Home / Financial Firm (Unknown - Insurer) / Determination 202255
Determination 202255
claim_denial
Summary
After two flood and stormwater events at his home, the applicant claimed building repairs, relocation costs and mortgage costs, and the FSP had paid $2,500 and later $19,119.05. AFCA ordered the FSP to indemnify the ceiling repair cost and reasonable alternative accommodation costs for the rectification period, and rejected the mortgage cost claim.
Storm water ingress is covered without any requirement that the storm create an opening, and damage is apportioned between covered and uncovered periods depending on which cover was in place.
Issues
- Claim denial primary · upheld
“The Panel finds the basis for the FSP's contractor recommending the claim be denied is without foundation and is in error”
- Claim amount dispute secondary · upheld
“the FSP is required to review the extent of its obligations to indemnify the applicant for the cost of repair to his water damaged ceiling”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
202255 Determination 1 of 6
DETERMINATION
Case number: 202255
Home Building, Contents – flood – storm
SUMMARY OF FACTS
1. The applicant held a home insurance policy insuring the contents of his home
for $41,686.
2. On 30 March 2009 the applicant’s home was inundated with flood water
causing damage to both the building and contents.
3. The Financial Services Provider accepted liability for a claim under the policy
and following assessment of the damage settled the claim by payment of
$2,500 less the policy excess.
4. On 3 November 2009 the applicant’s home was further inundated with water.
The FSP denied liability for damage arising from this event on the ground the
damage was the result of wear and tear and excluded from cover provided by
the policy.
5. The FSP reviewed the payments made in relation to the March 2009 incident,
and made a further payment of $19,119.05 for floor coverings, skirtings and
painting plus interest.
6. The applicant contends the FSP is responsible for rectifying the building
damage in the sum of $35,000, relocation costs and mortgage repayment
costs.
ISSUES IN DISPUTE
7. Whether the FSP has settled the claim in accordance with the provisions of the
policy.
RELEVANT POLICY PROVISIONS
“General exclusions – apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal liability caused
by:
…
wear and tear and lack of maintenance, including rust, corrosion, deterioration, except in
the case of escape of liquid *refer to page 21), or legal liability claims
gradual loss or damage of any kind’
…
Events you are covered for
…
Flash flooding
Your are covered for flash flooding as defined on page 16.
You are not covered for damage:
- …
- for the first 48 hours of this policy …’
Storm
202255 Determination 2 of 6
…
Your are not covered for storm damage to:
...
the building or contents for the first 48 hours of this policy.’
…
Alternative accommodation costs
If we agree that an insured event has caused so much damage to your building that you
cannot live in it, we will pay the a lternative accommodation costs.”
LAW INVOLVED
Section 46 of the Insurance Contracts Act 1984 provides that if a claim is made in respect of
a loss that occurred in whole or in part as a result of a defect or imperfection in a thing and
the insured was not aware of the defect or a reasonable person in the circumstances could
not be expected to have been aware of the defect or imperfection the insurer may not rely on
an exclusion clause that refers to the condition of the thing before the contract was entered
into.
REASONS FOR DECISION
8. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
The Applicant’s Submission
9. In March 2009 the floor coverings and gyprock were damaged by floodwater.
10. He obtained a quote to repair the damage in the sum of $ 35,000. The FSP
paid only $2,500. There was no ceiling damage at this stage.
11. In October 2009 the house was again damaged by flood at which time the
ceiling collapsed.
12. The house was unsafe to live in. As he has children, he rented another place.
13. He is claiming building damage $35,000; Floor coverings $9,400. Relocation
costs and ongoing rent of $280 per week; mortgage costs of $480 per week.
The FSP’s Submission
14. This matter involves two claims. The first in March 2009 and the second in
November 2009.
First claim
15. Following assessment of the damage, payment in the sum of $2,500 was made
to the applicant based on a scope of works provided by the assessor.
16. An assessment report established that the majority of the damage claimed was
due to wear and tear.
Second claim
17. Following assessment it was established that some damage was attributable to
the March 2009 event, but the majority of damage was due to wear and tear
and gradual deterioration
202255 Determination 3 of 6
18. It was decided that the applicant’s claim for carpets should be paid. A further
payment of $19,119.05 was made to include floor coverings, skirting, painting
and interest.
