Storm roof damage claim declined due to shallow pitch fault

FirmFinancial Firm (Unknown - Insurer)
Decided2010-09-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for storm damage to a tiled roof that the FSP declined, having paid a $1,000 ex-gratia payment for internal damage. AFCA found the water ingress was caused by the roof's shallow pitch, a pre-existing fault excluded by the policy.

The policy clearly and unambiguously excludes cover for fixing a fault that existed before the loss, and the expert evidence established the shallow pitch as the cause.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

203691 Determination 1 of 6 DETERMINATION Case number: 203691 Home Building – storm damage – extent of cover SUMMARY OF FACTS 1. The applicant holds a policy of insurance with the Financial Services Provider (FSP) covering a residential property up to $318,300. The policy was incepted on 13 May 1997 and is subject to a $300 excess on all claims. 2. On 17 November 2008, the applicant contacted the FSP to advise that the property had been damaged by a storm on 16 November 2008. 3. The FSP engaged 3 assessors to inspect the property and the damage that resulted from the storm. The FSP was informed that although storm water ingress had occurred, it occurred as a result of the shallow pitch of the roof. 4. The FSP considered that as the applicant was unaware of the shallow pitch, that it would cover the internal damage and provide an ex-gratia payment of $1,000. The FSP denied cover for the damage to the roofing caused by the shallow pitch rather than the storm itself. 5. The applicant disputes the FSP decision to decline the roofing damage on the basis that the roof was repaired prior to inspection and he believes that the roof pitch is not too shallow as the roof has not leaked prior to the storm. ISSUES IN DISPUTE 6. Whether the FSP has correctly declined the claim for the replacement roofing. RELEVANT POLICY PROVISIONS “ Home Cover When we insure your home, we will cover it for loss of or damage which:  is caused by an Insured Event and  happens in the period of insurance. ... Insured Events NOT Insured ... Storm and rainwater run-off × rain, hail or wind entering your home because of a defect, structural fault of design fault in your home that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (eg. if there are signs that a defect previously caused rainwater damage, we will not pay a later claim for further damage from this defect). ... We will not: ... × f ix a fault that existed before the loss or damage occurred” 203691 Determination 2 of 6 REASONS FOR DECISION 7. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 8. The applicant notes the FSP has refused to pay for storm damage to the roof. He notes the FSP indicated he should seek aid from the SES to tarp damaged tiles after the first inspection by an assessor (“WMC”) , given the forecast of further storms. 9. The SES attended and replaced broken tiles supplied by the applicant and repositioned other tiles. 10. The applicant notes that when a roofer attended (“AS”) there was little or nothing to assess due to these repairs. Upon AS hearing that the FSP refused to pay for repairs, it suggested replacing the tile roof with a „zinc alum‟ to compensate for the low pitch. 11. The applicant suggested to the FSP that it pay part of the cost of a new roof and the FSP declined the offer to negotiate a settlement. 12. The applicant notes the FSP was the last party to repair the roof after storm damage caused broken tiles in 2004. 13. The applicant seeks a minimum two thirds contribution toward the replacement costs of the roofing. 14. The applicant contends that the FSP did not contact AS despite WMC not being able to see any damage to the roof from „just standing on patio railing‟ and another builder (“CNS”) was unable to properly comment given it had only performed interior work. 15. The applicant notes that some of the tiles did not show damage until t hey were being removed as the damaged lapped edges (drains) were only visible after removal. 16. The applicant notes that a neighbour confirmed that the previous owners of his home had not reported any leaks. The applicant notes the roof has not leaked prior to the storm of 14 November 2008 and he says it would have if the pitch was an issue. 17. The applicant has enclosed photographs of broken tiles that were the result of storm damage on 14 November 2008. The photographs indicate the tiles were chipped and broken. 18. The photographs provided of the home from the eastern side show how the roof only leaked on the northern end above doors in the lounge-room, dining room and kitchen. 19. The applicant provided photographs of the northern end to show the shallow pitch that the experts say is a problem. 20. The applicant has enclosed a report from CNS undated from which I note the following – 203691 Determination 3 of 6  There were points of water entry at the top of the window and door jambs in the kitchen and dining rooms.  The insured‟s main roof is constr ucted of tiles whilst the veranda along the eastern side is of „colorbond‟ construction.  There seems to be an ongoing issue with water inundation in this area.  The pitch of the veranda roof is less than five degrees.  Under severe storm conditions the water on the veranda roof may be pooling at the intersection of the main roof and veranda.  CNS concludes that this would be a maintenance issue as the damage did not occur during the storm even in November. 21. The applicant has enclosed a copy of the WMC report from which I note the following –  The damage was caused by wind rain and hail storm. The rain was being forced under the tiles into ceiling space.  A roof tiler report stated that the tile roof was constructed at a low pitch which had allowed storm water to penetrate under the tiles.  The insured has been advised to repair/replace the roof to prevent further water damage to the interior. 22. The applicant has enclosed a copy of the AS report dated 2 February 2010 from which I note the following –  AS states it has been engaged to carry out repairs and a full roof restoration to the insured property.  AS notes that as part of the restoration process, tiles have been removed from the low pitched roof and replaced with colorbond sheeting as well as flashing along the joint.  The roof has been cleaned with sealant and colour applied.  The total cost of all the work was $8,952 inclusive of GST. 23. The applicant has enclosed copies of correspondence between the parties. The FSP ’s Submission 24. The FSP contends the damage to the applicant‟s roof was not caused by the storm event. The FSP notes that three qualified professionals have inspected the property and have the opinion that the roof leaked due to a shallow pitch. 