Delay and poor handling of a land and construction loan application, and a dispute over the interest rate quoted
Text of the determination
Determination
|
Case number
|
12-26-348323
|
Financial firm
|
Westpac Banking Corporation
Case number: 12-26-348323 31 August 2026
1 Determination overview
1.1 Complaint
MG (complainant) first approached the financial firm (bank) in mid-October 2025 for a combined land and construction loan. Prior to any loan approval, he signed a contract of sale (CoS) to purchase vacant property at an estate located at M Rd (land). He planned to develop the land by building a new home.
The CoS included a subject-to-finance withdrawal option, due to expire on 18 November 2025. On that day, the loan application was amended to cover just the land purchase (land loan). This was to avoid the risk that delays with the building contract and the construction finance could delay settlement of the land purchase. The bank issued conditional approval for the land loan on 18 November 2025. On 8 December 2025, settlement of the land purchase proceeded as scheduled.
The complainant says:
· the interest rate on the land loan was higher than promised
· the bank caused building contract and construction funding delays
· he had to prompt the bank repeatedly to ensure settlement would proceed on schedule
· the bank did not communicate clearly or in a timely manner
· he has suffered financial loss and both he and his partner PT (the second complainant) have suffered non-financial loss due to the unreasonable delays and substantial stress caused by the bank.
The complainant seeks approximately $30,000 compensation for his financial and non-financial loss. The second complainant seeks compensation for the stress they experienced as the complainant’s partner.
1.2 Issues and key findings
Did the bank mislead the complainant about the interest rate?
No. The complainant says the bank’s lender told him at their first meeting an interest rate of 5.39% per annum could be available. The rate subsequently offered to the complainant was 0.25% per annum higher. I am not satisfied a single verbal reference at the start of the loan application process amounts to misleading conduct. However, the bank agreed to make a ‘one-off refund’ to the complainant worth $1,125 as a goodwill gesture. It should honour that commitment, which is reflected in the outcome of this determination.
Did the complainant suffer loss due to the bank’s management of his loan application?
I am not satisfied the complainant has suffered financial loss caused by the bank’s management of his loan application. The settlement of the land purchase occurred on schedule without penalty and I am not satisfied the agreed postponement of the construction funding caused financial loss. However, I am satisfied the bank should pay the complainant $3,000 non-financial loss compensation to reflect the level of stress, delay and inconvenience he experienced in his dealings with the bank.
Why is the outcome fair?
The complainant had found himself an interstate property investment opportunity and was attracted to a rate the bank advertised, for which he mistakenly thought he was eligible. Later, he became concerned the bank’s carriage of his land and construction loan application might cause him to miss the finance and settlement deadlines in the CoS. He reached a compromise with the bank to postpone the construction funding, and both deadlines were then met. It would not be fair to require the bank to compensate the complainant for the financial loss he says flowed from the postponement. However, I am satisfied the complainant experienced unnecessary stress, delay and inconvenience as a result of the bank’s management of his loan application. In these circumstances, it is fair the bank pays the complainant $3,000 non-financial loss compensation. It is also fair the bank pays the complainant the ‘one-off’ refund amount to which it committed after the complainant objected to the interest rate in his land loan offer documentation.
1.3 Determination
This determination is partly in favour of the complainant. If the complainant accepts this determination, the bank must:
· pay the complainant $1,125 into an account he nominates, being the amount of the one-off refund the bank agreed in November 2025 it would pay to him
· pay $3,000 non-financial loss compensation into an account he nominates, within ten business days of that acceptance.
2 Reasons for determination
2.1 Did the bank mislead the complainant about the interest rate?
No. The complainant says the bank’s lender told him at their first meeting an interest rate of 5.39% per annum could be available. The rate subsequently offered to the complainant was 0.25% per annum higher. I am not satisfied a single verbal reference at the start of the loan application process amounts to misleading conduct. However, the bank agreed to make a ‘one-off refund’ to the complainant worth $1,125 as a goodwill gesture. It should honour that commitment, which is reflected in the outcome of this determination.
Financial firms must not engage in misleading conduct
The complainant says the bank promised him an interest rate of 5.39% per annum. Instead, when the bank confirmed his conditional loan approval, the interest rate specified was 5.69% per annum.