Consideration of each party’s submission
19. The FSP relies on clauses in the policy to deny parts of the claim, and therefore
has the burden of establishing on the balance of probability that the terms of
the relevant clauses apply to defeat the claim.
Policy cover
20. At the time of the 30 March 2009 damage, the policy insured contents only. On
2 April 2009 the policy was endorsed to include cover on the building.
21. While the policy provides cover for damage caused by flash flood and storm,
these covers are excluded for the first 48 hours of the policy. Whether or not
this exclusion period applies, at the time of the March 2009 damage, the policy
did not cover damage caused to the building by flash flood or by storm.
22. A report on the damage arising from the March 2009 eve nt commissioned by
the FSP noted stormwater had penetrated the house and heavy rain had
overflowed the valley flooding the pantry ceiling.
23. The assessment included a scope of works (SOW) costed in the sum of
$2,500. The SOW included rectification of some b uilding damage.
24. The FSP accepted the claim and paid the applicant the sum of $2,500 in
accordance with the SOW.
25. The Panel notes the further payment of $19,119.05 which was subsequently
made in August 2010 to the applicant following revision of the March 2009 and
November 2009 claims.
26. The Panel is mindful of the FSP’s comments that the policy was backdated for
administrative reasons to allow the claim to be registered and progressed and
that the applicant had been notified that the building claim may not be covered.
Although there is some lack of clarity as to which damage the FSP has
attributed to which time event, it is clear that at the time of the first claim only
the contents were covered, whereas at the time of the second claim both
building and contents were covered.
27. The Panel will therefore consider the issues in dispute on that basis.
The claims
Floor coverings
28. The FSP has accepted the quote in the sum of $9,434 submitted by the
applicant for installation of carpet and cork tiles, and included this sum in the
payment of $19,119.05 to the applicant.
29. The Panel accepts that this part of the dispute has been resolved.
202255 Determination 4 of 6
Building damage
30. A report obtained by the FSP following the March 2009 event contains the
following information:
- Storm water washed away all surface bark from the backyard and
penetrated into the lounge room
- Heavy rains overflowed the valley flooding the pantry ceiling.
- Approximately 25-30 cm of water flooded the house.
- The damage was consistent with water damage from flash flooding and
overflow of roof gutters.
31. Following the November 2009 event, the FSP commissioned a report from a
consultant builder to investigate the damage claimed. The report dated 23
November 2009 described water damage to a number of rooms in the building.
The report further contains the following major points:
- The valley gutters have corroded and require replacement
- 60% of the Dechromastic roof tiles sustained heavy pedestrian traffic
damage and were no longer waterproof as the overlaps do not seal
correctly and allow water to penetrate into the ceilings.
- The kitchen cupboards were in poor condition. The doors were
delaminating, two doors had fallen off
- The lounge room window frames have dry rot and had deteriorated
- The ground levels were inadequate and did not provide sufficient step
down to redirect stormwater runoff. The northern elevation garden beds
were higher than the lounge room floor level and allowed water through
the side door.
32. The consultant reported:
“the loss would not appear to fall within the scope of the relevant PDS due to
there being no storm created openings, there are significant signs of wear, tear
and deterioration and there are signs of poor workmanship, we therefore
recommend that this claim be denied,…”
33. The consultant provided a SOW to rectify the building damage which was
estimated in the sum of $31,142.56.
34. The policy provides cover for loss or damage caused by storm or flash flood.
The Panel has examined the relevant terms of the policy and is unable to find
any terms which require the storm to make an opening to bring the resultant
damage within the cover provided. In these circumstances, the Panel finds the
basis for the FSP’s contractor recommending the claim be denied is without
foundation and is in error.
35. It follows that any damage arising from the ingress of storm water to the
building is covered by the policy subject to the general exclusions set out in the
contract.
36. The applicant submitted a quote in the sum of $38,083. The contractor
assessed the property and noted that storm water had entered through the rear
of the house and continued into every room causing damage to floor coverings,
walls, ceilings, skirtings, vanities, kitchen cabinets and floor tiles including
severe damage to the kitchen and laundry areas.
