Summary
After high winds damaged ceilings in a home, the insurer accepted the claim but disputed how the ceilings should be repaired. AFCA found both parties' scopes inadequate and ordered damaged plasterboard replaced and the remaining ceilings fixed to building standards or manufacturer requirements, without fixing a dollar figure.
The policy lets the insurer choose repair or replacement, but any repair must meet current building standards and manufacturer recommendations for affixing ceilings.
Subjects and remedies
home or building damagenatural disasterrepair or rectify
Text of the determination
201722 Determination 1 of 7
DETERMINATION
Case number: 201722
Home Building – settlement – extent of works required
SUMMARY OF FACTS
1. The applicant holds a Home Building policy with the Financial Services Provider
covering her residential property. The period of insurance for the policy was 18
September 2008 to 18 September 2009.
2. In June 2009 the applicant lodged a claim for damage to the ceiling of the
insured property. The applicant stated the damage occurred from high winds in
April 2009.
3. The FSP engaged assessors and engineers and determined it would pay the
claim for repairing the ceiling.
4. A scope of works was prepared by the FSP‟s preferred repairer and the
applicant also obtained several quotes outlining a scope of repairs.
5. The FSP is prepared to replace the area of deflected ceiling, but considers re-
screwing and nailing of the plaster ceiling to the trusses as adequate for the
other rooms.
6. The applicant disputes the scope of works on the basis she wishes the entire
ceiling to be replaced and to ensure the proposed repairs meet the Australian
standards.
ISSUES IN DISPUTE
7. Whether the FSP has provided an appropriate scope of works to undertake
repairs.
RELEVANT POLICY PROVISIONS
“How We Settle Claims
...
We will at our option unless limited by this part:
reinstate, rebuild or repair your home to a condition equal to but not better or more
extensive than its condition when new
replace the property with the nearest equivalent new property available or
pay the cost of reinstatement, rebuilding, replacement or repair.
...
we will try to match any materials used to repair your home with the original materials.
If we cannot, we will use the nearest equivalent available
we will not pay any costs for replacing undamaged property
...
We will pay as part of your sum insured
Building fees and related costs
The reasonable cost of:
demolition and/or removing debris from the site
architects ’ , engineers ’ and consultants’ fee s
201722 Determination 2 of 7
obtaining building approvals and permits from local authorities
any extra costs to meet the changed requirements of local or statutory authorities, and
temporary protection of your property, necessarily and reasonably incurred to replace,
rebuild or repair your home following loss, damage, or destruction by an insured
event.”
REASONS FOR DECISION
8. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
9. I have read each party‟s submissions and documents. As the dispute is on the
nature of the scope of repairs, I will only refer to those materials and
submissions that are relevant to this issue.
The Applicant’s Submission
10. The applicant notes her property sustained substantial wind damage to the
ceilings in her family room/kitchen, laundry and main bathroom which are all
under a large truss room extension to the home. The ceilings were installed in
1993.
11. The applicant considers the scope of works provided by the FSP‟s assessor
(“WH”) was unsatisfactory because it did not appear to be in accordance with
the current building standards for plastering truss ceilings (AS/NZS 2589.2007).
12. The applicant contends that her policy covers any extra cost to meet the
changed requirements of local and statutory authorities incurred to replace,
rebuild or repair the home following loss, damage or destruction by an insured
event.
13. The applicant submits that the experts did not inspect the bathroom and
laundry areas and only one of the engineers entered the roof cavity to inspect
the trusses.
14. The applicant quotes the original assessor, WH, as follows:
“The ceiling is dropping – that is apparent from exposed nail holes and distinct
lines along plaster sheet joints....We suspect the ceiling will have to come down
and be a replaced (sic) disturbing cornices and walls which will need re-painting
at least” .
The applicant contends this original opinion is consistent with the advice she
received from builders and plasterers.
