Home / Financial Firm (Unknown - Insurer) / Determination 203691
Determination 203691
Storm roof damage claim declined due to shallow pitch fault
Summary
The applicant claimed for storm damage to a tiled roof that the FSP declined, having paid a $1,000 ex-gratia payment for internal damage. AFCA found the water ingress was caused by the roof's shallow pitch, a pre-existing fault excluded by the policy.
The policy clearly and unambiguously excludes cover for fixing a fault that existed before the loss, and the expert evidence established the shallow pitch as the cause.
Issues
- Claim denial primary · not upheld
“Policy excludes cover to fix a fault that existed before the loss or damage occurred; water ingress was due to the shallow pitch of the roof.”
- Inadequate claim investigation secondary · not upheld
“Applicant's evidence was weighed against three experts; the FSP's stance on the roof was considered appropriate.”
Subjects and remedies
home or building damageno remedy
Text of the determination
203691 Determination 1 of 6
DETERMINATION
Case number: 203691
Home Building – storm damage – extent of cover
SUMMARY OF FACTS
1. The applicant holds a policy of insurance with the Financial Services Provider
(FSP) covering a residential property up to $318,300. The policy was incepted
on 13 May 1997 and is subject to a $300 excess on all claims.
2. On 17 November 2008, the applicant contacted the FSP to advise that the
property had been damaged by a storm on 16 November 2008.
3. The FSP engaged 3 assessors to inspect the property and the damage that
resulted from the storm. The FSP was informed that although storm water
ingress had occurred, it occurred as a result of the shallow pitch of the roof.
4. The FSP considered that as the applicant was unaware of the shallow pitch,
that it would cover the internal damage and provide an ex-gratia payment of
$1,000. The FSP denied cover for the damage to the roofing caused by the
shallow pitch rather than the storm itself.
5. The applicant disputes the FSP decision to decline the roofing damage on the
basis that the roof was repaired prior to inspection and he believes that the roof
pitch is not too shallow as the roof has not leaked prior to the storm.
ISSUES IN DISPUTE
6. Whether the FSP has correctly declined the claim for the replacement roofing.
RELEVANT POLICY PROVISIONS
“ Home Cover
When we insure your home, we will cover it for loss of or damage which:
is caused by an Insured Event and
happens in the period of insurance.
...
Insured Events NOT Insured
...
Storm and rainwater run-off
× rain, hail or wind entering your home because of a
defect, structural fault of design fault in your home
that you knew about (or should reasonably have
known about) and did not fix before the loss or
damage occurred (eg. if there are signs that a
defect previously caused rainwater damage, we
will not pay a later claim for further damage from
this defect).
...
We will not:
...
× f ix a fault that existed before the loss or damage occurred”
203691 Determination 2 of 6
REASONS FOR DECISION
7. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
The Applicant’s Submission
8. The applicant notes the FSP has refused to pay for storm damage to the roof.
He notes the FSP indicated he should seek aid from the SES to tarp damaged
tiles after the first inspection by an assessor (“WMC”) , given the forecast of
further storms.
9. The SES attended and replaced broken tiles supplied by the applicant and
repositioned other tiles.
10. The applicant notes that when a roofer attended (“AS”) there was little or
nothing to assess due to these repairs. Upon AS hearing that the FSP refused
to pay for repairs, it suggested replacing the tile roof with a „zinc alum‟ to
compensate for the low pitch.
11. The applicant suggested to the FSP that it pay part of the cost of a new roof
and the FSP declined the offer to negotiate a settlement.
12. The applicant notes the FSP was the last party to repair the roof after storm
damage caused broken tiles in 2004.
13. The applicant seeks a minimum two thirds contribution toward the replacement
costs of the roofing.
14. The applicant contends that the FSP did not contact AS despite WMC not being
able to see any damage to the roof from „just standing on patio railing‟ and
another builder (“CNS”) was unable to properly comment given it had only
performed interior work.
