Ground movement cracking after water leak declined under earth movement and seepage exclusions
Text of the determination
201879 Determination 1 of 8
DETERMINATION
Case number: 201879
Home Building – earthquake – leaking water – exclusions
SUMMARY OF FACTS
1. The applicants hold a home building and contents insurance policy with the
Financial Services Provider (FSP). They took out the policy on 30 November
2007 to cover a residential building and contents.
2. On 5 December 2009 the applicants lodged a claim with the FSP for
rectification of cracks which had appeared and then worsened due to the
earthquakes of 6 and 18 March 2009.
3. The FSP engaged a loss adjustor and an engineer to assess the cause of the
damage. The FSP received reports indicating the property had a drainage
problem and a leaking pipe and, further, that the damage to the property
resulted from the drainage problem and not the leaking pipe or earthquakes.
4. The FSP denied the claim on the basis that the damage did not arise from an
insured event and was excluded under the terms of the policy.
5. The applicants dispute the FSP’s claim declinature on the basis of their own
engineering and plumbing reports which state there is no drainage issue and
the damage arose from the leaking pipe.
ISSUES IN DISPUTE
6. The proximate cause of the damage; and
7. Whether the FSP has correctly declined the claim.
RELEVANT POLICY PROVISIONS
“This policy does not cove r:
...
Loss, damage, destruction, consequential loss or liability directly or indirectly caused by,
contributed to by, resulting from, or arising out of or in connection with:
...
Erosion, subsidence, landslide, settling, shrinkage, expansion, undermining, washing
away or other earth movement except when loss or damage is caused by:
– Earthquake
– Storm or rain water
– Explosion, or
– Escape of liquid
And occurring within 72 hours after the event
...
Settling seepage, shrinkage or expansion in buildings, walls, roofs, floors, ceilings,
foundations, pavements, roads and the like.
....
We will settle losses resulting from:
...
201879 Determination 2 of 8
10. bursting, leaking, discharge or overflowing of fixed apparatus, fixed tanks, or pipes
used to carry liquid of any kind.
Where claimable damage has occurred we will pay up to $2,000 for the exploratory costs
incurred (subject to there being claimable damage) in identifying and locating the cause of
the destruction or damage if it is necessary to do so to carry out repairs.
We will not settle losses relating to:
Loss or damage:
...
By erosion subsidence, landslide, mudslide, shrinkage or any other earth movement
except when damage or destruction is caused by soil or other debris striking or
entering a permanent structure having walls, a roof and a f loor as a result of storm
and/or rainwater and occurring within 72 hours after the storm and/or rainwater.
From water seeping into or entering your home due to:
- Poor attention to maintenance
- Building addition and alterations
- Structural defects, faulty desi gn or faulty workmanship.”
...
Repairing or replacing the tank, pipe, system or other apparatus which has failed .”
REASONS FOR DECISION
8. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
9. It is well established in law that the applicants must prove a loss or damage
arises which is covered under the policy terms and conditions. The onus of
proof rests with the FSP to establish any exclusion on which it relies to exclude
cover.
10. The Panel notes that the FSP has indicated there was no claim denial. The
letter to the applicants dated 18 February 2010 indicates this to be the case,
but the internal claim file notes and the letter to the applicants dated 28 July
2009 suggest the claim was in fact denied. The material regarding whether the
claim was denied or not is contradictory and it appears that up until February
2010 the insurer’s intent was to deny the claim. Accordingly , the Panel will deal
with this matter as a claim denial.
11. The issue of earthquake will not be dealt with by the Panel as it is no longer
germane to this claim.
The Applicants Submission
12. They submit as follows –
(i) They lodged a claim on 18 March 2009 as their house commenced
cracking internally due to the earthquakes.
(ii) After the FSP sent an assessor and engineer to assess the damage, a
leak was found under the house which led the applicants to lodge a claim
for the leaking water.
(iii) They engaged a plumber to attend and fix the water leak which had been
leaking for approximately 3 months under the property. The applicant
notes that his water bills provide evidence of the leak.
201879 Determination 3 of 8
(iv) The FSP rejected the claim as a drainage problem, but their plumber
indicates that there is no drainage problem.
(v) The FSP’s expert only performed a soil test at the rear of property and he
inserted a sharp iron rod into the lawn which went right through. As it
rained the night before the expert’s attendance at the property , the soil
was wet and it is unreasonable to suggest this as a basis that drainage
problems existed.
