Partial decline of cyclone damage claim for ceilings; dispute over cause of damage and cash settlement
Summary
The complainant claimed for cyclone damage to all ceilings in his home; the insurer accepted only the garage and stairwell ceilings. AFCA found for the insurer on scope but required it to add the garage flashing repair, uplift the cash settlement by 10% and pay interest.
The insurer's expert evidence was more persuasive than the complainant's that only the garage ceiling was cyclone damaged, but the flashing was insured damage and a contingency uplift was fair for cash settlement.
Issues
- Claim denial primary · not upheld
“insurer's assessment more persuasive; cyclone damage limited to the garage ceiling, other ceilings due to age and glue failure”
- Claim amount dispute secondary · upheld
“insurer to include flashing repair cost and increase final settlement offer by 10% for contingencies”
- Inadequate claim investigation secondary · not upheld
“Not satisfied insurer instructed T to remove statement; amended report explained and consistent with body”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestreassess claim
Text of the determination
Determination
|
Case number
|
12-25-341833
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-25-341833 26 August 2026
1 Determination overview
1.1 Complaint
The complainant holds a home building insurance policy (policy) with the financial firm (insurer). On 6 April 2025, a claim was lodged for damage to the garage ceiling said to be caused by Cyclone Alfred (cyclone) on or about 8 March 2025. The complainant has on two later dates claimed for additional damage to the building.
The insurer has partially accepted the claim for damage to the garage and stairwell ceilings. It has declined cover for all other remaining areas on the basis this damage is not due to the cyclone. Rather, it says the declined damage is due to circumstances excluded under the policy.
The complainant is dissatisfied with the insurer’s assessment of its liability. He is of the view that all the ceilings within the insured building present with cyclone damage and should be accepted under the claim.
1.2 Issues and key findings
Is the insurer’s assessment of its liability reasonable?
Yes. The exchanged information supports the insurer’s assessment of its liability under the policy. Therefore, it is fair the insurer be permitted to limit its liability under the claim. However, it is fair the insurer increases its settlement offer in line with this determination.
Why is the outcome fair?
The outcome is fair as it is based on the exchanged information and the policy. The complainant has not provided persuasive information to show all the claimed damage is due to the cyclone. Rather, the information from the insurer is more persuasive and establishes the cyclone damage is limited to the garage ceiling. It has as a gesture of good faith also accepted to cover the stairwell ceiling.
1.3 Determination
This determination is in favour of the insurer.
Within 14 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to:
· include within its accepted scope of woks the cost to repair the flashing above the garage
· increase its final claim settlement offer by a further 10% to allow for contingencies
· pay interest on the claim settlement amount from 27 November 2025 to the date of payment using the rate specified for section 57 of the Insurance Contracts Act 1984 (Act).
2 Reasons for determination
2.1 Is the insurer’s assessment of its liability reasonable?
Yes. The exchanged information supports the insurer’s assessment of its liability under the policy. Therefore, it is fair the insurer be permitted to limit its liability under the claim. However, it is fair the insurer increases its settlement offer in line with this determination.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Storm, cyclone, rainwater or run-off’. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
Complainant has onus to show the damage triggers cover under the policy
When making a claim, the complainant has the initial onus of establishing they suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on balance, the application of any exclusion it relies on to reduce its liability or deny the claim.
This means that not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events occurring during the period of insurance and not subject to the exclusions, is covered.
Circumstances relevant to the consideration of this complaint
The exchanged information, on balance, shows the following:
· the location of the insured property was subject to a significant weather event (cyclone) on or around 8 March 2025
· after the event the complainant found water ingress damage to the garage ceiling for which the claim was lodged on 6 April 2025
· the insurer appointed consultants ‘T’ to assess the cause and extent of the garage damage. T completed an assessment of the garage ceiling and roof on 10 April 2025, and found:
> evidence of water ingress into the garage ceiling space causing the plaster to drop and consistent with a one-off weather event
> noted the flashing above the garage to be ‘insurable repairs’ and needed to be made watertight
· after this assessment the complainant has contacted the insurer and advised it of damage to the stairwell ceiling
· the insurer arranged for T attend the insured property on 15 July 2025 to assess this damage. T found:
> the damage to the stairwell ceiling was due to normal ongoing structural movement
> the stairwell ceiling sheets were direct fixed to the underside of the timber truss without metal battens and no sarking installed underneath the tiled roof
> the damage had been occurring slowly over a long period of time
· regardless of the above findings, the insurer says it accepted to cover the cost to repair the stairwell ceiling as a gesture of good faith
· the complainant has on a third occasion contacted the insurer to advise of noticing damage to the living room ceiling. The insurer arranged for T to re-attend to assess the living room ceiling on 9 October 2025. T’s report shows the assessor chose to inspect all the ceilings throughout the residence as opposed to limiting the assessment to the living room. He found:
> the damage appears to be from age and glue fixings failure which is allowing the glue to detach from the ceiling joists – the ceilings were estimated to be 27 years old
> the damage is consistent with occurring over a period of time with evidence of the ceiling sheet joins visible in previous real estate photos from 2022
> all the ceilings were noted to have dropped and popping nails were noted
· given the above, the insurer has partially declined the claim limiting cover to the garage and stairwell ceiling previously accepted
· the complainant appointed roofing consultant ‘IR’ to inspect the property and provide a report. IR has provided a report dated 7 January 2026 advising:
> the garage ceiling had ceiling displacement, with adhesive failure and popped fixings identified
> stairwell, living, kitchen and bedrooms also have ceiling displacement, with adhesive failure and popped fixings identified
> the roof inspection did not identify the water ingress occurred due to lack of maintenance, but was due to extensive rain and wind during the storm event on 8 March 2025
> the water ingress has caused the ceiling lining to delaminate from adhesive.
