Home / Financial Firm (Unknown - Insurer) / Determination 201785

Determination 201785

Chicken shed storm collapse claim denied as caused by faulty modifications and workmanship

FirmFinancial Firm (Unknown - Insurer)
Decided2010-12-20
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$379,040
SourceAFCA PDF

Summary

A poultry shed roof collapsed in a storm, killing birds, and the insurer denied the $379,040 building claim. AFCA found the modifications and workmanship were the proximate cause and ordered nothing.

The storm was only a trigger, and the faulty modifications and workmanship, which the policy excludes, were the proximate cause of the building loss.

Issues

Subjects and remedies

business interruptionsmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

201785 Determination 1 of 7 DETERMINATION Case number: 201785 Farm Insurance – storm – faulty workmanship – wear & tear – proof of policy exclusion SUMMARY OF FACTS 1. The applicants, a small business, held a farm insurance policy with the Financial Services Provider (FSP) to provide accidental damage cover to farm buildings which housed large stocks of chickens. 2. The applicants contacted the FSP, via their broker, on 10 March 2008 to lodge a claim for a chicken shed which had collapsed during a storm on the same day, killing several thousand birds contained within the building. 3. The FSP has denied the claim on the basis that the chicken shed had been weakened by poor structural modifications, a beetle infestation and fungal attack which are excluded under the terms of the policy. 4. The applicants submit that the damage was as a result of the storm and as the building requires replacement, seeks the sum insured of the property, namely $379,040. ISSUE IN DISPUTE 5. Whether the FSP is required to indemnify the applicants in respect of this loss. RELEVANT POLICY PROVISIONS “ GENERAL OBLIGATIONS Where You are insured under any policy, You must: a) take all reasonable precautions for the safety of the property and safeguard any property damage; b) comply with and maintain any Statutory obligation, regulation, by-law and directions and use equipment in accordance with the manufacturer‟s design recommendations. ... These obligations are important and are required to be fulfilled before We pay a claim. ... WHAT YOU ARE INSURED FOR Buildings We will cover You for Accidental Loss to Your Buildings unless the Loss is excluded. WHAT THIS INSURANCE DOES NOT COVER You are not covered for; 1 any consequential loss including penalties, loss of use of any property, delay, loss of market; ... 6 normal working, normal maintenance, wear and tear, erosion, corrosion, slowly developing deformation or distortion, marring or scratching. 7 action of micro-organisms, vermin including birds and possums or insects; ... 12 the cost of repairing or replacing faulty materials; 201785 Determination 2 of 7 13 the cost of putting right faulty workmanship; 14 the cost of putting right work performed to a faulty or defective design plan or design specification; 15 the cost of putting right faulty or defective work where the fault or defect results from an error or omission in design, plan or design specification; ACCIDENT means an unintended and unforeseen happening or event. „ACCIDENTAL‟ has the corresponding meaning. ... STORM means violent wind sometimes combined with thunder, heavy falls of rain, hail or snow. „STORM‟ does not mean persistent bad weather nor does it mean heavy or persistent rain by itself.” REASONS FOR DECISION 6. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 7. The applicants lodged a claim with the FSP on 10 March 2008 for the total loss of a chicken shed following a storm earlier that day. 8. When submitting a claim, the burden of proof lies with the applicants to demonstrate on the balance of probabilities that the loss claimed is as a result of an insured event “Accident”, which in this case, means an unintended and unforeseen happening or event. 9. Once an insured event has been established, the onus transfers to the FSP to show on the balance of probabilities that the loss claimed falls within one or more of the policy exclusions. 10. In this particular case, there is no dispute that the applicants would not have intended or foreseen the collapse of the building which resulted in the death of several thousand chickens. On this basis the applicants have established a prima facie loss; therefore the FSP is required to establish one or more of the policy exclusions on which it relies. 11. Upon lodgement of the claim, the FSP arranged for a loss adjuster to attend the applicants‟ property and report on the extent and cause of the damage. The loss adjuster has reported: “[ applicant] has advised that on Monday morning 10 th March 2008, during the course of gusty coastal wind condition in the area he was occupied on the property, when he suddenly heard a massive crash emanating from the vicinity of the broiler sheds. ... The supporting steel and timber framing members in the roof had evidently given way during the gusty winds which persisted at time and impacted upon the poultry stock contained within the structure. A substantial quantity of the broiler chickens were killed due to the collapse of the roof structure, whilst others have since progressively perished due to being trapped within the debris, during high temperatures. ... Built in the 1960‟s the shed in question measured in total vicinity of 1,200 square metres with a corrugated iron roof supported on steel and timber framework with 201785 Determination 3 of 7 a clay floor covered in saw dust. The walls were timber framed, clad in timber panels and asbestos cement sheet, with some being covered with an external cladding of metal decked lining and recently strengthened with additional steel framing. The Insured have advised that this shed was the oldest broiler shed on the property. They have also admitted that as the roof was partially subsiding prior to the incident in question, some four months ago they had arranged