Home / Allianz Australia / Determination 12-25-338697

Determination 12-25-338697

Claim declined under soil movement exclusion; storm exception not established

FirmAllianz Australia
Decided2026-06-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer denied a home insurance claim for a damaged sewer line, relying on the soil movement exclusion. AFCA upheld the denial and found no compensation warranted, but required the insurer to reimburse the complainant's plumber's assessment fees.

Proximate cause was ongoing soil movement, excluded unless directly caused by and within 72 hours of a single storm event, which was not established; the plumber's assessment cost was fairly reimbursable.

Issues

Subjects and remedies

broker or intermediaryhome or building damagenatural disasterpay compensation

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-338697 | Financial firm | Allianz Australia Insurance Limited Case number: 12-25-338697 25 May 2026 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under her home insurance policy for damage sustained to a sewer line. The insurer denied the claim on the basis that the damage was caused by excluded factors under the policy. The complainant disagrees with the insurer’s decision and states that the proximate cause of the damage is storm. Further, the complainant is dissatisfied with the insurer’s handling of the claim. 1.2 Issues and key findings Can the insurer deny the claim? Yes. This is because: · the proximate cause of the damage is soil movement · the policy excludes soil movement unless caused by and occurs within 72 hours of a storm · there is no persuasive evidence to establish a single storm event has triggered the soil movement resulting in the pipe damage · the policy exclusion defeats the claim. Is the insurer liable for compensation? No. The insurer handled the claim reasonably overall. Why is the outcome fair? The outcome is fair because the insurer relied on a qualified forensic engineer and a plumber, whose detailed assessments found the damage was caused by ongoing soil movement and settlement over time, not a specific storm event. This conclusion is consistent with the policy exclusion for soil movement, meaning the claim falls outside the policy’s scope of cover 1.3 Determination This determination is in favour of the insurer. The insurer can deny the claim, however, is required to reimburse the complainant for her plumber’s assessment fees as outlined in section 2.2 of the determination. 2 Reasons for determination 2.1 Can the insurer deny the claim? Yes. This is because: · the proximate cause of the damage is soil movement · the policy excludes soil movement unless caused by and occurs within 72 hours of a storm · there is no persuasive evidence to establish a single storm event has triggered the soil movement resulting in the pipe damage · the policy exclusion defeats the claim. Policy covers accidental damage subject to policy exclusions and conditions The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. The complainant’s policy covers accidental unexpected mishaps that are caused unintentionally and are not excluded. The product disclosure statement (PDS) defines ‘Accidental Damage’ as damage caused by sudden, unforeseen and unintended events. There is no dispute that the complainant’s sewer line is damaged and requires replacement. On balance, soil movement is the proximate cause of the damage The complainant’s plumber (JP) observed severe damage and misalignment at the biocycle inlet and connection point. In his report, JP states: · he observed poor ground water management where stormwater cannot adequately escape the retaining wall · ground movement resulted in damage to, and misalignment of, the relevant systems · excessive rain received during Cyclone Alfred caused soil to be washed away and resulted in lack of support for the sewer pipework. In assessing the cause of the damage to the sewer line, the insurer’s engineer (CR) concludes that the damage to the sewer line at the rear of the residence is due to a combination of factors, including: · differential settlement of the retained fill overtime which leads to cracks, joint separation and pipe sagging · multiple junctions and bends, where each connection is a weak point which is vulnerable to cracking or separation with minor ground movement · fatigue at connections, where the pipes have been subject to small cyclic movements from thermal expansion, which over time can loosen joints or cause cracks to develop · ingress of water to the founding soils can soften the retained fill and increase settlement which leads to cracking or separation of the pipes. CR concluded that the movement of soils has damaged the sewer line. CR also observed the concrete pavement along the rear of the residence and above the retaining wall has settled, indicating historic settlement of the founding soils. There is no dispute that the sewer line extends alongside the rear elevation of the property, below the ground level and within the vicinity of the settled