Insurer declined claim for remaining bedroom ceiling damage as wear and tear; defective repairs also raised
Text of the determination
Determination
|
Case number
|
12-26-351989
|
Financial firm
|
AAI Limited
Case number: 12-26-351989 23 September 2026
1 Determination overview
1.1 Complaint
The complainant holds a strata policy with the financial firm (insurer) for his residential duplex in South Australia (property). In November 2021, he lodged a claim for storm damage to the roof of the property, as well as resulting internal water damage to one of the bedrooms.
The insurer accepted the claim. It offered a settlement, and later arranged repairs through its appointed builder, CB.
The complainant is unhappy with the insurer’s handling of the claim. He says the scope of works (SOW) and the repairs undertaken by CB did not include replacing damaged ceiling battens and plaster in the ceiling of the bedroom. The complainant says there is still storm-related damage to the ceiling in the main bedroom. He says the ceiling battens were damaged by the storm and there are now undulations in the original plaster ceilings that were not apparent before the storm.
The complainant says the insurer should, therefore, replace the ceiling and repaint the affected bedroom. He estimates the costs of these works to be about $7,359.
The insurer says:
· the battens and ceiling plaster were not damaged by the storm, but are a result of wear and tear and deterioration over time
· damage caused in this manner is excluded from cover under the terms and conditions of the policy.
The complainant also says some of CB’s repairs were not completed properly. He says the insurer should rectify them. The insurer has agreed to do so.
1.2 Issues and key findings
Is the insurer entitled to deny the claim for the remaining damage to the bedroom ceiling?
Yes. The exchanged material shows the insurer is entitled to deny the claim for the remaining damage to the bedroom ceiling, including the ceiling battens.
Should the insurer fix any defective repairs?
Yes. The insurer should fix any outstanding defective repairs. The exchanged material shows the insurer has agreed to do so. If the complainant is still dissatisfied, he is entitled to lodge a further complaint with AFCA regarding this specific issue.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainant has failed to establish a valid claim for the remaining bedroom ceiling damage, including damage to the ceiling battens
· the exchanged material shows the proximate cause of the damaged ceiling plaster and battens in the bedroom is wear and tear and gradual deterioration over time
· the insurer must fix any outstanding defective repairs.
1.3 Determination
This determination is in favour of the insurer.
Apart from ensuring all defective repairs have been fixed, the insurer is not required to take any further action in relation to this complaint.
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim for the remaining damage to the bedroom ceiling?
Yes. The exchanged material shows the insurer is entitled to deny the claim for the remaining damage to the bedroom ceiling, including the ceiling battens.
Complainant says the storm damaged the bedroom ceiling
The property includes a single level building with double brick walls and a pressed-metal tiled roof. The exchanged material shows it was built in about 1925. It has original lath and plaster ceilings, including ceiling battens.
The roof of the property was damaged in the storm. The complainant says rainwater entered the main bedroom via the damaged roof. He says the rainwater damaged the ceiling battens and the ceiling plaster in the bedroom. He says the insurer should accept his claim in full, insofar as it relates to the damage to the bedroom ceiling.
The complainant relies upon the evidence of RA, builder, who says the ceiling battens were damaged by the storm and cannot be repaired. RA recommends the bedroom ceiling be replaced.
Complainant has the onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim, either wholly or in part.
Policy provides cover for damaged caused by ‘Storm’ and damage caused accidentally
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the policy.
The policy provides cover for damage to the property caused accidentally, as well as property damage caused by various insured events during the period of insurance. Page 42 of the PDS says:
What you are covered for – Accidental loss or damage
Accidental loss or damage to the building and common contents
We cover Building cover
We cover the building at the insured address for:
· accidental loss or damage caused by an incident;
· loss or damage caused by the incidents described on pages 41 to 52, in the period of insurance provided that the loss or damage is not excluded, and subject to the conditions of your policy.
Page 44 of the PDS says:
Storm
We cover:
Loss or damage caused by a storm.
Policy cover is subject to limitations, conditions and exclusions
Not all loss and damage to the property is automatically covered by the policy. The cover provided by the policy is subject to conditions, limitations, and exclusions.
