Home / RAC WA / Determination 12-26-357533

Determination 12-26-357533

Cash settlement amount for storm damage to granny flat and non-financial loss for claim delays

FirmRAC WA
Decided2026-09-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$78,912
Non-financial loss$500
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted a storm claim for a granny flat after initially denying it, but offered a $7,384.30 cash settlement based on its builder's scope. AFCA found the complainant's builder WA's scope more reasonable, ordered a cash settlement on WA's $71,738 quote plus 10% uplift, and awarded $500 non-financial loss.

WA's scope and quote were the most comprehensive and reasonable assessment, the insurer's scope omitted necessary repairs, and avoidable claim delays justified modest non-financial loss compensation.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All RAC WA determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-26-357533 | Financial firm | RAC Insurance Pty Limited Case number: 12-26-357533 17 September 2026 1 Determination overview 1.1 Complaint The complainant holds a building and contents policy with the financial firm (insurer) for her home in Western Australia (property). On 3 June 2025, she lodged a claim for damage to the property. She says a storm which occurred earlier that morning damaged a granny flat in the rear garden of the property. The insurer initially denied the claim on the basis the granny flat was not well maintained. In doing so, it relied upon a report by SE, engineers. In January 2026, after further information was provided by the complainant, the insurer reversed its decision and accepted the claim. However, the insurer says the required repairs are unwarrantable. It therefore offered the complainant a cash settlement of $7,384.30 based on a scope of works (SOW) by RB, builders. RB was also engaged by the insurer. The complainant says RB’s SOW and the insurer’s proposed cash settlement do not take into account all necessary repairs. She seeks a cash settlement based on a SOW and costings from MS and WA, both builders that she engaged. The complainant also says the insurer should pay her non-financial loss compensation for her poor claim experience. 1.2 Issues and key findings Is the insurer’s SOW adequate and reasonable? No. The exchanged material shows the claim should be resolved in accordance with WA’s SOW and associated quote. This evidence should form the basis of the insurer’s cash settlement. Should the insurer pay non-financial loss compensation? Yes. The insurer should pay the complainant $500 non-financial loss compensation Why is the outcome fair? The outcome is fair in all the circumstances because: · WA’s SOW and associated quote are to be preferred. The documents are comprehensive and reasonable · an award of non-financial loss compensation is reasonable and appropriate in this instance. 1.3 Determination This determination is in favour of the complainant. The complaint should be resolved in accordance with the matters set out in sections 2.1 and 2.2, below. 2 Reasons for determination 2.1 Is the insurer’s SOW adequate and reasonable? No. The exchanged material shows the claim should be resolved in accordance with WA’s SOW and associated quote. This evidence should form the basis of the insurer’s cash settlement. Complainant says the granny flat was severely damaged The property includes a free-standing, four-bedroom brick home. The one-bedroom, brick-veneer granny flat sits in the rear garden, close to an inground swimming pool. The granny flat has a combined living/dining/kitchen area, floating timber floors over a concrete slab foundation, and a skillion metal roof. The exchanged material says the main dwelling was built in the 1970’s. The age of the granny flat is estimated to be about 20 years. When the complainant lodged the claim, she told the insurer the granny flat had sustained substantial damage because of the storm. As mentioned, the insurer initially denied the claim on 1 October 2025. It said the damage arose because of a failure to keep the building in ‘good repair and condition, structurally sound, watertight, secure or well maintained’. It says damage caused in this manner is excluded from cover under the terms and conditions of the policy. Insurer’s experts inspected the property The insurer based its claim denial upon the reports of SE and RB. SE inspected the property on 14 July 2025. It reported: The owner explained that there had been a heavy rainstorm in May/June this year (she could not recall the exact date) during which a significant amount of water had entered the granny-flat…. She advised that a large amount of water could be seen in the back yard including on the lawn and pavers and that the pool had overflowed slightly…. The owner advised that, when she inspected the flat the next day, water was coming up through the floating timber floors of the main (rear) living/dining/kitchen area…. The purpose of [this] inspection was to assess and report on drainage at the site in terms of compliance of the granny-flat building (and surrounds) with relevant building regulations and on whether or not drainage issues caused the flooding. Upon inspection of the granny flat SE observed, amongst other things: · the timber flooring and skirting boards had been stripped · internal plaster walls (plasterboard over stud) appeared undamaged, except at the skirting level · ceilings appeared unaffected · the building does not appear to have been affected externally. SE concluded: · the lack of damage above floor level