Home / Financial Firm (Unknown - Insurer) / Determination 202144

Determination 202144

Claim decline (flood exclusion)

FirmFinancial Firm (Unknown - Insurer)
Decided2010-10-07
ProductGeneral Insurance · Motor
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$150,000
SourceAFCA PDF

Summary

A motor trade business's premises and contents were inundated during a May 2009 storm, and the insurer denied the claim as flood damage. AFCA found, on hydrology evidence, that the water was flood water excluded by the policy.

The insurer discharged its onus under the policy's flood exclusion, as the expert hydrologist evidence showed the inundation came from overflowing Enoggera Creek rather than local stormwater, and the policy's flood definition captures such runoff.

Issues

Subjects and remedies

natural disastersmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

202144 Determination 1 of 6 DETERMINATION Case number: 202144 Small Business – flood – onus of proof SUMMARY OF FACTS 1. On 20 May 2009 the applicants ’ business premises were inundated with water following heavy storms in the area causing damage to the building and contents. The applicant s’ estimate the cost of the damage to be in the vicinity of $150,000. 2. The Financial Services Provider (FSP) denied a claim under the applicants motor trade insurance policy on the ground the water was flood water as defined by the policy and excluded from cover. ISSUES IN DISPUTE 3. Whether damage to the premises and contents was caused by flood water as defined by the applicants ’ policy. RELEVANT POLICY PROVISIONS “General Definitions Word Meaning Flood Flood is when water from a river, creek, lake, swamp, watercourse, reservoir, dam or navigable canal (whether they are in their original state or have been modified), overflows onto normally dry land. We also regard any Rainwater on Your property: (a) That cannot run off into a river, creek, lake swamp, watercourse, reservoir, dam or navigable canal (whether they are in their original state or have been modified) because it is overflowing in Flood; and/or (b) That mixes with the floodwater coming from the river creek, lake swamp, watercourse, reservoir, damage or navigable canal (whether they are in their original state or have been modified) as water coming from a Flood … We do not insure You under Section 1 for any of the following circumstances. (3) Flood We will not pay for loss, destruction or damage caused directly or indirectly by Flood, unless You have selected the Variation and Extension 1.6(1) REASONS FOR DECISION 4. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. The Applicants Submission 5. Their shed was inundated with approximately seven feet of water during a storm on 20 May 2009. The insurer denied their claim due to flood. 202144 Determination 2 of 6 6. Immediately after the event several, other businesses were also refused cover on the same basis as their claim. However those insurers quickly changed their minds and paid the claims. 7. Their insurer is at odds with the industry. 8. A similar water event in November 2008 was paid by the insurer and a precedent has therefore been set. The FSP’s Submission 9. The applicants ’ premises were located only 400m from Enoggera Creek and closer to Finsbury Park drain. 10. The hydrologist calculations indicate the local drainage system would have been able to cope with the most intense local rainfalls of this event. 11. Water began bubbling out of the storm water drain in the car park at around 1345 hours. According to the hydrologist, this correlates with the time that Enoggera Creek water would have begun to back up out of Finsbury Park drain, remembering that peak water levels were reached at 1530 hours being 1 hour 45 minutes later. 12. Peak water level within the premises reached 1.5m which is a depth unable to be generated by storm water created by the local rainfall in this event. 13. The rainfall event was widespread throughout Brisbane, Ipswic h and the Sunshine Coast resulting in the flooding of Enoggera Creek from waters accumulated upstream. According to the Flood Wise Property Report by Brisbane City Council (Appendix 4), the property is flood prone and the minimum habitable floor level to a void inundation by flood water is 5.9 metres AHD. 14. The proximate cause for damage to the applicants ’ premises was the impact of flood water which is excluded from cover provided by the policy. Consideration of each party’s submission 15. The FSP seeks to rely on a clause in the policy to deny the claim and therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clause apply to defeat the claim. 16. The assessor in describing the circumstances giving rise to the claim stated the area of south east Queensland was subject to an intense storm event which resulted in extremely strong winds up to 100kmh and rainfall of 600mm in some areas commencing from 18 May 2009 and extending into the following week. The areas affected included the Sunshine Coast, Brisbane, Ipswich and the Gold Coast. 17. The assessor went on to say the applicants premises appeared to have been inundated as a result of water being unable to drain from the nearby drainage channel resulting in the water overflowing and backing up into the applicants premises. 