The applicant claimed all damage from a June 2009 storm, quoted at $100,833.96. AFCA required the FSP to pay the interior ceiling and wall repairs ($16,893.62), electrical repairs ($500.38) and a replaced roof sheet, and refused subsidence, soffit, entry ceiling and sewage pipe damage.
Pre-existing subsidence and gradual maintenance-related deterioration did not occur within 72 hours of the storm, so only storm-caused damage was covered.
Issues
- Claim denial primary · not upheld
“the Panel determines that the FSP is not liable to repair the subsidence damage to the building”
- Claim amount dispute secondary · not upheld
“the Panel determines that the quotation of $16,893.62 ... is fair and reasonable”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
203374 Determination 1 of 5
DETERMINATION
CASE NO: 203374
Home – storm damage – proximate cause – exclusion
SUMMARY OF FACTS
1. The applicant holds a home and contents policy with the Financial Services
Provider (FSP).
2. The applicant lodged a claim under the policy for damage to the property
following a significant storm on 3 June 2009. The FSP appointed an assessor
and then a structural engineer and a soil scientist to investigate the claim.
Based on these reports, the FSP accepted some elements of the claim relating
to water damage to ceilings and walls, but rejected other elements relating to
the building subsidence.
3. The applicant disputes the conclusions of the FSP‟s independent experts and
asserts that all damage was caused by the June 2009 storm. A builder has
provided a quotation for $100,833.96 to repair all damage.
4. The FSP‟s claims department technical manager reviewed the FSP‟s decision
at the request of the applicant. He maintained that the earlier decision to accept
part of the claim and reject other aspects was reasonable. The applicant
continues to dispute the FSP‟s position and requests that all damage to be
indemnified by the FSP.
ISSUES IN DISPUTE
5. Whether the applicant is entitled to indemnity for all elements of the claim.
RELEVANT POLICY PROVISONS
“What all sectio ns of this policy do not cover
We will not pay claims caused by or arising from the following:
....
Landslide or subsidence except as detailed on pages 18 and 28 if you selected „Cover
1 – Listed Events‟, or pages 18, 19 and 28 if you selected „Cover 2 – Accidental
Damage‟
What you must do when you make a claim
....
You must also do the following
Take all reasonable steps to prevent any further loss occurring.
Cover 2 – Accidental Damage
We will cover your domestic farm buildings and domestic contents , shown on your
schedule , for any accidental damage or accidental loss including that caused by the
following:
Landslide or subsidence . Cover only applies if it occurs within 72 hours of the
cessation of the event, and is contributed to, or caused by one of the following events:
Storm, rainwater or wind.
Earthquake, subterranean fire, or volcanic eruption.
Explosion.
203374 Determination 2 of 5
Liquid that escapes from a fixed pipe or something attached to a pipe, fixed
gutter, fixed tank or drain.”
REASONS FOR DECISION
6. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised. The Panel notes the comment from the FSP that it had not
previously received a copy of the letter supplied by the applicant dated 25 May
2010.
The Applicant’s Submission
7. The storm was responsible for all the damage sustained by the property. The
damage broadly fits into two categories. Firstly, damage from storm water
entering the roof of the building following heavy winds raising or loosening
some of the corrugated sheet metal panels. Secondly, storm water pooling
underneath the property causing the building to subside in some areas.
8. Prior to the storm, the roof did not leak, the ceilings did not bow, and there was
no evidence of subsidence. There are a number of inaccuracies in the various
reports obtained by the FSP.
The FSP’s Submission
9. There is no doubt that some of the damage to the property was caused by the
severe storm which struck the property. However, reports from an assessor, a
building consultant, a soil scientist and a structural engineer, have indicated
that the property exhibited signs of poor maintenance to the roofing and some
pre-existing subsidence to the footings.
10. A settlement offer has been made for repairs to the property which can be
identified as storm related. However, the pre-existing damage is not covered by
the p olicy‟s terms and conditions which limit liability to any damage occurring
within 72 hours of the cessation of an insured event.
