Home / Suncorp Group / Determination 12-26-353887

Determination 12-26-353887

Fair settlement amount for a total loss home claim after prolonged claim mishandling and repair failures

FirmSuncorp Group
Decided2026-08-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$900,000
Non-financial loss$12,600
Amount claimed$1,300,000
SourceAFCA PDF

Summary

A home damaged by a truck impact in 2016 became a total loss after prolonged claim mishandling. AFCA found the insurer's $912,600 global settlement offer fair, rejected the roughly $1.3 million claimed, and required payment within 14 days of acceptance.

Building loss is measured by rebuild cost (with a 20% contingency) rather than replacement property purchase, and other claimed losses were unsubstantiated or outside the policy, so the insurer's offer was fair.

Issues

Subjects and remedies

elderly or capacityhome or building damagemental healthmotor vehicle collisionthird party authoritypay claimpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-26-353887 | Financial firm | AAI Limited Case number: 12-26-353887 29 July 2026 1 Determination overview 1.1 Complaint In December 2016, the complainant’s home was damaged by a truck impact. The insurer accepted the claim. The claims handling following this was prolonged and difficult. This involved repeated problems with repairs, water ingress, mould contamination, contents handling, delays and claim management amongst other things. The claim has also been the subject of earlier AFCA complaints. It is now accepted by both parties the home cannot be repaired and must be demolished. The dispute is no longer about liability. It is about the appropriate remedy for this claim and complaint. Specifically, whether the insurer’s settlement offer fairly resolves the loss. Related AFCA complaints 12‑26‑350833 and 12‑26‑372834 were merged into this complaint because they arise from the same policy, claim and underlying events. 1.2 Issues and key findings Is the insurer’s settlement offer fair? Yes. This is because the exchanged information shows this amount fairly compensates the complainant for her claim and complaints experience. Why is the outcome fair? This is an unusual and long-running claim involving poor claim handling, repeated repair failures, delay and significant disruption, which AFCA recognises. Having regard to the policy, the earlier AFCA outcomes, the present total loss, the estimated rebuild cost and the insurer’s current offer, the panel is satisfied the insurer’s total offer of $912,600 is fair in all the circumstances to resolve the claim and complaint. 1.3 Determination The insurer should pay $912,600 to the complainant (minus any amounts it may have already paid towards this global figure) in full and final settlement of this claim and complaint. The insurer should do so within 14 days of receiving notice the complainant accepts this determination. 2 Reasons for determination 2.1 Is the insurer’s settlement offer fair? Yes. This is because the exchanged information shows this amount fairly compensates the complainant for her claim and complaints experience. Insurer says its offer exceeds policy limits The insurer has offered to pay $912,600 in full and final settlement of this claim and complaint. In making this offer, the insurer notes the following: · the building and contents sums insured for the relevant period were $297,100 and $33,100 respectively · it obtained an actionable quote to demolish and rebuild the property totalling $565,356 · the amount offered was inclusive of $450,000 for the building component, $33,100 for contents, $12,600 for non-financial loss and $54,00 for demolition – the further $362,900 was offered in good faith. The insurer says its $900,000 offer was made on a commercial basis and exceeds both the rebuild cost and the policy limits. Building damage loss is to be calculated by reference to rebuilding costs The complainant seeks around $1.3 million. The complainant says the insurer should pay enough to allow her to sell the damaged property and buy a replacement property in the same area. The settlement should also factor buying and selling costs as well as inspections, moving costs, support services, temporary accommodation, counselling and contingencies. She says this is fair because the current loss is the result of prolonged mishandling, not just the original insured event. She is also a vulnerable elderly customer who should not be burdened with managing a knock-down rebuild. She has various issues that will make it very difficult for her to manage a rebuilding process. She relies on proposals and costs exchanged with the insurer during late 2025 and early 2026 to support a figure materially above the insurer’s current offer. The panel acknowledges the complainant’s difficult circumstances. However, the panel does not accept this is a fair remedy for the building damage given the following: · the complainant’s loss for the building would be by reference to either its rebuilding cost or the diminution in value for the land (noting the rebuilding cost is typically higher, particularly for older properties) · allowing compensation for selling the property and buying another goes beyond the scope of the policy or would not be fair compensation when you consider the following: > the policy insures the building and contents at the specific address > the policy does not insure, or cover, someone who wants to move addresses following an insured event > the additional costs involved in buying and selling are not losses insured by the policy or within the reasonable contemplation of the parties when the policy was issued > finding comparable properties as a fair remedy would be quite difficult given most properties have varying characteristics that can materially affect their value (e.g. land size, type and age of home, room sizes, age of property, neighbourhood etc) – this inevitably means they are unlikely comparable in all material aspects. On the last point, the panel notes the complainant had referred to four properties she said was comparable. On this point, the panel notes the following: · two contained large land sizes (704m2 and 805m2) – these are substantively higher than the complainant’s property of 565m2 so are not comparable · two were more comparable in land size (580m2 and 558m2), however their