(vi) There were no drainage issues at all prior to the leak occurring. The
stumps were sitting in water due to the leak and the applicants do not
understand the basis for the expert stating that the substantial water leak
did not cause the damage, and that the stump simply sank under its own
weight.
(vii) They are aware of Mr M’s allegation of pre -existing damage and of them
not obtaining a pre-purchase inspection report. The damage was not pre-
existing and only happened after the leak. Further, they did obtain a pre-
purchase inspection report and never advised the expert that they did not
obtain one.
(viii) Due to the length of time involved, the cracking has worsened and the
repairs may cost up to $30,000. (The Panel notes that there is no
quotation for repairs evidencing this amount.)
13. The applicants have enclosed a plumber’s report dated 11 February 2010
which states that he –
(i) Tested for operation of flow in the stormwater and sewerage drains.
(ii) Found the drains worked effective with no overflow
(iii) Investigated under the property and observed the ground was dry without
signs of dampness. There was no sign of leaking pipes and the source of
excessive dampness was deemed to have been eliminated.
14. Other evidence supplied by the applicants includes:
Copies of a water bill due November 2009 indicating a consumption rate
of 174 litres per day. A copy of water bill due 25 May 2009 indicates a
consumption rate of 588 litres per day.
15. They also provided a plumber’s repair invoice indicating repairs were
conducted to a burst copper pipe running the hot water unit. The report notes
that the hole in the wall on the west side was approximately 1/2˝
16. Their pre-purchase inspection report dated 17 September 2007 included the
following observations:
(i) Concrete stumps (good), (the Panel presumes this indicates the stumps
are in good condition)
(ii) There is evidence of a stump problem and all the originals have been
packed in order to straighten floors and many extra stumps have been
installed.
(iii) The pre-purchase inspection notes that there may be some movement,
but the stumps are “ structurally okay ”.
(iv) The rendered brickwork indicates a small amount of movement, although
there was nothing to be concerned about.
(v) Cracking and uneven settlement due to the reactive soil
(vi) The Hot Water System is approximately 8 years old and the applicants
“ should get fe w more years out of it ”
201879 Determination 4 of 8
17. They provided two reports dated 29 March 2010 from their engineer reviewing
the property. The two reports are essentially the same save that the author of
one of the reports addresses the issue of drainage whilst the other does not.
The engineer reported: –
(i) The wall cracks of less of than 5mm in width can be filled. The cracks are
associated with floor movement which requires underpinning and/or
footing replacement.
(ii) Wall cracks greater than 5mm and less than 15mm require repairs and
the cracks indicate that underpinning and/or footing replacement is
required.
(iii) A visual inspection of the location and quantity of cracks indicate that an
event occurred which resulted in the reduction of the soil bearing pressure
and movement in the outer strip and inner pad footings.
(iv) It is “highly probable that this event was as a direct result of the flooding
caused by the broken pipe” . The quantity of water accumulating under the
property saturated the founding soils supporting the house footings. This
would have a softening effect on these soils reducing soil bearing
pressure.
(v) Further, as the soils dried out, the clays would result in continued footing
movement thus increasing the problem.
(vi) A visual inspection of the site which included the stormwater system did
not reveal any issues with drainage. The engineer considers that the
plumbing report confirms that the existing stormwater system and water
supply pipes are in good working order and are not leaking.
18. A number of photographs demonstrate the cracking to the property
The FSP ’s Submission
19. It submits that –
i. It relies upon its policy terms and conditions which excludes the loss and
damage caused by subsidence, settling, shrinkage, expansion or any
earth movement unless it occurs within 72 hours of escape of liquid. It
considers this exclusion applies to the applicants’ claim.
ii. The policy excludes gradual deterioration, inherent defects, settling,
seepage, shrinkage or expansion in buildings, walls, roofs, floors, ceilings,
foundations, pavements and the like. This exclusion applies to the
applicants’ claim.
iii. It relies on its expert ’ s first report on the damage which indicated the
damage was unlikely to occur from an earth tremor. He expressed the
view that the damage arose from a drainage issue and that only after the
drainage issue is successfully rectified can an assessment of the water
leak be undertaken. He also believed the stumps had pre-existing
damage.
iv. The expert reviewed the pre-purchase inspection report, water bill and
repair for leaking water service after which he indicated the leaking water
service may have contributed to the damage on top of the drainage issue.
Further, that the water consumption readings confirm a considerable
discharge during the quarter ending April 2009. The pre -purchase
inspection report proves that there was pre-existing instability in the
footings.
