Determination 202144
Claim decline (flood exclusion)
Summary
A motor trade business's premises and contents were inundated during a May 2009 storm, and the insurer denied the claim as flood damage. AFCA found, on hydrology evidence, that the water was flood water excluded by the policy.
The insurer discharged its onus under the policy's flood exclusion, as the expert hydrologist evidence showed the inundation came from overflowing Enoggera Creek rather than local stormwater, and the policy's flood definition captures such runoff.
Issues
- Claim denial primary · not upheld
“the Panel concludes the cause for the damage does not fall within the terms of cover provided by the policy and determines the FSP was entitled to deny liability for the claim.”
- Product terms interpretation secondary · not upheld
“The policy defines flood to include runoff rainwater that cannot run off into a creek because it is overflowing in flood, or that mixes with floodwater.”
Subjects and remedies
natural disastersmall businessno remedy
Text of the determination
202144 Determination 1 of 6
DETERMINATION
Case number: 202144
Small Business – flood – onus of proof
SUMMARY OF FACTS
1. On 20 May 2009 the applicants ’ business premises were inundated with water
following heavy storms in the area causing damage to the building and
contents. The applicant s’ estimate the cost of the damage to be in the vicinity of
$150,000.
2. The Financial Services Provider (FSP) denied a claim under the applicants
motor trade insurance policy on the ground the water was flood water as
defined by the policy and excluded from cover.
ISSUES IN DISPUTE
3. Whether damage to the premises and contents was caused by flood water as
defined by the applicants ’ policy.
RELEVANT POLICY PROVISIONS
“General Definitions
Word Meaning
Flood Flood is when water from a river, creek, lake, swamp, watercourse, reservoir,
dam or navigable canal (whether they are in their original state or have been
modified), overflows onto normally dry land.
We also regard any Rainwater on Your property:
(a) That cannot run off into a river, creek, lake swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their original state
or have been modified) because it is overflowing in Flood; and/or
(b) That mixes with the floodwater coming from the river creek, lake swamp,
watercourse, reservoir, damage or navigable canal (whether they are in
their original state or have been modified)
as water coming from a Flood
…
We do not insure You under Section 1 for any of the following circumstances.
(3) Flood We will not pay for loss, destruction or damage caused directly or indirectly
by Flood, unless You have selected the Variation and Extension 1.6(1)
REASONS FOR DECISION
4. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
The Applicants Submission
5. Their shed was inundated with approximately seven feet of water during a
storm on 20 May 2009. The insurer denied their claim due to flood.
202144 Determination 2 of 6
6. Immediately after the event several, other businesses were also refused cover
on the same basis as their claim. However those insurers quickly changed their
minds and paid the claims.
7. Their insurer is at odds with the industry.
8. A similar water event in November 2008 was paid by the insurer and a
precedent has therefore been set.
The FSP’s Submission
9. The applicants ’ premises were located only 400m from Enoggera Creek and
closer to Finsbury Park drain.
10. The hydrologist calculations indicate the local drainage system would have
been able to cope with the most intense local rainfalls of this event.
11. Water began bubbling out of the storm water drain in the car park at around
1345 hours. According to the hydrologist, this correlates with the time that
Enoggera Creek water would have begun to back up out of Finsbury Park
drain, remembering that peak water levels were reached at 1530 hours being 1
hour 45 minutes later.
12. Peak water level within the premises reached 1.5m which is a depth unable to
be generated by storm water created by the local rainfall in this event.
13. The rainfall event was widespread throughout Brisbane, Ipswic h and the
Sunshine Coast resulting in the flooding of Enoggera Creek from waters
accumulated upstream. According to the Flood Wise Property Report by
Brisbane City Council (Appendix 4), the property is flood prone and the
minimum habitable floor level to a void inundation by flood water is 5.9 metres
AHD.
14. The proximate cause for damage to the applicants ’ premises was the impact of
flood water which is excluded from cover provided by the policy.
Consideration of each party’s submission
15. The FSP seeks to rely on a clause in the policy to deny the claim and therefore
has the burden of establishing on the balance of probabilities that the terms of
the relevant clause apply to defeat the claim.
16. The assessor in describing the circumstances giving rise to the claim stated the
area of south east Queensland was subject to an intense storm event which
resulted in extremely strong winds up to 100kmh and rainfall of 600mm in some
areas commencing from 18 May 2009 and extending into the following week.
