Summary

The insurer denied a claim for eave damage caused by nesting birds and left the roof opening unrepaired. AFCA upheld the denial but found the insurer should have done make safe works, so it must assess and cover secondary roof damage and pay $500 non-financial loss.

The bird nesting general exclusion validly defeated the original claim, but in these circumstances it was fair and reasonable for the insurer's builder to make safe the exposed roof, making the insurer liable for resulting secondary damage.

Issues

Subjects and remedies

home or building damagepay non financial lossreassess claimrepair or rectify

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-26-369267 | Financial firm | Hollard Insurance Partners Limited Case number: 12-26-369267 31 July 2026 1 Determination overview 1.1 Complaint The complainants hold a building and contents policy with the financial firm (the insurer) for their beachside home in South Australia (the property). They lodged a claim for damage to the eaves of the property in December 2025. The insurer denied the claim in January 2026. It says the damage was caused by birds nesting in the roof. Damage caused in this manner is excluded from cover under the terms and conditions of the policy. The complainants disagree and say the insurer should accept the claim. The complainants also say the insurer inspected the property shortly after they lodged the claim and therefore knew the roof was exposed by the hole made by the birds. However, the insurer failed to undertake emergency make-safe works to prevent further roof damage caused by exposure to the harsh coastal weather. The complainants say this failure caused secondary roof damage. The insurer says, amongst other things: · when it first inspected the roof there was no indication emergency make safe repairs were required · in any event, the policy does not provide cover for make-safe repairs in this instance. The exclusion that applies to defeat the claim for the damage caused by the birds also applies to the cover provided for make safe works · the policy does not provide cover for secondary damage. The complainants disagree and say the insurer should have completed make safe works and, because it failed to do so, it should now be liable for the costs to repair the secondary damage. Finally, the complainants say the insurer should pay non-financial loss compensation because of unreasonable claim delays, as well as stress, anxiety and upset caused by the insurer’s claim mismanagement. 1.2 Issues and key findings Should the insurer accept the claim for the damage to the eaves? No. The exchanged material shows the insurer is entitled rely upon the terms and conditions of the policy to deny the claim for the damage caused by the birds. Should the insurer have completed make safe works? Yes. In this particular instance, it is fair and reasonable that make safe repairs should have been completed by the insurer. The insurer erred by not completing a make safe repair after its builder assessed the property. Should the insurer accept the claim for the secondary roof damage? Yes. The insurer should have completed make safe works. The complainants tried to mitigate their loss. Nevertheless, it is likely secondary roof damage may have occurred. Any secondary damage that does indeed exist must be assessed and accepted by the insurer. Should the insurer pay non-financial loss compensation? Yes. Within 14 days’ notice that the complainants accept this determination, the insurer must pay them $500 in non-financial loss compensation. By way of clarification, the single payment of $500 in non-financial loss compensation is to be made to both complainants jointly, and not separately. Why is the outcome fair? The outcome is fair in all the circumstances because: · the insurer correctly denied the claim for the damage caused by the birds · the insurer erred in failing to complete make safe repairs · the complainants attempted to mitigate their loss and the probability of secondary roof damage occurring · it is likely secondary roof damage may have occurred · it is reasonable and appropriate that the insurer accepts liability for any secondary roof damage that has, in fact, occurred · an award of non-financial loss compensation is fair and appropriate in this particular instance. 1.3 Determination This determination is substantially in favour of the complainants. The complaint should be resolved in accordance with section 2.5, below, and the matters set out in this determination. 