202255 Determination 5 of 6
37. Having regard to the evidence, the Panel concludes damage to the building
was caused by a combination of the flash flood in March 2009 and the ingress
of stormwater in March and November 2009.
38. However the policy also excludes claims for loss or damage caused by wear
and tear, lack of maintenance, deterioration or gradual loss or damage of any
kind.
39. The evidence has established the ingress of water through the roof was caused
by a combination of stormwater overflowing from the valley gutters and as a
result of damage to roof tiles.
40. While it has been established the valley gutters were corroded and needed
replacement, the evidence is that they overflowed. It therefore is reasonable to
conclude that the corrosion referred to was not a contributing factor in the valley
overflowing.
41. It has also been established that the roof leaked due to heavy foot traffic
damaging about 60% of the roof tiles.
42. The applicant had lived in the house for about five years prior to the March
2009 storm event. While there is evidence of heavy pedestrian traffic on the
roof tiles, there is no evidence as to how or when this damage was occasioned.
43. As there were differing levels of cover in place at the time of each event, the
Panel has endeavoured to ascertain which building damage is attributable to
which event.
44. The Panel notes that the builder’s report dated 25 July 2009 (which assessed
the damage resulting from the March 2009 claim) notes that areas of the
building had suffered significant damage, including walls, doors, cupboards and
skirtings. These are also reported as being damaged following the November
2009 event. There is no evidence to suggest that these items had been
repaired since the March 2009 event and therefore the Panel concludes that
these building related items were damaged at the time when building cover was
not in place.
45. As a result of the applicant’s dispute , the FSP has reviewed all of the evidence
available. The Panel notes that in August 2010 the FSP agreed to indemnify
the applicant for his contents damage over and above the amount previously
paid, and also for that part of the building damage for which it believes the
applicant has a valid claim.
46. The evidence indicates that the majority of the current building damage was
occasioned as a result of the March 2009 event; however the FSP does not
appear to have included an allowance for the cost of replacing areas of the
ceilings which were noted as being damaged in the November 2009 event. As
the July 2009 report does not include this damage, it is reasonable to conclude
that this damage occurred in November 2009 at which time buildings cover was
in place.
47. Having carefully considered the evidence, the Panel is satisfied that with the
exception of the ceiling damage , the FSP has now correctly indemnified the
applicant to the extent of his insured loss. The Panel further notes that the FSP
has acknowledged its previous erroneous declinature and has cor rected this by
allowing interest to the applicant on the previously unpaid amount.
202255 Determination 6 of 6
48. For these reasons, the Panel concludes that the FSP is required to review the
extent of its obligations to indemnify the applicant for the cost of repair to his
water damaged ceiling. In making that payment, the FSP will have met its
liability for the damage to the building and contents as a result of the ingress of
water during the March and November storms, subject of course to the
applicant’s agreement.
Alternative accommodation costs
49. The policy provides cover for alternative accommodation costs if the building
cannot be lived in, if the insured event caused so much damage, the home
could not be lived in.
50. The applicant states that he had continued to live in his home after the March
2009 event, however following the November 2009 event, his home became
uninhabitable. In these circumstances the Panel considers the applicant is
entitled to reimbursement of his alternate accommodation costs for the period
during which it would be reasonable for the rectification works to be carried out
up to a maximum of twelve months. The applicant is required to provide
suitable evidence as to his actual expenditure for this period.
Repayment of mortgage costs
51. The policy makes no provision for payment of mortgage costs. The Panel
therefore concludes the FSP is not liable for this part of the claim.
CONCLUSION
52. After analysis of the available material, the Panel considers the FSP has not
fully discharged its liability with respect to the claim arising from the event in
November 2009.
53. Accordingly the Panel determines:
(a) The FSP indemnify the applicant for the cost of rectifying the water
damaged ceilings;
(b) The FSP indemnify the applicant for the reasonable cost of alternate
accommodation for the period of time taken to rectify the insured damage;
(c) The FSP is not liable for payment of the applicant’s mortgage costs.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.