The areas affected included the Sunshine Coast, Brisbane, Ipswich and the
Gold Coast.
17. The assessor went on to say the applicants premises appeared to have been
inundated as a result of water being unable to drain from the nearby drainage
channel resulting in the water overflowing and backing up into the applicants
premises.
18. The FSP commissioned an hydrologist to report on the source of the inundation
of the applicants premises. The hydrologist in her report of 9 June 2009
provided the following relevant information:
202144 Determination 3 of 6
– The floor level of the applicants ’ premises was approximately 0.2m above
ground level. The inundation was approximately 1.5m above floor level.
The spray booth was approximately 0.2m higher that the adjoining floor
level.
– A total of 274mm rainfall was recorded between 1800 hours on 19 May
and 2400 hours on 20 May at a rainfall statio n 1.4 km north of the
applicants ’ premises. The most intense burst occurred between 1000
hours and 1400 hours on 20 May 2009.
– The applicants ’ premises are located approximately 400m north of
Enoggera Creek. The water level in Enoggera Creek recorded at a station
1.0km upstream peaked at 6.82m RL at about 1530 hours on 20 May.
– The local stormwater catchment is approximately 3.4ha. Runoff from this
catchment drains via pipes to the Finsbury Park drain or overland through
a number of properties.
– The Finsbury park drain is a concrete lined channel with defined bed and
banks and discharges to Enoggera Creek through Finsbury Park at
Newmarket. The catchment draining to Finsbury Park drain has an area of
approximately 9ha which includes the 3.4ha draining to the property.
– The applicants noticed water bubbling out of the stormwater drain in the
car park at around 1345 hours. By 1415 hours they could no longer drive
cars out into Edmonstone Street.
19. The hydrologist concluded:
“ Based on our site inspection and assessment of available data for the subject
site, we conclude that:
The maximum depth of inundation above floor level at the subject property
was caused by floodwater overflowing from Enoggera Creek up the
Finsbury park drain and across from Edmonstone Street to the subject
property
Local stormwater would not have inundated the workshop or the spray
booth above floor level prior to the arrival of the flood water from Enoggera
Creek” .
20. In response to the applicants assertion that it was surface runoff rainwater that
inundated his premises, the hydrologist made the following comments in her
report of 2 October 2009:
– The reported time of the stormwater surcharge in the car park
corresponded with the time at which elevated water levels in Enoggera
Creek would be expected to affect the free discharge of stormwater from
the trunk pipe drainage system located near the applicants ’ property. The
rainfall intensity at this time was equal to the highest intensity recorded
during the event.
– The total catchment contributing to the flow in the trunk drainage system
is about 180ha. The trunk pipe system would have a total flow capacity of
about 19m/3/s. Adopting the council runoff coefficient for a 1 year Average
Recurrence Interval (ARI) event (0.65) and the maximum 15 minute
rainfall intensity of 56mm/hr, the catchment draining to the applicants
property would generate a peak stormwater discharge of about 18m3/s.
This flow rate is less than the capacity of the trunk pipe drainage system.
Therefore the peak flow rate generated during the May 2009 event should
have been accommodated within the pipe system with minimal overland
flow.
202144 Determination 4 of 6
– It was likely the observed surcharging of the pipe system at about 1345
hours was due to rising water levels at Enoggera Creek which were at that
time about 1m below the recorded peak level. As water levels in the creek
continued to rise the capacity of the trunk pipe stormwater drainage
system would have been reduced thereby reducing the amount of
stormwater that could enter the pipe system.
21. The hydrologist remained of the opinion that inundation of the applicants
property above floor level was caused by floodwaters overflowing from
Enoggera Creek.
22. The FSP relies substantially on the report of an expert witness in particular an
Hydrologist to deny the claim. The Panel is satisfied that rainwater and its flow-
on affect on the environment is a subject in which expert evidence is
admissible. In arriving at her finding, the hydrologist inspected the area and
relied on known rainfall data, the topography, and drainage and peak water
levels in the relevant water systems. The Panel is also satisfied the hydrologist
was appropriately qualified to provide expert evidence of the type required in
this dispute.
23. After careful analysis of the evidence, the Panel is of the opinion the FSP was
entitled to rely on the expert evidence provided by the hydrologist. The
hydrologist concluded that the inundation to the applicants ’ property was
caused by flood water overflowing from Enoggera Creek, up the Finsbury Park
drain and across the street in which the applicants ’ premises were located.