A financial firm must not engage in conduct relating to credit activity that is misleading or deceptive or is likely to mislead or deceive.
Misleading conduct can happen when a financial firm:
· makes a representation about something that is incorrect
· acts in a way that misleads a complainant
· does not say or do something (such as correct a complainant’s apparent misunderstanding) when it should.
Misleading conduct can occur even if the financial firm did not intend to mislead the complainant or the complainant could have found out the true position by looking into the matter further.
Broadly, to succeed in a claim for misleading or deceptive conduct relating to a financial product or financial service, the complainant must establish:
· the financial firm made a statement or engaged in conduct that was false or misleading (representation or omission)
· the complainant relied on the representation or omission to their detriment or was led into error by the misleading or deceptive representation or omission, and
· relying on the misrepresentation caused them loss.
In assessing whether a statement or conduct was misleading, we assess whether a reasonable person in the class of persons the complainant belonged to was likely to have been misled by the statement or conduct.
The complainant was attracted to an interest rate of 5.39% per annum
The complainant says a major reason for approaching the bank for a land and construction loan was the bank’s competitive interest rates. In particular, he was keen to take advantage of a variable interest rate of 5.39% per annum he had seen advertised. The complainant says the bank‘s lender (Mr S ) told him ‘verbally’ on 13 October 2025 he would be able to access that rate. However, after the bank’s conditional loan approval on 18 November 2025 was issued, he discovered the rate would be 5.64% per annum. The complainant has not said he could have obtained a better rate for the same loan type from another lender or that he had made a loan application with another lender, but he does say by the time he realised the bank’s rate would be 0.25% per annum higher than expected, it was too late to shop around.
5.39% per annum interest was for online applications with an LVR up to 70%
The bank says its advertised interest rate of 5.39% per annum was only available for online loan applications, not those where a borrower’s loan pathway was through an in-house bank lender. The complainant was given a copy of the bank’s advertising for the 5.39% per annum rate on 21 November 2025 after he queried the 0.25% per annum disparity. The advertisement refers to 5.39% per annum as ‘Our lowest online variable rate...When you apply online with our Online offer’ for a loan with an LVR of 70%. The loan sought by the complainant substantially exceeded 70% LVR.
Although it is clear the complainant was not eligible for the advertised 5.39% per annum variable rate, this does not eliminate the possibility Mr S may have said or implied this rate was available when the complainant first approached the bank in mid-October 2025. However, the complainant does not say there was any subsequent verbal or written confirmation that 5.39% per annum would be the opening variable rate when the loan commenced, even though he had numerous interactions with the bank’s in-house lending officers.
The complainant points to the bank’s email of 21 November 2025 from another of the bank’s in-house lenders (Ms D) following a phone discussion earlier that day. Ms D had become involved in the administration of the complainant’s loan application after he lodged a complaint on 18 November 2025 expressing a lack of confidence in Mr S and requesting a new bank lending officer. He also expressed concern about the slow progress of the loan approval. Ms D recalls the complainant raising the 5.39% per annum interest rate. She confirmed the loan had been ‘fully approved’ and went on to state in an email follow-up to a telephone conversation:
As discussed, we will provide a one-off refund consisting of:
Six months’ interest difference (5.64% p.a. vs 5.39%p.a.) totalling $730.00, and
A refund of the fist-year package fee of $395.00 once the loan settles.
The complainant submits this is proof the bank recognised it had made an interest rate error. That is one interpretation. It is equally plausible the bank saw an opportunity to ensure it acquired the complainant’s business. Ms D says the one-off refund and the one-off package fee waiver were a ‘goodwill gesture’.
Based on all the available information, I am not persuaded the bank misled the complainant about the interest rate because:
· There is nothing in writing (text or email) from the bank to confirm the loan the complainant sought would carry an initial variable interest rate of 5.39% per annum.
· The complainant does not say the prospect of 5.39% per annum was ever repeated, even though he had numerous dealings with the bank’s lenders between 13 October 2025 and 18 November 2025 when the bank’s loan offer of 5.64% per annum was made.
