Home / Suncorp Group / Determination 12-26-353193
Determination 12-26-353193
Insurer declined a water damage claim from a leaking shower and refused to renew the policy
Summary
Complainants disputed the insurer's refusal to renew their policy and its denial of a water damage claim from a leaking shower. AFCA found for the insurer on both issues.
The insurer complied with section 58 of the Insurance Contracts Act when declining renewal, and the policy does not cover escape of liquid from a shower, so no claimable loss was shown.
Issues
- Claim denial primary · not upheld“The insurer is entitled to deny the claim because the complainants have not shown a claimable loss under the policy. The policy does not cover escape of liquid from a shower.”
- Policy cancellation or underwriting secondary · not upheld“The insurer complied with the Act by notifying the complainants of its decision not to offer a renewal for 2025/26 and providing its reasons.”
Subjects and remedies
home or building damageno remedy
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
|
Case number
|
12-26-353193
|
Financial firm
|
AAI Limited
Case number: 12-26-353193 15 September 2026
1 Determination overview
1.1 Complaint
The complainants lodged a claim with the financial form (insurer) under their home business insurance policy on or around 23 December 2025. Water escaping from the bathroom had damaged the property.
The insurer denied the claim on the basis the policy excludes cover for escape of liquid from the shower. It had also refused to offer a renewal for the 2025/26 period because the complainants had not confirmed if they had completed the necessary repairs to the property using the cash settlements received under prior claim(s).
The complainants seek the insurer to renew the policy for the 2025/26 and accept the water damage claim.
1.2 Issues and key findings
Is the insurer obliged to offer a renewal?
No. The insurer has shown it complied with the requirements of the Insurance Contracts Act 1984 (the Act) by notifying the complainants of its decision not to offer a renewal for 2025/26 and providing its reasons for doing so. The insurer has established the relevant correspondence was sent to the complainants by email and post (preferred method of contact) more than 14 days before the renewal date of 11 October 2025.
Is the insurer entitled to deny the claim?
Yes. The insurer is entitled to deny the claim because the complainants have not shown a claimable loss under the policy. The policy does not cover escape of liquid from a shower.
Why is the outcome fair?
The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to refuse to renew the policy and decline the claim.
2 Reasons for determination
2.1 Is the insurer obliged to offer a renewal?
No. The insurer has shown it complied with the requirements of the Insurance Contracts Act 1984 (the Act) by notifying the complainants of its decision not to offer a renewal for 2025/26 and providing its reasons for doing so. The insurer has established the relevant correspondence was sent to the complainants by email and post (preferred method of contact) more than 14 days before the renewal date of 11 October 2025.
Insurer complied with obligations set out in section 58 of the Act
When a renewable insurance policy is due to expire, the insurer must provide a notice under section 58 of the Act. The notice must:
· be provided at least 14 days before the policy will expire;
· say when the policy will expire; and
· say whether the insurer is willing to renew the policy.
The policy notes show the insurer placed the policy on review on 28 April 2025. This is because it had concerns about whether the complainants had completed the necessary repairs to the property using the cash settlement(s) it had paid for prior claim(s).
The policy notes show the insurer attempted to discuss the above underwriting concerns and was unsuccessful on the following dates:
· 3 September 2025
· 8 September 2025.
The insurer subsequently sent the following letter to the complainants by email and post on 3 September 2025:
Notice of non-renewal…
We are writing to you about your Business Insurance policy SPH… which is due to expire on 11/10/2025.
Recently we tried to contact you to discuss the upcoming renewal of your policy but were unsuccessful. We required some additional information from you before we could offer renewal of your policy.
Unfortunately, because we were not able to obtain this information from you, we will not be able to offer renewal of your policy. This means your insurance cover will cease at 4.00pm on 11/10/2025.
If you would like to discuss cover for your business beyond this date, please contact our Customer Service Team on 13…to provide the information we require.