201879 Determination 5 of 8
v. It is currently uncertain whether or not an insured event had caused
damage to the applicant’s p roperty or whether the damage was the
subject to an exclusion or in fact predates the policy inception.
vi. It has not denied the claim, but requires the drainage issue to be rectified
before it can re-inspected and determine the extent, if any, to which the
leaking water service contributed to the damage and whether the policy
should respond to the claim.
vii. It is aware of the plumber’s report and note that the expert has stated the
drainage problem had nothing to do with pipes or drains but seepage. The
issue was an engineering matter not a plumbing issue. The moisture is
deep under the surface where the stump and peripheral wall footings are
founded. The seepage was largely, if not solely, responsible for the
substantial stump instability which has existed for many years.
viii. The applicants’ expert makes no reference to the drainage issue or
previous restumping.
ix. The applicants have not taken action to rectify the drainage issue.
20. It has enclosed a loss adjuster’s report dated 18 May 2009 which states that –
(i) The type of damage which has occurred to the property.
(ii) The damage has existed for 18 months and the cracking has recently
worsened since the earthquakes.
(iii) There were no visible signs of leaking pipes.
(iv) The damage is due to subsidence and ground movement which has
resulted in movement/subsidence of the house structure at external walls.
Internally corresponding damage has occurred to the walls and ceilings.
(v) The worst damage is across the centre of the house from front to rear
suggesting the most stress manifested mid-point.
(vi) The damage is consistent with subsidence caused over recent years by
drought.
(vii) Even if damage involved water leakage from pipes none of the damage
has manifested within a 72 hour period of time, but rather over several
years.
(viii) The damage cannot be attributed to earthquakes due to the distance of
the property from the epicentre.
(ix) An estimate for the repair damage is given as potentially up to $10,000 -
$15,000.
(x) The report attaches photographs with commentary.
The author of the FSP ’s expert’s report date d 8 July 2009 refer to the following:
(i) He discounts any earthquake damage on the basis that the Shire of Baw
Baw has received no reports of building related damage in the entire
municipality due to the Korumburra earthquakes. Mr M therefore deems it
unlikely to be the result of earthquakes.
(ii) He refers to considerable past restumping and re-levelling together with
pools of water under the house.
(iii) He found a leak in the water service under the floor of the house which
was then rectified by the applicants’ plumber.
(iv) He stated that he conducted soil testing and determined a substantial
source of seepage moving in a south-west direction which he considered
responsible for the history of instability.
201879 Determination 6 of 8
(v) He believes that the cracked render is due to excessive moisture under
the house which may be contributed to by the leaking water service, but
also contributed to by the acute drainage problem.
(vi) He refers to old re-opened cracks in the property.
(vii) He states that water related damage cannot be assessed until foundation
moisture content is restabilised but he does not explain how the drainage
issue is to be rectified.
21. The FSP has enclosed copy of a loss adjuster’s report dated 9 July 2009
entitled “ Earthquake Claim: Second Report”. The loss adjuster relies upon and
reiter ates the expert’s opinion. It is concerning that the loss adjuster then
indicates whether the matter should be excluded under the policy terms and
conditions. The Panel notes such a decision is for the FSP to make not a loss
adjuster.
Consideration of eac h party’s submission
22. The Panel has considered the submissions and documents provided by each
party together with the policy terms and conditions.
23. The Panel notes that the parties no longer appear to be attributing the damage
claimed to an earthquake, and state the damage it is now attributable to either
a leaking pipe, drainage issues, or pre-existing damage to the stumps.
24. The Panel notes that the policy terms and conditions cover loss or damage
arising from escaped liquid as well as exploratory costs up to $2,000. The
terms and conditions indicate that the hot water service from which the liquid
escaped would not be covered.
25. The exclusions under escape of liquid state that subsidence or earth movement
will not be covered unless it occurs within 72 hours fro m a storm and/or
rainwater event.
26. The Panel has reviewed the FSP’s loss adjuster’s report which attributes the
loss or damage to subsidence arising from drought. This is clearly contradicted
by both the FSP’s expert and the applicants’ expert. The FSP’s expert has
clearly indicated that the property has a drainage issue and the stumps had a
history of instability due to previous repairs. Further, he acknowledged that the
leaking pipe contributed to foundation instability and associated internal wall
and ceiling cracks and possibly some cracked render.