15. The applicant notes that some of the tiles did not show damage until t hey were
being removed as the damaged lapped edges (drains) were only visible after
removal.
16. The applicant notes that a neighbour confirmed that the previous owners of his
home had not reported any leaks. The applicant notes the roof has not leaked
prior to the storm of 14 November 2008 and he says it would have if the pitch
was an issue.
17. The applicant has enclosed photographs of broken tiles that were the result of
storm damage on 14 November 2008. The photographs indicate the tiles were
chipped and broken.
18. The photographs provided of the home from the eastern side show how the
roof only leaked on the northern end above doors in the lounge-room, dining
room and kitchen.
19. The applicant provided photographs of the northern end to show the shallow
pitch that the experts say is a problem.
20. The applicant has enclosed a report from CNS undated from which I note the
following –
203691 Determination 3 of 6
There were points of water entry at the top of the window and door jambs
in the kitchen and dining rooms.
The insured‟s main roof is constr ucted of tiles whilst the veranda along the
eastern side is of „colorbond‟ construction.
There seems to be an ongoing issue with water inundation in this area.
The pitch of the veranda roof is less than five degrees.
Under severe storm conditions the water on the veranda roof may be
pooling at the intersection of the main roof and veranda.
CNS concludes that this would be a maintenance issue as the damage
did not occur during the storm even in November.
21. The applicant has enclosed a copy of the WMC report from which I note the
following –
The damage was caused by wind rain and hail storm. The rain was being
forced under the tiles into ceiling space.
A roof tiler report stated that the tile roof was constructed at a low pitch
which had allowed storm water to penetrate under the tiles.
The insured has been advised to repair/replace the roof to prevent further
water damage to the interior.
22. The applicant has enclosed a copy of the AS report dated 2 February 2010
from which I note the following –
AS states it has been engaged to carry out repairs and a full roof
restoration to the insured property.
AS notes that as part of the restoration process, tiles have been removed
from the low pitched roof and replaced with colorbond sheeting as well as
flashing along the joint.
The roof has been cleaned with sealant and colour applied.
The total cost of all the work was $8,952 inclusive of GST.
23. The applicant has enclosed copies of correspondence between the parties.
The FSP ’s Submission
24. The FSP contends the damage to the applicant‟s roof was not caused by the
storm event. The FSP notes that three qualified professionals have inspected
the property and have the opinion that the roof leaked due to a shallow pitch.
25. The FSP notes that the damage must result from a single insured event before
it can be covered under the policy. Further, the applicant is required to prove
his case.
26. The FSP notes that at no time has the applicant argued the FSP failed to
provide relevant policy documents or make the terms and conditions clear.
Accordingly, the FSP considers that it is entitled to rely upon the policy terms
and conditions.
203691 Determination 4 of 6
27. The FSP did not authorise repairs to be carried out, but rather requested the
applicant provide a report from the builder to support his claim.
28. The report from AS does not support the applicant‟s contention the roof had
storm damage as the report merely states the restoration works which occurred
to the roof.
29. The FSP has made an ex-gratia payment of $1,000. Further, the ex-gratia
payment was made in good faith for both the damage to the sarking and any
damaged tiles that may have been replaced by the SES before damage could
be confirmed by one of the FSP assessors, or the company authorised to carry
out restoration to the roof.
30. The FSP confirms that it did repair two tiles in 2004, but the repairs did not
affect the pitch of the roof. Further, compliance with its policy under a separate
claim does not make it liable for new repair costs.
31. The FSP has provided copies of all three expert reports (as outlined above).
32. The FSP has provided copies of tax invoices for a firm (“SCD”) .
33. The FSP has provided a copy of an email from a further roofing contractor
(“KWR”) sent to SCD. KWR provi ded an opinion that the “..reason the roof is
leaking is because of a shallow pitch. This is not storm damage. We suggest
that tiled roof be removed and a metal roof installed over rear veranda ”
34. The FSP has enclosed a copy of the 2004 tax invoice for repairs.
35. The FSP has enclosed copy of assessor report noting that two tiles required
changing and the pitch on the roof on the eastern face is too low and must be
at least 17.5 (degrees).