Consideration of each party’s submission
11. The Panel has reviewed the submissions of the parties in relation to the terms
and conditions of the policy.
12. There are a number of issues in this dispute and the parties have supplied a
large amount of supporting material. For convenience and clarity, the Panel will
deal with each issue under a separate heading.
Roofing
13. The applicant submits that the roof was in good condition prior to the storm, but
the strong winds and rain lifted the sheeting below the air conditioning unit and
loosened and raised other sheets. He claims that, had the roof not been in
good condition, greater damage wo uld have occurred.
14. The Panel notes the building consultant‟s report which states “ During my
inspection of the external roof area, I observed the roof to be in poor condition .”
It further states:
203374 Determination 3 of 5
“ the loose roof sheets to the western rear of the building are a maintenance
issue as the nails to the sheets have worked loose over a considerable time and
not from one storm event”.
15. The Panel does not consider the debate over whether the air conditioning unit
was faulty or not to be fundamental to the condition of the roof. Whether the
bore water has caused corrosion or merely alkaline water stains, the corrugated
iron roof sheeting immediately below the unit has failed and allowed a
significant amount of water to ingress the roof cavity. The Panel accepts that
this sheet may well have been disturbed by the storm event. However, the
photographic evidence shows this section of the roof to be in poor condition
and other photos demonstrate nails in other sheets not being secured into
roofing battens, nails/screws missing and various gaps appearing where foot
traffic has occurred.
16. The applicant has advised that he has replaced this sheet of roofing and has
provided photographic evidence to verify that fact.
17. Accordingly, the Panel determines that the FSP should reimburse the applicant
for the cost of replacing the sheet of corrugated roofing, but is not liable for
other repairs to, or replacement of the existing roof.
Interior ceilings and walls
18. The Panel notes that the FSP has accepted this part of the claim wi th an
excess of $100 payable by the applicant. However the applicant has advised
that the hallway cupboards and the bathroom ceiling were omitted from the
repair quotation and the Panel expects this work to be included in these repairs.
19. The Panel determines that the quotation of $16,893.62 for the rectification of
the kitchen, front lounge room, small hallway, sunroom, dining room entry,
bathroom and pantry, is fair and reasonable. The FSP needs to reconfirm that
the repairer can still complete these repairs for this amount and that the hallway
cupboards and bathroom ceiling are included.
Entry room ceiling
20. The Panel notes the comments made by the Structural Engineer “ I am also of
the opinion the section of bowed ceiling located at the entry room is a structural
problem associated with the building subsiding. I opened the metal roof to the
general location and observed at the approximate position where the ceiling is
bowed; there is a timber hanger over the joists. The 90mm timber cover leads
me to believe that a wall has been removed at the time of the renovation; a
timber hanger is supporting the ceiling joists that were once supported by the
wall. Due to the building subsiding in opposite directions, (east and west) this
section of the roof is being pulled apart and the ceiling joists have dislodged
resulting in the dip to the ceiling. I could find no evidence of water damage to
this section of the roof .”
21. The applicant has stated that this bowing was not evident when he last visited
the property, and he has also stated that there was not a wall removed from
this section of the property. It is difficult for the Panel to understand whether
structural changes to this area of the property have been made at some time or
203374 Determination 4 of 5
not. However, the applicant does not offer a view as to why there is no
evidence of water damage to this section of the roof.
22. Accordingly, the Panel determines that the FSP is not liable for repairs to the
entry room section of the ceiling.
Soffits
23. The Structural Engineer stated:
“I noted that the timber sprocket (framing) to which the Masonite eave lining is
nailed to be deteriorated from prolonged water exposure. I noted the southern
and western eave soffit linings, to be generally warped and water damaged. I
noted all the affected eave (sic) have been warping for a considerable time and
not due to a single storm event.”