24. Significantly the hydrologist addressed the issue of surface runoff rainwater, but
considered the stormwater would not have entered the workshop above the
floor level because of the height of the floor level above the ground surface.
According to her calculations, the capacity of the trunk pipe drain system was
capable of accepting the flow rate at the time of the peak rainfall leading her to
conclude that the surcharging of the pipe observed by the applicants at about
1345 hours was due to rising levels in Enoggera Creek.
25. The policy defines flood to include runoff rainwater that cannot run off into a
creek because it is overflowing in flood, or that mixes with floodwater coming
from the creek.
26. The FSP’s commercial portfolio manager stated she is the o nly person
authorised in Queensland to authorise flood cover on a commercial property.
All requests for flood cover are based on flood data or actual site surveys.
When a request is received for a Brisbane property she refers to the City
Council Site Floodwise Property Report. She goes on to state that the
applicants ’ property is in a flood prone area , and as such she would not agree
to providing cover. The only time cover is granted is for areas that have no
history of flooding or are only slightly susceptible.
27. A copy of the Council Floodwise Property report for the premises at the
applicants address shows the minimum habitable floor level is 5.9m AHD
(Australia Height Datum reference for defining ground levels. 0.0m AHD is
approximately mean sea level) The applicants premises are 0.2 metres above
ground, and therefore may be regarded as flood prone.
28. The Panel was initially concerned that the applicants had provided minimal
information in support of their case. They simply appeared to be relying upon
202144 Determination 5 of 6
the fact that other insurers had paid claims. In these circumstances, the Panel
caused a letter to be forwarded to the applicants giving them an opportunity of
providing eye witness accounts of relevant events and information in support of
their submission that it was rain water/storm water which initially inundated the
property. In the letter the Panel also referred to possible eye witnesses as to
relevant events and sought advice from the applicants as to whether these
persons would be able to provide statements or information expanding on the
limited material that the applicants had provided.
29. In response to that letter, the applicants provided an email indicating that one of
the eye witnesses referred to in the hydrologist report could not be contacted
and no further information could be obtained. The applicants then provided a
paragraph of information refe rring to a comment by another person “that water
was running down the hill from the north and banking up against the northern
wall of our premises to the extent that he considered the wall to be in danger of
collapse”. They went on to state “ that the ground level outside the northern wall
of the property was about half a metre below the floor level inside the shed and
that water was already coming through the weep holes in our northern wall”.
30. Unfortunately this information does not in any way cause the Pane l to reject the
conclusions in the Hydrologist report, or conclude the opinion ought to be
disregarded. The statement makes no reference to times in relation to the other
events that need to be considered such as water activity in other areas such as
the Enoggera Creek or the Finsbury Park drain.
31. After considering this material, the Panel is persuaded the FSP has discharged
the onus that rests with it to show the cause for the damage does not fall within
the cover provided by the policy.
32. The Panel has been provided with a report by the hydrologist responding to the
applicants ’ comments that the policy responded to a claim for similar damage in
November 2008.
33. The hydrologist noted without knowing the time of the initial inundation of the
applicants premises that it was difficult to provide a definitive conclusion as to
the source of the inundation, but concluded it was likely that the maximum
depth of the inundation was caused by floodwater overflowing from Enoggera
Creek. However it was possible on this occasion that that stormwater to a depth
of 0.1m above floor level inundated the premises prior to arrival of the flood
waters from Enoggera Creek.
34. In any event the FSP relied on a report by its adjuster when accepting the claim
for damage arising from the November 2008 storm event. In the matter arising
from the May 2009 storm events, the FSP relied on the expertise of an
engineer qualified in the field of hydrology.
35. On many occasions insurers rely on the expertise of consultants commissioned
at the time of the loss to determine liability. However it is clear the level of
expertise can vary according to the qualifications of the consultants which in
turn may impact on the insurer’s liability.
36. In the circumstances, the Panel is of the opinion the FSP’s decis ion to accept
liability for the November 2008 claim does not prejudice it to the extent that it
may not rely on the consultant's evidence for the May 2009 claim.
202144 Determination 6 of 6
CONCLUSION
37. On the basis of the above analysis, the Panel concludes the cause for the
damage does not fall within the terms of cover provided by the policy and
determines the FSP was entitled to deny liability for the claim.