Storm damage to driveway declined as loose material exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2010-12-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Owners' driveway was damaged by road gravel washed down in a storm, and the insurer denied the claim as a loose surface. AFCA found the loose topping was excluded but the bound base was not, and ordered payment for removal of road metal and base repairs, with quantum to be agreed or referred back.

The plain meaning of loose applies to the topping only, as the cement-bound base was firm and the damage was caused by external gravel rather than erosion.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

202785 Determination 1 of 7 DETERMINATION Case Number: 202785 Home Building – exclusion – policy wording – loose material SUMMARY OF FACTS 1. The applicants hold a home building insurance policy with the Financial Services Provider (FSP) which commenced on 22 March 2006 and was renewed until 22 March 2010. The policy provides complete replacement cover and is subject to an excess totalling $300. 2. On 31 October, the applicants lodged a claim for damage sustained to the driveway at their home after a heavy storm the previous day. 3. The FSP subsequently arranged for an assessor to attend the property and inspect the damage. 4. The FSP decided to decline the claim as it considered the material constituting the driveway to be loose material which is excluded from cover under the policy. 5. The applicants dispute the FSP ‟s denial on the basis that the base of the driveway did not consist of loose material. 6. A FOS Case Manager provided a Recommendation on these matters on 30 June 2010. Whilst the FSP accepted the Recommendation, the applicants advised that they would not accept the Recommendation and provided further submissions. ISSUE IN DISPUTE 7. Whether the FSP was entitled to deny the claim. RELEVANT POLICY PROVISIONS “The building excludes: ... The loose surfaces of tennis courts, driveways and paths ... What we cover – insured events … You are covered for damage or loss to your home building occurring during the period of cover and caused by the following events: … Storm and rainwater including stormwater run-off from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. ... You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: … Erosion or washing away of soil, earth or gravel The washing away or movement of the surface of any path or driveway which has a surface consisting of a loose material such as gravel, stone or dirt.” 202785 Determination 2 of 7 REASONS FOR DECISION 8. Prior to reading the Recommendation, I considered all of the material on the file. I am satisfied that the Case Manager has set out in great detail, the fact ual situation and the submissions of the various parties. I adopt the Case Manager‟s account of the fact s and the various submissions of the parties, and those portions of the Case Manager‟s Recomme ndation now follow and form part of my Determination. 9. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 10. After consideration of all the material, including the photographs, I formed the opinion that an inspection of the damaged driveway would be of assistance. I attended the subject property on 21 October 2010. I regret that due to my scheduling error, a representative of the FSP attended the property a week earlier. Nevertheless, I found the inspection was valuable and it has assisted me in making this Determination. The Applicants‟ Submission 11. T he applicants‟ re levant submissions are summarised as follows: (a) In the storm, the property was subject to a heavy downpour of rain and the driveway was flooded with 50mls (approximately) in 30 minutes. (b) After the downpour the applicants discovered the driveway had gouges in it and the edges had been eroded away by the rocks washed off the road. (c) The applicants submit that their driveway was not constructed of loose material and therefore should not be excluded from cover. (d) The applicants note that there was an amount of loose topping on the top of the solid driveway which washed away in conjunction with the blue metal from the nature strip crossing. However, the basis of the claim was for replacement of a large section of the base of the driveway which is made of Lilydale toppings mixed with cement and then laid and compacted to form a solid surface, described by the contractors who constructed the driveway as a „Colorado Stabilized Topping‟ surface. (e) The applicants note the FSP‟s contention that it would be reasonable to accept the damage would not have occurred if it had been concrete. The applicants say that if the driveway consisted of loose gravel the only repair needed would be to re-grade the driveway to return all the toppings to their original location. However, the repair quotation clearly indicates that a jack hammer is required to break up the existing base [to a depth of 100ml] to ensure it will mix together with the replacement blend. (f) The applicants submit that nowhere in the FSP‟s policy is there any requirement for a driveway to be concrete or asphalt. (g) The applicants note the Australian Pocket Oxford Dictionary describes “loose” as: “not compact or fixed or tight” 202785 Determination 3 of 7 (h) The compacted part of the driveway cannot therefore be defined as loose in accordance with ordinary dictionary definitions. The driveway is 70mm thick and constituted of cement, toppings, water and another binding agent compacted with a hard roller and not to be driven on for 48 hours after being installed. (i) The applicants state that if the policy document said that only solid driveways were covered: “it would be a requirement that we prove our driveway is „solid‟ however, given that the policy documents only mentions the exclusion of „loose‟ surfaces, we should only have to provide information that the toppings were mixed with a binding agent to ensure they were bound together and therefore no longer loose, which is what we have done” (j) The applicants were not satisfied that the first and second denials were verbally provided rather than in writing with substantiation for the denial. 