maintenance works on the structure, by installing substantial settle portal frames and roof trusses inside the shed. This was done in order to provide further stability to the subsiding roof structure. The Insured have advised that these works were completed of the own accord, without a building permit and the welding works associated with the steel installations were completed on their behalf by a local boiler maker acquaintance. The Insured advised that as these were internal maintenance works, on the advice of a local Shire Inspector (who has apparently since retired), they understood that a Building Permit would not be required. During our inspections it was noted that the majority of the steel members within the roof of the shed structure had also collapsed with a number of the steel upright posts in the sheds side walls remaining in place. The writer was concerned as to the extent of the recent maintenance works completed by the Insured, without engineer‟s specifications and an appr opriate building permit. We also noted that the majority of the timber framing in the collapsed structure was severely decayed and showed signs of extensive pest infestation. We consider that the extent of this infestation may have well also contributed to the failure of the structure, despite the gusty wind conditions described by the Insured on the morning in question. At the time of our attendance we advised the Insured the further investigation of the cause of the shed‟s collapse would be required further in by a qualified building consultant or structural engineer.” 12. In accordance with the loss adjuster‟s recommendations , a building consultant was appointed to attend the applicants‟ property and has reported on the extent and cause of the damage sustained; “The owners have recently modified/strengthened the shed installing RHS portal frames adjacent to every second timber frame and removing the internal timber columns to allow the chicken catching machine to spread across the full width of the shed. ... The building has suffered a catastrophic roof failure, where the central section of the roof has collapsed into the shed killing hundreds of chickens and rendering the building no longer serviceable. The collapse was caused by a number of contributing factors being: (i) Local strong wind activity on the day of collapse (ii) A weakened building structure due to recent modifications and internal column removal. (iii) A weakened building structure due to beetle infestation within the structural timbers. (iv) A weakened building structure due to fungal attack of structural timbers 201785 Determination 4 of 7 ... The following observations were made: (i) The central section of the shed has collapsed into the centre of the building – the building end walls were still upright and partially supporting the end frames. (ii) The shed was full of full term broilers at the time of collapse and hundreds of these birds were killed in the collapse. No farm staff were int eh shed at the time of collapse. (iii) The structural timber throughout the shed had been affected over the long term by both a beetle infestation and wet rot/fungal attack. The beetles are most likely Darkling Beetle „alphitobius diaperinus‟ which is a common pest in poultry sheds and is known to cause damage to insulation etc in its egg laying/pupa stages. (iv) The timber laminated portal frames were fabricated from hardwood framing members 70mm wide x 45 high overclad with 7.00mm thick masonite nail laminated to the hardwood members. (v) The new RHS portal frames have been site fabricated from 150 x 100 x 5.00 RHS installed beside every SECOND timber portal with 125 x 75 RHS underpurlins running along the same alignment as the old timber columns (now removed). This work was carried out in November 2007 by the owners and local boilermaking contractor. (vi) The new steel port frame knee joints which were still visible, were poorly prepared, poorly welded with inadequate weld length to develop full strength of the member/joint. (vii) The adjacent shed, Shed 1 was constructed with mild steel UB portal frames – water drippers and feed equipment was all suspended from the roof structure via a lift up pulley system. ... The roof structure has been severely weakened by a number of contributing factors being: (a) The removal of internal timber support columns and replacement using full span RHS portal frames The major bending moment on a pinned base portal frame is normally located at the knee joint, but in this case the welding/fixing was inadequate preventing the joint to develop full moment capacity which transferred the maximum moment to the apex/ridge joint of the frame. These welded butt joints were of poor quality and it is most likely that due to strong localized wind, this joint failed due to tension in the bottom weld, triggering the progressive roof collapse. (b) The long term activity of beetles and their larvae in the timber support member of the building. This burrowing activity reduces the cross sectional area of the structural members and their subsequent ability to sustain loads. (c) The long term effects of timber decay and fungal attack. The original timber frame has various areas of wet rot due to the constant washdown of the sheds following the removal of each group of broilers. The damp conditions and slow drying are perfect conditions for fungal spored to develop, weakening the timber cross sections. The actual collapse was triggered by reported local high wind gusts experienced on the day of failure....The highest wind gust experienced...on the day of collapse was 52km/hr indicating that there was high wind conditions in the area on the day. 201785 Determination 5 of 7 ... Wind gust speed had been higher prior to the collapse although the direction and localised differences may have been unique on the day to trigger the failure. ... It is apparent that a Structural/Civil Engineer was not consulted regarding the building frame design. The owner advised that he purchased the steel from the local steel merchant and it was welded together by a local Boilermaking subcontractor. It is unknown how the owner determined the member sizes, their spacing or any another structural details hence the member sizes and the fabrication/welding was inadequate. The adjacent shed, Shed 1, has Universal Beam portal frames of the same span and this should have been an indicator at least, of the size and spacing of the new frames. It is estimated that a minimum of a 250 UB portal should have been used noting that the complete frame would need to be redesigned considering all additional deal loads, wind conditions and fo undation capacity.” 