Home / Financial Firm (Unknown - Insurer) / Determination 200410

Determination 200410

Bathroom water damage: amount payable disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2010-10-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$12,300
Non-financial loss—
Amount claimed$13,500
SourceAFCA PDF

Summary

The applicants' bathroom had water damage from a leaking pipe and they claimed $13,500 for repairing the floor and walls after the FSP paid part of the loss. AFCA found the FSP's prejudice argument and refusal of the wall repairs were not made out, and ordered the balance plus statutory interest.

The applicants acted reasonably to prevent further loss and the damage could not be assessed without removing the wall linings, so the FSP's prejudice argument failed.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

200410 Determination 1 of 4 DETERMINATION Case number: 200410 Home building – water damage – FSP’s prejudice SUMMARY OF FACTS 1. The applicants held a home building policy with the Financial Services Provider (FSP) from 23 August 2002. 2. The applicants contacted the FSP on 18 September 2009 to lodge a claim for water damage sustained to their bathroom. 3. The FSP does not dispute that damage has been sustained to the applicants bathroom by leaking water and has paid for the replacement of the floor and lower wall beams. However it disputes liability for any additional costs incurred as the bathroom had been partially demolished prior to inspection by its representative, and therefore it has been prejudiced in determining the extent of the loss for which it would be liable. 4. The appl icants do not seek the entire cost of refitting the bathroom’s hardware as this is a cost they would have incurred at the eventual time of renovation. However they do seek full reparation for the cost of repairing the water damage to the floor and the walls in the sum of $13,500. ISSUES IN DISPUTE 5. Whether the FSP’s position has been prejudiced by the commencement of works prior to inspection by its representatives. 6. Whether the FSP has met its liability in full under the terms of the policy. RELEVANT POLICY PROVISIONS “Escape of Liquid Cover is limited to accidental escape from any pipe, fixed tank, waterbed, fish tank or any fixed item that is used to hold the liquid. We will also pay for the reasonable exploratory costs in locating the source of the damage provided we have agreed to pay for the loss or damage caused by the escape of the liquid. We will not pay: - for loss or damage to the item from which the liquid escaped and if the liquid escaped from a shower recess the cost of re-tiling the walls or floor of the shower recess - to repair or for replacement of undamaged parts of your building to match an area that has been repaired or replaced - for loss or damage caused by any gradual escape of liquid which is evident and which you fail to rectify. ... Related expenses If we agree to pay a claim for loss or damage to your Building following an event, we will also pay for the related expenses listed below. We will only pay those expenses that are incurred provided they are reasonable and appropriate. 200410 Determination 2 of 4 The most we will pay for loss or damage and related expenses listed below is the sum insured shown in the schedule. These related expenses should be taken into account when determining your sum insured.  Temporary Repairs and Protection The reasonable costs incurred for temporary repairs and protection necessary to prevent further loss or damage. ... Your responsibilities As soon as possible after an event that has caused loss, damage, injury or legal liability, you must:  Do everything possible to prevent further loss, damage, injury or legal liability  Contact us with details of what has happened ...  Provide us with access and a reasonable time to inspect the loss or damage before you allow anyone to fix or interfere with it” REASONS FOR DECISION 7. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 8. Whilst carrying out the renovations to the applicants’ kitchen , it was noted by the tradesman, that there appeared to be water leaking from an adjacent bathroom and was collecting in pools under the kitchen cupboards. 9. When the applicants were made aware of the leak , they contacted the FSP on 18 September 2009 to lodge a claim for the water damage which had occurred in the bathroom. 10. The applicants contacted the FS P’s out of hours service and were advised that they would receive a return telephone call on the next business day so that a claim could be formally lodged. There is no evidence to suggest that a return telephone call was made to the applicants. 11. The tradesman appointed by the applicants to renovate the kitchen and then subsequently the bathroom, provided a statement which details: “Prior to the demolition of the bathroom, the water damage that was occurring beneath was not at all apparent. Once the kitchen floor had been ripped up however, the extent of the water damage was realised. Whilst we had initially planned on doing the bathroom potentially at a later date, the damage confirmed it was absolutely necessary and urgent as the source and extent of the leak was unknown, but possibly extensive. ... The bathroom demolition started on the 28 September 2010 [sic]. The entire flooring under the tiles in the bathroom was rotten. It was impossible to tell where the leak was coming from prior to removing the tiled floors and walls. The bathroom fixtures, floors and walls all had to be removed at which time the severe extent of the damage was seen. The bathroom had to be stripped back to the skeleton. It would not have been possible to fix the rotting floor, beams and walls beams without removing the entire surface layer of tiles on all the floor and walls of the bathroom. ” 12. Having still not heard from the FSP, the applicants engaged the services of a plumber to attend the property on 25 September 2009 to ascertain the cause of the water leak. 200410 Determination 3 of 4 13. The plumber confirmed that the origin of the leak was in pipe work located behind the bath spout which he was able to repair. 