· The bank’s marketing prominently stated the online and 70% LVR preconditions for access to the 5.39% per annum rate.
· Mr S does not recall a conversation promising the complainant a variable interest rate of 5.39% per annum, and emphasises the only interest rate commitment given to the complainant was in the 18 November 2025 loan offer documents.
· The complainant has not established he suffered loss in the period during which he thought the variable rate was going to be 5.39% per annum.
The complainant says if he had known at the beginning 5.39% per annum was not going to be available, he would have ‘assessed other options immediately’. Even if I were to accept Mr S made a clear commitment to the complainant that his opening variable rate would be 5.39% per annum, it is speculative whether the complainant would have decided to borrow elsewhere and that he suffered a financial loss by staying with the bank. However, regardless of the bank’s underlying reasons, on 21 November 2025 it promised to implement a two-pronged ‘one-off refund’ at settlement, totalling $1,125.
The bank confirms the refund was never processed. The bank explains it was superseded by the bank’s offers in early December 2025 in response to a complaint made by the complainant on 3 December 2025. If the one-off refund were an offer for the complainant to accept, I would agree, but I am satisfied the refund Ms D detailed on 21 November 2025 was a firm commitment the bank had made and it was presented that way to the complainant. It follows I consider it fair the bank should make good on the refund, in the amount of $1,125. I consider this to be an adequate recognition of the confusion over and misconception about the applicable interest rate.
2.2 Did the complainant suffer loss due to the bank’s management of his loan application?
I am not satisfied the complainant has suffered financial loss caused by the bank’s management of his loan application. The settlement of the land purchase occurred on schedule without penalty and I am not satisfied the agreed postponement of the construction funding caused financial loss. However, I am satisfied the bank should pay the complainant $3,000 non-financial loss compensation to reflect the level of stress, delay and inconvenience he experienced in his dealings with the bank.
The bank must pay the complainant non-financial loss compensation
The complainant approached the bank seeking to finance an interstate investment property development project he had identified. He says the bank’s unsatisfactory management of his land and construction loan application caused him serious stress, delayed his construction finance and disrupted his development project timetable. The complainant says he is entitled to compensation for this ‘non-financial harm’.
AFCA can require a financial firm to compensate a complainant for non-financial loss the financial firm’s conduct causes them. AFCA will generally only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, interference with or impact on the complainant’s expectation of enjoyment or peace of mind. AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered.
Here, I am satisfied the complainant is entitled to non-financial loss compensation because:
· the bank should have clarified sooner he did not meet the eligibility criteria for the advertised 5.39% per annum interest rate
· the bank did not properly explain what the guarantee process would entail or that the bank would have to wait for consent to the guarantors’ mortgage from a different bank
· the bank knew the subject-to-finance deadline in the CoS was getting closer but continued to insist that without access to the final building contract, it could not provide any loan approval
· by agreeing with the complainant’s suggestion to postpone assessment of the construction funding application, the bank implicitly conceded there was a real risk the combined loan approval would not be ready before the subject-to-finance deadline and might not be ready in time for settlement
· despite being notified on 21 November 2025 the land loan had now been ‘fully approved’, the bank recommended one week before settlement (and without prior warning) the complainant seek a two-week settlement extension because the bank was not yet able to commit to the 8 December 2025 settlement
· the bank recognised it had caused the complainant non-financial loss when it apologised to the complainant in December 2025 for the ‘delays, ‘service failures’ and ‘poor overall experience’
· the guarantee process had to be repeated after the bank’s 18 December 2025 approval for a single loan to take over from the existing land loan and fund the construction.
I am satisfied the conduct I have outlined contributed to the stress, delay and inconvenience the complainant experienced. Where a financial firm has caused or contributed to an unusual amount of stress, inconvenience, delay or impact, AFCA can award non-financial loss compensation having regard to the nature, impact and duration of that conduct. In all the circumstances, I consider it is fair the bank pays $3,000 non-financial loss compensation to the complainant.
While I accept it is likely the second complainant was impacted by the complainant’s experience, they were not a party to the loan and they were not directly involved in the dealings with the bank. I do not consider it would be fair to require the bank to pay non-financial loss compensation to the second complainant.