Relevantly, the insurer relies upon the following policy exclusions set out on page 26 of the PDS to deny the claim for the remaining ceiling damage:
Things we don’t cover
Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from:
· […]
· Wear, tear and gradual deterioration
any part of the building or common contents that has wear, tear, rust, fading, rising damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to:
— tiles and their adhesive or grouting breaking down;
— weathering of roof tiles or roof ridge capping;
— gradual weathering and breakdown of bricks, mortar or concrete.
Experts inspected the property
The insurer arranged for CB, builders, to inspect the property on 25 November 2021, shortly after the storm occurred. CB observed:
· a small water stain and slight cracking in the ceiling of the main bedroom
· dents to pressed-metal roof tiles.
CB concluded:
· the observed damage to the ceiling panel appears to be from age and wear and tear
· the observed ceiling damage, including any damage to the ceiling battens, is not related to the storm
· the dents in the metal roof tiles appear to be from foot traffic after solar panel installation and are not related to the storm event.
The photographs attached to CB’s report show the damage described in its report.
CB then prepared a SOW for the claim related repairs. The SOW included:
· replacement of the affected section of the main bedroom ceiling
· stain blocking and repainting of the ceiling
· replacement of affected insulation.
The SOW did not include replacement of the ceiling, or the battens.
As mentioned, RA inspected the property for the complainant in May 2023. In an undated report RA says:
When I first attended the property…. in May 2023 to provide an initial quote, I observed that the battens were damaged because of the storm event. For this reason, when I submitted the quote to [the complainant], I recommended a full replacement, and the quote clearly itemised each component.
A case officer from the insurance company later contacted me for clarification, and I explained that the battens were damaged beyond repair and that replacement was the only viable option.
CB then inspected the property again on 17 May 2024. By this time repairs had been completed in accordance with its SOW. CB said:
We have reattended to the property as requested by the [the complainant] as he is unhappy with the repairs completed, as he believes the battens to the ceiling have bowed.
Upon inspection, CB observed that the ceiling battens were, ‘bowing throughout the property’.
CB concluded:
· the bowed ceiling battens are not related to the storm event
· the repairs to the ceiling have been completed to a high standard
· the damages referred to by the complainant are not claim-related.
RA inspected the property again in April 2026. RA said:
In April 2026, [the complainant] requested an updated quote. I revisited the property and noted that the repairs carried out by the insurance contractor were not completed properly, and the battens remained damaged. As the battens still could not be repaired, I again recommended a full replacement of the bedroom ceiling.
Proximate cause of damage needs to be assessed
Damage can have more than one cause. For instance, in this matter the complainant says the remaining ceiling damage was caused by the storm. In contrast, the insurer says the damage was caused by wear and tear over time, which is excluded under the terms and conditions of the policy.
In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.
Complainant has not established a valid claim for the remaining bedroom ceiling damage
I am satisfied the exchanged material shows the storm is not the proximate cause of the remaining ceiling damage. Rather, I am of the opinion any ceiling damage caused by the storm has been repaired, and any remaining ceiling damage has been caused by wear and tear and gradual deterioration over time.
This means the complainant has failed to show the claimed damage is a result of an insured event (the storm) that occurred during the period of insurance. In other words, the complainant has failed to establish a valid claim.
It follows the insurer is entitled to deny the claim for the remaining ceiling damage.
This is because of the following considerations.
First, the ceiling damage observed shortly after storm occurred was relatively minor. CB reported in November 2021 that there was only a small water marking in the main bedroom ceiling and age-related cracking. No damage to the ceiling battens was observed. The storm-related damage was then repaired.
Second, the remaining ceiling damage that was first reported about mid-2023, approximately 18 months or so after the insured event happened, is the same type of damage that is now present throughout the property. When it reinspected the property in May 2024, CB said that undulations and batten bowing were present throughout the dwelling, including in areas unaffected by the claimed storm damage. CB concluded this condition is consistent with age-related deterioration and the inherent characteristics of horsehair (lath and plaster) ceilings, rather than storm damage.
CB says the dwelling, constructed circa 1925, exhibits systemic sagging attributable to the original construction method and the absence of strapping, not a specific insured event.
