Home / Allianz Australia / Determination 12-25-334792

Determination 12-25-334792

Claim for pool subsidence declined as not caused directly by storm; report costs and non-financial loss also in issue

FirmAllianz Australia
Decided2026-07-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$660
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

Complainants claimed for pool subsidence they said was caused by storm; the insurer denied the claim. AFCA upheld the denial but ordered reimbursement of $660 report costs and $4,000 for non-financial loss due to claim handling failings.

The proximate cause of subsidence was long-term soil saturation and settlement rather than the storm, so the claim was outside cover, but the insurer's handling failures and need for the complainants' report justified costs and compensation.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay compensationpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-334792 | Financial firm | Allianz Australia Insurance Limited Case number: 12-25-334792 17July 2026 1 Determination overview 1.1 Complaint On 19 February 2025, on returning home from a few days away, the complainants discovered that their pool had subsided at one end and was out of level. They claimed on their home insurance policy on 20 February 2025 on the basis the damage was caused by a storm whilst they were absent. The financial firm (the insurer) has denied the claim on the basis the damage was not caused by storm but was a result of ground movement over time. The complainants want the pool reinstated, reimbursement for the cost of a report obtained from a pool company, and compensation for non-financial loss caused by the insurer’s mishandling of the claim. 1.2 Issues and key findings Is the insurer entitled to deny liability to reinstate the pool? Yes. On balance, longer-term processes of soil saturation and subsidence were likely the dominant cause of the subsidence of the pool. The complainants have not established a claim under the policy for damage caused by storm. Is the insurer liable to reimburse the complainants’ report costs? Yes. The report the complainants obtained from a pool company was necessary to ensure proper consideration of the claim and the insurer should reimburse the complainants for the cost of obtaining it. Is the insurer liable to compensate the complainants for non-financial loss? Yes. There were both acknowledged and unacknowledged failings in the insurer’s handling of the claim, causing significant stress to the complainants. Why is the outcome fair? This outcome is fair. The insurer has limited cover under the policy to damage caused directly by storm. Whilst the complainants’ pool has been damaged the dominant cause was long term processes of soil saturation and settlement. Those processes are not covered by the policy and it is fair that the insurer be able to rely on the policy terms to deny the claim. 1.3 Determination This decision is substantially in favour of the insurer. The insurer is entitled to deny the claim. Within 14 days of being notified of the complainants’ acceptance of this determination, the insurer must pay the complainant: · $660 reimbursement for professional report costs; and · $4,000 in compensation for non-financial loss. 2 Reasons for determination 2.1 Is the insurer entitled to deny liability to reinstate the pool? Yes. On balance, longer-term processes of soil saturation and subsidence were likely the dominant cause of the subsidence of the pool. The complainants have not established a claim under the policy for damage caused by storm. Policy covers damage due to storm subject to exclusions It is established insurance law that an insured must first establish, on balance, that the loss or damage claimed falls within the policy cover. If that is done, the burden then shifts to the insurer to establish, again on balance, the application of any exclusion in the policy should it want to deny the claim. The complainants’ policy covers damage caused by a series of defined events, one of which is storm, cyclone, rainwater or run off. It reads: Storm, cyclone, rainwater or run-off What’s covered? Buildings and/or contents Loss or damage caused by: · storm Loss or damage caused by or arising from: · soil movement, including erosion · landslide · mudslide · subsidence if it is caused directly by and occurs within 72 hours of a storm. The policy also has a number of general exclusions applicable to all areas of cover. They include loss or damage as a result of, caused by or arising from: Soil movement including erosion, landslide, mudslide or subsidence unless it is directly caused by and occurs within 72 hours of an explosion, earthquake, tsunami, storm or flood If the damage is due to subsidence, to be covered under the policy, the complainants need to establish that it: · was caused directly by a storm; and · occurred within 72 hours of that storm. In this case, there is no dispute that there was a storm with heavy rain at the relevant time. The dispute is as to whether the subsidence was caused by that storm. Insurer initially denied the pool was damaged at all The insurer initially had a pool company T, and a building consultant and engineer, C, report on the pool. Both attended and reported on 4 March 2025. Both found that the pool had not