15. The applicant notes that a contractor (“JC”) was sent out by WH to inspect the
property to find a cause of damage. JC did not inspect the roof cavity and then
reported that the plaster ceiling in the combined kitchen, dining and family
rooms deflected in several areas from the timber roof trusses above. JC further
made comments that there was water stain marks and damp insulation in the
roof cavity despite not inspecting the roof cavity. The applicant notes JC did not
mention the laundry or bathroom ceilings as he did not inspect same.
16. The applicant contends that the first engineer (“LR”) did not inspect the roof
cavity as due to his age, he declined to get into the roof cavity. LR noted that
the family area (described as a lounge-room) was sagging and had deflected
between 30-55mm over the central section of this area and was possibly only
supported by the cornices to the perimeter walls.
201722 Determination 3 of 7
17. The applicant considers that LR only conducted a cursory inspection as the
laundry, kitchen and bathroom were not inspected. Further, the applicant
contends that LR informed her that in order to have the works properly
performed and not just re-screwed, the applicant would need to pay half.
18. The applicant notes that another engineer (“RR”) attended the premise and
inspected the roof cavity, but not the bathroom or laundry areas.
19. The RR report does not outline the full extent of damage, an acceptable
method of repair or level of finish in accordance with current building
construction, Australian Building Standards or recommended repairs/installation
of plasterboard ceilings as advised by both Boral and CSR experts.
20. The applicant notes th e recommended repairs by the FSP‟s plasterer did not
conform to current trade practices and standards as advised by CSR Gyprock
and Boral technical experts. The applicant considers the FSP has alleged fixing
her plasterboard to current Australian and New Zealand standards would
constitute „improvements‟ to her property. The applicant notes the Australian
Standards changed in 1997 and the ceilings were installed in 1993.
21. The applicant contends that the policy covers any extra costs to meet the
changed requirements of local or statutory authorities.
22. The applicant has been verbally advised by both Boral and CSR that once a
plasterboard has bent or sagged, it cannot be successfully screwed back as it
will buckle in another spot when pushed up and a flat surface cannot be
obtained.
23. The applicant has enclosed materials provided to her by CSR regarding the
framing of Gyprock plasterboard. I note the materials covers topics such as the
maximum span of the plasterboard, metal batten/furring channel used in
ceilings and levels of finish. Of particular interest is the section entitled
„repairing an old plaster ceiling‟ which outlines how to fix same. The
recommendations include removing all existing cornices, plaster cover batten,
mouldings etc and running steel battens (furring channels) at right angles to
existing ceiling joists and screw fix to each joist. The battens should be spaced
at 600mm. Glue and nails should then be used to fix the gyprock to the new
battens, fix the joins and fix the new cornice around the perimeter of the room.
24. The applicant was dissatisfied by the attendance of a plasterer without notice
on the day the applicant was taking her daughter for brain surgery.
The FSP ’s Submission
25. The FSP notes the original method of recommended repair was double
screwing the complete ceiling and applying a plaster scrim over the existing
trusses.
26. The FSP‟s expert engineer LR reported the trusses were true and level with no
sign of collapse or misalignment, and there was no sign of water entry or
damage. LR noted the only way to confirm whether the fixings were suspect
would be to remove a section of the ceiling to examine same.
27. LR further recommended the deflected area be removed and replaced and the
remaining areas screwed or nailed as required.
201722 Determination 4 of 7
28. I have reviewed the LR report and note the following recommendations were
made –
(a) The deflected area of ceiling be removed along with the insulation and an
engineer‟s inspection be carri ed out at the time the ceiling is removed to
enable the adequacy of the existing ceiling fixings to be determined and a
method of re-fixing a new plaster ceiling.
(b) Screwing or nailing be carried out as required to the remaining sections of
the plaster ceili ngs to the whole of the area of the extension as all the
fixings to the ceiling could be suspect in this area.
(c) The area in which the plaster ceiling has been removed should be re-
insulated by installing insulation between the truss bottom cords.
(d) The new plaster ceiling board be applied and properly fixed to the whole
of the area of the deflected ceiling including taping, filling and sanding
joints.
(e) We would recommend that the remainder of the plaster ceiling be
checked for hairline cracks to the plasterboard and cornices and repairs
carried out to any cracks evident within the area of ceiling.