soil, and that it was installed 25 years ago. Further the ground in which the sewer line has been installed compromise of fill soils retained by a terraced retaining wall system. Importantly, CR states that he did not observe any silt deposits of evidence or erosion or washout and that the movement cannot be attributed to an isolated storm event as the complainant asserts. In the absence of information to the contrary, and on balance, I accept the proximate cause of the damage is the ongoing soil movement. The insurer can deny the claim I have carefully considered the exchanged evidence and the parties’ arguments. I am satisfied that the insurer can deny the claim. For the sake of expediency, I consider the soil movement is sudden, unintended and unexpected from the complainant’s point of view and that it has caused the damage to the sewer pipes. Accordingly, I accept the complainant has established a valid claim. In denying the claim, the insurer states the policy excludes loss, damage, injury or legal liability as a result or caused by or arising from: Soil movement including erosion, landslide, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood or flood water, combined with run-off and/or rainwater The policy excludes the damage, which is as a result of, caused by or arising from soil movement. As stated, I am satisfied the proximate cause of the damage is the ongoing soil movement. The circumstances of the loss meet the first limb of the exclusion. Both JP and CR concluded that the sewer line was damaged by soil movement due to several reasons, including poor water management. Simply put, the policy does not extend indemnity to cover damage caused by soil movement. That said, I acknowledge there is an exception to this exclusion. The damage may be covered if it is ‘directly caused’ and ‘occurs within 72 hours’ of, one of the specified events, including storm. I have carefully considered the exchanged evidence, and I am not satisfied that there is a causal link between the soil movement and any of the listed events. The list of events is exhaustive. In other words, the soil movement must be directly caused by explosion, earthquake, tsunami, storm, flood or flood water. The complainant says the policy does not state that the storm must be a single identifiable event. I am not satisfied that this argument advances the complainant’s position. This is because the second limb of the exception requires the damage to ‘occur within 72 hours’ of an explosion, earthquake, tsunami, storm or flood or flood water, combined with run-off and/or rainwater. The 72-hour window is indicative of a single identifiable event. Further, the use of the word ‘an’ which implied a singular event and, in the circumstances of this claim, a single storm. I am not satisfied that the exchanged evidence assists the complainant in establishing: · a single identifiable storm event; and · that the damage to the sewer line occurred within 72 hours of that event. I acknowledge that JP suggested Cyclone Alfred as a possible cause. However, the damage manifested several months after the event. CR concluded that there is insufficient evidence to attribute the damage to an isolated event. Accordingly, I accept the above exclusion defeats the claim and the insurer is entitled to rely on it to deny indemnity. The complainant’s arguments do not advance her position The complainant states: · all reports, videos and the supporting information confirm that the damage resulted from ongoing soil movement however the policy does not exclude gradual storm related soil movement · the region has experienced repeated storm activities and prolonged rainfall, and the damage can still be classified as storm related · the insurer sent a builder who is not qualified given he did not carry out invasive investigation such as digging up the soil or opening the sewer pipe · the policy clearly states the pipes are insured building components. I accept the damaged sewer pipe is part of the building as defined by the policy. I equally accept that cover extends to it in the event arises from an insured event or accidental damage as defined by the policy. That said, cover is subject to conditions and exclusions and in this instance, the damaged pipe, although part of the building, was damaged by a factor that is namely excluded under the policy. The policy covers damage caused by soil movement occurring within 72 hours of a storm event rather than on going movement from several storm and rain events. This has not been established in this case. I am satisfied that CR is qualified to assess the cause of the damage in light of JP’s findings. The exchanged evidence shows that CR assessed the entire area where the sewer line is located and whether there is evidence of a single storm. It was reasonable for CR to rely on JP’s assessment given he investigated the extent of the damage as a qualified plumber and provided a quote for repairs. Importantly, CR also identified other damage consistent with ground movement in surrounding areas of