12. The applicants have provided photographs of the driveway. The photographs appear to show a solid base with displaced loose topping material on top. 13. The applicants have provided a copy of the marketing material for the Colorado material provider. 14. The applicants have enclosed a quotation from the driveway construction company which lists the work required to remedy the problem as follows:  “ Clean crushed rock of driveway due to washing from road.  Jackhammer damaged areas of driveway min depth 100m.l  Supply and fill skip.  Taiper [sic] edge of major damaged areas in order to marry in with existing Colorado toppings.  Supply and lay fresh produce (Colorado), screed then wet then wack, then wash.  Excavate area for box cutter, cut off drain at top of gate running into garden bed.  Clean away any crushed rock (Blue Metal) off any other affected areas, and then use vibration roller.” 15. The applicants have provided a document from the driveway construction company stating the following: “This is to verify that the mixtur e we used at [name of applicant] property [location of property]. Our mixture has Lilydale topping, with lime in the topping and approximately 5 bags of cement per cubic metre and one other product to help it set. This mixture is mixed the same way ready mix concrete e.g. (Boral), then compacted before the cement sets. This forms a solid base once dried and does not sink or leave tyre marks, a surface similar to concrete and with a stoney aggregate look and Nat ural. That‟s why we call it Colo rado stabilized topping not Lilydale topping.” 16. Following the publication of the Recommendation to the Parties, the applicant made further submissions. Those submissions have influenced me in the decision which I have reached. 17. The Case Manager noted in her Recommendation that the compacted materials may have become loose over time and it was unclear how long the driveway had been laid. In her further submission, the female applicant pointed out that the surface had only been laid in the past six months. 202785 Determination 4 of 7 The FSP‟s Submission 18. T he FSP‟s re levant submissions are summarised as follows: (a) The policy excludes loose surfaces of tennis courts, driveways and paths as part of cover for buildings. (b) The policy excludes cover for the washing away or movement of a surface of any path or driveway which has a surface consisting of loose material such as gravel, stone or dirt. (c) The FSP disputes that the Lilydale Topping driveway is not made of loose material and is actually a solid driveway. (d) The FSP‟s assessor attended the a ppl icants‟ property and noted: “Property is on the low side of a gravel road with no curb and channel. Stormwater runoff has run down IO‟s sloping rear driveway which is Lildale [sic] toppings on a compacted base of Lilydale topping and cement acting as a binding agent. The base is not concrete. The storm water has washed off the toppings & along the left hand edge of the base which crumbles if you kick it...IO disputes that the base is a loose surface... Advised IO that if the base was for example concrete it would not wash away” (e) The FSP notes the applicants ‟ submission that the driveway was compacted solid with some loose material sitting on top and that the policy exclusions do not apply to this claim. In response , the FSP states that the surface may appear to be hard once laid but the photographs clearly demonstrate the surface consisted of loose gravel. Further, if the base had been a solid surface it is reasonable to presume the driveway would not have washed away and broken up with heavy rainfall if the gravel had been set in concrete. (f) The FSP notes that the brochure for the provider of the topping states the design is a fabulous alternative to concrete or asphalt. (g) The FSP maintains that a driveway constructed of this material type is excluded from cover. (h) The FSP note the applicants‟ submissions in relation to the driveway‟s solidity. The FSP disputes that the construction material used on the driveway is similar to set concrete. The surface may appear hard once laid, however the surface clearly consists of loose gravel and heavy rain has caused the surface to break apart. (i) The FSP also notes it is reasonable to conclude that the damage would not have occurred had the material set as hard as concrete. 19. The FSP has provided a copy of photographs of the damaged property demonstrating a gravel type material with deep gouges into the underlying material. 20. The FSP has provided internal claims notes which include the assessor ‟s report and correspondence between the parties. Consideration of each party’s submission 21. I have reviewed each party‟s submissions, attached documents and the policy terms and conditions. 202785 Determination 5 of 7 22. In my view, this dispute centres on the definition of “ loose material ”. If I consider the applicants‟ driveway was constructed of loose material then damage to it is excluded under the policy terms and conditions. 23. Both parties have argued the physical construction of the driveway as part of their submissions. The applicants have argued that the base of the driveway is „not loose‟ relying upon the description of the construction by the contractor which installed it. The FSP has argued that the surface is essentially compacted solid and thus should not be considered solid given it washed away with rainwater. 24. I note that the policy states that loose surfaces of tennis courts, driveways and paths are excluded from cover, as are loose materials such as gravel, stone or dirt. However, there is no specific definition of „ loose materials ‟ contained within the policy definition section. 25. Accordingly, it is appropriate to utilise the ordinary plain English meaning. The Macquarie dictionary defines loose as including: “ 2. free or released from fastening or attachment: a loose end. 3. uncombined, as a chemical element. 4. not bound together, as papers or flowers. .... 13. not close or compact in structure or arrangement; having spaces between the parts, or open: a loose weave. 