Home / Financial Firm (Unknown - Insurer) / Determination 203981

Determination 203981

Storm damage settlement amount and cash settlement versus repair

FirmFinancial Firm (Unknown - Insurer)
Decided2010-12-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$16,186
Non-financial loss—
Amount claimed$28,986
SourceAFCA PDF

Summary

Rural applicants claimed $28,985.85 for storm damage to their home and contents. The insurer accepted that damage was covered but withheld settlement pending other work and quotes. AFCA ordered a cash settlement of $16,185.85, with the roof quote to be broken down before further cash settlement.

Storm damage was agreed to be covered, so AFCA accepted the reasonable quotes provided and ordered cash settlement rather than repair.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

203981 Determination 1 of 4 DETERMINATION Case number: 203981 Home Property – storm damage – delay on repairs – unsubstantiated quantum SUMMARY OF FACTS 1. The applicants held a home property policy with the Financial Services Provider (FSP) from 22 July 2007. The policy provided buildings cover for $100,000 and contents cover of $62,000. 2. On 19 December 2007, the applicants‟ property was subjected to a violent storm, which caused them to lodge a claim with the FSP. 3. The FSP appointed an engineer to visit the property and he expressed doubts over some of the damage, due to the age of the structure. The expert concluded that some repairs would be appropriate, but work would have to be conducted by the applicant first, and that this would not be covered by the policy. 4. The applicants accepted this submission from the expert, but they are potato farmers and have found it difficult to arrange for the required additional work to be completed. The FSP will not attend to repairs until this work is completed. 5. Both sides seek a resolution to the claim, for which the applicant is seeking $28,985.85. ISSUES IN DISPUTE 6. Whether the amount sought by the applicants has been satisfactorily established. 7. Whether the applicants must have the damage repaired/replaced, or whether a cash settlement of the claim is appropriate. REASONS FOR DECISION 8. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicants ’ Submission 9. The applicants sustained damage to their home, some of their surroundings and to their possessions as a result of a storm on 19 December 2007. 10. They seek coverage under the policy to reinstate them to the position they were in prior to the event. The FSP ’s Submission 11. The FSP concurs that the applicants are entitled to recover their reasonable loss from the incident. 203981 Determination 2 of 4 12. It contends that it cannot attempt repairs until such time as the applicants attend to work on the building to prepare it for the repairs covered under the claim. Cons ideration of each party’s submission 13. It was common ground that when the dispute was lodged, that the applicants suffered a loss in the storm, but the full extent of the loss had not been verified. 14. The applicants reside in a relatively remote area of rural South Australia and it is likely that it is not as readily accessible to the FSP‟s agents as a suburban property. This would appear to have affected the negotiations between the parties and the attempts to view and determine the level of damage to be covered under the claim. 15. I accept that the applicants have work commitments that make it difficult to have the home available for an assessment by the FSP, although I am not entirely convinced that the efforts of the FSP‟s agents have been thorough enough to facilitate a resolution. 16. The Case Manager has made several calls to the FSP in an effort to resolve this matter. The Case Manager records that those calls have not been returned. 17. The engineering expert retained by the FSP to inspect the damaged roof suggested that repairs to the area would not be beneficial without a major renovation of the roofs ‟ structure. The applicants were informed of this and they appear to have accepted that some work was necessary. The FSP withheld settlement of the claim until such time as the applicants attended to this work and provided a list of the items (with quotes) for which they sought to claim. 18. I am satisfied that the engineering report provides adequate support for the requirement that the applicant complete some non storm event work to the roof before the storm event damage is completed. 19. The applicants have not attended to the required work, and it is not clear from the submissions of the exact nature of what the applicants were required to do. The engineer suggested that the applicant was not entitled to have the roof cladding replaced and that there was effectively no damage evident to the roof structure that was caused by the storm. 20. The engineer concedes that some of the nails in the roof were displaced and that some remedial work to attend to this should be covered under the policy, although this amount was not quantified. 21. It appears that the FSP was waiting on an expert report from the applicants in relation to the roof, but this was not provided. The purpose of this is unclear, as the FSP has at no stage denied the claim, nor has it stipulated to the applicants (through a denial of the claim) that there were specific items of damage covered or not covered by the policy. 