14. The FSP submits that it subsequently contacted the plumber who advised that he disconnected the water supply on 25 September 2009. However he did not locate the origin of the water leak until 30 September 2009. Although the FSP seeks to rely on the contents of this conversation, it has provided no evidence by way of claim notes, statutory declaration or telephone recording to establish the matters on which it relies. 15. The applicants again contacted the FSP on 28 September 2009 and formally lodged a claim for the damage sustained to the bathroom. 16. Upon lodgement of the claim, the FSP appointed a contractor to attend the applicants’ property and report on the exte nt and cause of the damage. The contractor reported: “On the 28 th September 2009, we inspected your Insured’s residence and were shown to the bathroom which has sustained damage as a result of an escape of liquid. Your Insured was carrying out renovations to the bathroom...by demolishing the fixtures and wall covering when they noticed water damage to the flooring of the bathroom, bottom plate and studs to the bathroom wall adjoining the kitchen. This is the result of a failure of the waterproofing membrane to the bathroom which we have informed your Insured is a maintenance item and must be rectified at their own expense which they acknowledge and agree with. We have also informed them that resultant damage to the wall linings will not be considered resultant damage as they have demolished them with the intent to renovate and have also jeopardised claiming for this repair as they have given no opportunity for the damage to be sighted which they acknowledge and agree with.” 17. The applicants strenuously deny that they were in the process of renovating the bathroom at the time the leak was discovered, and that they accepted that the damage to the wall linings would not be considered by the FSP due to their prior removal. 18. The applicants have clearly provided evidence to demonstrate that water damage was not evident prior to the renovation of their kitchen, not the bathroom, and the full extent of the damage could not be gauged without the removal of the internal wall linings. 19. The applicants have provided photographs detailing the extent of the damage sustained to the bathroom. I find that these photographs assist in understanding the level of damage by clearly depicting extensive water damage throughout the bathroom, which not only affected the floor but the walls as well. 20. I am of the opinion that if the internal wall linings not been removed, the extent of the damage would not have been evident to the FSP’s contractor. 21. I find it difficult to comprehend the contractor’s opinion that the waterproofing membrane had been compromised, as there were no internal walls to inspect and he has not made clear how he reached such an opinion without the physical evidence before him. 22. The FSP has made reference to the areas of expertise of the persons employed by the applicants and whether or not they are fully qualified to 200410 Determination 4 of 4 express a professional opinion. However, it has failed to provide evidence of the qualifications of the individual employed by its contractor who attended the applicants’ property and provided the subsequent report. 23. The FSP argues that the applicants failed to provide it with a reasonable time frame in which to have the property inspected, prior to the commencement of work, and in these circumstances they prejudiced its ability to determine the extent of its liability. 24. However, in my opinion after waiting seven days for the FSP to return their initial telephone call, and being aware of a potentially extensive water leak, a reasonable person in the circumstances would employ a plumber to disconnect the water supply and attend to the repair of a leaking pipe. If they had not done so, they may have breached their obligation to minimise their loss. 25. Furthermore, I am of the opinion that the applicants were acting in accordance with the policy wording, that they should ‘do everything possible to prevent further loss’ and that cover is afforded for the cost of doing so under the ‘Temporary Repairs and Protection’ section of the policy. 26. The applicants do not seek the entire cost of refitting the bathroom’s hardware as this is a cost they would have incurred at the eventual time of renovation, but seek full indemnification for the cost of repairing the water damage to the floor and the walls. CONCLUSION 27. After reviewing all the evidence and considering the relevant issues, I find that the applicants made contact with the FSP as soon as they were made aware of the damage to their bathroom, carried out necessary repairs to prevent further damage, and provided the FSP with the opportunity to view the full extent of the damage which would not have been evident without the removal of the internal wall linings. The contractor who performed the work has provided a statement as to the nature, extent, and cost of work. 28. Accordingly, I determine that the FSP reimburse the applicants the cost of repairing the damage to the bathroom, this being $13,500, less $1,200 already paid to the applicants and less any policy excess. 29. In addition, I further determine that interest at the statutory rate be applied to the sum of $12,300 (less any excess) from the date of the Internal Dispute decision of 8 April 2010, until the date payment is released to the applicants.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.