The insurer says:
Upon reviewing the ceilings throughout the home, it's clear all ceilings are suffering from a similar extent of sagging or undulation. Horsehair ceilings are widely known and notorious for this type of sagging and undulating which is associated with gradual deterioration, wear and tear. The dwelling was first built in 1925 and the current ceilings are original to the dwelling.
These conclusions are cogent and logical. In particular, it is reasonable to conclude that damage caused by a storm would usually be localised to the affected area. However, a condition that is present across the property is more likely to be the result of wear and tear and gradual deterioration over time.
Third, I am not persuaded by RA’s evidence. When RA first inspected the property in May 2023 he said, ‘I observed that the battens were damaged because of the storm event…. I recommended a full replacement’. However, RA fails to explain how the storm caused the batten damage and he does not identify specific damage linked directly to the insured event.
Similarly, when he reinspected the property in April 2026, RA said:
…. the repairs carried out by the insurance contractor were not completed properly, and the battens remained damaged. As the battens still could not be repaired, I again recommended a full replacement of the bedroom ceiling.
Yet, RA failed to explain how or why the repairs were improper, what batten damage remained, and why the battens could not be repaired.
Fourth, I have also considered the photographs provided by the complainant. Whilst the photos show cracking and movement, they do not clearly show damage that can be linked to the storm event. Furthermore, I acknowledge some of the photos show the battens may need to be replaced. However, the need to replace them does not, on its own, establish they were damaged by the storm.
Insurer is entitled to deny the claim for the remaining ceiling damage
In all the circumstances, I am satisfied the exchanged material shows:
· any ceiling damage caused by the storm has been accepted by the insurer and repaired
· the ceiling damage which is the subject of this ongoing claim, including the need to repair the battens and relace the bedroom ceiling, has not been caused by the storm
· the dominant, effective and proximate cause of the need to replace the ceiling and repair the battens is wear and tear and gradual deterioration over time
· the complainant has, therefore, failed to establish a valid claim for the remaining damage to the ceiling, including the battens.
It follows the insurer is entitled to deny the claim for the remaining bedroom ceiling damage.
2.2 Should the insurer fix any defective repairs?
Yes. The insurer should fix any outstanding defective repairs. The exchanged material shows the insurer has agreed to do so. If the complainant is still dissatisfied, he is entitled to lodge a further complaint with AFCA regarding this specific issue.
Complainant is unhappy about the insurer’s claim management
The complainant says CB’s repairs were inadequate and were not completed to an acceptable standard. I acknowledge his concerns about this however, as set out above, I am not satisfied the insurer is required to replace the ceiling, including the battens.
Nevertheless, there were some defects in the repairs completed by CB.
When CB reattended the property in May 2024 it reported:
· painters have caulked all the cracks to the existing battens and painted the entire bedroom ceiling
· trades have marked the walls that were not part of the SOW
· we have engaged trades to reattend and rectify the marks on the walls
· there are a few paint splatters that need to be cleaned off the floor, even though we did cover the entire floor - sometimes this happens. We have also let the trades know this needs to be cleaned off
· no other damages to the property were found or advised
· all policy-related damages have been scoped for submission purposes.
In an email to the complainant dated 31 October 2024, the insurer says:
We have received an update from [CB]…. they have advised they have scheduled for the rectification repairs to be completed on 11/11/2024….
In its Additional Response dated 2 June 2026, the insurer says:
[The] Insurer and [CB] have accepted responsibility for the minor quality issues which were identified in May 2024: cleaning paint splatter and repainting marked or affected walls.
These [remedial] works were offered by [CB], as part of the Insurer’s lifetime workmanship guarantee and confirmed in…. subsequent communications.
The exchanged material therefore indicates the remedial works have been offered by the insurer and have likely been completed. However, the insurer should complete any outstanding remedial works as soon as possible. If the complainant remains dissatisfied, he is entitled to lodge a further complaint with AFCA about this specific issue.
2.3 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainant has failed to establish a valid claim for the remaining bedroom ceiling damage, including damage to the ceiling battens
· the exchanged material shows the proximate cause of the damaged ceiling plaster and battens is wear and tear and gradual deterioration over time
· the insurer must fix any outstanding defective repairs.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
Whilst the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.