27. The Panel is uncertain from the information provided within the report as to the
nature of the drainage issue as the expert’s report refers to seepage at the rear
of the property, but does not state what the applicant could do to assist the
alleged seepage or drainage problem. The Panel considers this to be
unsatisfactory given the FSP later insisted that the applicants attend to this
issue prior to any determination being made as to the contribution of damage
caused by the leaking pipe.
28. It should be noted the Panel has concerns that there is no mention in the FSP’s
expert’s report of soil samples being taken and analysed by an appropriately
qualified geotechnical expert. The Panel has received no rebuttal from the
expert who did not challenge or rebut the allegation of the applicants that he
tested the soil by sticking a rod into the earth following a rain event. The Panel
201879 Determination 7 of 8
considers this minimalistic investigation to be insufficient to determine whether
there was a seepage problem.
29. The Panel also notes the allegation regarding previous stump problems and
accepts there is evidence of re-packing, installation of new stumps and
patching of cracks.
30. The expert has stated that the re -packed stumps actually contributed to the
damage as the stumps have essentially sunk under their own weight and
suggests the stumping works had not been properly conducted.
31. The FSP’s expert estimates that approximately 14,000 litres of water has
escaped under the property within a 3 month period including March 2009
which is the time the applicants noted cracking starting to appear and becoming
worse. Surprisingly, he fails to comment on how the pools of water around the
stumps (as depicted by photographs) from the leaking water service effected
their bearing capacity. He states that he is unable to properly assess the effect
of leaking water until the alleged drainage problem is rectified.
32. The Panel also notes that Mr M viewed the stumps in a damaged state.
However the author of the pre-purchase inspection report who viewed the
stumps before the escape of water occurred indicated that there had been a
stump problem and all the original stumps had been packed to straighten them
and extra stumps were installed. Further the stumps were “structurally ok”.
Given this, the Panel has some doubt as to whether the history of instability
was an ongoing issue which contributed to the damage, or whether the
subsequent stump problems can be attributed to the leaking water service.
33. It appears from the pre-purchase inspection report that there had been a prior
issue about the stumps, but remedial work had been done to rectify this
problem by packing the stumps, and installing new stumps.
34. The Panel has reviewed the report of the applicants ’ expert who has offered the
opinion that the escape of water resulted in the reduction of soil bearing
pressure (or capacity) which in turn caused movement of the outer strip and
inner pad footings. This differential movement created cracking externally and
internally. He could not identify any issue with the stormwater drainage system.
35. The plumbing report indicates that there are no issues with the existing
drainage systems and that the ground under the property is now dry and did not
exhibit signs of dampness at the time of the inspection.
36. The expert engaged by the FSP has not sufficiently explained the nature and
extent of the drainage problem and how the applicants are to rectify it. Given
the lack of information on this issue, how it caused the stumps to move, and the
actual level of soil saturation in relation to the seepage, the Panel concludes
that there is insufficient evidence to establish poor drainage was the cause of
the damage.
37. The Panel does not consider the fact that the stumps had repairs undertaken to
them as proof that the stumps were unstable between the date of pre-purchase
inspection and the water leak. It appears the previous owner took action to
maintain the stumps rather than allowing them to deteriorate.
201879 Determination 8 of 8
38. On the balance of probabilities, the Panel accepts that the 14,000 litres of
escaped water reduced the bearing capacity of the soil causing the footings to
fail which in turn resulted in internal and external cracking.
39. The cracking commenced on 18 March 2009 whilst the water was continuing to
discharge. The date was specifically recalled by the applicants as they
originally misattributed the damage to the earthquake event. Accordingly the
Panel accepts on the balance of probabilities that the damage occurred within
the 72 hour period of the escape of water event.
CONCLUSION
40. The Panel determines that the FSP has incorrectly declined the claim and/or
withheld payment without sufficient evidence to do so.
41. The Panel determines that the FSP shall make good the footings, re-level the
flooring and repair internal and external cracking.
42. The Panel expects that the FSP shall p romptly arrange a scope of works and
costing for the repairs, and arrange for settlement in accordance with the policy
terms and conditions.
43. The Panel determines the FSP shall pay to the applicant the cost of the expert
fees of the plumber who explored potential drainage issues.
44. The Panel determines that as the applicants were required to obtain expert
reports to determine the damage resulting from the leaking water service (as Mr
M declined to do so) that it is appropriate for the FSP to reimburse this cost up
to a limit of $2,000.
45. The Panel determines that the FSP is not liable under the policy terms and
conditions to make payment of the actual repairs to the water service.