2 Reasons for determination 2.1 Should the insurer accept the claim for the damage to the eaves? No. The exchanged material shows the insurer is entitled rely upon the terms and conditions of the policy to deny the claim for the damage caused by the birds. Claim denied by insurer The property includes a large, two-storey, four bedroom, two bathroom dwelling with a pitched tiled roof. The policy documents indicate the dwelling was built in about 1995. It is described as being in ‘good’ condition. The complainants have lived at the property for a number of years. It is located very close to the beach and the ocean. The complainants lodged a claim for damage to the eaves of the dwelling on 14 December 2025. They say the damage includes the accidental collapse of a section of a rear second storey eave sheet. The insurer assessed the circumstances of the loss and damage. It arranged for JL, builders, to inspect the property on 16 December 2025. JL reported: · the complainants pointed out the damaged eave sheet hanging off the northwest corner of the second storey roof · the complainants advised a section of the eave sheet had collapsed · baby birds and a bird’s nest fell out with the damaged section of the eave · the complainants said that, apart from a small bulge, there was no indication of damage in the eaves before the section collapsed. JL concluded the damage was a direct result of birds nesting in the eave sheet. The insurer later denied the claim. Policy includes cover for ‘accidental’ damage, subject to exclusions The policy includes cover for ‘accidental damage’. The terms and conditions of the policy, which are set out in the Product Disclosure Statement (PDS) and the Certificate of Insurance, are clear and unambiguous in this regard. Page 47 of the PDS describes the cover for accidental damage. However, the policy also contains a general exclusionary provision related to damage caused by birds which applies to defeat all claims, including claims for ‘accidental’ damage. This general policy exclusion is set out at page 53 of the PDS as follows: General Exclusions General exclusions apply to all sections of this policy. Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: […] 17. birds or bats pecking, scratching, biting, soiling or nesting…. Insurer correctly denied the claim for damage caused by the birds JL said the damaged eave sheet was consistent with long‑term birds nesting. The complainants have not provided any persuasive evidence to displace the conclusion that the damaged section of eave sheet collapsed because birds were nesting in it. In all the circumstances, I am satisfied the insurer is entitled to rely upon the policy exclusion regarding birds and bird nests set out above to deny the claim. 2.2 Should the insurer have completed make safe works? Yes. In this particular instance, it is fair and reasonable that make safe repairs should have been completed by the insurer. The insurer erred by not completing a make safe repair after its builder assessed the property. Complainants say the insurer should have undertaken a make safe repair The complainants say the insurer should have undertaken an urgent, temporary make safe repair of the damaged eave sheet as soon as JL was aware of the size of the hole in the eave sheet. They say this would have prevented further roof damage occurring as a result of the roof space being exposed to adverse coastal weather conditions. The complainants say the insurer’s failure to undertake the make safe repair has, indeed, probably resulted in secondary roof damage and the insurer should now cover the costs to repair that damage. Policy provides cover for emergency make safe works Page 42 of the PDS, under the heading ‘Emergency works and temporary repairs’, says: Emergency work and temporary repairs What is covered If your building and/or contents are damage as a result of an Insured Event, we will pay the reasonable costs of any emergency work or temporary repairs required to protect your building and/or contents against further loss or damage. Insurer says it did not have to undertake make safe works in this instance The insurer relies upon the following make safe policy exclusion set out on page 42 of the PDS: Emergency work and temporary repairs What is not covered There is no cover under this Additional Benefit for the cost of removing any fallen items or objects where no claimable damage has occurred. There is also no cover under this Additional Benefit where a General Exclusion applies (see pages 53 to 55 of the PDS). This means the policy says emergency or temporary repairs are not covered when a general exclusion applies to the claimed damage. The policy also states that, after a claim is made, the insured party must take all reasonable steps to prevent any further loss or damage to the building or contents (see page 57 of the PDS). Moreover, the insurer says the complainants advised at claim lodgement that urgent repairs to prevent further loss were not required. It also says that, at the relevant time, the complainants had not established additional claimable damage had occurred as a result of ‘the loss event’. The insurer says, therefore, it is reasonable that no make safe works were performed. Insurer was aware of potential for further damage at an early stage in the claim process The complainants say they provided a photograph to the insurer when they lodged the claim. The photo shows the section of the eave sheet that collapsed, causing a distinct opening to the roof space of significant size and dimensions. Photos from JL’s December 2025 report are also instructive, Whilst JL’s report includes the sentence, ‘The dwelling is watertight’, the photos clearly show the roof space was not. The photos depict a large hole in one of the rear second storey roof eaves which clearly has the potential to allow wind driven rain to enter the roof space above the broken eave. The complainants say they expressed concern to JL about the risk of further damage occurring during his