Home / Financial Firm (Unknown - Insurer) / Determination 200869
Determination 200869
Foundation damage settlement offer disputed as inadequate
Summary
The applicants claimed the $56,030 foundation underpinning quote after the FSP offered $14,007.50 less excess for storm water related subsidence. The Panel found 75% of the loss was covered, applied a 50% pre-inception reduction and ordered payment of $21,011.25 plus 37.5% of the applicants' expert report.
Where causes cannot be apportioned precisely, the Panel applies what is fair in all the circumstances, splitting the competing expert opinions and upholding the 50% reduction for damage that likely pre-dated the policy.
Issues
- Claim amount dispute primary · upheld
“I determine that the FSP should attend to payment of $21,011.25.”
- Claim denial secondary · not upheld
“I consider the FSP's evaluation of a 50% deduction for the level of cover ... as not unreasonable.”
Subjects and remedies
pay claim
Text of the determination
200869 Determination 1 of 6
DETERMINATION
Case Number: 200869
Home Building – foundation damage and settlement – consideration of cause
SUMMARY OF FACTS
1. The applicants held home building insurance with the Financial Services
Provider (FSP) from 10 July 2007. The policy provided for buildings cover of
$300,000 with a standard excess of $200.
2. The building was a single storey, brick veneer home, on a concrete slab with a
tiled roof. It was constructed sometime around 1991 and purchased by the
applicants in or around the time that the policy was incepted in 2007.
3. On 21 July 2008, the applicants lodged a claim for damage observed to the
building. It was reported to the FSP that the slab was sinking on the property,
that there was cracking at the front of the house and that underpinning of the
property was required.
4. The FSP appointed a loss adjuster to attend the property and provide a report.
The report recommended the appointment of a structural engineer and the FSP
ultimately retained two. After lengthy investigations, it was determined that the
damage was largely attributable to two major issues, one issue being the effect
of large trees on the property and the second issue was the saturation of
foundation clays from storm water spillage.
5. The FSP offered a partial settlement of the claim. It obtained a quote for the
necessary works to repair and reinstate the footings for $56,030. Further work
would be required on the building after the underpinning was attended to and
the property settled.
6. Based on the quote, the FSP determined that 50% of the damage (relating to
the storm water spillage) should be covered on the claim, and made an offer in
this regard. The offer was reduced by an additional 50% as it was determined
that much of the damage was likely to have been incurred prior to the purchase
of the property by the applicants. The final offer was $14,007.50 less excess.
7. The applicants rejected the offer and consider it inadequate. They have
retained their own expert, who contends that the storm water leak from the
adjoining property is the principal cause of the loss. It seeks payment for the full
amount quoted by the FSP.
ISSUES IN DISPUTE
8. Whether the FSP and/or its agents made an accurate evaluation of the
applicants’ loss and a fair offer for settlement.
9. The extent to which the loss (if any) occurred during the period of insurance
and should be covered within the ambit of the claim.
200869 Determination 2 of 6
RELEVANT POLICY PROVISIONS
Page 3 of the Product Disclosure Statement (PDS)
“We will insure you for:
Loss or damage caused by one or more of the insured events...”
Pages 4-5 of the PDS
“Words with special meanings...
„period of insurance‟ means the period of time commencing on the effective date stated in
the current schedule...”
Page 42 of the PDS
“Unless... state[d] differently in your policy, [the FSP] will not pay for...
b. any loss or damage which is not caused directly by one of the insured
events...”
TERMS OF REFERENCE
Page 15 of the Terms of Reference (TOR)
“8.2 ...FOS will do what in its opinion is fair in all the circumstances”.
REASONS FOR DECISION
10. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
The Applicants‟ Submission
11. The applicants noticed cracks appearing in their driveway at the front of the
property, and throughout the house itself and lodged a claim with the FSP.
12. They were aware of a similar problem with their neighbour’s property.
Excavation at the site revealed a leaking stormwater pipe, which had saturated
the soil affecting both the properties over a considerable period of time.
13. The insurer for the neighbour’s property is allegedly to cover their claim.
14. Evidence is present of the movement within the soil at the property, causing
significant damage to areas of the home. The applicants rely upon a report from
their expert that states the damage is attributable to leakage from the
neighbour’s property and not (significantly) attributable to the surrounding trees,
as alleged by the FSP’s experts.