14. (of earth, soil, etc.) not cohering: loose sand. ” 26. I note the particular wording of the policy indicates that a driveway which has a “surface consisting of a loose material such as gravel, stone or dirt” is excluded. However, I question whether the base of a driveway which has been bound together using five bags of cement per cubic tonne of material, may still be regarded as loose. The photos of the undamaged part of the driveway appear to demonstrate a firm, congealed or coherent surface. The Surface Topping 27. T he applicants have acknowledged there was a “loose topping on the top of our solid driveway which washed away”. They concede that the FSP has no liability to replace or repair the loose topping. 28. The photographs indicate there is a loose gravel-type topping acting as the surface of the driveway. 29. The plain English meaning of „ loose ‟ would also be appropriate to this driveway surface as the stones/gravel are not bound together or attached to anything. 30. Accordingly, I consider the surface topping material was indeed loose and the replacement of this portion of the driveway would not be covered by the policy. The Base 31. I now turn to the base of the driveway, which is constructed of soil, cement, Lilydale topping, lime and one other product. This material has been compacted down and then covered in the loose surface material. 202785 Determination 6 of 7 32. There is no dispute that the base had five metres of cement per cubic metre with other products included to assist in binding the matter. Further, the base materials were compacted before the cement set to form a solid base. 33. The photographs clearly show that the base of the driveway has been eroded or washed away as well as the surface topping. There are deep channels through the base of the driveway and the assessor provided observations that the base was crumbling. Other Matters 34. From the outset of this matter the applicant has suggested that much of the damage had been caused by gravel, stone or metal however described, flowing from the unsealed road down onto the applicants ‟ driveway. The FSP‟s assessor has confirmed that the topography is as suggested by the applicant. The applicants ‟ property and driveway sit below the le vel of the road. The quotation for repairs which the applicants have produced refers to the item “clean crushed rock of [sic] roadway due to washing from road” . Incidentally, since this incident, work has been carried out to the roadway which may have the effect of lessening the likelihood that a similar incident can occur again. 35. In these circumstances and as confirmed at my inspection, it is significant that the entire driveway has not been damaged. Indeed there is no discernible damage whatsoever to the majority of the driveway. This must be considered in the light of one of the FSP‟s submissions in which it is said “ While [FSP] accept that the surface may appear hard once laid, the surface clearly consists of loose gravel and heavy rain has cau sed the surface to break apart” . 36. It is clear to me following my inspection, that the heavy rain has not, of itself, caused any damage at all. Rather, the damage has been caused by loose bluestone gravel from the road which has been carried onto, and down, portion of the driveway. Plainly the influx of such bluestone gravel has been such as to cause very significant damage to the left edge of the driveway (looking from the junction between the driveway and the road).Once this damage has been caused, no doubt the heavy rain pouring down the steep slope will have accentuated the problem This may be equated with “stormwater run -off from areas surrounding the site” which, as I have noted, is one of t he events for which cover is offered. 37. Photos taken after the event demonstrate the crumbling of edges and loose material, but these do not prove what the condition was prior to the storm. This may be demonstrated by considering the major pot-holes now evident on Victorian roads following recent rain events. These potholes demonstrate loose road- making gravel and edges “which crumble if you kick them” ( to use the language employed by the F SP‟s assessor). P rior to the rain event, these surfaces have been bound, congealed, coherent and in no manner could they have been described as „loose‟ . 38. I do not regard the need for jack hammering as critical, but it does demonstrate that beneath a crumbling surface, which I believe is due to the damage caused by the storm, there remains a solid surface. The fact that rainwater, carrying road metal from the roadway, was able to create gouges in the base material does not lead to the conclusion that the base surface was loose prior to the 202785 Determination 7 of 7 storm. A simple description of the base surface as Lilydale Toppings is misleading. Beneath the surface topping (which, as I have said earlier, is clearly not covered by the policy), the surface is firm. My inspection has led me to the clear opinion that the base is not a loose surface. 39. The policy also notes that soil, earth and gravel erosion are not covered. I have accordingly also given consideration to the question of whether what has occurred constitutes „erosion‟. I consider that it does not because it is my view that the damage has been caused by external factors, namely the gravel from the road carried by the very heavy rain, which has resulted in the base being damaged. 40. On the basis of the above analysis, I consider that the base of the driveway was not constructed of loose material and is therefore not excluded from cover. CONCLUSION 41. Accordingly, I determine that the FSP is liable to make payment of that part of the claim which relates to the removal of any metal which has been carried onto the driveway by the storm water, together with repairs to the base of the driveway surface (but not the surface topping). 42. The parties have not made any submission as to the quantum of such repairs and therefore I can make no determination as to that issue. If the parties are unable to agree on quantum, the issue may be referred back to this Service.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.