Home / Financial Firm (Unknown - Insurer) / Determination 201785
Determination 201785
Chicken shed storm collapse claim denied as caused by faulty modifications and workmanship
Summary
A poultry shed roof collapsed in a storm, killing birds, and the insurer denied the $379,040 building claim. AFCA found the modifications and workmanship were the proximate cause and ordered nothing.
The storm was only a trigger, and the faulty modifications and workmanship, which the policy excludes, were the proximate cause of the building loss.
Issues
- Claim denial primary · not upheld“the proximate cause of the damage to the applicants' property was as a result of the faulty modifications and inferior workmanship which are excluded under the terms of the policy.”
- Product terms interpretation secondary · not upheld“the effective cost of rectification of the faulty modifications is equivalent to the full extent of the loss, and therefore the FSP's exclusion entitles it to deny the claim.”
Subjects and remedies
business interruptionsmall businessno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
201785 Determination 1 of 7
DETERMINATION
Case number: 201785
Farm Insurance – storm – faulty workmanship
– wear & tear – proof of policy exclusion
SUMMARY OF FACTS
1. The applicants, a small business, held a farm insurance policy with the
Financial Services Provider (FSP) to provide accidental damage cover to farm
buildings which housed large stocks of chickens.
2. The applicants contacted the FSP, via their broker, on 10 March 2008 to lodge
a claim for a chicken shed which had collapsed during a storm on the same
day, killing several thousand birds contained within the building.
3. The FSP has denied the claim on the basis that the chicken shed had been
weakened by poor structural modifications, a beetle infestation and fungal
attack which are excluded under the terms of the policy.
4. The applicants submit that the damage was as a result of the storm and as the
building requires replacement, seeks the sum insured of the property, namely
$379,040.
ISSUE IN DISPUTE
5. Whether the FSP is required to indemnify the applicants in respect of this loss.
RELEVANT POLICY PROVISIONS
“ GENERAL OBLIGATIONS
Where You are insured under any policy, You must:
a) take all reasonable precautions for the safety of the property and safeguard any
property damage;
b) comply with and maintain any Statutory obligation, regulation, by-law and directions
and use equipment in accordance with the manufacturer‟s design recommendations.
...
These obligations are important and are required to be fulfilled before We pay a claim.
...
WHAT YOU ARE INSURED FOR
Buildings
We will cover You for Accidental Loss to Your Buildings unless the Loss is excluded.
WHAT THIS INSURANCE DOES NOT COVER
You are not covered for;
1 any consequential loss including penalties, loss of use of any property, delay, loss of
market;
...
6 normal working, normal maintenance, wear and tear, erosion, corrosion, slowly
developing deformation or distortion, marring or scratching.
7 action of micro-organisms, vermin including birds and possums or insects;
...
12 the cost of repairing or replacing faulty materials;
201785 Determination 2 of 7
13 the cost of putting right faulty workmanship;
14 the cost of putting right work performed to a faulty or defective design plan or design
specification;
15 the cost of putting right faulty or defective work where the fault or defect results from
an error or omission in design, plan or design specification;
ACCIDENT
means an unintended and unforeseen happening or event. „ACCIDENTAL‟ has the
corresponding meaning.
...
STORM
means violent wind sometimes combined with thunder, heavy falls of rain, hail or snow.
„STORM‟ does not mean persistent bad weather nor does it mean heavy or persistent rain
by itself.”
REASONS FOR DECISION
6. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address any
issues raised.
7. The applicants lodged a claim with the FSP on 10 March 2008 for the total loss
of a chicken shed following a storm earlier that day.
8. When submitting a claim, the burden of proof lies with the applicants to
demonstrate on the balance of probabilities that the loss claimed is as a result
of an insured event “Accident”, which in this case, means an unintended and
unforeseen happening or event.
9. Once an insured event has been established, the onus transfers to the FSP to
show on the balance of probabilities that the loss claimed falls within one or
more of the policy exclusions.
10. In this particular case, there is no dispute that the applicants would not have
intended or foreseen the collapse of the building which resulted in the death of
several thousand chickens. On this basis the applicants have established a
prima facie loss; therefore the FSP is required to establish one or more of the
policy exclusions on which it relies.
11. Upon lodgement of the claim, the FSP arranged for a loss adjuster to attend the
applicants‟ property and report on the extent and cause of the damage. The
loss adjuster has reported:
“[ applicant] has advised that on Monday morning 10 th March 2008, during the
course of gusty coastal wind condition in the area he was occupied on the
property, when he suddenly heard a massive crash emanating from the vicinity
of the broiler sheds.
...
The supporting steel and timber framing members in the roof had evidently given
way during the gusty winds which persisted at time and impacted upon the
poultry stock contained within the structure.
A substantial quantity of the broiler chickens were killed due to the collapse of
the roof structure, whilst others have since progressively perished due to being
trapped within the debris, during high temperatures.
...
