Summary

After two flood and stormwater events at his home, the applicant claimed building repairs, relocation costs and mortgage costs, and the FSP had paid $2,500 and later $19,119.05. AFCA ordered the FSP to indemnify the ceiling repair cost and reasonable alternative accommodation costs for the rectification period, and rejected the mortgage cost claim.

Storm water ingress is covered without any requirement that the storm create an opening, and damage is apportioned between covered and uncovered periods depending on which cover was in place.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

202255 Determination 1 of 6 DETERMINATION Case number: 202255 Home Building, Contents – flood – storm SUMMARY OF FACTS 1. The applicant held a home insurance policy insuring the contents of his home for $41,686. 2. On 30 March 2009 the applicant’s home was inundated with flood water causing damage to both the building and contents. 3. The Financial Services Provider accepted liability for a claim under the policy and following assessment of the damage settled the claim by payment of $2,500 less the policy excess. 4. On 3 November 2009 the applicant’s home was further inundated with water. The FSP denied liability for damage arising from this event on the ground the damage was the result of wear and tear and excluded from cover provided by the policy. 5. The FSP reviewed the payments made in relation to the March 2009 incident, and made a further payment of $19,119.05 for floor coverings, skirtings and painting plus interest. 6. The applicant contends the FSP is responsible for rectifying the building damage in the sum of $35,000, relocation costs and mortgage repayment costs. ISSUES IN DISPUTE 7. Whether the FSP has settled the claim in accordance with the provisions of the policy. RELEVANT POLICY PROVISIONS “General exclusions – apply to the overall policy Unless included in additional cover, we will not cover loss, damage or legal liability caused by: …  wear and tear and lack of maintenance, including rust, corrosion, deterioration, except in the case of escape of liquid *refer to page 21), or legal liability claims  gradual loss or damage of any kind’ … Events you are covered for … Flash flooding Your are covered for flash flooding as defined on page 16. You are not covered for damage: - … - for the first 48 hours of this policy …’ Storm 202255 Determination 2 of 6 … Your are not covered for storm damage to: ...  the building or contents for the first 48 hours of this policy.’ … Alternative accommodation costs If we agree that an insured event has caused so much damage to your building that you cannot live in it, we will pay the a lternative accommodation costs.” LAW INVOLVED Section 46 of the Insurance Contracts Act 1984 provides that if a claim is made in respect of a loss that occurred in whole or in part as a result of a defect or imperfection in a thing and the insured was not aware of the defect or a reasonable person in the circumstances could not be expected to have been aware of the defect or imperfection the insurer may not rely on an exclusion clause that refers to the condition of the thing before the contract was entered into. REASONS FOR DECISION 8. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicant’s Submission 9. In March 2009 the floor coverings and gyprock were damaged by floodwater. 10. He obtained a quote to repair the damage in the sum of $ 35,000. The FSP paid only $2,500. There was no ceiling damage at this stage. 11. In October 2009 the house was again damaged by flood at which time the ceiling collapsed. 12. The house was unsafe to live in. As he has children, he rented another place. 13. He is claiming building damage $35,000; Floor coverings $9,400. Relocation costs and ongoing rent of $280 per week; mortgage costs of $480 per week. The FSP’s Submission 14. This matter involves two claims. The first in March 2009 and the second in November 2009. First claim 15. Following assessment of the damage, payment in the sum of $2,500 was made to the applicant based on a scope of works provided by the assessor. 16. An assessment report established that the majority of the damage claimed was due to wear and tear. Second claim 17. Following assessment it was established that some damage was attributable to the March 2009 event, but the majority of damage was due to wear and tear and gradual deterioration 202255 Determination 3 of 6 18. It was decided that the applicant’s claim for carpets should be paid. A further payment of $19,119.05 was made to include floor coverings, skirting, painting and interest. Consideration of each party’s submission 19. The FSP relies on clauses in the policy to deny parts of the claim, and therefore has the burden of establishing on the balance of probability that the terms of the relevant clauses apply to defeat the claim. Policy cover 20. At the time of the 30 March 2009 damage, the policy insured contents only. On 2 April 2009 the policy was endorsed to include cover on the building. 21. While the policy provides cover for damage caused by flash flood and storm, these covers are excluded for the first 48 hours of the policy. Whether or not this exclusion period applies, at the time of the March 2009 damage, the policy did not cover damage caused to the building by flash flood or by storm. 22. A report on the damage arising from the March 2009 eve nt commissioned by the FSP noted stormwater had penetrated the house and heavy rain had overflowed the valley flooding the pantry ceiling. 23. The assessment included a scope of works (SOW) costed in the sum of $2,500. The SOW included rectification of some b uilding damage. 24. The FSP accepted the claim and paid the applicant the sum of $2,500 in accordance with the SOW. 25. The Panel notes the further payment of $19,119.05 which was subsequently made in August 2010 to the applicant following revision of the March 2009 and November 2009 claims. 26. The Panel is mindful of the FSP’s comments that the policy was backdated for administrative reasons to allow the claim to be registered and progressed and that the applicant had been notified that the building claim may not be covered. Although there is some lack of clarity as to which damage the FSP has attributed to which time event, it is clear that at the time of the first claim only the contents were covered, whereas at the time of the second claim both building and contents were covered. 27. The Panel will therefore consider the issues in dispute on that basis. The claims Floor coverings 28. The FSP has accepted the quote in the sum of $9,434 submitted by the applicant for installation of carpet and cork tiles, and included this sum in the payment of $19,119.05 to the applicant. 29. The Panel accepts that this part of the dispute has been resolved. 202255 Determination 4 of 6 Building damage 30. A report obtained by the FSP following the March 2009 event contains the following information: - Storm water washed away all surface bark from the backyard and penetrated into the lounge room - Heavy rains overflowed the valley flooding the pantry ceiling. - Approximately 25-30 cm of water flooded the house. - The damage was consistent with water damage from flash flooding and overflow of roof gutters. 