18. The FSP commissioned an hydrologist to report on the source of the inundation of the applicants premises. The hydrologist in her report of 9 June 2009 provided the following relevant information: 202144 Determination 3 of 6 – The floor level of the applicants ’ premises was approximately 0.2m above ground level. The inundation was approximately 1.5m above floor level. The spray booth was approximately 0.2m higher that the adjoining floor level. – A total of 274mm rainfall was recorded between 1800 hours on 19 May and 2400 hours on 20 May at a rainfall statio n 1.4 km north of the applicants ’ premises. The most intense burst occurred between 1000 hours and 1400 hours on 20 May 2009. – The applicants ’ premises are located approximately 400m north of Enoggera Creek. The water level in Enoggera Creek recorded at a station 1.0km upstream peaked at 6.82m RL at about 1530 hours on 20 May. – The local stormwater catchment is approximately 3.4ha. Runoff from this catchment drains via pipes to the Finsbury Park drain or overland through a number of properties. – The Finsbury park drain is a concrete lined channel with defined bed and banks and discharges to Enoggera Creek through Finsbury Park at Newmarket. The catchment draining to Finsbury Park drain has an area of approximately 9ha which includes the 3.4ha draining to the property. – The applicants noticed water bubbling out of the stormwater drain in the car park at around 1345 hours. By 1415 hours they could no longer drive cars out into Edmonstone Street. 19. The hydrologist concluded: “ Based on our site inspection and assessment of available data for the subject site, we conclude that:  The maximum depth of inundation above floor level at the subject property was caused by floodwater overflowing from Enoggera Creek up the Finsbury park drain and across from Edmonstone Street to the subject property  Local stormwater would not have inundated the workshop or the spray booth above floor level prior to the arrival of the flood water from Enoggera Creek” . 20. In response to the applicants assertion that it was surface runoff rainwater that inundated his premises, the hydrologist made the following comments in her report of 2 October 2009: – The reported time of the stormwater surcharge in the car park corresponded with the time at which elevated water levels in Enoggera Creek would be expected to affect the free discharge of stormwater from the trunk pipe drainage system located near the applicants ’ property. The rainfall intensity at this time was equal to the highest intensity recorded during the event. – The total catchment contributing to the flow in the trunk drainage system is about 180ha. The trunk pipe system would have a total flow capacity of about 19m/3/s. Adopting the council runoff coefficient for a 1 year Average Recurrence Interval (ARI) event (0.65) and the maximum 15 minute rainfall intensity of 56mm/hr, the catchment draining to the applicants property would generate a peak stormwater discharge of about 18m3/s. This flow rate is less than the capacity of the trunk pipe drainage system. Therefore the peak flow rate generated during the May 2009 event should have been accommodated within the pipe system with minimal overland flow. 202144 Determination 4 of 6 – It was likely the observed surcharging of the pipe system at about 1345 hours was due to rising water levels at Enoggera Creek which were at that time about 1m below the recorded peak level. As water levels in the creek continued to rise the capacity of the trunk pipe stormwater drainage system would have been reduced thereby reducing the amount of stormwater that could enter the pipe system. 21. The hydrologist remained of the opinion that inundation of the applicants property above floor level was caused by floodwaters overflowing from Enoggera Creek. 22. The FSP relies substantially on the report of an expert witness in particular an Hydrologist to deny the claim. The Panel is satisfied that rainwater and its flow- on affect on the environment is a subject in which expert evidence is admissible. In arriving at her finding, the hydrologist inspected the area and relied on known rainfall data, the topography, and drainage and peak water levels in the relevant water systems. The Panel is also satisfied the hydrologist was appropriately qualified to provide expert evidence of the type required in this dispute. 23. After careful analysis of the evidence, the Panel is of the opinion the FSP was entitled to rely on the expert evidence provided by the hydrologist. The hydrologist concluded that the inundation to the applicants ’ property was caused by flood water overflowing from Enoggera Creek, up the Finsbury Park drain and across the street in which the applicants ’ premises were located. 24. Significantly the hydrologist addressed the issue of surface runoff rainwater, but considered the stormwater would not have entered the workshop above the floor level because of the height of the floor level above the ground surface. According to her calculations, the capacity of the trunk pipe drain system was capable of accepting the flow rate at the time of the peak rainfall leading her to conclude that the surcharging of the pipe observed by the applicants at about 1345 hours was due to rising levels in Enoggera Creek. 