The FSP‟s Submiss ion
15. The damage present on the property was attributable to a number of factors,
including the proximity (and size) of the trees to the building on the property,
the effect of the stormwater leakage, the grade of the soil present and possibly
seasonal changes to rainfall and soil moisture contents over recent years.
16. The FSP accepts that some damage present is due to a defined insured event,
being the leakage from the stormwater drain. It relies upon the opinion of its
second engineering expert to suggest that this accounts for 50% of the
observed damage.
200869 Determination 3 of 6
17. The FSP also contends that the extent of the damage demonstrates that it has
occurred over a long period of time that pre -dated the insurance cover on the
property (and ownership of same) for the applicants. On this basis, it further
reduced the cover to reflect the loss that was occurred over the period of
insurance.
Consideration of each party’s submission
18. It is not in dispute that the applicants’ sustained a loss that was covered by the
FSP and therefore that they are entitled to at least partial cover under the
policy.
19. The FSP retained a loss adjuster to inspect the property. The adjuster
subsequently engaged two building engineers, a plumber and a specialist to
quote the underpinning work.
20. Regardless of the underpinning works to be conducted, the applicants and the
FSP are still to quote the work to repair the building and this will not be done
until after the initial work is completed and the consulting engineer is satisfied
that the building has stabilised. This Determination will be limited in scope to
evaluating the damage relevant to the initial work.
21. The loss adjuster essentially served a purpose to facilitate the appointment of
professionals to view the property and keep the FSP apprised of the progress
on the claim. Therefore, I will limit my consideration of the expert evidence to
that provided by the structural engineers for the FSP and the expert for the
applicants.
22. The first structural engineer asserted that the damage present was attributable
to three factors:
a. poor maintenance of the site;
b. seasonal changes in soil moisture contents; and
c. relatively low rainfall in recent years.
23. None of the three proposed causes were defined events within the context of
the FSP’s policy, and this would by extension invalidate the applicant’s claim.
24. It is fair to say that the FSP did not adopt the report as a reasonable analysis of
the damage, as it agrees that the applicants have sustained a loss of some
description.
25. The loss adjuster also appeared unconvinced by the report and with the
permission of the FSP, instructed a second structural engineer to view the
property and report on the damage.
26. This report was more thorough in my opinion and better examined the causes
of the damage. The second engineer stated the causes of the damage to be:
a. the effect of the surrounding trees near the property and their proximity
to the home.
b. ongoing wetting of the foundation clays from stormwater spillage along
the western perimeter of the home.
27. This report ventured two major contributing causes to the damage, with one
being covered under the terms of the policy and the other not. When pressed
200869 Determination 4 of 6
later on for an opinion as to the respective percentages for contribution to the
damage, the engineer suggested that each cause was roughly responsible for
50% of the damage.
28. The second engineer also suggested that the damage had been occurring over
a long period of time, and that it may even have been occurring since the
building of the home in or around 1991.
29. A quote to re-establish the footings of the property was obtained for $56,030
from a specialist.
30. Based on the report from the second engineer, the FSP proposed a settlement
to the applicant for 50% of the damage, being $28,015, less an allowance for
what damage was likely to have pre-dated the policy of insurance in 2007. It
was decided to further reduce the settlement by 50% and the applicant was
offered the sum of $14,007.50, less excess.
31. The applicants rejected the offer and considered it unreasonable. They retained
their own expert to review the damage and provide an opinion.
32. The applicants’ expert was an engineering consultant and his investigation
involved viewing the property and the neighbouring home, where the
responsible stormwater drain resided.
33. This report provided photos of th e excavated soil to show evidence of the “very
wet” ground conditions and the impact of the leaking pipe. The expert
suggested that the saturation from the defective sub-surface drain was
“extensive”, and he considered that little of the damage could be at tributed to
the presence of the surrounding trees.
34. On the subject of the trees, the expert suggested that this arguably would have
had a stabilising effect, as they would have soaked up some of the excessive
dampness caused by the leaking drain. This should have eased the effect of
the damage and arguably not exacerbated it.
35. It was suggested that the neighbour had lodged a claim with his insurer and
been covered for the loss, based on the leak discovered in the sub-surface
drain. No evidence was presented i n support of this.
36. The FSP has had opportunity to review and provide opinion on the report of the
applicant’s expert, and it has not sought, nor provided expert opinion to
challenge same. It does take issue with the fact that the report was compiled
almost two years after the initial reported event, and after the repair of the
damaged drain.