31. Following the November 2009 event, the FSP commissioned a report from a consultant builder to investigate the damage claimed. The report dated 23 November 2009 described water damage to a number of rooms in the building. The report further contains the following major points: - The valley gutters have corroded and require replacement - 60% of the Dechromastic roof tiles sustained heavy pedestrian traffic damage and were no longer waterproof as the overlaps do not seal correctly and allow water to penetrate into the ceilings. - The kitchen cupboards were in poor condition. The doors were delaminating, two doors had fallen off - The lounge room window frames have dry rot and had deteriorated - The ground levels were inadequate and did not provide sufficient step down to redirect stormwater runoff. The northern elevation garden beds were higher than the lounge room floor level and allowed water through the side door. 32. The consultant reported: “the loss would not appear to fall within the scope of the relevant PDS due to there being no storm created openings, there are significant signs of wear, tear and deterioration and there are signs of poor workmanship, we therefore recommend that this claim be denied,…” 33. The consultant provided a SOW to rectify the building damage which was estimated in the sum of $31,142.56. 34. The policy provides cover for loss or damage caused by storm or flash flood. The Panel has examined the relevant terms of the policy and is unable to find any terms which require the storm to make an opening to bring the resultant damage within the cover provided. In these circumstances, the Panel finds the basis for the FSP’s contractor recommending the claim be denied is without foundation and is in error. 35. It follows that any damage arising from the ingress of storm water to the building is covered by the policy subject to the general exclusions set out in the contract. 36. The applicant submitted a quote in the sum of $38,083. The contractor assessed the property and noted that storm water had entered through the rear of the house and continued into every room causing damage to floor coverings, walls, ceilings, skirtings, vanities, kitchen cabinets and floor tiles including severe damage to the kitchen and laundry areas. 202255 Determination 5 of 6 37. Having regard to the evidence, the Panel concludes damage to the building was caused by a combination of the flash flood in March 2009 and the ingress of stormwater in March and November 2009. 38. However the policy also excludes claims for loss or damage caused by wear and tear, lack of maintenance, deterioration or gradual loss or damage of any kind. 39. The evidence has established the ingress of water through the roof was caused by a combination of stormwater overflowing from the valley gutters and as a result of damage to roof tiles. 40. While it has been established the valley gutters were corroded and needed replacement, the evidence is that they overflowed. It therefore is reasonable to conclude that the corrosion referred to was not a contributing factor in the valley overflowing. 41. It has also been established that the roof leaked due to heavy foot traffic damaging about 60% of the roof tiles. 42. The applicant had lived in the house for about five years prior to the March 2009 storm event. While there is evidence of heavy pedestrian traffic on the roof tiles, there is no evidence as to how or when this damage was occasioned. 43. As there were differing levels of cover in place at the time of each event, the Panel has endeavoured to ascertain which building damage is attributable to which event. 44. The Panel notes that the builder’s report dated 25 July 2009 (which assessed the damage resulting from the March 2009 claim) notes that areas of the building had suffered significant damage, including walls, doors, cupboards and skirtings. These are also reported as being damaged following the November 2009 event. There is no evidence to suggest that these items had been repaired since the March 2009 event and therefore the Panel concludes that these building related items were damaged at the time when building cover was not in place. 45. As a result of the applicant’s dispute , the FSP has reviewed all of the evidence available. The Panel notes that in August 2010 the FSP agreed to indemnify the applicant for his contents damage over and above the amount previously paid, and also for that part of the building damage for which it believes the applicant has a valid claim. 46. The evidence indicates that the majority of the current building damage was occasioned as a result of the March 2009 event; however the FSP does not appear to have included an allowance for the cost of replacing areas of the ceilings which were noted as being damaged in the November 2009 event. As the July 2009 report does not include this damage, it is reasonable to conclude that this damage occurred in November 2009 at which time buildings cover was in place. 47. Having carefully considered the evidence, the Panel is satisfied that with the exception of the ceiling damage , the FSP has now correctly indemnified the applicant to the extent of his insured loss. The Panel further notes that the FSP has acknowledged its previous erroneous declinature and has cor rected this by allowing interest to the applicant on the previously unpaid amount. 202255 Determination 6 of 6 48. For these reasons, the Panel concludes that the FSP is required to review the extent of its obligations to indemnify the applicant for the cost of repair to his water damaged ceiling. In making that payment, the FSP will have met its liability for the damage to the building and contents as a result of the ingress of water during the March and November storms, subject of course to the applicant’s agreement. Alternative accommodation costs 49. The policy provides cover for alternative accommodation costs if the building cannot be lived in, if the insured event caused so much damage, the home could not be lived in. 50. The applicant states that he had continued to live in his home after the March 2009 event, however following the November 2009 event, his home became uninhabitable. In these circumstances the Panel considers the applicant is entitled to reimbursement of his alternate accommodation costs for the period during which it would be reasonable for the rectification works to be carried out up to a maximum of twelve months. The applicant is required to provide suitable evidence as to his actual expenditure for this period. Repayment of mortgage costs 51. The policy makes no provision for payment of mortgage costs. The Panel therefore concludes the FSP is not liable for this part of the claim. CONCLUSION 52. After analysis of the available material, the Panel considers the FSP has not fully discharged its liability with respect to the claim arising from the event in November 2009. 53. Accordingly the Panel determines: (a) The FSP indemnify the applicant for the cost of rectifying the water damaged ceilings; (b) The FSP indemnify the applicant for the reasonable cost of alternate accommodation for the period of time taken to rectify the insured damage; (c) The FSP is not liable for payment of the applicant’s mortgage costs.