25. The policy defines flood to include runoff rainwater that cannot run off into a creek because it is overflowing in flood, or that mixes with floodwater coming from the creek. 26. The FSP’s commercial portfolio manager stated she is the o nly person authorised in Queensland to authorise flood cover on a commercial property. All requests for flood cover are based on flood data or actual site surveys. When a request is received for a Brisbane property she refers to the City Council Site Floodwise Property Report. She goes on to state that the applicants ’ property is in a flood prone area , and as such she would not agree to providing cover. The only time cover is granted is for areas that have no history of flooding or are only slightly susceptible. 27. A copy of the Council Floodwise Property report for the premises at the applicants address shows the minimum habitable floor level is 5.9m AHD (Australia Height Datum reference for defining ground levels. 0.0m AHD is approximately mean sea level) The applicants premises are 0.2 metres above ground, and therefore may be regarded as flood prone. 28. The Panel was initially concerned that the applicants had provided minimal information in support of their case. They simply appeared to be relying upon 202144 Determination 5 of 6 the fact that other insurers had paid claims. In these circumstances, the Panel caused a letter to be forwarded to the applicants giving them an opportunity of providing eye witness accounts of relevant events and information in support of their submission that it was rain water/storm water which initially inundated the property. In the letter the Panel also referred to possible eye witnesses as to relevant events and sought advice from the applicants as to whether these persons would be able to provide statements or information expanding on the limited material that the applicants had provided. 29. In response to that letter, the applicants provided an email indicating that one of the eye witnesses referred to in the hydrologist report could not be contacted and no further information could be obtained. The applicants then provided a paragraph of information refe rring to a comment by another person “that water was running down the hill from the north and banking up against the northern wall of our premises to the extent that he considered the wall to be in danger of collapse”. They went on to state “ that the ground level outside the northern wall of the property was about half a metre below the floor level inside the shed and that water was already coming through the weep holes in our northern wall”. 30. Unfortunately this information does not in any way cause the Pane l to reject the conclusions in the Hydrologist report, or conclude the opinion ought to be disregarded. The statement makes no reference to times in relation to the other events that need to be considered such as water activity in other areas such as the Enoggera Creek or the Finsbury Park drain. 31. After considering this material, the Panel is persuaded the FSP has discharged the onus that rests with it to show the cause for the damage does not fall within the cover provided by the policy. 32. The Panel has been provided with a report by the hydrologist responding to the applicants ’ comments that the policy responded to a claim for similar damage in November 2008. 33. The hydrologist noted without knowing the time of the initial inundation of the applicants premises that it was difficult to provide a definitive conclusion as to the source of the inundation, but concluded it was likely that the maximum depth of the inundation was caused by floodwater overflowing from Enoggera Creek. However it was possible on this occasion that that stormwater to a depth of 0.1m above floor level inundated the premises prior to arrival of the flood waters from Enoggera Creek. 34. In any event the FSP relied on a report by its adjuster when accepting the claim for damage arising from the November 2008 storm event. In the matter arising from the May 2009 storm events, the FSP relied on the expertise of an engineer qualified in the field of hydrology. 35. On many occasions insurers rely on the expertise of consultants commissioned at the time of the loss to determine liability. However it is clear the level of expertise can vary according to the qualifications of the consultants which in turn may impact on the insurer’s liability. 36. In the circumstances, the Panel is of the opinion the FSP’s decis ion to accept liability for the November 2008 claim does not prejudice it to the extent that it may not rely on the consultant's evidence for the May 2009 claim. 202144 Determination 6 of 6 CONCLUSION 37. On the basis of the above analysis, the Panel concludes the cause for the damage does not fall within the terms of cover provided by the policy and determines the FSP was entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.