Built in the 1960‟s the shed in question measured in total vicinity of 1,200 square
metres with a corrugated iron roof supported on steel and timber framework with
201785 Determination 3 of 7
a clay floor covered in saw dust. The walls were timber framed, clad in timber
panels and asbestos cement sheet, with some being covered with an external
cladding of metal decked lining and recently strengthened with additional steel
framing.
The Insured have advised that this shed was the oldest broiler shed on the
property.
They have also admitted that as the roof was partially subsiding prior to the
incident in question, some four months ago they had arranged maintenance
works on the structure, by installing substantial settle portal frames and roof
trusses inside the shed. This was done in order to provide further stability to the
subsiding roof structure.
The Insured have advised that these works were completed of the own accord,
without a building permit and the welding works associated with the steel
installations were completed on their behalf by a local boiler maker
acquaintance.
The Insured advised that as these were internal maintenance works, on the
advice of a local Shire Inspector (who has apparently since retired), they
understood that a Building Permit would not be required.
During our inspections it was noted that the majority of the steel members within
the roof of the shed structure had also collapsed with a number of the steel
upright posts in the sheds side walls remaining in place.
The writer was concerned as to the extent of the recent maintenance works
completed by the Insured, without engineer‟s specifications and an appr opriate
building permit.
We also noted that the majority of the timber framing in the collapsed structure
was severely decayed and showed signs of extensive pest infestation.
We consider that the extent of this infestation may have well also contributed to
the failure of the structure, despite the gusty wind conditions described by the
Insured on the morning in question.
At the time of our attendance we advised the Insured the further investigation of
the cause of the shed‟s collapse would be required further in by a qualified
building consultant or structural engineer.”
12. In accordance with the loss adjuster‟s recommendations , a building consultant
was appointed to attend the applicants‟ property and has reported on the extent
and cause of the damage sustained;
“The owners have recently modified/strengthened the shed installing RHS portal
frames adjacent to every second timber frame and removing the internal timber
columns to allow the chicken catching machine to spread across the full width of
the shed.
...
The building has suffered a catastrophic roof failure, where the central section of
the roof has collapsed into the shed killing hundreds of chickens and rendering
the building no longer serviceable. The collapse was caused by a number of
contributing factors being:
(i) Local strong wind activity on the day of collapse
(ii) A weakened building structure due to recent modifications and internal
column removal.
(iii) A weakened building structure due to beetle infestation within the structural
timbers.
(iv) A weakened building structure due to fungal attack of structural timbers
201785 Determination 4 of 7
...
The following observations were made:
(i) The central section of the shed has collapsed into the centre of the building
– the building end walls were still upright and partially supporting the end
frames.
(ii) The shed was full of full term broilers at the time of collapse and hundreds
of these birds were killed in the collapse. No farm staff were int eh shed at
the time of collapse.
(iii) The structural timber throughout the shed had been affected over the long
term by both a beetle infestation and wet rot/fungal attack. The beetles are
most likely Darkling Beetle „alphitobius diaperinus‟ which is a common pest
in poultry sheds and is known to cause damage to insulation etc in its egg
laying/pupa stages.
(iv) The timber laminated portal frames were fabricated from hardwood framing
members 70mm wide x 45 high overclad with 7.00mm thick masonite nail
laminated to the hardwood members.
(v) The new RHS portal frames have been site fabricated from 150 x 100 x
5.00 RHS installed beside every SECOND timber portal with 125 x 75 RHS
underpurlins running along the same alignment as the old timber columns
(now removed). This work was carried out in November 2007 by the
owners and local boilermaking contractor.
(vi) The new steel port frame knee joints which were still visible, were poorly
prepared, poorly welded with inadequate weld length to develop full
strength of the member/joint.
(vii) The adjacent shed, Shed 1 was constructed with mild steel UB portal
frames – water drippers and feed equipment was all suspended from the
roof structure via a lift up pulley system.
...
The roof structure has been severely weakened by a number of contributing
factors being:
(a) The removal of internal timber support columns and replacement using full
span RHS portal frames
The major bending moment on a pinned base portal frame is normally
located at the knee joint, but in this case the welding/fixing was inadequate
preventing the joint to develop full moment capacity which transferred the
maximum moment to the apex/ridge joint of the frame. These welded butt
joints were of poor quality and it is most likely that due to strong localized
wind, this joint failed due to tension in the bottom weld, triggering the
progressive roof collapse.
(b) The long term activity of beetles and their larvae in the timber support
member of the building.
This burrowing activity reduces the cross sectional area of the structural
members and their subsequent ability to sustain loads.
(c) The long term effects of timber decay and fungal attack.
The original timber frame has various areas of wet rot due to the constant
washdown of the sheds following the removal of each group of broilers. The
damp conditions and slow drying are perfect conditions for fungal spored to
develop, weakening the timber cross sections.
The actual collapse was triggered by reported local high wind gusts experienced
on the day of failure....The highest wind gust experienced...on the day of
collapse was 52km/hr indicating that there was high wind conditions in the area
on the day.