suffered from any recent subsidence and was undamaged. Rather, they said that the pool had been built out of level when it was built in 1985. They found it to be 50 millimetres out of level. T noted that it would have been obvious that the pool was out of level once it was filled. Central to their conclusions was the fact that there were no distortions in the vinyl liner of the pool. They said there would be distortions in the vinyl liner if there had been any recent subsidence. The complainants obtained their own report The insurer contacted the complainants by telephone, advised them about the conclusions of T and C and invited them to withdraw the claim. The complainants then obtained their own report on the pool from a pool refurbishment specialist Y. Y reported on 5 May 2025 and concluded that the fact that the damage occurred immediately after the storm suggested that it was caused by ground movement not long-term installation faults. Y was also critical of the reports of T and C, stating that they: · referred to it as a concrete pool whereas in fact it had a fibro asbestos wall structure, a concrete slab base and a vinyl liner, and this put their conclusions into doubt; · failed to take the recent extreme weather patterns over two years into account; · were inadequately qualified and experienced with pools; and · did not do any testing. Y concluded that geotechnical soil testing and analysis was needed to determine the true cause of the problem. Comprehensive report was then obtained The complainants then decided to obtain a comprehensive report from a geotechnical engineer F. After some dispute, the insurer agreed to fund this report. F recruited a structural engineer, A, and a plumber, C, to also inspect and report on the pool. F included all of their findings (geotechnical, structural and plumbing) in one report dated 15 September 2025. The investigation underlying F’s report was more detailed and thorough than any of the prior examinations. It included the taking of borehole samples, laboratory testing of representative samples for reactivity and moisture content and penetrometer testing. It included extensive photographs of the area under the pool and the original construction drawings. All 3 experts involved accepted that there had been subsidence of the pool. F, in its geotechnical report found that the pool had been built on uncontrolled fill to a depth of a metre and possible deeper. The borehole analysis found the uncontrolled fill to be in a moist to wet condition. The penetrometer testing found it to be soft and loose. F concluded that: It is therefore assessed from a geotechnical perspective that the settlement of the swimming pool has likely been caused by ‘collapse settlement’ of the uncontrolled fill. ….. Overtime this poorly compacted fill is expected to have settled beneath the sides of the pool and the adjacent deck contributing to the observed settlement of the concrete pool structure to the south-east. Collapse settlement occurs in partially saturated soils when, through wetting, there is a reduction of the inter-particle bonds which leads to a change in the effective stress of the material and a more stable particle re-arrangement. As such, the pool foundation movement was likely triggered by excessive rainfall, however it is extremely difficult to identify the single event when this occurred. F also noted that given the nature of collapse settlement with uncontrolled fill, further settlement is likely although this is expected to be minor. P’s contribution to the report on plumbing issues concluded that P was “confident” that the pipework was not a cause of the subsidence of the pool. From a structural perspective, A noted a number of workmanship problems with the construction of the pool. However, A concluded that nothing about the pool structure was compromised in anyway so as to cause such a significant settlement. In addition, A observed that, examining the pool surrounds, there was nothing suggesting a level of scouring or erosion that might be associated with a sudden storm event causing sudden settlement. A concluded: My experience would suggest that the settlement that has occurred is more likely to have occurred over a larger timeframe rather than having been the result of a storm, but I am happy to defer to my geotechnical colleagues on that point. It is necessary to determine the proximate cause Where there is a dispute on causation, it is established insurance law that the proximate cause must be determined. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. If there are several contributing factors each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause. In this dispute the complainants need to show the proximate cause of the damage to the pool was, on balance, the storm event. The complainants have in their submissions repeatedly referred to the storm as a triggering event. However, it is not sufficient that the storm had a triggering effect. It has to be established that it was the proximate cause. Multiple contributing factors identified in the reports F’s geotechnical report refers to two contributing factors to the subsidence. The first is the settlement of the uncontrolled fill which has occurred overtime. The second is the triggering of the pool foundation movement by excessive rainfall. F