24. The applicant has responded to this statement by submitting that the storm
lifted and loosened a couple of sheets of iron in addition to the sheet above the
pantry. This allowed water to enter the soffits and the caretaker and his wife
have commented that water ran out of these soffits for at least a couple of days
following the storm.
25. The Panel notes that the assessor stated:
“Water damage has also been sustained to the soffits along the southern and
western sides of the property totalling approximately 42 metres”.
The Panel does not dispute that the soffits sustained water damage, but are
satisfied by the expert comments from the Structural Engineer that eave
warping had been occurring over a considerable time and not due to a single
storm event.
26. Accordingly, the Panel determines that the FSP is not liable for
replacement/repair of the soffits.
Electricals
27. The Panel notes that the FSP has accepted this part of the claim and the
applicant has agreed with the FSP‟s decision. The quotation dated 18
November 2009 is not precise in classifying what „Electrical‟ actually covers in
its quote of $500.38, but the Panel believes this is to cover the cost of repairs to
the pantry wiring and lighting. On that understanding, the Panel believes this
offer is fair and reasonable.
Building Movement
28. The Structural Engineer states in his report:
“The house is in poor condition ....It is clear that defects to the house are
predominately due to settlement of the footings .... There is evidence of
settlement such as packing on top of the stumps....The defects such as gaps
opening up between ceiling and walls, bowed ceilings, defects and slopes to the
floor are due to footings to the stumps and brick base settling due to the soils
shrinkage and the footings being well undersized. In addition this is not recent
but has been caused by successive draughts.”
29. The soil engineer drilled two bore holes next to the building to a depth of 2.0
metres and 2.1 metres and terminated both holes when the drill struck
sandstone rock. The soil tests indicated that the soil was dry and very stiff at
that depth and very stiff to hard at a depth of 0 - 900 mm. This test was
203374 Determination 5 of 5
conducted in October 2009 and the Panel believes the lack of moisture in the
soil at that time supports the view that the storm water ran off after the heavy
rains ceased and did not penetrate into the soil.
30. The Panel notes that the expert‟s report provided by the applicant dated 23 July
2010, states that the “undercroft area is completely sodden” and later
“ Undercroft area remains totally wet ...” These comments were made following
an inspection on 13 May 2010 which is almost 12 months after the storm which
is the subject of this claim and only 2 months after the Charleville floods of
March 2010. They clearly conflict with the findings of October 2009 report from
the soil engineer.
31. The policy covers subsidence that occurs within 72 hours of the cessation of an
insured event. In this instance, the Panel is satisfied that the subsidence in the
building was present prior to the storm and did not occur within 72 hours of the
cessation of the storm. Accordingly, the Panel determines that the FSP is not
liable to repair the subsidence damage to the building.
Sewage pipe
32. The applicant states that the cracked sewage pipe was discovered in
September when a manhole cover was opened in the pantry floor. The
manhole cover was underneath a piece of sheeting that was covering the
pantry floor.
33. The Panel is not clear how the crack in the pipe could be attributed to the storm
water finding its way under the floor sheeting and through the manhole cover in
sufficient volume to cause the sewage pipe to crack. Accordingly, the Panel
determines that the FSP is not liable to repair the cracked sewage pipe.
CONCLUSION
34. In conclusion, the Panel determines that the FSP indemnifies the applicant for
repairs to the interior walls and ceilings that were damaged by the 3 June 2009
storm, together with repairs to the pantry‟s electrical wiring and fittings. The
Panel believes the quotation dated 18 November 2009 for $16,893.62, less any
input tax credit to which the applicant may be entitled, is fair and reasonable,
provided that the repairer reconfirms that he is still prepared to perform the
repairs for this amount.
35. The Panel also determines that the FSP reimburse the applicant for the cost of
the corrugated iron roof sheet that was replaced by the applicant.
36. The FSP is not liable for further indemnity for damage that is related to
subsidence as the Panel determines that the subsidence did not occur within
72 hours of the storm‟s cessation.