indicates that water entry was through the walls and most likely through one of the doors · based on discussions with the complainant and on-site observations, the most likely scenario for water entry into the flat is: > discharge from downpipes at the rear of the flat and patio overflowed onto the pavers behind the granny-flat > the ponded overflow water was then able to enter the granny flat due to a combination of the sliding door being open, the rear paving being flat, the internal and external floor levels being equal and the lack of a catchment drain against the door. SE also says the granny flat did not comply with various applicable building codes and regulations. Insurer accepted the claim after the provision of additional evidence The complainant then provided additional information, including a pre-purchase inspection report and invoices regarding maintenance she had completed since purchasing the property the previous year, including ‘water proofing’ works in the sum of $6,710. The insurer then reversed its claim denial. In its undated ‘AFCA Dispute Submission’, the insurer says: After the review of all documents and invoices provided by the member it was determined that they had taken steps to carry out maintenance after the purchase of the property, as such we have overturned the decline of the claim and offered the insured a cash settlement of $7,384.30 (full scope of works) as the builder is unable to warrant repairs as the granny flat is not built correctly. Policy provides cover for listed insured events, including ‘Storm’ The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the policy. The policy was incepted in March 2024, shortly after the complainant purchased the property. The relevant period of insurance is 18 March 2025 to 18 March 2026. The policy provides cover for damage caused by various listed insured events, including ‘Storm’ (see page 10 of the PDS). Page 47 of the PDS defines a ‘Storm’ as: A violent atmospheric disturbance producing strong winds, rain, lightning, hail or snow and it includes cyclones and tornados. Complainant has established a valid claim When the insurer reversed its claim denial and accepted the claim in January 2026, it effectively acknowledged: · the granny flat is a ‘building’ which is covered by the policy for storm damage (see page 12 of the PDS) · the complainant has established a valid claim for the damage to the granny flat, subject to the terms and conditions of the policy. However, the parties remain in dispute about the extent of the insurer’s liability and exactly what repairs to the granny flat should be covered as part of the overall claim. The complainant says RB’s SOW and the cash settlement offered by the insurer do not cover all the required repairs. Insurer’s offer based upon RB’s SOW The insurer obtained a SOW and associated quotation from RB dated 21 January 2026. The SOW and quote include, amongst other things: · cabinetry and flooring removal and replacement in the bedroom of the granny flat, as well as the open plan area · labour for painting architraves, skirting, walls and doors · works in the kitchen, allowing for a partial refit of cabinets, along with the supply and installation of shelving and kickboards. In addition, RB stated it could not warrant these repairs due to non-compliant construction of the granny flat, hence the cash settlement. RB says the granny flat’s original construction does not comply with the following applicable building codes and regulations: · Uniform Building by-laws 1974 · National Construction Code 2022 Amendment 1 · Liveable Housing Design Standard 2022. In particular, RB says: · the internal floor level of the granny flat is equal to the external ground level · the external paved level does not adequately fall away from the granny flat · overflow from the downpipes is not prevented from entering the granny flat. RB‘s quote does not include costs for unforeseen works that may arise once unaffected areas of the granny flat are exposed during the storm-related repairs. Complainant relies upon SOWs by two builders The complainant provided a quote and a SOW from each of two builders, MS in the sum of $38,995 (dated 8 March 2026) and WA in the sum of $71,738 (dated 14 April 2026). In addition to works proposed by RB, MS included electrical and plumbing works, along with the installation of a stainless-steel attic drain to connect to a soak well. However, MS’s quote does not account for the remediation of mould, said to be identified by the complainant in the latter part of 2025 and early 2026. WA’s quote covers the line items identified in MS’s quote, as well as, amongst other things, the remediation and/or removal of mould affected materials. WA’s SOW should be preferred In all the circumstances, I am satisfied the exchanged material shows WA’s SOW and quote should be preferred and should be used as the basis for a cash settlement. This is because of the following considerations. First, the complainant provided compelling reasons why RB’s SOW (and, hence, the insurer’s proposed cash settlement) was insufficient. These reasons include: · potential damage (including mould damage) caused by water ingress into wall cavities not having been assessed correctly without opening the affected areas · the failure to assess the likelihood of insulation being affected by water and the need for it to be replaced where necessary · the failure to assess the risk of cabinetry trapping moisture, causing further underlying damage. Second, whilst I acknowledge deficits in MS’s SOW and quote, I am not