Foundation underpinning claim partly accepted at 10%; balance declined
Summary
Applicant claimed about $46,750 for underpinning foundations allegedly caused by a leaking stormwater drain. AFCA found the FSP's offer of 10% ($4,675) justified and ordered no further payment.
The engineer's expert apportionment that the stormwater leak caused no more than 10% of the damage was thorough and uncontradicted, and the landslide or subsidence exclusion applied to the remainder.
Issues
- Claim denial primary · not upheld“AFCA found the 10% award justified and no further award necessary; subsidence exclusion applied to remaining loss”
- Claim amount dispute secondary · not upheld“Engineer's 10% apportionment to the stormwater leak preferred and uncontradicted”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
202998 Determination 1 of 4
DETERMINATION
Case number: 202998
Home Buildings – insured event – storm water drain leak
– consideration of expert opinion
SUMMARY OF FACTS
1. The applicant held a Home Insurance Listed Events Policy with the Financial
Services Provider (FSP) from 12 July 2005, which was renewed annually and
extended up to the period of 12 July 2009.
2. The policy covered building coverage for $250,000 and contents for $52,000
with a $100 excess payable, in the event of a claim.
3. On 11 July 2009, the applicant submitted a claim for underpinning and related
works to the house footings, allegedly arising from stormwater drain leakage
under the property.
4. The FSP engaged an assessor to visit the property and consider the damage.
The subsequent report suggested that a more specialist analysis of the damage
was required. The assessor instructed an engineer, who concluded that the
damage was largely attributable to other factors.
5. The claim was partially accepted, with the FSP offering payment for 10% of the
assessed loss, being $4,675 out of $46,750.
6. The applicant rejects the FSP’s decision and seeks reimbursement for the full
loss.
ISSUES IN DISPUTE
7. Whether the damage to the applicant’s property arose as a result of an insured
event; and
8. Whether a set amount can be accurately evaluated as to a fair and reasonable
settlement of the claim.
RELEVANT POLICY PROVISIONS
“What is covered
We will cover your buildings... for loss or damage (for)...
Liquid that escapes from:
– A fixed pipe or something that is attached to that pipe... or a drain”
…
“How we pay a claim for your buildings
... we will pay the cost of rebuilding your buildings or repairing the damaged portions to the
same condition as when they were new”.
…
“We will not pay claims for loss, damage or liability arising from:
Landslide or subsidence except as detailed on [page number]
Any event that does not occur within the period of insurance”.
202998 Determination 2 of 4
REASONS FOR DECISION
9. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
10. For the purposes of considering the respective submissions, I will evaluate the
evidence on the balance of probabilities, which is the appropriate test.
The Applicant’s Submission
11. The applicant’s late husband and son noticed fine cracks within the building
walls at the property approximately 7-8 years ago. Repairs were attended to at
the time, but as the years passed, the damage became more noticeable.
12. The applicant attended to underpinning works to the foundations of her home in
early 2009, after initially receiving advice from her broker that the repairs would
not be covered under the scope of the insurance policy.
13. Whilst this work was being conducted, the foreman of the project alerted the
applicant to a water problem, apparent within a stormwater pit on the property.
14. The applicant decided to lodge a claim on the policy together with a one page
report from a building surveyor as to the work done. The FSP instructed an
assessor to visit the site.
15. The assessor determined that the storm water drain on the property had cracks
within the concrete pit floor as a result of soil movement. The report suggested
that the pit “could be responsible for some, if not all, of the movement to the
property”. It theorised that drough t conditions and other factors may limit the
liability of the FSP, but that there was merit in the applicant’s claim.
16. The assessor engaged an engineer to assess the claim as well. Repairs had
already been conducted to the house, but the engineer reviewed the various
reports and repair documents before inspecting the property. This report
conceded that there may be some level of cover granted to the applicant, and
calculated this amount at 10%.
17. The applicant contends that the FSP is aware that the problem arose as a
result of an insured event, noting that leakage from a stormwater drain was a
significant factor in the ground movement that damaged the footings of the
property. She seeks indemnity for the full sum of her claim.
The FSP ’s Submission
18. The FSP submits that the engineer found that there were several contributing
factors to the foundation movement of the property.
19. As it was constructed in the 1950’s, the property was made with shallow
footings in highly reactive soil, which was conducive to changeab le expansion
and shrinkage. The external walls were without articulation joints (which was
normal for the time), and this would also lead to cracking and a less secure
base for the footings.