The complainant had approached the bank early to avoid loan approval delay
The complainant contacted the bank in mid-October 2025 having paid a holding deposit on the property. On 28 October 2025 he signed a binding CoS with a settlement date of 8 December 2025. He was concerned to ensure the finance he sought would be approved before he lost his right to invoke the subject-to-finance provision in the CoS. He was equally concerned he needed his finance in time for the land purchase settlement.
The land and construction loan approval became stuck in a stalemate. The bank wanted to see a signed building contract and the builder wanted to see the loan approval. The bank’s lending policy prevented loan approval without knowing the construction cost, and the complainant cannot expect the bank to override its policy. However, he was also disappointed Mr S had been largely unresponsive to his repeated requests for the bank to give the builder a funding indication of some sort, even if this was not in the form of a conditional approval.
On 10 November 2025 the complainant suggested postponing the construction funding, but only because he was not confident there would otherwise be a timely loan approval. The bank says it agreed because it was required to act on its customer’s instructions. On 18 November 2025 the bank gave conditional approval for a land loan, just in time to meet the subject-to-finance deadline in the CoS. The complainant says he found this whole experience very stressful and considers he should not have had to push and prompt the bank so much to get a result. Soon afterwards, the bank agreed to allocate a different in-house lending officer, Ms D.
In my view, the bank would have seen the ‘stalemate’ situation play out with other customers. The bank could have reduced the complainant’s stress if it had foreshadowed the problem, ensured the complainant was aware of it, and explained how the issue is usually addressed. This may have avoided the construction postponement solution that was adopted.
The loan had procedural complexity
I acknowledge the complainant’s scepticism when the bank said in early December 2025 the loan was ‘complex’ and this had contributed to delay and the bank’s concern it might not be ready for settlement. However, it is fair to acknowledge the loan involved procedural complexity.
Although the complainant met with Mr S on 13 October 2025, he did not sign the CoS until 28 October 2025. Two weeks later the complainant was already anxious the loan had not received approval, primarily because the subject-to-finance deadline he had agreed to was looming. The procedural complexity arose because:
· The complainant wanted the loan to fully fund the purchase price of the land and to cover the stamp duty.
· The complainant wanted the loan to fund the cost of building a dwelling on the property.
· The bank had to make a serviceability assessment and comply with its responsible lending obligations.
· The bank required the complainant’s parents to provide a guarantee, and the guarantee involved obtaining a second mortgage over their property.
· The second mortgage involved a valuation of the complainant’s parents’ property
· The parents’ mortgagee bank had to agree to the second mortgage.
· The guarantee process included a requirement for the guarantors to obtain independent legal advice.
· The complainant had to provide a signed building contract specifying the stage payments the bank would need to fund as the build progressed.
Having listed these complexity factors, I do not consider they excuse the bank from responsibility for causing the stress, delay and inconvenience the complainant experienced. If anything, the bank was on notice there would be procedural challenges and it was up to the bank to manage the loan approval process efficiently, communicate clearly and inform the complainant in advance where there was a likelihood of delay or complication. The bank itself has conceded it did not do this well.
The bank has admitted its service level was unsatisfactory
On 3 December 2025 the complainant escalated his concerns about delay and the competence of the bank’s staff to the office of the bank’s CEO. He received a reply acknowledging the ‘distress the situation has caused you’ and expressing the bank’s disappointment ‘we have fallen short of the standards of excellence we expect from our people.’ On 5 December 2025 the bank’s State Manager for Regional Lending (State Manager) apologised for the complainant’s ‘poor overall experience and unnecessary delays’. He offered $4,000 ‘in recognition of our service failures and the non-financial loss incurred by you and your family’. At the same time the bank assured the complainant it was ready, willing and able to settle the loan on 8 December 2025.
On 8 December 2025 the complainant sent a lengthy email to the State Manager outlining his experience since approaching the bank in mid-October 2025 and the impact it had made on himself, his partner and his family. The email from the complainant had referred among other things to:
· the interest rate confusion
· miscommunication about the land loan amount he sought (105%LVR versus the 100%LVR he was offered)
· the extent to which he had needed to press the bank for progress updates and explanations
· confusion over the true status of a ‘fully approved loan’
· the unnecessary construction funding delay caused by the bank’s failure to plan and co-ordinate appropriately
· the bank’s failure to efficiently plan and co-ordinate the parental guarantee process.
