Home / Financial Firm (Unknown - Insurer) / Determination 200416

Determination 200416

Hail damage roof replacement claim declined

FirmFinancial Firm (Unknown - Insurer)
Decided2010-08-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$9,964
Non-financial loss—
Amount claimed$14,234
SourceAFCA PDF

Summary

Applicant claimed hail damage to a zincalume roof, with a replacement cost of $14,234 cited. AFCA found the FSP was not entitled to deny the claim and ordered it to pay 70% of the replacement cost, with the applicant bearing 30% for pre-existing condition.

Hail damage was established as an insured event during cover, and the FSP could not rely on a single contractor report to reject its own contractor's acceptance, though wear and tear justified a 30% reduction.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

200416 Determination 1 of 3 DETERMINATION Case number: 200416 Home Building – storm – insured event – onus of proof – use of expert reports SUMMARY OF FACT 1. The applicant held a home building policy with the Financial Services Provider (FSP) from 09 May 2006. Prior to this date the applicant held a home building policy with the same FSP from 28 June 2005 until 27 June 2006. 2. The FSP states that the applicant contacted the FSP on 27 August 2009 to lodge a claim for hailstone damage to her roof which had occurred on or around 20 September 2008. The applicant states it was on 27 August 2008 and the date of the hailstorm was 20 August 2008. The FSP’s formal denial letters stated it was 27 August 2008, although an unnamed person had changed the “8” to a “9” by hand. 3. The applicant submits that her roof needs to be replaced as a result of the hailstorm, at a cost of $14,234. 4. The FSP denies the claim on the basis that the damage occurred prior to the date of loss provided by the applicant and possibly prior to the commencement of the policy, and that the roof was deteriorated to such a degree that it was in need of replacement in any case. ISSUES IN DISPUTE 5. Whether the FSP is entitled to deny the claim. RELEVANT POLICY PROVISIONS “WHAT YOU ARE COVERED FOR Storm If your home or contents suffer loss or damage caused by ...  thunderstorm or hail ... we will NOT cover  loss, damage...that occurs as a result of ...  wear, tear, rust, corrosion, deterioration or erosion  depreciation” REASONS FOR DECISION 6. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 7. The applicant contacted the FSP on 27 August 2009 to lodge a claim for hailstone damage to her roof which occurred on or around 20 September 2008, notwithstanding the analysis of dates contained in paragraph 2 . 200416 Determination 2 of 3 8. The applicant asserts that she was notified of the damage to the roof by a contractor engaged to install insulation to the roof. 9. When submitting a claim, the burden of proof lies with the applicant to show on the balance of probabilities that the loss claimed is a result of an insured event, in this case storm-related hailstones. 10. Only after an insured event has been established does the onus transfer to the FSP to demonstrate on the balance of probabilities that the loss claimed falls within an exclusion of the policy, or outside the period of insurance cover. 11. Upon lodgement of the claim, the FSP appointed a contractor [DW] to attend the applicant’s property and report on the extent and cause of the damage. 12. DW reported: “Damage has been caused to the zincalume corrugated roofing to all elevations of the house. The separate rear timber garage is in a dilapidated condition and is not included in the claim. ... Damage has been caused by the hail impacts during the storm ... In my opinion damage is claimable and is a direct result of the hail storm. This claim will need to be marked ACCEPT” 13. Upon receipt of the DW’s report, for a reason unexplained in its Notice of Response to the Service, the FSP appointed another contractor [CBC] to attend the applicant’s property and report on the extent and cause of the damage. 14. CBC reported: “Extensive hail denting is present to t he entire roof surface, all of which appears pre-existing to any recent hail storm occurrence as the dents are painted over with no scuffing or scratching of the pain. Paint deterioration is present at isolated dents however this deterioration is also present where there are no dents indicating this is not due to hail impact. Sheets are loose in places and considerable denting as a result of pedestrian traffic is also present. Extensive rust, with holes, is present in the end laps with silicon applied for waterproofing. A few small dents are present in the whirly bird although this is much softer material and hail of this size would not damage the roof sheeting.” 15. Photographs of the applicant’s roof have been submitted and I am of the opinion that the roof shows clear evidence of extensive hail damage and that the roof is showing signs of rust and wear and tear. 16. The FSP denied the applicant’s claim on the basis of CBC’s report alone. 17. I find it remarkable that the FSP should choose to completely disregard the initial unequivocal evidence of one of its contractors which unambiguously concluded that the claim was one for acceptance, and then utilise the opinion of another contractor to deny the claim. At the very least, it should have established some shortcoming with the first report. 18. Coincidentally, CBC had provided the applicant with a pre-purchase building report in April 2005 detailing: “Re -screwing and patching at minimum, is required to the roof sheeting. However given its overall poor condition, replacement should be considered. ... 200416 Determination 3 of 3 Corrosion/rust has commenced in the end laps of the roof sheets on both pitches. There are only a couple of small holes allowing daylight through on the Eastern pitch. However patching of the roof sheeting at minimum will be required and replacement of the roof sheeting should be considered” 19. The applicant has objected to the use of the above report, citing conflict of interest. 20. I have carefully considered the reports compiled by CBC and note that although the roof did require attention, there is no indication that it was not serviceable and in need of urgent replacement. Indeed CBC indicated that patching at minimum was necessary to ensure continued function. 21. The applicant has provided a statement from a contractor employed by her in November 2007 to repaint the roof. The statement confirms that the hail damage occurred after this work was completed. 22. The applicant has also submitted a statement from neighbours confirming that extensive hailstone falls had occurred in the area at the approximate time of the date of loss, which also caused severe damage to their own property. 23. The FSP asserts that the damage could have occurred prior to the commencement of cover. For this to have been the case, the damage would need to have been sustained between the date of the pre-purchase inspection, being 22 April 2005, and the commencement of a building policy on 28 June 2005. 24. The FSP has not provided any evidence to suggest that the hail damage occurred during the excluded period and therefore I am of the opinion that on the balance of probabilities, the damage occurred whilst cover was afforded by the FSP. CONCLUSION 25. After carefully reviewing all the somewhat confused factual and expert evidence provided and carefully considering the relevant issues, I find that on the balance of probabilities the damage sustained to the applicant’s roof was as a result of an insured event which occurred during a period the FSP was on risk for such an event. 26. Accordingly, in my opinion the FSP was not entitled to deny the claim. However, taking into consideration what I consider to be the condition of the roof in respect to non-hail damage and deterioration, I consider it reasonable in the circumstances that the applicant contribute 30% toward the cost of its replacement. 27. I there determine that the FSP is to pay the applicant 70% of the cost of replacing the roof.