Home / Financial Firm (Unknown - Insurer) / Determination 200416
Determination 200416
Hail damage roof replacement claim declined
Summary
Applicant claimed hail damage to a zincalume roof, with a replacement cost of $14,234 cited. AFCA found the FSP was not entitled to deny the claim and ordered it to pay 70% of the replacement cost, with the applicant bearing 30% for pre-existing condition.
Hail damage was established as an insured event during cover, and the FSP could not rely on a single contractor report to reject its own contractor's acceptance, though wear and tear justified a 30% reduction.
Issues
- Claim denial primary · upheld
“FSP was not entitled to deny the claim; hail damage found to be an insured event during cover”
- Claim amount dispute secondary · not upheld
“Applicant to contribute 30% toward replacement due to pre-existing rust, wear and tear”
- Inadequate claim investigation secondary · upheld
“FSP denied on the basis of a second contractor's report alone, disregarding the first report recommending acceptance”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
200416 Determination 1 of 3
DETERMINATION
Case number: 200416
Home Building – storm – insured event – onus of proof – use of expert reports
SUMMARY OF FACT
1. The applicant held a home building policy with the Financial Services Provider
(FSP) from 09 May 2006. Prior to this date the applicant held a home building
policy with the same FSP from 28 June 2005 until 27 June 2006.
2. The FSP states that the applicant contacted the FSP on 27 August 2009 to
lodge a claim for hailstone damage to her roof which had occurred on or around
20 September 2008. The applicant states it was on 27 August 2008 and the
date of the hailstorm was 20 August 2008. The FSP’s formal denial letters
stated it was 27 August 2008, although an unnamed person had changed the
“8” to a “9” by hand.
3. The applicant submits that her roof needs to be replaced as a result of the
hailstorm, at a cost of $14,234.
4. The FSP denies the claim on the basis that the damage occurred prior to the
date of loss provided by the applicant and possibly prior to the commencement
of the policy, and that the roof was deteriorated to such a degree that it was in
need of replacement in any case.
ISSUES IN DISPUTE
5. Whether the FSP is entitled to deny the claim.
RELEVANT POLICY PROVISIONS
“WHAT YOU ARE COVERED FOR
Storm
If your home or contents suffer loss or damage caused by
...
thunderstorm or hail
...
we will NOT cover
loss, damage...that occurs as a result of
...
wear, tear, rust, corrosion, deterioration or erosion
depreciation”
REASONS FOR DECISION
6. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
7. The applicant contacted the FSP on 27 August 2009 to lodge a claim for
hailstone damage to her roof which occurred on or around 20 September 2008,
notwithstanding the analysis of dates contained in paragraph 2 .
200416 Determination 2 of 3
8. The applicant asserts that she was notified of the damage to the roof by a
contractor engaged to install insulation to the roof.
9. When submitting a claim, the burden of proof lies with the applicant to show on
the balance of probabilities that the loss claimed is a result of an insured event,
in this case storm-related hailstones.
10. Only after an insured event has been established does the onus transfer to the
FSP to demonstrate on the balance of probabilities that the loss claimed falls
within an exclusion of the policy, or outside the period of insurance cover.
11. Upon lodgement of the claim, the FSP appointed a contractor [DW] to attend
the applicant’s property and report on the extent and cause of the damage.
12. DW reported:
“Damage has been caused to the zincalume corrugated roofing to all elevations
of the house. The separate rear timber garage is in a dilapidated condition and is
not included in the claim.
...
Damage has been caused by the hail impacts during the storm
...
In my opinion damage is claimable and is a direct result of the hail storm. This
claim will need to be marked ACCEPT”
13. Upon receipt of the DW’s report, for a reason unexplained in its Notice of
Response to the Service, the FSP appointed another contractor [CBC] to attend
the applicant’s property and report on the extent and cause of the damage.
14. CBC reported:
“Extensive hail denting is present to t he entire roof surface, all of which appears
pre-existing to any recent hail storm occurrence as the dents are painted over
with no scuffing or scratching of the pain.
Paint deterioration is present at isolated dents however this deterioration is also
present where there are no dents indicating this is not due to hail impact.
Sheets are loose in places and considerable denting as a result of pedestrian
traffic is also present.
Extensive rust, with holes, is present in the end laps with silicon applied for
waterproofing.
A few small dents are present in the whirly bird although this is much softer
material and hail of this size would not damage the roof sheeting.”
15. Photographs of the applicant’s roof have been submitted and I am of the
opinion that the roof shows clear evidence of extensive hail damage and that
the roof is showing signs of rust and wear and tear.
16. The FSP denied the applicant’s claim on the basis of CBC’s report alone.
17. I find it remarkable that the FSP should choose to completely disregard the
initial unequivocal evidence of one of its contractors which unambiguously
concluded that the claim was one for acceptance, and then utilise the opinion of
another contractor to deny the claim. At the very least, it should have
established some shortcoming with the first report.
18. Coincidentally, CBC had provided the applicant with a pre-purchase building
report in April 2005 detailing:
“Re -screwing and patching at minimum, is required to the roof sheeting.
However given its overall poor condition, replacement should be considered.
...
200416 Determination 3 of 3
Corrosion/rust has commenced in the end laps of the roof sheets on both
pitches. There are only a couple of small holes allowing daylight through on the
Eastern pitch. However patching of the roof sheeting at minimum will be required
and replacement of the roof sheeting should be considered”
19. The applicant has objected to the use of the above report, citing conflict of
interest.
20. I have carefully considered the reports compiled by CBC and note that although
the roof did require attention, there is no indication that it was not serviceable
and in need of urgent replacement. Indeed CBC indicated that patching at
minimum was necessary to ensure continued function.
21. The applicant has provided a statement from a contractor employed by her in
November 2007 to repaint the roof. The statement confirms that the hail
damage occurred after this work was completed.
22. The applicant has also submitted a statement from neighbours confirming that
extensive hailstone falls had occurred in the area at the approximate time of the
date of loss, which also caused severe damage to their own property.
23. The FSP asserts that the damage could have occurred prior to the
commencement of cover. For this to have been the case, the damage would
need to have been sustained between the date of the pre-purchase inspection,
being 22 April 2005, and the commencement of a building policy on 28 June
2005.
24. The FSP has not provided any evidence to suggest that the hail damage
occurred during the excluded period and therefore I am of the opinion that on
the balance of probabilities, the damage occurred whilst cover was afforded by
the FSP.
CONCLUSION
25. After carefully reviewing all the somewhat confused factual and expert evidence
provided and carefully considering the relevant issues, I find that on the
balance of probabilities the damage sustained to the applicant’s roof was as a
result of an insured event which occurred during a period the FSP was on risk
for such an event.
26. Accordingly, in my opinion the FSP was not entitled to deny the claim.
However, taking into consideration what I consider to be the condition of the
roof in respect to non-hail damage and deterioration, I consider it reasonable in
the circumstances that the applicant contribute 30% toward the cost of its
replacement.
27. I there determine that the FSP is to pay the applicant 70% of the cost of
replacing the roof.