The bank’s State Manager replied acknowledging the ‘frustrating experience’ and attributing the recent delay to ‘the second mortgage consent which we required from another financial institution’. He increased the bank’s ‘resolution offer’ to $6,300, in light of the additional details the complainant had provided.
The second complainant confirms the complainant ‘suffered significant distress, sleep disruption, and exacerbation of existing health conditions’ as he dealt with the bank over the loan funding and settlement schedule. The complainant has costed his ‘non-financial harm’ at $13,500. I do not accept this costing and in any case it exceeds the ceiling imposed on non-financial loss compensation under AFCA’s Rules.
Based on the available information and my own assessment, I am satisfied it is fair the bank pays the complainant $3,000 non-financial loss compensation. I have summarised my reasons earlier in this section of the determination. They include the bank’s own statements during December 2025 about unnecessary delays, poor service standards and the complainant’s evident distress and frustration.
The bank is not required to pay financial loss compensation
The complainant says he has suffered combined financial and non-financial loss totalling $31,141.
In connection with financial loss, the complainant refers to:
· an increase of 0.25% in the variable interest rate that applied at the commencement of the land loan, which he says is worth $2,175 on an assumption the 5.39% rate would have remained unchanged for the first two years of the loan
· interest costs of $4,086 thrown away between the settlement of his land purchase (10 December 2025) and the commencement of the bank’s construction funding (10 February 2026)
· delayed building commencement
· additional professional costs.
I have addressed the interest rate issue in section 2.1 of this determination. I am not satisfied this claimed loss was caused by the bank’s error or breach, but the bank did commit to a one-off refund and should be held to that commitment. As for the holding costs and other unspecified financial costs incurred due to the delayed building project, the complainant has not established building work would have commenced before Christmas 2025 if the combined loan (approved on 18 December 2025) had been ready on 8 December 2025.
I note builders and building trades are routinely unavailable during the month of January. In any event, it is important to recall there was agreement between the complainant and the bank to postpone the construction funding. I have taken into account the complainant’s frustration about the construction funding delay, in connection with my award of non-financial loss compensation. While I accept the bank’s conduct caused the complainant stress, delay and inconvenience, I am not persuaded the bank’s conduct caused him financial loss.
The complainant says he has suffered indirect financial loss because he estimates he ‘spent 61 business hours and more than 100 personal hours managing the [bank] process and its consequences’. He has costed (‘monetised’) his time at approximately $70 per business hour and $50 per personal hour. The complainant says this loss comes to a total of $9,280. AFCA does not generally award financial loss compensation for the time complainants spend in their dealings with financial firms. I am not satisfied it is appropriate to compensate the complainant for this form of indirect financial loss. Instead, I have considered the time the complainant himself contributed to the loan approval process as a factor influencing my award of non-financial loss.
2.3 Why is outcome fair?
The complainant had found himself an interstate property investment opportunity and was attracted to a rate the bank advertised, for which he mistakenly thought he was eligible. Later, he became concerned the bank’s carriage of his land and construction loan application might cause him to miss the finance and settlement deadlines in the CoS. He reached a compromise with the bank to postpone the construction funding, and both deadlines were then met. It would not be fair to require the bank to compensate the complainant for the financial loss he says flowed from the postponement. However, I am satisfied the complainant experienced unnecessary stress, delay and inconvenience as a result of the bank’s management of his loan application. In these circumstances, it is fair the bank pays the complainant $3,000 non-financial loss compensation. It is also fair the bank pays the complainant the ‘one-off’ refund amount to which it committed after the complainant objected to the interest rate in his land loan offer documentation.