20. The proximity of three trees to the home could affect the water base under the
property and contribute to the soil movement and subsequent structural
damage to the property.
202998 Determination 3 of 4
21. The report concluded that it was “debateable” as to whether the stormwater
drain caused any direct damage. The conclusion was that the damage from the
“leaking stormwater pit is slight, if not negligible”.
22. The engineer estimated the total loss to the applicant at $46,750 inclusive of
GST and this estimate also includes an estimated $15,000 worth of work which
was yet to be done.
23. The engineer noted th at it was possible that “leaks from the pit may have
contributed to the settlement”, but that “no more than 10% of the damage would
be attributable to the stormwater leak”.
24. Based on the report from the engineer and the further recommendations of the
assessor, an offer for 10% of the claim, or $4,675, was made to the applicant.
Consideration of each party’s submission
25. There is an onus on the applicant to establish on the balance of probabilities
that a claim fits the definition of an insured event.
26. In this instance, the applicant was informed and aware that the initially
observed damage was unlikely to be covered , but the consideration of whether
a claim existed changed with the advice from the repairer attending to her
property.
27. The report supplied by the building surveyor for the applicant is not particularly
helpful. It describes the nature of the damage incurred, but offers no
professional insight as to the cause of the problems or a judgment as to
whether the damage should be considered as an insured eve nt.
28. The FSP’s assessor appears to have been open to the prospect that a claim
might exist, and the initial report from this office implied that a claim might be
accepted.
29. The subsequent report from the engineer contained a more forensic analysis of
the issues surrounding the damage. Its detail as to the work required to attend
to the property is impressive. The report considers the issues and offers viable
opinions as to the potential causes of the damage.
30. The only limitation of the report is that the engineer did not inspect the property
whilst it remained in its damaged state. In normal circumstances, this might
place some limitations on the observations made, but there is no reason to
question the conclusions reached in this instance.
31. I am satisfied that the engineer’s report was a thorough investigation of the
problem and that the expert opinion provided is sound.
32. The engineer queries as to whether there was any loss directly attributable to
the stormwater drain at all, but errs on the side of caution and recommends that
10% of the claim is accepted by the FSP. This recommendation was endorsed
by the assessor.
33. This finding satisfies the need for the applicant to discharge her onus that (at
least some of) the damage arose as a result of an insured event. The report
also cites other factors, such as the age of the property, the limitations of the
building specifications at the time, the condition of the soil, the possible effect of
the surrounding trees and other factors.
202998 Determination 4 of 4
34. I am satisfied that the damage t o the applicant’s property did not arise as a
direct result of any one event, and arose from a combination of factors.
35. The applicant contends that the FSP’s experts agree that the loss is attributable
to the leak from the stormwater drain, and therefore that she should be entitled
to full cover on the claim. The engineer’s report directly disputes this.
36. No contrary evidence has been supplied by the applicant to examine the factors
itemised by the engineer and to establish how each might have had an
influenc e. I note that the reason for the applicant’s initial claim was as a result
of the foreman’s discovery of water under the property and the foreman’s
opinion that this might permit a claim under the policy.
37. The issue discovered by the foreman was considered by the FSP’s experts and
10% was awarded to the applicant on this basis. It was not definitively
determined that this was the exact amount of damage caused, or that there
was a directly attributable amount. The award was an arbitrary suggestion by
the engineer, adopted by the assessor and the FSP.
38. Whilst it is within the power of FOS to reconsider the amount apportioned for
the damage, I am satisfied with the work done by the engineer in this matter,
and prefer to rely upon his expertise for the apportionment. As stated, the
report was thorough and is uncontradicted.
39. In denying the full claim, the FSP relied upon the general exclusion for
“landslide or subsidence”, for which a claim is only permitted under certain
conditions that arise within a 72-hour period. The circumstances of this loss do
not fit within the policy definition.
40. The wording of the policy is sufficient to verify the exclusion of any damage
beyond that attributable to the stormwater leakage, although it could be better
defined. It is apparent that the damage occurred over a long period of time and
would not fit with the 72-hour timeframe. I am satisfied based on the material
presented that the applicant was aware that there would be no claim unless it
was established that the damage was caused by the leaking stormwater drain.
41. I therefore determine that the FSP is entitled to maintain its stance on the claim,
with an offer for 10% for the damage being sufficient in the circumstances.
CONCLUSION
42. I determine that the award made by the FSP to the applicant was justified and I
am satisfied that no further award on the claim is necessary.