sale prices were markedly different such that they do not provide reasonable comparisons > the first sold for $1.9m in December 2025 and the second for $1.4m in November 2025 > the second contained quite different dimensions (the more expensive property had only 3 bedrooms, 1 bathroom and 1 parking space whilst the cheaper property had 6 bedrooms, 3 bedrooms and 4 parking spaces). The complainant says the insurer agreed to her method of calculation. The panel disagrees. The information shows the insurer was open to considering this proposal. However, as the parties could not agree to a figure, the insurer ultimately landed on its current position. It was entitled to do so as part of negotiations in resolution of the claim and complaint. Therefore, the panel agrees the fairest method to calculate the complainant’s loss regarding the building damage is either its rebuilding costs or the diminution in value. The insurer’s offer incorporates the fair rebuilding costs The only information available to the panel about the rebuilding costs is a scope of works and quote provided by the insurer totalling $563,356. The complainant has raised various concerns about its adequacy, including the following: · there was no uplift included – a minimum of 30% should be allowed · there are noticeable failures (e.g. laminate kitchen when it was a two pack polyurethan, ornate cornices not mentioned, yellow tongue boards for flooring when there were solid polished floorboards) · no allowance for an independent project management cost given this project would be too difficult for the complainant to manage · no temporary accommodation and other incidental costs included · nothing to confirm the quote is actionable. The difficulty with the complainant’s position is that no other information has been provided regarding a fair rebuilding cost. The insurer maintains it could be done for this amount. There is no comparison quote or expert evidence. In the absence of this information, the panel accepts it is fair the rebuilding cost be based on the insurer’s quote. The panel does agree with the complainant’s position the insurer cannot cap its liability to the relevant sum insured. This is because there is no dispute the main reason the building cannot be repaired is due to the insurer’s poor claims handling, not the claimed event itself. The panel agrees a contingency would be appropriate when rebuilding the property. However, the panel does not agree 30% is required as submitted by the complainant. That appears excessive. It is not substantiated as to why such a large contingency is warranted. Instead, the panel considers 20% to be more reasonable when you factor the following: · this calculates to a monetary contingency of $113,071.20 – this should adequately address the risks of any missing items identified by the complainant as well as other possible incidentals · the total amount for the rebuilding cost (including demolition) is $678,427.20 – this is more than double the sum insured applicable at the time of the claimed event · no information has been provided to suggest the cost to rebuild the property would exceed this, even factoring in the risks of the works. The panel does not accept a project management fee is necessary. This is because any rebuilding cost should be managed by a registered and licensed builder. For temporary accommodation, contents and other costs sought, the panel will consider this down below. Concerns about the other amounts sought For contents, there have been photos and some lists included. However, there is insufficient information exchanged that can allow the panel to reasonably quantify the extent of this loss. For instance, the complainant claims this is likely to exceed $150,000. However, the exchanged information does not clearly substantiate this. It is also significantly higher than the sum insured even factoring inflation. Further, no proof of value has been provided (such as receipt of purchase and replacement cost) to confirm the nature of the items or their fair repair/replacement costs for most items. It is unfortunately a figure that is not substantiated with independent information. In addition, there is no verification from experts or otherwise of the extent of contents that require repair or replacement beyond the complainant’s assertion. That is, whilst the complainant has provided submissions setting out contents she says require replacement or repair, with their estimated value, there is minimal supporting information to substantiate: · the total amount of contents damaged by the claimed event · for the contents damaged, whether it is reasonable to repair or replace · the estimated cost of repair and replacement. Given all this, the panel cannot reasonably conclude the contents aspect would be at, or near, $150,000. The complainant is also claiming for other costs on top of this, such as moving contents, renting furniture as well as exiting and cleaning fees. However, such losses cannot be substantiated given the contents loss remains uncertain. For instance, if the contents requiring replacement includes the items being rented or stored, then there would be no reason for the insurer to pay for renting or storing them. In terms of relocating the complainant, there are no quotes or invoices to substantiate them. Whilst the panel accepts there may be costs involved, it is difficult to quantify same in the absence of quotes. Further, the global settlement offered is enough to cover reasonable costs of relocation, particularly as the insured will not be required to also rebuild the house in this scenario. The panel accepts temporary accommodation should continue to be allowed. The complainant estimated this to be around $67,200 for 12 months. Given it is quite possible that it could take at least twelve months to demolish and rebuild the property, this is a reasonable allowance. The complainant also sought reimbursement of premiums since 2016. This is reasonable for at least the building insurance premiums noting it has effectively been declared a total loss as a result of the 2016 claims handling. Several other costs the complainant had sought was to do with selling the insured property and buying a new property (e.g. pre-purchase inspections, selling agents, property settlement fees). These are not payable for reasons set