(f) Preparatory works be carried out for painting and the whole of the ceiling
area and cornices be painted.
29. The FSP engaged RR to attempt to obtain a consensus with the scope of works
as the applicant disputed LR‟s scope of works. RR recommended close nailing
throughout, but did not supply a scope of works.
30. I have reviewed the RR report and note the following recommendations were
made –
(a) Carefully locate the bottom chords of all trusses over the family
room/meals area and mark the centrelines and screw locations on the
ceiling;
(b) Use of a 40mm „W‟ screw, coarse thread screws in accordance with the
manufacturer‟s recommendations – driving the head of the screw just
under the plasterboard surface but not to tear the paper liner;
(c) Install battens at 300mm maximum spacings along all trusses – make firm
and if necessary install intermediate screws in areas of persisting sag or
[illegible]
(d) Remove all temporary strapping/fixings and check ceiling for true and
[illegible]
(e) Remove all damaged plasterboard surfaces in accordance with
manufacturer‟s recommendations
(f) Sand surface and prepare for painting
(g) Repaint the whole of the ceiling as far as is necessary to [illegible] and
provide an acceptable cosmetic result
(h) Clean up and obtain final approval of works
31. The FSP contends that the applicant has referred to building standards, but has
failed to clarify her specific areas of concern.
32. The FSP contends that it has attempted to abide by its policy which allows (at
its option) to reinstate, rebuild or repair the home to a condition equal to but not
better or more extensive than its condition when new.
201722 Determination 5 of 7
33. The FSP acknowledges that its policy allows for additional costs to meet the
changed requirements of local or statutory authorities. However it submits that
any scope of works, which has not been prepared, would address the repairs in
terms of current building standards.
34. The FSP believes the plasterboards re-screwing and/or nailing would be an
adequate method of repair except for the area of deflection which would require
replacement.
35. The FSP has enclosed copy of quotation received from the applicant. The
quotation states the following –
“back room – kitchen laundry and bath room.
To install new cilling (sic) plastor (sic) cornerers (sic) as original
To paint walls + cilling (sic)
(to fix & repair existing trusses)
Total cost: $39,000”
36. The FSP has enclosed a copy of the applicant‟s building quotation for $33,500.
The quotation includes –
(a) stripping out the entire existing cornices, entire plaster ceiling and ceiling
bat.
(b) To carry out repairs to existing trusses (additional bracing and fixing)
(c) To install metal battens to the entire trusses for straight ceiling line and
install existing insulation bats to the ceiling area
(d) Apply new 10mm ceiling plaster sheeting to the entire ceiling
(e) Apply new cornices to match existing
(f) Prepare plaster and cornices for painting and then paint the walls, ceiling
and cornices to match existing
(g) To fix and repair ceilings – Laundry and Bathroom
(h) To paint entire rooms – walls, ceilings, laundry and bathroom only
(i) Remove debris from site.
37. The FSP has enclosed a further quotation received from the applicant in the
sum of $29,900 (Inc of GST) which includes the following works –
(a) Demolition & removal of damaged ceiling and cornices
(b) Removal of existing insulation batts
(c) Repair and reinforce existing ceiling trusses – additional blocks, trimmers
and bracing
(d) Supply & fit metal battens, laser level entire area
(e) Supply & fit Gyprock SuperCeil board to entire ceiling area
(f) Supply & fit new cornice to match existing
(g) Install insulation batts to ceiling area
(h) Paint walls, ceilings and cornices to match existing
(i) Repair & paint ceilings in laundry and bathroom as required.
(j) Removal and disposal of demolition materials. Clear and make site safe
by removal of debris.
38. The FSP has enclosed an email and scope of works from JC from which I note
the following –
(a) JC quotes the works at $4,697 (GST inclusive) to carry out the plaster
works to familyroom, kitchen, laundry and bathroom, seal and repaint the
ceilings to these areas and relay existing insulation.
201722 Determination 6 of 7
(b) JC and the plasterer were both of the opinion that the plaster ceilings
should be double screwed, temporarily removing the existing insulation
batts and plaster scrim the ceiling from above the trusses.