The outcome is fair
I am satisfied the outcome is fair both to the complainant and to the bank. The bank itself has accepted its handling of the complainant’s loan application was unsatisfactory and caused the complainant distress and unnecessary delay. I have carried out my own assessment of the bank’s conduct and I am satisfied the complainant is entitled to non-financial loss compensation. However, I am not satisfied the negotiated delay in the construction funding caused the complainant financial loss. It would therefore not be fair to require financial loss compensation to be paid to the complainant.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Chronology of key actions or events
This chronology is not intended to cover every action, communication, decision or milestone. It consists of key actions or events I have found useful in my consideration of the complaint.
|
Date
|
Action or event
|
13-10-2025
|
Complainant approached the bank for a land and construction loan.
Loan amount discussed was $872,500.
Complainant says he received verbal assurance the interest rate would be 5.39%.
|
21-10-2025
|
Complainant sends bank a copy of proposed contract of sale (CoS).
|
27-10-2025
|
Complainant sends bank copy of the builder’s quote for construction.
|
28-10-2025
|
Complainant signs CoS to purchase the investment property for $435,000.
Complainant enquires with bank about progress of pre-approval so builder can start compiling a detailed building contract.
|
29-10-2025
|
Complainant seeks pre-approval/letter of comfort from bank to allow building contract to be finalised.
|
10-11-2025
|
Complainant says building contract not ready and doubts it will be ready before 18 November 2025 (CoS finance deadline). He enquires whether it might be better to proceed only with the home loan portion of the finance package.
|
18-11-2025
|
Land & construction loan amended to land loan. Conditional loan approval confirmed ($435,000).
|
18-11-2025
|
‘Subject to finance’ deadline in CoS.
|
19-11-2025
|
Complainant contacts bank to say dismayed the finance deadline has passed but he still only has conditional approval.
|
21-11-2025
|
Bank emails complainant: ‘Congratulations - your [land only] loan has been fully approved’.
|
21-11-2025
|
Bank informs complainant the applicable (variable) interest rate is 5.64%. Bank says 5.39% was for wholly online loan applications.
|
21-11-2025
|
Bank confirms it will credit $730 to allow for difference between interest rate of 5.69% and interest rate of 5.39%.
Bank confirms it will waive $395 ‘package fee’ the complainant would otherwise be required to pay.
|
26-11-2025
|
Bank supplies complainant with summary of loan application including confirmation of complainant’s requirements and objectives, and details of his income and expenses.
|
26-11-2025
|
Unconditional approval confirmed in writing - bank issues land loan offer of $435,000, to commence with variable interest rate of 5.69%.
|
26-11-2025
|
Bank given draft copy of building contract.
|
01-12-2025
|
Bank informs complainant’s conveyancer the loan is ‘complex’ due to ‘the involvement of a security guarantor and the requirement for second-mortgage consent from other [sic] financial institution for Guarantor’.
Bank says it cannot commit to a settlement on 8 December 2025.
|
02-12-2025
|
Guarantors’ advice acknowledgment signed.
|
03-12-2025
|
Complainant emails the CEO of the bank about its mishandling of his land and construction loan application, the delays the bank has caused and misrepresentation about the applicable interest rate.
|
03-12-2025
|
Bank apologises for ‘your experience with the Group and the distress the situation has caused you and those close to you.’
Bank confirms it is ready to participate in the 8 December 2025 settlement.
Bank says it will make a ‘goodwill’ payment of $2,500.
|
05-12-2025
|
Bank apologises for ‘poor overall experience and unnecessary delays’ as well as ‘the added stress our advice about potentially not being able to meet the settlement deadline caused.’ The bank confirms the ‘loan structure is complex’ but that this does not justify the delay. The bank increased its goodwill offer to $4,000.
|
|
|
08-12-2025
|
Building contract is signed. Building to be completed in 12 months.
|
08-12-2025
|
Settlement proceeds and purchase of the property is completed.
|
08-12-2025
|
Complainant puts a more detailed version of his December 3 December 2025 complaint to the State Manager.
|
12-12-2025
|
Bank says construction loan application ready.
|
15-12-2025
|
Bank increases its goodwill settlement offer to $6,300.
|
16-12-2025
|
Bank says conditional approval for the (new) land/construction loan is imminent. Finance amount will be $873,500.
|
18-12-2025
|
New land/construction loan receives unconditional approval.
|
08-01-2026
|
Complainant submits AFCA complaint
|
10-02-2026
|
New land/construction loan supersedes the
land loan, which is paid out.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.