inspection, although the insurer denies this. On 27 January 2026, the complainants emailed the insurer to complain about the time taken to reach a claim decision. They also made the insurer aware the delay of more than five weeks since JL’s inspection was increasing the risk of further roof damage happening because of the hole in the damaged eave sheet. As indicated, on 30 January 2026, the insurer formally denied the claim on the basis of the policy exclusion related to birds and bird nests. By that stage, no make safe works had been undertaken by the insurer and the hole in the damaged eave sheet remained. Insurer should have performed a make safe repair In my opinion, particularly given the location of the dwelling and its susceptibility to adverse coastal weather conditions, a prudent builder acting as an agent for the insurer should have undertaken an emergency make safe repair to cover the damaged section of eave. Moreover, I am of the opinion it is reasonable to conclude this would not have been a difficult task for an experienced builder, such as JL. I am also satisfied it was fair and reasonable that the insurer should have performed this temporary make safe repair prior to a claim decision because: · the damaged section of eave sheet obviously rendered part of the roof space open to the elements · a temporary repair was likely not a difficult or complex repair for an experienced builder · the temporary repair would have effectively mitigated the likelihood of further damage to the roof · such a make safe repair would have been consistent with the insurer acting with due regard to the legitimate interests of the complainants · the temporary make-safe in this case would not have been a costly endeavour for the insurer · undertaking the make safe repair in this instance was a fair, reasonable, practical and decent thing to do and, in my opinion, should have formed part of the insurer’s efficient claim management process. I emphasise that this finding is confined to the specific circumstances of this complaint. Insurer’s generally do not have the same responsibilities to mitigate further loss and damage that insured’s have. However, in this particular instance, JL, the insurer’s agent and an experienced builder, was aware of the obvious potential for further damage, was on site, and was likely equipped with the tools to undertake a temporary make safe (because he was equipped for a thorough inspection of the property). Or, if additional equipment and materials were required to undertake the make safe, JL would probably have been able to make the necessary arrangements relatively easily, in my opinion. The property is not in a remote location. In fact, it is close to a major population centre with easy access to material suppliers. 2.3 Should the insurer accept the claim for the secondary roof damage? Yes. The insurer should have completed make safe works. The complainants tried to mitigate their loss. Nevertheless, it is likely secondary roof damage may have occurred. Any secondary damage that does indeed exist must be assessed and accepted by the insurer. Complainants say secondary damage has likely occurred In an email dated 1 February 2026 the complainants say: [Our] property was left with an open hole while [we] awaited the assessment outcome. Over that six‑week period in coastal conditions, further deterioration occurred (wind‑driven moisture, salt exposure and extreme heat fluctuations inside the roof space). In an email dated 13 March 2026 the complainants say: The opening has therefore remained exposed for an extended period to wind, weather and coastal conditions. As the property is located in a coastal environment, salt air and weather exposure have begun to cause visible deterioration to materials within the roof space. In an email dated 2 June 2026 the complainants say: Since the claim was lodged, the damaged area remained unresolved for an extended period. Due to difficulties obtaining contractors willing to attend a relatively small two-storey repair, a family member ultimately assisted in installing a replacement board using scaffolding access. During this process, sections of adjacent timber were observed to be soft, which raises concerns regarding deterioration occurring after the original event. [We] acknowledge that this observation is not from an independent expert, however it is consistent with my concerns regarding prolonged exposure. I accept it is likely that secondary damage may have occurred. Insurer says it is not responsible for secondary damage in this instance The insurer says secondary or consequential damage is only payable if a covered insured event triggers an obligation to indemnify and, in this case, the policy excludes the original damage. This policy limitation is set out on page 54 of the PDS. Therefore, the insurer says it is not obliged to pay for any secondary or consequential damage. The insurer also says it should not have to pay the costs to repair any secondary roof damage because the complainants failed to mitigate their loss after they lodged the claim. Insurer should provide indemnity for secondary roof damage In an email dated 14 June 2026 the complainants say: After the claim was declined, [we] made genuine attempts to arrange repairs