persuaded by the insurer’s submissions about inadequacies in WA’s quote and SOW. Whilst MS’s quote lacks line itemisation and units of measure (including m², lineal metres, and the like), WA’s SOW and quote includes itemisation to a degree, as well as provisional sums for additional matters such as mould remediation. RB’s SOW does not include such matters. WA’s SOW also includes costs associated with: · the replacement of corroded steel frame members · appropriate provisional sums, including for the replacement of a shower screen · the application of a black bituminous waterproofing membrane (Bituseal or equivalent) to external face of brickwork below ground level to provide protection against moisture ingress. The insurer has not provided persuasive evidence that the costs associated with these works should be excluded from cover. Third, I have not placed a great deal of weight on the insurer’s submissions regarding the alleged non-compliance of the granny flat with relevant building codes and regulations. I note that the codes referred to by the insurer generally post-date construction of the granny flat. Furthermore, the insurer has not adequately explained how the codes and standards should be applied to this claim which involves a building constructed in circa 2006. Fourth, RB states it cannot warrant repairs to the granny flat. In the absence of persuasive evidence as to why this is, I consider RB’s quotation is not actionable. Fifth, basing a cash settlement upon WA’s SOW and quote provides finality to the claim and the complaint. WA’s SOW and its associated quote are the most complete assessments based upon all available information. In addition, WA appears to be willing to undertake the works. Complaint should be resolved this way Within 14 days of receiving notice that the complainant accepts this determination, the insurer must pay the complainant a cash settlement in accordance with WA’s quote dated 14 April 2026, plus a 10% uplift to account for the probable increase in the costs of materials and labour over the past 12 months or so, albeit the complainant has not provided evidence regarding the extent of any such increases. I am satisfied there is no need to provide an uplift for: · the risk of the works passing to the complainant · the likely possibility that further works may be required. This is because WA’s quote is comprehensive in nature and the sums set out appear to be ample and sufficient. 2.2 Should the insurer pay non-financial loss compensation? Yes. The insurer should pay the complainant $500 non-financial loss compensation. AFCA can award non-financial loss compensation in certain circumstances The complainant says the insurer’s poor claim management caused avoidable delays. These delays, in turn, caused her unnecessary upset, inconvenience, and stress. Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, complainants should note that non-financial loss is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer. Award of non-financial loss compensation reasonable and appropriate in this instance I accept the complainant in this matter has suffered an unusual degree of physical inconvenience and interference with her expectation of enjoyment and peace of mind. I am also satisfied that some of this inconvenience and upset is a direct result of avoidable claim delays. In particular, I note the insurer’s decision to deny the claim on 1 October 2025 was primarily based upon a report by SE. SE inspected the granny flat on 14 July 2025. However, the insurer did not receive SE’s report until 26 September 2025. The insurer has not provided an adequate explanation for this delay. In addition, during the period between lodgement of the claim in early June 2025 and the claim denial in early October 2025, the insurer did not ask the complainant to provide any evidence in support of her claim, such as pre-purchase inspection reports or information about maintenance she had completed. It should have done so, especially because it’s claim denial in October 2025 was because: [T]he damage arose because of a failure to keep the building in ‘good repair and condition, structurally sound, watertight, secure or well maintained. AFCA sought clarification from the insurer about why it reversed its claim decision. The insurer stated: The member provided further evidence that maintenance was carried out after the purchase of the property. The insurer did not elaborate about why it failed to request such information from the complainant before the claim was denied. Had it done so, claim delays, and associated upset and inconvenience for the complainant, would have been avoided. Understandably, the complainant feels aggrieved. However, I acknowledge the complainant has not provided a detailed description of the upset, stress and inconvenience she says she has suffered as a result of the insurer’s poor claim management. She has listed complaints, such as inconvenience and stress, but she has not provided a detailed description of how she has been adversely affected. In all the circumstances, particularly in light of these considerations, within 14 days’ notice that the complainant accepts this determination, the insurer must pay her $500 non-financial loss compensation. 2.3 Why is the outcome fair? The outcome is fair in all the circumstances because: · WA’s SOW and associated quote are to be preferred. The documents are comprehensive and reasonable · an award of non-financial loss compensation is reasonable and appropriate in this instance. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.