201785 Determination 5 of 7
...
Wind gust speed had been higher prior to the collapse although the direction and
localised differences may have been unique on the day to trigger the failure.
...
It is apparent that a Structural/Civil Engineer was not consulted regarding the
building frame design. The owner advised that he purchased the steel from the
local steel merchant and it was welded together by a local Boilermaking
subcontractor.
It is unknown how the owner determined the member sizes, their spacing or any
another structural details hence the member sizes and the fabrication/welding
was inadequate.
The adjacent shed, Shed 1, has Universal Beam portal frames of the same span
and this should have been an indicator at least, of the size and spacing of the
new frames.
It is estimated that a minimum of a 250 UB portal should have been used noting
that the complete frame would need to be redesigned considering all additional
deal loads, wind conditions and fo undation capacity.”
13. The FSP sought clarification on the building requirements necessary following
the internal modifications from the building consultant:
“Q1 Would the building have been compliant with all statutory regulator
and local authority requirements?
A Without seeing every part of the building prior to a major part of it being under
collapsed material, I am of the opinion that prior to modifications, it would have
been compliant with the regulations that applied when it was constructed.
Remember of course that a building only has to comply with the regulations in
force at the time of construction. (Codes have been tightened up over the last 40
years). Following the modifications the building would not have met the
requirements of the Building Code of Australia or any of the applicable Australian
Standards, in particular
AS 1170.01, 1, 2 & 3 Loading Codes & AS 4100 Steel Structures Code.
Q2Confirm if the insured was required by local council to obtain a building permit
prior to the shed renovation taking place?
A Minor maintenance on buildings does not normally require a building permit.
The column removal undertaken in this case is classified as major structural
works, and as such, it would have required a Building Permit. Design drawings
and full design and computations by a Structural Engineer are mandatory and if
not provided with the permit application would have been requested by the
Building Surveyor before any permit was issued.”
14. The applicants argue that they were verbally advised by a member of the
council that such a permit was not required. This particular person has since
retired from a position within the council not connected to building permits and
no evidence has been submitted from him regarding the alleged conversation.
15. The FSP seeks to rely on the applicants „General Obligation‟ to “comply with
and maintain any Statutory obligation, regulation, by- law and directions”. In this
particular case, the Panel is of the view that there is insufficient substantive
evidence to show that the applicants have failed to comply with their obligations
as required under the terms of the policy.
201785 Determination 6 of 7
16. However, the applicants submit that irrespective of this, the collapse of the
shed was as a direct result of a storm event which should be afforded cover
under the terms of the policy.
17. In these circumstances, the Panel consider it necessary to determine the
proximate cause of the damage to the applicants‟ property. It has not been
disputed that the timber frames had been subject to extensive fungal attack and
a beetle infestation, nor has contradictory evidence been submitted by the
applicants that the modifications were inadequate for the nature of the
structure.
18. Despite its exposure to rot/infestation and a range of weather conditions over
many years, the shed remained serviceable. However it is significant that the
recent structural changes preceded the failure of the building, and it is of note
that the building consultant reported that the roof structure has been severely
weakened by a number of contributing factors. Specifically, the removal of
internal timber support columns and replacement using full span RHS portal
frames, and the new steel port frame knee joints were poorly prepared, poorly
welded with inadequate weld length to develop full strength of the member/joint.
19. Having carefully considered the evidence, the Panel is of the view that the
storm event, which is not disputed occurred, was merely a catalyst or trigger in
the collapse of the building and that the proximate cause of the damage was
the previous significant modifications. There is also evidence that the fungal
attack and beetle infestation would have contributed to the weakening of the
structure.
20. The Panel notes the wording of the FSP‟s exclusions are limited to the cost of
„repairing‟ or „putting right‟ the defective work. However in this case, the Panel
is of the view that the effective cost of rectification of the faulty modifications is
equivalent to the full extent of the loss, and therefore the FSP‟s exclusion
entitles it to deny the claim for its building loss.
21. The applicants have also requested payment for interruption of the business.
The Panel is aware that acceptance or denial of that particular claim will be
dependent upon the outcome of this dispute for the building damage and the
FSP should address this accordingly upon receipt of this Determination.
22. The Panel also notes that the applicants are subject to a claim from the owner
of the chickens, for whom the applicants were growing the birds. The Panel is
of the view that the applicants‟ policy ext ends to provide cover in circumstances
where liability between the parties is established, and the FSP is required to
address this aspect with the applicants, should any claim be made against the
applicants in this regard.
CONCLUSION
23. After thoroughly reviewing all the evidence and considering the relevant issues,
the Panel finds that the proximate cause of the damage to the applicants‟
property was as a result of the faulty modifications and inferior workmanship
which are excluded under the terms of the policy.
201785 Determination 7 of 7
24. Accordingly, the Panel determines that the FSP is not required to indemnify the
applicants in respect of this part of the loss.