the loss was not caused by an insured event.

The policy excludes faulty workmanship, settling, shrinkage, expansion and subsidence, and the expert report identified the dominant cause as backfill slumping from installer workmanship rather than storm damage.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

204120 Determination 1 of 3 DETERMINATION CASE NO: 204120 Home – swimming pool – proximate cause – exclusion – cause and effect SUMMARY OF FACTS 1. The applicants held a home building and contents policy with the Financial Services Provider (FSP) from March 2006 to May 2009. 2. On 05 March 2008, the applicants contacted the FSP to lodge a claim for damage to their swimming pool following a severe storm. The FSP’s claim lodgement system recorded the following notations: “[The male applicant] clld (called) into the Nowra Office to advise of possible claim since heavy storms and rain he has noticed a large crack appearing from the top of the pool in the shallow end... have only lodged for consideration insured aware of this”. 3. The FSP appointed an independent expert to access the crack in the pool. The FSP refused indemnity on the basis of the expert’s report which stated that the crack was likely to be a result of washaway or slumping of the backfill material. The report also noted the failure of the pool installers to use sufficient cement to bind together the backfilling material. 4. 18 months after the claim was denied, the applicants requested that the FSP review its decision to refuse indemnity. 5. The FSP reviewed the claim and maintained its decision to refuse indemnity. 6. The applicants con tinue to dispute the FSP’s position, arguing that the damage was caused by the storm. ISSUES IN DISPUTE 7. Whether the FSP is entitled to refuse indemnity under the terms and conditions of the policy. RELEVANT POLICY PROVISONS “What IS covered … 17. “Insured Events” means: ... (i) Storm, Hail or Rainwater ... Exclusions Applicable to Your policy X In respect of Sections 1, 2, 4 and 5, We will not pay for loss or damage caused by or arising from or occurring to any item by way of: ... 6. wear and tear, lack of maintenance or inherent defect; ... 13. structural defects or faulty workmanship, settling, shrinkage or expansion; 14. the action of the sea, erosion, landslide, subsidence or tsunami;” 204120 Determination 2 of 3 REASONS FOR DECISION 8. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 9. The crack is the result of heavy rains during a severe storm. No cracks or bowing were evident prior to the storm activity. The policy covers damage to the pool under the insured event of “storm, hail or rainwater” . 10. The FSP advised at policy inception that the in-ground pool was covered under the Home Building policy. 11. The pool was replaced at a cost of $30,000 to the applicants. They have contacted the FSP and offered to accept a 50/50 settlement in order to resolve their dispute. The FSP’s Submission 12. The expert’s report states that the damage to the pool may be caused by washaway or slumping of the backfilled material. This may be due to faulty workmanship as a result of the pool installers failing to use sufficient cement to bind together the backfilling material. The report did not indicate any evidence of storm damage. 13. The policy excludes faulty workmanship, settling, shrinkage, expansion or subsidence. Consideration of each party’s submission 14. I have reviewed the submissions of the parties in relation to the terms and conditions of the policy. 15. Having reviewed the policy, I am satisfied that it covers the in-ground pool and loss resulting from storm events, but excludes damage which is a result of faulty workmanship, settling, shrinkage, expansion or s ubsidence. 16. The licenced builder inspected the pool and prepared a report dated 01 April 2008, which concludes: “It is my opinion that the crack in the pool is the result of stresses exerted on the pool’s floor caused by the walls of the pool being pushed i nward. The deflection in the walls may be due to washaway or slumping of the backfill material around the perimeter of the pool. This view is supported by the detected hollow sound and feeling under the east coping. The close proximity of the garden bed and lawn and the usually watering, may be a contributing factor to the slumping of the backfilled material. The slumping may be the result of failure of the pool installers to use sufficient cement to bind together the backfilling material.”(sic) 17. The FSP’s expert’s report states that the crack in the pool has been caused by stresses exerted on the pool’s floor caused by the walls being pushed inward. However, in my opinion the report was not clear on what caused the deflection of the wall. 18. The applicants have submitted that the pool failure was due to ‘storm, hail or rainwater’ and that contractors they engaged felt it should be covered under the 204120 Determination 3 of 3 policy. However, the applicants have not obtained any reports from these contractors to confirm what they believe happened to the pool. 19. In considering the dominate or proximate cause of the applicants’ loss, I am guided by the expert report. Based on that report, I find that the loss was not the result of an insured event. CONCLUSION 20. After considering all the material provided by the parties, I am satisfied that the loss is the result of a washaway or slumping of the backfilled material caused by the failure of the pool installers to use sufficient cement to bond the backfilled material. 21. Accordingly, I determine that the FSP is entitled to refuse indemnity under the terms and conditions of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.