13. The FSP sought clarification on the building requirements necessary following the internal modifications from the building consultant: “Q1 Would the building have been compliant with all statutory regulator and local authority requirements? A Without seeing every part of the building prior to a major part of it being under collapsed material, I am of the opinion that prior to modifications, it would have been compliant with the regulations that applied when it was constructed. Remember of course that a building only has to comply with the regulations in force at the time of construction. (Codes have been tightened up over the last 40 years). Following the modifications the building would not have met the requirements of the Building Code of Australia or any of the applicable Australian Standards, in particular AS 1170.01, 1, 2 & 3 Loading Codes & AS 4100 Steel Structures Code. Q2Confirm if the insured was required by local council to obtain a building permit prior to the shed renovation taking place? A Minor maintenance on buildings does not normally require a building permit. The column removal undertaken in this case is classified as major structural works, and as such, it would have required a Building Permit. Design drawings and full design and computations by a Structural Engineer are mandatory and if not provided with the permit application would have been requested by the Building Surveyor before any permit was issued.” 14. The applicants argue that they were verbally advised by a member of the council that such a permit was not required. This particular person has since retired from a position within the council not connected to building permits and no evidence has been submitted from him regarding the alleged conversation. 15. The FSP seeks to rely on the applicants „General Obligation‟ to “comply with and maintain any Statutory obligation, regulation, by- law and directions”. In this particular case, the Panel is of the view that there is insufficient substantive evidence to show that the applicants have failed to comply with their obligations as required under the terms of the policy. 201785 Determination 6 of 7 16. However, the applicants submit that irrespective of this, the collapse of the shed was as a direct result of a storm event which should be afforded cover under the terms of the policy. 17. In these circumstances, the Panel consider it necessary to determine the proximate cause of the damage to the applicants‟ property. It has not been disputed that the timber frames had been subject to extensive fungal attack and a beetle infestation, nor has contradictory evidence been submitted by the applicants that the modifications were inadequate for the nature of the structure. 18. Despite its exposure to rot/infestation and a range of weather conditions over many years, the shed remained serviceable. However it is significant that the recent structural changes preceded the failure of the building, and it is of note that the building consultant reported that the roof structure has been severely weakened by a number of contributing factors. Specifically, the removal of internal timber support columns and replacement using full span RHS portal frames, and the new steel port frame knee joints were poorly prepared, poorly welded with inadequate weld length to develop full strength of the member/joint. 19. Having carefully considered the evidence, the Panel is of the view that the storm event, which is not disputed occurred, was merely a catalyst or trigger in the collapse of the building and that the proximate cause of the damage was the previous significant modifications. There is also evidence that the fungal attack and beetle infestation would have contributed to the weakening of the structure. 20. The Panel notes the wording of the FSP‟s exclusions are limited to the cost of „repairing‟ or „putting right‟ the defective work. However in this case, the Panel is of the view that the effective cost of rectification of the faulty modifications is equivalent to the full extent of the loss, and therefore the FSP‟s exclusion entitles it to deny the claim for its building loss. 21. The applicants have also requested payment for interruption of the business. The Panel is aware that acceptance or denial of that particular claim will be dependent upon the outcome of this dispute for the building damage and the FSP should address this accordingly upon receipt of this Determination. 22. The Panel also notes that the applicants are subject to a claim from the owner of the chickens, for whom the applicants were growing the birds. The Panel is of the view that the applicants‟ policy ext ends to provide cover in circumstances where liability between the parties is established, and the FSP is required to address this aspect with the applicants, should any claim be made against the applicants in this regard. CONCLUSION 23. After thoroughly reviewing all the evidence and considering the relevant issues, the Panel finds that the proximate cause of the damage to the applicants‟ property was as a result of the faulty modifications and inferior workmanship which are excluded under the terms of the policy. 201785 Determination 7 of 7 24. Accordingly, the Panel determines that the FSP is not required to indemnify the applicants in respect of this part of the loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.