Information from the insurer’s appointed experts is more persuasive
The complainant has provided several reasons disputing the insurer’s assessment and its decision to partially decline the claim. These range from technical concerns regarding the mechanism of the damage, location of accepted damage (stairwell), inconsistencies in the information from T and his personal views.
I have considered all this information, however, do not intend on reiterating this information here. Having considered the complainant’s view, and all the available expert reports and supporting information (including photos), I find the insurer’s position to be more persuasive.
I acknowledge the complainant’s view that T has provided conflicting information in its reports. This is for the most part based on the complainant’s view that if T accepts the damage to the garage and stairwell are from the cyclone, then it follows the rest of the damage is also due to the cyclone.
However, I am not satisfied this is the case. This is because each of T’s reports are based on an inspection of a different area of the home given the intervals in the complainant’s claims for damage. Further, I am not satisfied the exchanged information shows water ingress damage or damage from any other insured event to any ceiling other than the garage.
The exchanged information does not show the damage to the stairwell ceiling is due to the cyclone. Rather, the damage was assessed as being consistent with normal ongoing structural movement but accepted in good faith by the insurer. This contradicts the complainant’s concerns regarding conflicting information, the location of the stairwell within the home and the mechanism of damage.
I accept the complainant’s view the insurer’s reference to real estate photos from 2022 is not compelling. This is because I accept the photos are not of good quality and were not taken with care and intention of highlighting damage or issues with the ceilings.
Similarly, I acknowledge the single photo provided by the complainant two days before the cyclone. However, I am not satisfied this photo alone is enough to set aside the more qualified and persuasive information from the appointed experts.
I have considered IR’s report and opinion. However, I am more persuaded by T’s assessments, reports, reasoning and supporting information. I am not satisfied there is any persuasive evidence establishing cyclone damage (or from any other insured event) to the declined areas of damage.
In saying that, I am satisfied the exchanged information does show it is most likely the garage roof flashing is insured damage. I find the opinion of T’s roofing expert ‘RA’ provided in the roof report dated 9 May 2025 to be more qualified and compelling. Therefore, the insurer is to include the cost to repair the flashings in its claim settlement offer.
Insurer did not unfairly request T to amend its report
I acknowledge the complainant’s concern the insurer contacted T and after which T amended its October 2025 re-attendance report. The insurer does not dispute this occurred, however, says it was not a request to remove information favourable to the complainant. Rather, it reached out to T seeking clarification on the information which resulted in T amending the report.
I have considered the report in its original form as well as the amended version. I accept the original version including a statement advising the damage was consistent with the claimed cyclone event. Further, that it was this statement that was removed in the amended version. However, I am not satisfied it would be fair to find the insurer instructed T to remove this statement.
Rather, the exchanged information shows this statement was clearly conflicting with the consultants’ assessment notes, opinions and supporting information within the body and conclusion of the report. Also, the exchanged information does not show the insurer’s representative instructed T to remove a specific statement. Rather, noting the conflicting positions in the report, she raised this concern regarding the inconsistency with and requested the assessor be asked to clarify his position.
The amended report was the result of the assessor clarifying his position regarding his intended outcome. This was consistent with the body, conclusion and supporting information from the assessor. I accept this was not ideal and raises reasonable concern. However, I accept the insurer has provided a reasonable and compelling explanation.
Therefore, I am not satisfied this concern assists the complainant’s position.
Insurer’s assessment of its liability is consistent with its policy obligations
I acknowledge the complainant’s concerns regarding the insurer’s calculation of the cost to repair the accepted damage and therefore its cash settlement offer.
I have considered the several scopes of work and repair quotes provided by the complainant. However, I note they are all for a much broader scope of works and include repairs to damage the insurer is not obliged to cover under the policy.
The complainant and his preferred consultants have not provided any reason or information that can reasonably be relied on to find the insurer’s proposed rates and costing are unreasonable or not within accepted industry standards. It is accepted that an insurer, when cash settling a claim, is entitled to do so based on what it would cost it to complete the repairs as long as this is based on an actionable repair quote.
Without any persuasive information showing the insurer’s cash settlement is unreasonable, I am not satisfied it would be fair to require it to pay a higher cash settlement. However, given the transfer of risk to the complainant, it is fair that a 10% uplift be applied to the claim settlement.
Having regard to all the exchanged information, including the policy provisions, I am satisfied the insurer assessment of its liability is consistent with and meets its policy obligations.
Insurer is to arrange settlement of the claim
Within 14 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to:
· include within its accepted scope of woks the cost to repair the flashing above the garage
· increase its final claim settlement offer by a further 10% to allow for contingencies
· pay interest on the claim settlement amount from 27 November 2025 to the date of payment using the rate specified for section 57 of the Act.
2.2 Why is the outcome fair?
The outcome is fair as it is based on the exchanged information and the policy. The complainant has not provided persuasive information to show all the claimed damage is due to the cyclone. Rather, the information from the insurer is more persuasive and establishes the cyclone damage is limited to the garage ceiling. It has as a gesture of good faith also accepted to cover the stairwell ceiling.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.