out above. The complainant also sought three years of counselling support for three people for three years due to this claims experience. She has provided reports from a psychologist in support. This is not payable. This is because when a person is seeking financial loss based on an assertion this was caused by the insurer’s breach of the policy, such losses must be within the reasonable contemplation of the parties when the policy was issued. The panel is not satisfied this type of loss would fall within that description when you consider the following: · there was only one insured yet the loss is being sought for three people · the policy does not cover this type of loss. Even if it is arguable this type of loss could fall within the reasonable contemplation of the parties, the panel notes the following: · it would be limited to only the insured given they were the other contracting party · this would be at most consequential financial loss and would be subject to the AFCA cap of $6,300. Insurer’s offer of $12,600 compensation for non-financial loss is fair This claim has involved an unusual amount of inconvenience, time, disruption and interference with the complainant’s peace of mind. Prior AFCA complaints already recognised the complainant experienced significant stress and inconvenience. This resulted in non-financial loss compensation being paid or agreed. In the current complaint, the insurer offered $6,300 each to the complainant and the complainant’s representative, totalling $12,600, in recognition of their experience over the lifetime of the claim. In the circumstances and particularly given the long and difficult history shown on this file, the panel considers that amount fair in all the circumstances. Insurer should pay $912,600 in full and final settlement The panel acknowledges the complainant intends to sell the property and buy a new one. If the complainant does follows through this, then it is possible the allowance for the building could result in a windfall. It has not been established that if the property had remained undamaged, the sale value of the land and house would be at least $678,427.20 more than its current value. Whilst the complainant maintains comparable properties indicate the loss would be greater, the panel is not persuaded by that. This is because minimal information has been provided to consider if the various properties are comparable. Instead, it is quite possible there are material differences that do not make them comparable as described above. Other losses sought by the complainant have not clearly been substantiated, such as contents. The panel acknowledges the complainant’s challenges in doing so given the protracted claims history and her difficult circumstances. However, the panel cannot confidently assess this to be able to reasonably conclude the loss substantively exceeds the relevant sum insured as alleged. Other costs being sought and payable are well accounted for by this global figure (e.g. temporary accommodation, moving costs). The amounts being allowed for the building and contents are well in excess of their respective sums insured. Further, the global figure: · reasonably accounts for the fair rebuilding cost · includes a sufficient additional allowance for a fair contingency to the rebuilding (which may not be required), other amounts payable and a fair proportion for the contents. There are also a range of other remedies being sought which the panel does not consider is payable for the above reasons. The panel acknowledges the complainant seeks continuation or reinstatement of support such as counselling, storage, lawn and garden maintenance, and chicken coop maintenance until the matter is fully resolved. The panel accepts those matters are important to her. However, once a fair and reasonable global settlement is paid, it is also fair that insurer-managed benefits come to an end. The insurer made that position clear in its previous correspondence. More importantly, the panel accepts the global settlement offered should provide the complainant with the financial means to organise her arrangements as she sees fit and in a manner that would make most effective use of the funds. Therefore, the insurer is not required to continue supports. The panel acknowledges the complainant raised various concerns about the insurer’s conduct, its assistance and its behaviour. The panel has considered all of this, along with all the other exchanged information. However, the panel has not addressed these specifically by analysing and making various findings. This because the amounts the insurer offered, particularly the allowance for non-financial loss, fairly compensates the complainant for her claims experience in line with our limits and approach and is a fair resolution in all the circumstances. There is no dispute the insurer’s claims handling has fallen significantly short of the required standard noting the complainant’s particular vulnerabilities – this is supported by the substantive sums of non-financial loss payable throughout the life of the claim. Accordingly, after careful consideration of all the exchanged information and arguments, the panel is persuaded the insurer’s offer to pay $912,600 in full and final settlement of all aspects of this claim and complaint is fair in all the circumstances. Further, and in the alternative, the panel is not persuaded there is sufficient information to warrant a higher amount. The insurer should therefore pay this sum (minus any payments it may have already made) within 14 days of receiving notice the complainant accepts this determination. 2.2 Why is the outcome fair? This is an unusual and long-running claim involving poor claim handling, repeated repair failures, delay and significant disruption, which AFCA has already recognised. Having regard to the policy, the earlier AFCA outcomes, the present total loss, the estimated rebuild cost and the insurer’s current offer, the panel is satisfied the insurer’s total offer of $912,600 is fair in all the circumstances to resolve the claim and complaint. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: · an ombudsman · a member with significant experience in the consumer sector · a member with extensive experience in the field of general insurance. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.