37. In consideration of the respective reports, I am inclined to accept (in part) each
of the reports from the second engineer for the FSP and the expert retained by
the applicants. Both experts raise important points and issues worthy of
consideration in determining an appropriate outcome.
38. I have largely disregarded the report from the FSP’s first expert as this also
appears to have been largely ignored in the recommendations adopted by the
FSP and I find the conclusions less credible than that from the latter reports.
39. I accept that the damage to the applicants’ property cannot solely be attributed
to the leaking sub-surface drain, and it is likely that a combination of factors
(including the presence of the trees) may have played a role.
200869 Determination 5 of 6
40. I consider that it is probably impossible to accurately estimate a definite
percentage for how the loss was ascertained, notwithstanding the attempt by
the second engineer for the FSP.
41. Noting the difficulty in assessing a formal percentage for such damage, I
consider that applying what is “fair in all the circumstances” is the most
appropriate measure of evaluating the loss.
42. The second engineer for the FSP evaluates the loss caused by the stormwater
drain at 50% of the overall damage. The expert for the applicant does not apply
a percentage, but considers it was substantially responsible (he concedes
some influence from the surrounding trees, but claims that such influence was
“minimal”).
43. It might not be unreasonable to suggest that the expert for the applicant would
have applied the loss as 95% attributable to the stormwater drain. As he has
not stipulated an actual figure, I will consider it as 100%, given it was stipulated
by the expert to be the defining contributing factor.
44. In considering two differing, but equally compelling expert reports, I am inclined
to determine that splitting the difference between the amounts speculated for
the loss would be appropriate. In that context, I am inclined to attribute 75% of
the loss to the damage caused from the stormwater drain.
45. The FSP deducted a further amount, being an additional 50% from the loss
estimate, in lieu of the timeframe accorded to the incurrence of the loss.
46. It is not suggested by any of the experts that the loss was a recent event, nor is
it disputed by the FSP that the applicants have incurred a loss during the period
of insurance.
47. Whilst it is seemingly apparent that the loss has occurred over a prolonged
period of time, it is not possible to pinpoint a period where the leak may have
originated.
48. I do not consider it unfair to speculate that the leakage of water predated the
applicant’s purchase of the property. I note that they did not commission a
building report at the time of purchase and they noted that there were minor
cracks present at that time, which were considered of no real concern.
49. Noting that the policy began in July 2007 (presumably after the purchase of the
property), and the structure dates back to 1991, it is conceivable that a great
deal of damage might have been done prior to the purchase of the property by
the applicants.
50. At the time of the reporting of the event to the FSP, the applicant had owned
the home for little more than 12 months.
51. I consider that the FSP’s e valuation of a 50% deduction for the level of cover to
represent the damage that likely occurred prior to the inception of the policy as
not unreasonable. The onus of proof to establish that the loss occurred solely
during the period of insurance rests with the applicants and this is an onus that
they cannot, and have not, discharged.
52. Therefore, I consider the application of a 50% discount on the amount
permitted for the damage to be appropriate and fair to the applicants.
200869 Determination 6 of 6
53. The applicants’ expert provided a quote for damage that was substantially less
than that provided by the FSP ($32,200 as against $56,030) as the expert
considered that there were aspects of the proposed underpinning that he would
not attend to. That said, the quote was not absolute and the expert suggested
that extra costs may be required.
54. Noting that the FSP is satisfied with the quote provided by its own expert, I am
inclined to accept this as a reasonable representation of the proposed
rectifications. This quote should be used as the basis for any cash settlement.
CONCLUSION
55. I determine that the tendered quote for $56,030 is a reasonable cost estimate
for the cost of underpinning the foundations of the building .
56. I consider that it is impossible, based on the submitted material, to determine
when the leakage (and any other contributing factors) started to affect the
property, although I accept the provided evidence that it pre-dated the inception
of the insurance policy.
57. I therefore determine that it is reasonable that only 50% of the amount to be
attributed to an insured event should be covered by the FSP. This leaves a
maximum claimable amount of $28,015.
58. I otherwise determine that the majority of the loss can be attributed to a leaking
stormwater pipe, and therefore that the FSP should attend to payment 75% of
the loss.
59. Based on the revised figures, I determine that the FSP should attend to
payment of $21,011.25.
60. In consideration of the amount awarded, I determine that the FSP should attend
to payment of 37.5% of the expert report obtained by the applicant, upon
receipt of the relevant invoice.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.