36. The FSP enclosed internal file notes and copies of correspondence between
the parties.
Consideration of each party’s submission
37. I have read each party‟s submissions and supporting documents together with
the policy terms and conditions.
38. The parties do not dispute that there was a storm event (either on the 14 or 16
November 2008) or that there was storm water ingress which occurred during
this event.
39. The parties further do not dispute that the interior of the property was damaged
and subsequently rectified by the FSP under its policy. The FSP noted it could
not be certain that the applicant was reasonably aware of the shallow pitch as
there was no record of the applicant having been advised of this in the 2004
claim. I note that I consider the FSP‟s stance on the internal repairs as
appropriate.
40. The parties dispute whether the storm water ingress occurred due to broken
tiles caused during the storm (later repaired by the SES prior to assessments),
which is a covered event, or due to the shallow pitch of the roof which is a
design/structural defect not covered by the policy.
203691 Determination 5 of 6
41. There are several reports before me which indicate the following –
(a) CNS considers the water ingress was an ongoing issue likely caused by
the shallow pitch of the roof. CNS determined it was a maintenance issue.
(b) The WMC report relied upon a tiler‟s report that stated the tiled roof was
constructed at a shallow pitch allowing water to penetrate under the tiles.
(c) The KWR email indicates that damage arose from a shallow pitch.
(d) The AS report does not provide a basis for the damage, but rather the
tiles were removed from the low pitched roof and replaced with colorbond
sheeting as well as flashing along the joint.
42. The applicant denies that the roof is low pitched and notes there has not been
an issue of leaking prior to the storm in November 2008. Additionally, the
applicant has contended that the SES has repaired a number of tiles and
moved tiles to prevent further leaking.
43. I have weighed the evidence of the applicant against three experts in roofing or
building and construction. The applicant has not stated he has any specific
qualifications in the area of building and construction or that he has measured
the angle of the roof and compared it to relevant building regulations/standards.
44. Given this, I accept on the balance of probabilities the water ingress was due to
the shallow pitch of the roof rather than storm damage itself.
45. The policy clearly and unambiguously excludes cover to fix a fault that existed
before the loss or damage occurred. I say this clearly and unambiguously as I
do not consider that there is a viable alternative meaning to the words.
46. I have considered the applicant‟s argument that the tiles were br oken and that
the SES fixed them.
47. I accept that the SES was called out and performed some rectification works to
the tiling.
48. I note that the applicant has not costed any potential tile rectification for the tiles
broken during the storm to indicate that the ex-gratia payment made by the
FSP was insufficient. Further, there is no evidence the applicant was required
to make payment to the SES for the make good works and is therefore not
entitled to reimbursement for this.
49. The dispute focuses solely on the roofing as the internal damage has been
rectified. Accordingly, the applicant is required to demonstrate what loss he has
suffered to the tiled roof as a result of the storm damage, but he has not done
so.
50. The applicant has instead sought two thirds of the payment for the new roof
constructed of different materials.
51. The new roofing according to AS is metal sheeting which the applicant has
specifically stated is to rectify the low pitched roof.
52. In stating this, the applicant has admitted the roofing has a shallow pitch that
requires rectification. The shallow pitch is in essence a structural/design defect
or fault in the roofing.
203691 Determination 6 of 6
53. Accordingly, the applicant is requesting reimbursement for the new roof which
he notes AS confirmed was designed to counter the low pitch. This is clearly
excluded under the policy terms and conditions as it would be payment for a
fault that existed prior to the storm and not the actual damage to the roof
caused by the storm.
54. Given the above analysis, I consider that the FSP has correctly declined the
claim for the replacement roofing.
CONCLUSION
55. I determine that the FSP has correctly declined the claim for replacement
roofing and is not liable to the applicant for any payment for the replacement
roofing.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.