the property. I am not satisfied that the complainants’ arguments assist her position. Insurer is required to reimburse complainant cost incurred for assessment The complainant says she has incurred plumbing costs such as clearing the drains, pipes and install a new pump to the septic tank. I am not satisfied that the insurer is liable for these costs. This is because: · these are non-insurable costs that the complainant is liable for in any event; and · an insured has an obligation to mitigate further damage to their property, even in the absence of an insurable loss. I acknowledge the extent of the complainant’s loss and the significant costs she is likely to incur in repairing the damage and undertaking further mitigative measures. However, the loss clearly is excluded under the terms and conditions of the policy, and the insurer is not required to cover this loss. However, there is no dispute that the complainant engaged JP who assessed the damage an provided a repair quote even prior to the claim lodgement. I accept the insurer has relied on JP’s assessment in assessing the extent of its liability under the policy. The exchanged evidence shows that JP carried out comprehensive investigation including CCTV inspection of the sewer line. I consider it fair that the insurer reimburses the complainant for JP’s assessment fees. Accordingly, subject to the complainant providing the insurer with JP’s invoice, the insurer is required to reimburse the reasonable costs of JP’s assessment. 2.2 Is the insurer liable for compensation? No. The insurer handled the claim reasonably overall. AFCA may award compensation for non-financial loss AFCA may award compensation for non-financial loss if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and delays. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The complainant is dissatisfied with the insurer’s handling of the claim. Amongst other things, the complainant says: · the insurer sent a builder to assess underground sewer infrastructure, and he is not qualified to do so · the insurer dismissed her plumber’s evidence and relied on her builder’s report · the ramifications of untreated sewer are severe affecting the wellbeing of all occupants and pets · she took preventative measures at her own costs given the insurer has failed to act promptly · the insurer failed to keep her informed of the progress of the claim or provide any updates · the insurer failed to take appropriate action in response to the claim · the insurer unnecessarily delayed the claim resulting in an increase in the cost of repairs. No compensation is warranted in the circumstances The exchanged information shows: · the claim was lodged on 28 July 2025 · CR assessed the property on 12 September 2025 · the insurer denied the claim on 2 October 2025. The evidence shows that, following lodgement of the claim, the complainant was in contact with the insurer’s loss adjuster, who arranged for an engineering assessment. The claim notes indicate that the loss adjuster decided to engage an engineer due to the nature of the damage, namely ground movement. I accept that this was a reasonable approach. The exchanged information also shows that the insurer was liaising with the complainant’s broker and responded to queries in a timely manner. I am satisfied that the insurer engaged the relevant expert, being a forensic engineer, to assess the cause of the damage to the sewer line in light of JP’s findings. A qualified plumber generally carries out leak detection, installation, and maintenance of plumbing systems, but does not typically provide expert engineering analysis regarding structural ground movement, soil behaviour, or geotechnical causes of damage. I accept there was time pressure on the complainant, given the nature of the damage and that she was required to undertake ongoing jetting and cleaning until the final repairs were carried out. However, I accept the insurer was entitled to investigate the circumstances of the loss so it can make an informed decision on indemnity. I am satisfied the timeframes between the claim lodgement, the appointment of CR and making a final decision were reasonable in the circumstances. The claim notes show that the insurer agreed to cover two invoices for the temporary jet washing costs to prevent the sewer backing into the house totalling $1,790. I accept the insurer handled the claim reasonably overall and no compensation is warranted in the circumstances. Even if there were some customer service shortcomings, I am satisfied that this payment adequately mitigates any resulting inconvenience. 2.3 Why is the outcome fair? The outcome is fair because the insurer relied on a qualified forensic engineer and a plumber, whose detailed assessments found the damage was caused by ongoing soil movement and settlement over time, not a specific storm event. This conclusion is consistent with the policy exclusion for soil movement, meaning the claim falls outside the policy’s scope of cover. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.