While not directly relevant to the issue in dispute, the insurer also sent a policy cancellation notice to the complainants by post on 19 September 2025. It provided mail dispatch records to show this letter was dispatched to the complainants’ nominated mailing address:
Cancellation of your Policy
Dear Mrs [R R],
This insurance account has been sent following your recent policy cancellation effective 11 October 2025.
Insurer not obliged to renew the policy for the period 2025/26
Under section 72A of the Act, the insurer can send written notice, such as renewals, to the complainants’ last known address. An insurer can also send a written notice by electronic communication in accordance with the Electronics Transactions Act 1999 (Cth).
The insurer says its business policy team confirmed its letter refusing renewal for the 2025/26 period was sent via email and post on 3 September 2025 to the complainants’ nominated email address r…@bigpond.com at 3.04pm and a copy sent via post to the insured address.
The insurer confirms its correspondence were sent to the complainants’ nominated postal address. The complainants do not dispute this point. The insurer’s policy notes show it updated the complainants’ preferred contact details later on 28 January 2026.
While the complainants say they had provided an updated email address to the insurer, no further information has been presented showing when this may have occurred. The complainants confirmed they had access to the email recorded on the policy but did not actively monitor it. This does not impact the outcome of this complaint because email was not the complainants’ preferred method of contact.
Given the complainants confirm they had consistently received paper correspondence advising them of the policy expiry in prior years, it is unclear why they may have not received the insurer’s correspondence sent in September 2025. The insurer has reasonably shown the subject letter was manually dispatched to the complainants’ nominated mailing address. The insurer also confirmed it had no record of the subject mail being returned to sender. I am therefore satisfied the insurer has shown that its letter refusing to offer a renewal for the 2025/26 period was dispatched to the complainants’ nominated mailing address.
I acknowledge the complainants say they had no record of receiving any voice messages from the insurer. While the insurer attempted to discuss the policy renewal with the complainants, which I consider is good industry practice, it was not obliged to do so. This is because the Act only requires the insurer to notify the complainants of its decision to not offer a renewal by the complainants’ preferred (mail) method of contact only.
Given the above, I am satisfied the insurer has shown it complied with the requirements of the Act by notifying the complainants of its decision not to offer a renewal for 2025/26 and providing its reasons for doing so. It is not therefore obliged to renew the subject policy.
2.2 Is the insurer entitled to deny the claim?
Yes. The insurer is entitled to deny the claim because the complainants have not shown a claimable loss under the policy. The policy does not cover escape of liquid from a shower.
Complainants must establish a claimable loss
When making a claim, the complainants have the initial onus of establishing they suffered a loss for which the insurance policy provides cover. The complainants must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim.
Policy cover is subject to terms and conditions
The complainants had a home and contents insurance policy. They had also purchased business insurance cover for contents only. The damage claimed falls within the home building cover.
The policy covers loss or damage caused by liquid leaking, overflowing or bursting from many sources including any drain, fixed pipes, drainage and sewage systems (not forming part of a shower cubicle wall, floor or base) and baths, sinks, toilets and basins (but not showers).
The policy does not cover the cost of repairing or replacing the item from which the liquid escaped (e.g. a cracked pipe or leaking tap).
It also does not cover exploratory costs relating to loss or damage or caused by, a leaking shower floor, leaking shower base, leaking shower cubicle walls, leaking shower glass screening or doors, leaking open shower floor areas or other wet areas.
Insurer entitled to deny the claim
The complainants raised concerns with the insurer in December 2025 about water damage they had identified. Their plumber (GP) concluded the water escaping from the shower had damaged the adjacent areas. GP observed shower installation defects (see section 3.2):
· the waste grate was installed wall to glass and the tile side was completed under at the tile and filled with silicon
· the sealing of the shower was also very thick in the corners and at the base of the shower
· the cause of the leak was the tiling and waterproofing - the tiles on the base of the shower and bathroom floor are 600 x 900. To keep the 900mm look, the tiler has started from the grate going towards the screen door and decided to cut the tile and leave the jagged edge to create the fall
· the tiler has not installed a water stop and/or bond breaker. If one was installed, it had failed
· because the join was installed so close together, there was no grout line. In the circumstances, the little amount of grout that was installed has fallen out. This had caused water to enter through the non-compliant grout line and faulty bond breaker into the wall.
