Home / Financial Firm (Unknown - Insurer) / Determination 202991

Determination 202991

Insurer refused to cover cracked brickwork and pier damage from a broken sewer pipe, attributing it to subsidence

FirmFinancial Firm (Unknown - Insurer)
Decided2012-01-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home building claim for cracked brickwork was refused by the insurer, which attributed the cracking to drought subsidence. AFCA preferred the complainant's expert and found the damage caused by a leaking sewer pipe, an insured event, so ordered indemnity without interest.

Damage caused by water suddenly escaping from a plumbing system is an insured event under the policy, and the expert evidence linking the crack to the broken sewer pipe was preferred.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

202991 Determination 1 of 6 DETERMINATION Case Number: 202991 Home Building – Water Damage – Broken Pipe – Subsidence – Extent of Cover SUMMARY OF FACTS 1. The Applicant insured her property under the Financial Service Provider ’ s (FSP) home building policy for a sum insured $186,000. 2. On 7 April 2009, the Applicant contacted the FSP and advised that her son had discovered cracking to the property which she believed occurred as a result of an earthquake. 3. The FSP engaged an assessor to inspect the nature and extent of the damage. 4. The assessor confirmed that he did not believe the damage was caused by an earthquake, but rather by a broken pipe and arranged for a leak detection test to be carried out. 5. The test revealed that the sewerage pipe was broken and blocked and the FSP requested that the Applicant have the pipe replaced. 6. Following this, the FSP arranged for a building consultant to inspect the damage who confirmed that the damage to the building was not caused by the earthquake, but due to long term subsidence and settlement. 7. Following a request from the Applicant for review, the FSP engaged an engineer to inspect the property and requested further comments from the building consultant. 8. The FSP maintained its decision to deny liability for the damage on the basis that both its experts concluded that damage has been caused as a result of long term subsidence as opposed to either an earthquake or the broken sewer pipe. 9. Ultimately, after a very long delay, the Applicant arranged for an expert to inspect the property. He concluded that the crack to the carport pier located on the west side of the site could be attributed to the leak from the nearby sewer line. 10. The FSP has, nevertheless, maintained its denial of the claim and further reports have been obtained by both parties. SUMMARY OF APPLICANT ’ S POSITION 11. The Applicant states that damage to the property has been caused by an insured event. 202991 Determination 2 of 6 12. Whilst the Applicant concedes she initially thought the cracking had occurred as a result of an earthquake leak, detection tests confirmed that cracking had been caused due to a cracked sewer pipe which had allowed the escape of water for an unknown amount of time. 13. The Applicant submits that she has researched subsidence on the internet and found that subsidence can occur when water leaks into the soil from a broken pipe or drain. 14. The Applicant submits that the research from the internet should be regarded as the evidence is unbiased. 15. Further, the Applicant submits that she has spoken to an engineer who stated that if subsidence due to the drought is the cause of the damage cracks would have appeared throughout the property. 16. Finally, the Applicant submits that drought is not the cause of the damage as if it was, all the houses in her street would have experienced the same issues. 17. Accordingly, the Applicant submits that the cost to repair the property is covered under the terms and conditions of the policy. 18. The Applicant relies upon the opinion of her expert JK. In his first report, JK stated: “it is my opinion that the crack to the carport pier located on the west side of the site, outside bedroom 1, can be attributed to the leak from the nearby sewer line. The leak from the sewer line has over-saturated the clay soil beneath the footing, thus softening the soil and reducing the soil bearing pressure capacity. The footing beneath the pier is supporting the brick pier and a significant part of the carport roof. When the soil bearing pressure dropped below the minimum value required to support the footing, the footing subsided, cracking the brick work. ” 19. In that report, JK made the following recommendation: “an underpin must be installed to realign and stabilise the footing.” (He there referred to an Appendix to his report for design documentation). “During the underpinning installation process, the underpinning contractors will attempt to close the cracked width. Once this is achieved, any damaged brick work can then be replaced.” 20. After this opinion was submitted to the FSP, the FSP requested its experts to comment upon it. After the FSP’s expert “LR” viewed the JK report, they advised that they disagreed with it. They concluded : “as a re sult of the above, we have no alternative but to conclude that the cracked brickwork has resulted from differential settlement of the footing supporting the brickwork due to drying out of the foundation material, a cause and result of the drought conditions which occurred throughout the Melbourne area at the time of the damage becoming evident.” 21. This further opinion from the FSP’s expert was, in turn, submitted to JK. 202991 Determination 3 of 6 22. He confirmed his earlier opinion. He stated that: “over -saturating the clay soil beneath the footing beneath the brick pier would not have assisted in reducing the cracking. Over saturation over an extended period of time has the effect of softening the foundation material and thus reduce its bearing pressure capacity. Conducting a soil test now to check the soil bearing pressure capacity beneath the pier would be useless since the moisture would have evaporated by now. ” 23. JK went on to point out that the evidence was that, initially, when the broken sewer pipe was discovered, there was extreme moisture in the region of the broken pipe and that given the proximity of the broken pipe to the pier, “it is most probable that the crack in the pier is as a direct result of over saturation ( sic) the clay soil beneath the footing.” SUMMARY OF FSP’S POSITION 24. The FSP states that it has relied on its expert reports to conclude that damage to the property has not been caused as a result of an insured event. 25. The FSP submits that the reports clearly conclude that damage to the property has not been caused by either an earthquake or the leaking sewer pipe. 26. The FSP submits that as subsidence is not listed as an insured event it was entitled to refuse indemnity to the Applicant for damage to the property under the terms and conditions of the policy. 27. The FSP has relied upon its reports from LR. Initially LR was asked to report as to the possibility that the damage had been related to an earthquake. Having made the obvious comment that: “the insured has definitely changed the reason for the alleged damage to the brick pier, an earthquake to damage caused by a leaking sewer pipe”. 