25. The FSP notes that the damage must result from a single insured event before it can be covered under the policy. Further, the applicant is required to prove his case. 26. The FSP notes that at no time has the applicant argued the FSP failed to provide relevant policy documents or make the terms and conditions clear. Accordingly, the FSP considers that it is entitled to rely upon the policy terms and conditions. 203691 Determination 4 of 6 27. The FSP did not authorise repairs to be carried out, but rather requested the applicant provide a report from the builder to support his claim. 28. The report from AS does not support the applicant‟s contention the roof had storm damage as the report merely states the restoration works which occurred to the roof. 29. The FSP has made an ex-gratia payment of $1,000. Further, the ex-gratia payment was made in good faith for both the damage to the sarking and any damaged tiles that may have been replaced by the SES before damage could be confirmed by one of the FSP assessors, or the company authorised to carry out restoration to the roof. 30. The FSP confirms that it did repair two tiles in 2004, but the repairs did not affect the pitch of the roof. Further, compliance with its policy under a separate claim does not make it liable for new repair costs. 31. The FSP has provided copies of all three expert reports (as outlined above). 32. The FSP has provided copies of tax invoices for a firm (“SCD”) . 33. The FSP has provided a copy of an email from a further roofing contractor (“KWR”) sent to SCD. KWR provi ded an opinion that the “..reason the roof is leaking is because of a shallow pitch. This is not storm damage. We suggest that tiled roof be removed and a metal roof installed over rear veranda ” 34. The FSP has enclosed a copy of the 2004 tax invoice for repairs. 35. The FSP has enclosed copy of assessor report noting that two tiles required changing and the pitch on the roof on the eastern face is too low and must be at least 17.5 (degrees). 36. The FSP enclosed internal file notes and copies of correspondence between the parties. Consideration of each party’s submission 37. I have read each party‟s submissions and supporting documents together with the policy terms and conditions. 38. The parties do not dispute that there was a storm event (either on the 14 or 16 November 2008) or that there was storm water ingress which occurred during this event. 39. The parties further do not dispute that the interior of the property was damaged and subsequently rectified by the FSP under its policy. The FSP noted it could not be certain that the applicant was reasonably aware of the shallow pitch as there was no record of the applicant having been advised of this in the 2004 claim. I note that I consider the FSP‟s stance on the internal repairs as appropriate. 40. The parties dispute whether the storm water ingress occurred due to broken tiles caused during the storm (later repaired by the SES prior to assessments), which is a covered event, or due to the shallow pitch of the roof which is a design/structural defect not covered by the policy. 203691 Determination 5 of 6 41. There are several reports before me which indicate the following – (a) CNS considers the water ingress was an ongoing issue likely caused by the shallow pitch of the roof. CNS determined it was a maintenance issue. (b) The WMC report relied upon a tiler‟s report that stated the tiled roof was constructed at a shallow pitch allowing water to penetrate under the tiles. (c) The KWR email indicates that damage arose from a shallow pitch. (d) The AS report does not provide a basis for the damage, but rather the tiles were removed from the low pitched roof and replaced with colorbond sheeting as well as flashing along the joint. 42. The applicant denies that the roof is low pitched and notes there has not been an issue of leaking prior to the storm in November 2008. Additionally, the applicant has contended that the SES has repaired a number of tiles and moved tiles to prevent further leaking. 43. I have weighed the evidence of the applicant against three experts in roofing or building and construction. The applicant has not stated he has any specific qualifications in the area of building and construction or that he has measured the angle of the roof and compared it to relevant building regulations/standards. 44. Given this, I accept on the balance of probabilities the water ingress was due to the shallow pitch of the roof rather than storm damage itself. 45. The policy clearly and unambiguously excludes cover to fix a fault that existed before the loss or damage occurred. I say this clearly and unambiguously as I do not consider that there is a viable alternative meaning to the words. 46. I have considered the applicant‟s argument that the tiles were br oken and that the SES fixed them. 47. I accept that the SES was called out and performed some rectification works to the tiling. 48. I note that the applicant has not costed any potential tile rectification for the tiles broken during the storm to indicate that the ex-gratia payment made by the FSP was insufficient. Further, there is no evidence the applicant was required to make payment to the SES for the make good works and is therefore not entitled to reimbursement for this. 49. The dispute focuses solely on the roofing as the internal damage has been rectified. Accordingly, the applicant is required to demonstrate what loss he has suffered to the tiled roof as a result of the storm damage, but he has not done so. 50. The applicant has instead sought two thirds of the payment for the new roof constructed of different materials. 51. The new roofing according to AS is metal sheeting which the applicant has specifically stated is to rectify the low pitched roof. 52. In stating this, the applicant has admitted the roofing has a shallow pitch that requires rectification. The shallow pitch is in essence a structural/design defect or fault in the roofing. 203691 Determination 6 of 6 53. Accordingly, the applicant is requesting reimbursement for the new roof which he notes AS confirmed was designed to counter the low pitch. This is clearly excluded under the policy terms and conditions as it would be payment for a fault that existed prior to the storm and not the actual damage to the roof caused by the storm. 54. Given the above analysis, I consider that the FSP has correctly declined the claim for the replacement roofing. CONCLUSION 55. I determine that the FSP has correctly declined the claim for replacement roofing and is not liable to the applicant for any payment for the replacement roofing.