22. Until such time as the applicants have their claim, or part of the claim, denied, I see no reason for them to retain an expert to provide analysis of the loss. 23. In relation to their loss, the applicants provided a list of items for which they are seeking to claim. These items include: Storm damaged roof $ 1,375.00 203981 Determination 3 of 4 Laundry repairs $ 1,122.00 Lobby repairs $ 1,650.00 Kitchen repairs $ 409.20 Side fence and post rails $ 3,275.00 Internal fence replacement $ 3,470.00 Letter box $ 116.85 Clothes line $ 349.00 Shed $ 959.40 Roof and ceilings $12,800.00 Lattice for pergola $ 959.40 Miscellaneous items $ 2,500.00 Total $28,985.85 24. The list includes two items involving the roof. The amount of $1375 has been accepted by the FSP and should be paid. The latter item, entitled „Roof and Ceilings ‟ , $12,800 has not been accepted in total. The quotation provides for one amount of $12, 800, but includes three items:  Replace storm damaged roof on house and verandah roof.  Replace ceiling in lobby and laundry due to storm damage.  Repaint both ceilings. I understand that the second and third items have been agreed by the FSP, but not the first. 25. Since the matter has been referred to FOS, the applicants have now provided up to date quotes for all items, although the roof damage, laundry, lobby and kitchen repairs were quoted informally by a local contractor in early 2010. Those amounts might be subject to change once repairs are undertaken. 26. The applicants‟ request for “miscellaneous items” includes three wardrobes, a suitcase set, computer, linen cupboard, books, craft gear, whipper snipper, baby clothes, toys and crockery. Individual quotes for these items have not been provided, but the total estimate was $2,500. 27. FOS has had discussions with both parties, with the ma jor initial difficulty being the obtaining of quotes and estimates for all claimed items. This has now been attended to by the applicants. 28. The initial quotes supplied were insufficient to justify the amount claimed and this was largely the reason for the settlement impasse. This was discussed with the applicants and they agreed to provide additional information and quotes for their loss. Upon provision of the supplementary material from the applicants, I am satisfied that they have adequately attempted to q uantify the claimed loss. 29. The newly provided documents were supplied to the FSP for consideration on 1 September 2010, with further documents provided on 9 September 2010. 203981 Determination 4 of 4 30. FOS invited the FSP to consider the additional information and to indicate if they were to attempt further negotiations with the applicants, or have the matter determined. I note that the parties were in agreement that (a) damage was caused and would be covered under the policy, and that (b) the FSP would cover the relevant amount, when established. 31. I have not received any further submission from the FSP and I am informed that the matter has not been resolved between the parties. 32. Given that the applicants made an attempt to justify the losses and the FSP has not disputed the additional figures provided or submitted specifics on which items of the claim would not be accepted, I am inclined to accept the list provided by the applicants. 33. The major issue cited for the continuing delays on the claim appears to be the frustration from the agent for its inability to inspect the property or properly verify the applicants‟ loss. I am of the opinion that, given the remote location of the applicants and their profession, it would have been appropriate for the FSP to obtain quotes for many of the damaged items on behalf of the applicants, and/or provide assistance to them with the process. 34. Whilst it is arguable as to whether the FSP has this obligation, it would have better suited the resolution of the claim, noting that the FSP has not disputed the ap plicants‟ entitlement to recovery of at least a portion of their loss. 35. Having considered all of the relevant issues, I determine that the most appropriate outcome is for a cash settlement. Both parties indicated a preparedness to accept this outcome in discussions with FOS. 36. However in respect of the quotation in the amount of $12,800, the applicant must first provide a breakdown of the three items referred to above. Having supplied the breakdown, the FSP should cash settle items two and three from the quotation. CONCLUSION 37. I determine that the FSP should attend to a cash settlement of the applicant‟s claim for $16,185.85. 38. Upon receipt of the further quotation, breaking down the amounts for roof repair, ceiling replacement and ceiling repainting, the FSP shall cash settle the amount for ceiling replacement and ceiling repainting. 39. I determine that the FSP is at liberty to reduce the level of cover on the policy for items relat ed to, or involving the applicants‟ buildings, to the extent of the settlement for these items, until such time as the applicants confirm that the relevant repairs have been completed.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.