28. LR reiterated his earlier opinion. In his view, the cracked and broken sewer pipe in our opinion: “have in fact assisted in reducing any differential settlement or cracking of the brickwork and not exacerbating it”. 29. He then commented: “we have no doubt considered the extensive evidence available both on the site and adjacent to the site with regard to excessive differential settlement, that the problem evident has resulted from the differential settlement of the foundation material supporting the footing beneath the brick pier.” 30. Further, “ as a result of the above, we have no alternative but to conclude that the cracked brickwork has resulted from differential settlement of the footing supporting the brickwork due to drying out of the foundation material, a cause and result of the drought conditions which occurred throughout the Melbourne area at the time of the damage becoming evident.” 202991 Determination 4 of 6 31. The FSP also relies upon the following policy provisions : RELEVANT POLICY PROVISIONS “Definitions (The Meaning Of Some Words) Some words and expressions in this policy have a specific meaning which is given below. Each word is printed in bold where it appears. ... “damage” or “damaged” means your home or part of it is physically harmed by does not include wear and tear ... “wear and tear” means damage or a reduction in value through age, ordinary use or through lack of maintenance. ... SECTION 1 INSURED EVENTS CAUSING LOSS OR DAMAGE This policy insures you up to the amount of the sum insured for loss or damage to your home caused by an insured event listed below ... 1.4 Earthquake You are insured for damage to your home caused by an earthquake. All damage that occurs within a period of 48 hours will be regarded as one incident. ... 1.7 Water Or Other Liquid You are insured for damage to your home caused when water or another liquid suddenly escapes from:  you or your neighbours  plumbing system ... We will not pay if the damage is the result of a gradual process For example we will not pay for damage:  where moisture is seeping through faulty shower recess grouting or  from condensation or rising damp or  where more damage has occurred over time because the fault was not remedied immediately.” 202991 Determination 5 of 6 ISSUE 32. Whether the FSP has made the correct decision in refusing to indemnify the Applicant for damage to the property on the basis that it was not caused by an event covered under the policy. REASONS FOR DECISION 33. I am satisfied that in this matter there has been an adequate exchange of material and that both parties have had the opportunity to submit their cases appropriately. 34. The matter has, however, not been assisted by the Applicant ’s determination to rely upon material sourced from the Internet, in an attempt to counter the expert reports obtained by the FSP. 35. Ultimately, the Applicant has obtained the reports from JK to which I have referred above, and these reports have obviously been of the greatest assistance to her, and to me in determining this matter. 36. In my opinion, there is no doubt that if the damage to the Applicant ’s property is caused by the leaking sewer (and the existence of the leaking sewer pipe was established without doubt) then it constitutes an insured event. 37. Such damage would be construed as damage to the home caused when water ... escapes from ... your plumbing system. 38. It is true that the matter has been muddied somewhat by the Applicant ’s initial belief that the problem may have been created by an earthquake. Not unnaturally, the FSP has pointed to this fact as being evidence of uncertainty on the part of the Applicant, but I do not think that she is to be blamed for this. It was only when investigation of the possible earthquake- related damage was undertaken, that the existence of the broken sewer pipe was discovered. 39. The Applicant initially sought to rely upon material sourced from the Internet. I entirely agree with the Applicant that the Internet is a valuable source of information, but it is hardly adequate to rely upon that information when confronted with reports sourced from reliable experts on behalf of the FSP. Regrettably, this was the course which was followed for a long period of time and it has resulted in great delay in this matter. 40. Ultimately, however the Applicant has obtained opinions from an equally reputable expert, JK. Having considered all of the material, I have reached the conclusion that the opinions of JK are to be preferred. 41. In reaching this conclusion, I note the fact that the damage has occurred precisely in the region of the broken sewer pipe. As the Applicant and JK have suggested, if the damage has been caused by “excessive differential settlement” one would have expected to find evidence of damage at other points on the property. This has not occurred. 202991 Determination 6 of 6 42. In my opinion, JK has conclusively answered the contention of LR. The opinion expressed by JK is consistent with a number of opinions which have been obtained from experts in other matters dealing with similar issues and I would conclude that it would be odd indeed if a broken sewer pipe, which may well have been leaking for a considerable time before it was discovered, did not give rise to damage of the nature which has been exhibited in this case, bearing in mind that the rest of the property was, at the time that the problem was discovered, sitting on founda tions which were excessively dry at the end of the drought which has affected the region in which the Applicant lives. 43. Although the final opinion of JK was forwarded to the FSP, it did not make any submission in response. 44. There was one other aspect of the LR opinions upon which I should comment. LR comments that: “the visible surface of the soil shows significant cracking and shrinkage around the whole dwelling. This has been occurring for some time as noted by the significant grass growth in the subsided areas of the subsided paving.” (I interpose by saying that the grass growth has occurred in the region of the broken sewer pipe). 45. LR then went on to comment that: “it is possible that the subsidence of the soils may have caused the pipe to break, although it is also possible that the pipe was not installed correctly, this is an unknown. ” 46. JK has had the opportunity to consider all of the opinions of the FSP’s experts, and on balance I find his opinions more persuasive. DETERMINATION 47. I therefore determine that the FSP should indemnify the Applicant for the costs incurred in repairing the cracked wall. 48. In the event that the FSP elects to cash-settle this matter, I determi ne that no interest should be payable because in my opinion the delays in the finalisation of this matter have been overwhelmingly caused by the Applicant ’s initial insistence upon reliance on the Internet, reliance which was maintained even after she had obtained the first opinion from JK.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.