by contacting multiple roofing contractors and advertising the work online but experienced significant difficulty obtaining assistance for a relatively small two-storey repair. Ultimately, a family member used scaffolding to install a replacement board to temporarily close the opening [in the eave sheet]. The insurer has not presented persuasive information to displace this evidence from the complainants. Therefore, I am satisfied the complainants made reasonable attempts to mitigate the likelihood of further secondary damage occurring after the claim was lodged. I am satisfied the complainants complied with their policy obligations in this regard. In all the circumstances, I am satisfied the insurer should assess and cover any and all secondary roof damage directly caused by its failure to undertake a make safe repair in December 2025. 2.4 Should the insurer pay non-financial loss compensation? Yes. Within 14 days’ notice that the complainants accept this determination, the insurer must pay them $500 in non-financial loss compensation. By way of clarification, the single payment of $500 in non-financial loss compensation is to be made to both complainants jointly, and not separately. AFCA can award non-financial loss compensation in certain circumstances The complainants seek compensation for distress and inconvenience arising from the insurer’s handling of the claim. This stress and upset was caused by delays during the period when the roof was exposed. The complainants say this caused anxiety and concern about the risk of further damage. Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, complainants should note that non-financial loss is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer. Award of non-financial loss compensation is reasonable and appropriate in this instance The exchanged material shows the insurer assessed the claim, arranged an inspection, communicated its position, and issued its decision within the timeframes set out in the General Insurance Code of Practice, to which the insurer subscribes. Nevertheless, I am satisfied the insurer’s omission to complete make safe repairs in this instance caused the complainants to suffer an unusual degree of physical inconvenience and interference with their expectation of enjoyment and peace of mind. The prospect of secondary damage occurring was of particular concern. Understandably, the complainants now feel aggrieved. Given these considerations, the insurer should pay the complainants $500 in non-financial loss compensation. Non-financial loss must be paid to both complainants together, not individually By way of clarification, the single payment of $500 non-financial loss compensation is to be made to both complainants jointly, and not separately. 2.5 Complaint should be resolved this way Time is of the essence Within 14 days of receiving notice that the complainants accept this determination, the insurer must pay them $500 in non-financial loss compensation. Within 28 days of receiving notice that the complainants accept this determination, the insurer must engage a qualified builder, engineer or roofing specialist (who has not previously inspected the property) to attend and inspect the property. This expert must draw up a scope of works (SOW) regarding the necessary repairs and associated works required to repair any and all secondary roof damage directly caused by reason of the roof space having been open to the elements during the period following JL’s inspection of the property on 16 December 2025. After receipt of the SOW, the insurer must promptly obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. All repairs and remedial works included in the SOW and quotation(s) must also comply with all current and applicable Commonwealth and South Australian building-related, safety-related and health-related laws, regulations and codes. Within seven days of receipt of the associated quotation(s), the insurer must elect to either: · agree to commence the necessary repairs and associated works as soon as possible, or · offer a cash settlement to the complainants based upon the preferred actionable quotation, but in accordance with the terms and conditions of the policy, plus a 10% contingency on top of this to factor in the risk of the works passing to the complainants and the likely possibility that further works may be required. If the complainants are dissatisfied with the insurer’s assessment of any secondary damage that does indeed exist, they will be entitled to lodge a further complaint with AFCA. 2.6 Why is the outcome fair? The outcome is fair in all the circumstances because: · the insurer correctly denied the claim for the damage caused by the birds · the insurer erred in failing to complete make safe repairs · the complainants attempted to mitigate their loss and the probability of secondary roof damage occurring · it is likely secondary roof damage may have occurred · it is reasonable and appropriate that the insurer accepts liability for any secondary roof damage that has, in fact, occurred · an award of non-financial loss compensation is fair and appropriate in this particular instance. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. Whilst the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.