(c) The re-gluing and screwing of ceiling to the trusses would return the
ceiling to a correct alignment.
Consideration of each party’s submission
39. It is not in dispute that the FSP has accepted the claim for repairs.
40. It is further not in dispute that the area of deflection requires complete
replacement of the plaster ceiling and cornices.
41. The issue in dispute is the method of repairing and/or reinstating the other
plaster ceilings in the property.
42. The applicant is concerned about the repairs not meeting the building
standards, but has not been particularly specific about why she says the FSP‟s
scope of works do not meet the standards. Further, the applicant has not
proffered a detailed scope of works that she considers would be suitable.
43. The FSP has correctly pointed out that any repairs/reinstatement are required
to meet the current building standards.
44. I have reviewed all of the quotations and/or scope of works.
45. The applicant‟s quotations lack detail which would be of assistance to this
matter. For example, in a number of the quotations the works are stated as
“ repair and paint ceilings in laundry and bathroom as required ” or similar. There
is no explanation as to whether the laundry and bathroom ceilings need to be
similarly demolished and replaced or the repairs are in fact re-screwing the
plasterboard.
46. I note the FSP ‟s expert RR appears to be in agreement with the quotations
from the applicant which involve installing additional battens to support the
ceiling. Additional battens/furring channels would appear to be consistent with
the manufacturer‟s recommendations.
47. I have concerns the JC quote is inadequate. The quotation‟s suggestion of re -
screwing the entire ceiling would be at odds with LR‟s report t hat the deflected
portion will need to be replaced. I also note that the report of RR suggests
removal of damaged plasterboard. Further, there is no mention of reinforcing
the trusses with additional battens/furring channels as recommended by RR
and the manufacturer.
48. I consider that plasterboard which shows signs of deflection or other damage
should be replaced pursuant to the recommendation of LR and RR.
49. I note that there are clear manufacturer‟s recommendations regarding fixing old
ceilings and the need to add additional battens for securing the ceiling. This
recommendation is consistent with the recommendations provided in RR‟s
report and should form part of the works.
50. I note that under the policy terms and conditions, the FSP has the discretion of
whether to replace or reinstate items. Accordingly, if the plasterboard in the
other rooms is not damaged and does not require replacement, then the FSP
has discretion to repair or replace the plasterboard in other rooms . Although it
201722 Determination 7 of 7
is noted that the affixing of additional battens may be required in these rooms
pursuant to any manufacturer‟s recommendation or building standards.
51. There are varied opinions within the reports and quotations on whether the
ceilings will need repainting or whether the ceiling and wa lls will require
repainting. I am of the opinion that if the plastering cannot be removed without
damaging the paint to the walls, then the walls will require repainting. If
however the walls are not damaged, then the FSP is only required to paint the
ceilings and cornices which required repairs. The policy only requires the FSP
to repair the damaged areas and does not provide any additional matching
benefit for wall coverings (such as paint) – although it is required to attempt to
achieve a match where possible.
CONCLUSION
52. I accept the damage to the ceiling falls within the cover provided by the policy,
and the FSP is to indemnify the policy holder according to the terms and
conditions of the policy.
53. It is my opinion that the scopes of work presented to me by both parties are
inadequate and do not provide me with sufficient information to make an
informed decision in relation to the appropriate method of repairs for each
room.
54. In these circumstances, I determine that the ceiling is to be fixed according to
the relevant building standards and/or manufacturer‟s recommendations for
affixing the ceilings. Further, if this includes securing by nailing and/or screwing
methods then the FSP is entitled to employ this method.
55. I determine that damaged or deflected plasterboard is to be replaced.
56. I determine that any works undertaken by the FSP must be undertaken
according to relevant building standards and/or manufacturer‟s
recommendations for affixing the ceiling.
57. I determine that the FSP guarantee the quality and standard of the works
performed by its agents.
58. I note the FSP should also have an opportunity to inspect the affixing method
when removing and replacing the plasterboard in the area of deflection.