The complainants did not have an active policy at claim lodgement. It is fair the insurer agreed to consider the claim under the policy given the nature of the damage.
Given the policy does not cover escape of liquid from a shower and GP concluded escape of liquid from the shower was the dominant cause of the damage, the insurer is entitled to deny the claim. It is unfortunate the complainants rejected the insurer’s settlement offer of $2,500 to resolve the claim and complaint. The insurer has since withdrawn this offer.
The complainants accept that aspects of the damage may involve defective or non-compliant workmanship, but say the situation is not limited to a single identifiable issue.
I acknowledge the complainants have indicated there may be other sources causing escape of liquid damage to the property. The responsibility first remains with the complainants to show a claimable loss under the policy.
Given this, if they provide additional expert evidence showing other escape of liquid sources causing damage to the property, the insurer should assess it and provide its claim decision in a timely manner.
2.3 Why is the outcome fair?
The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
|
Expert
|
Findings
|
Complainants’ plumber GP
Report
12-12-2025
|
[GP] were call out on the 23rd of dec 2025 to inspect a leak coming from a the bathroom wall escaping into the walk in robe. The walk in robe was fitted out and the client had been smelling a musky smell in the room for years but had never seen any water or dampness in the room. It was noticed when thew built in were removed to install floor boards.
At first we inspected the bathroom which was renovated 4 years ago.
On inspection we discovered a few defects in the installation starting with the shower which is were the leak was caused we found that the waste grate was installed wall to glass and the tile side was completed under at the tile and filled with silicon.
We also found that the sealing of the shower was also very thick in the corners and at the base of the shower.
The cause of the leak was in fact the tiling and waterproofing, the tiles on the base of the shower and bathroom floor are 600 x 900 and to keep the 900mm look the tiler has started from the grate going towards the screen door and decided to cut the tile and
leave the jagged edge to create the fall.
In doing this he has not installed a water stop also the bond breaker if it was installed has also failed.
But because the join was installed so close together there is no grout line and in that case the little amount of grout that was installed has fallen out and that has caused the water to enter through the non compliant grout line and through the faulty bond breaker and into the wall.
The bottom plate of the walk in robe wall was very water damaged instigating that the water had been pooling up in the wall for a long time causing the timber to mould and brake down.
This bathroom has also a few other defects.
Vanity - the floor mounted vanity is hard up against the glass panel causing it to mould.
Exhaust fan - the fan has been disconnected at some point of the rough in and not connected extricating the celling to mould over a period of time.
Water Pressure - After also connecting water pressure tests we found that the house mains water pressure was exuding 500-700 kpa.
|
Insurer’s builder AB
Report
6-2-2026
|
The damage is consistent with water ingress. It is confirmed its from a leak from the adjacent bathroom to the WIR. There is long term water damage due to the slow water leak. The WIR requires new wall base plate, skirting, patching and painting to repair the damage.
The bathroom was renovated 4 years ago and to non-compliant standards which have caused the leak into the WIR. The plumbing report confirms the non compliance through waterproofing issues and installation of the tiles and waste causing a slow leak.
|
Complainants’ tiler NI
Report
8-5-2026
|
Inspection Findings
Upon inspection of the ensuite bathroom, evidence of water damage was observed that appears
consistent with waterproofing failure. This is evident due to the presence of existing mould and visible
deterioration to the lower section of the vanity unit.
It is also evident that the leak has likely not been fully resolved, as surrounding areas are now beginning to
show signs of water-related damage. This includes the adjoining walk-in robe where the hybrid flooring is
lifting and warping, indicating moisture intrusion extending beyond the ensuite area.
Without lifting the underlying flooring and removing the vanity unit, it is difficult to accurately determine the
exact source of the leak or the full extent of the damage present behind and beneath the affected areas.
However, as of the date of inspection, water damage is definitely present and further invasive investigation
is strongly recommended.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.