notes it is difficult to determine the single event when this occurred. This wording is somewhat ambiguous. It is not clear if F is saying it definitely occurred in a single event but it is hard to say when this was. Alternately F may be raising doubt as to whether it was a single event or a number of events. A concludes that because of the lack of scouring or erosion around the pool there is no evidence of a single storm event causing sudden collapse. Thus, A thinks it more likely that it has occurred overtime. The complainants say this goes beyond A’s brief as A was there as a structural engineer. The complainants also note that A was willing to defer to the geotechnical experts on the issue. However, A’s conclusion is based on experience and is backed up by observations of the surrounding area which are uncontested in the other reports. Thus, it still carries some weight. More importantly, F prepared the final report. If F was in strong disagreement with A on this issue, it was open to F to either discuss it with A and reach a consensus or note the disagreement and F’s reasons for disagreeing in the report. F did neither of those things. Having carefully considered the report, I am satisfied it is fair to conclude that there was a longer-term process of settlement going on. Even if the final step (where the problem became apparent) occurred on a particular day in February 2025. I am reinforced in this view by the report of Y. Y’s report repeatedly emphasises the role of two years of above average rainfall in the subsidence. That this “extreme weather pattern” meant two years of saturated soils, which weakened the subgrade soils and allowed movement under load. Y referred to the storm in February 2025 as triggering. The long-term processes are the more likely proximate cause of the subsidence The experts have identified two factors as involved. First, the long-term settlement and weakening of the uncontrolled fill through saturation. Second, the triggering effect of the storm. It is possible that a storm that triggers a final change is also the proximate cause of that change. However, for that to be the case that triggering effect would have to be the dominant causal factor. A referred to the lack of scouring or erosion as suggesting the storm was less significant meaning the longer-term processes were dominant. F did not disavow that conclusion. A’s conclusion is supported by the rainfall data cited by C and relied upon by the insurer. The highest day of rainfall for the area where the house is located was 14.2 millimetres on 11 February 2025. There was 0.8 of a millimetre on 12 February 2025 and 3.4 millimetres on 14 February 2025. Then there was a further 11.6 millimetres on 15 February 2025. There was then no further rain recorded for the area prior to the subsidence. The total rainfall for the month, 54.2 millimetres, was well below the long-term average for February in the area which is 72.4 millimetres. Notably, the long-term average number of February days with rain of 1 millimetre or more is 5.6. This means that it is common for February rainfall to be concentrated in a relatively small number of days with rainfall over 10 millimetres. This data suggests that the rainfall from the storm prior to the subsidence was not particularly high or unusual. The complainants have argued that there can be local variations in rainfall. That is true. But it would be entirely speculative to conclude, without any evidence, that the localised rainfall near the complainants’ home was dramatically different to that for the area. On balance, the evidence suggests that the process leading to subsidence was a long term one. At least two years, based on Y’s statements about extreme weather patterns during that time, and very likely longer. This process was likely occurring over time and it is the dominant cause of the subsidence that has occurred. The storm added to the existing process and was in a sense the final straw. However, the collapse is likely to have occurred at some point and this particular storm was not the dominant cause. The longer-term processes of saturation and settlement being dominant, they are the proximate cause of the damage. The complainants have not established the claim for damage due to storm and the insurer is entitled to deny the claim. 2.2 Is the insurer liable to reimburse the complainant’s report costs? Yes. The report the complainants obtained from Y was necessary to ensure proper consideration of the claim and the insurer should reimburse the complainants for the cost of obtaining it. AFCA has power to award a contribution to professional costs of a complainant Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainants needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. It was necessary and justified that the complainants obtain a report from Y The claim was initially denied on the basis the pool had been built out of level and had been out of level for 40 years. The insurer’s expert also suggested this would have been obvious. The complainants obtained a report from Y to pursue the claim and convince the insurer that a further investigation was needed. Based on Y’s report the insurer agreed to obtain the report from F. The cost of obtaining Y’s report was $660. F’s report made clear that the reasons for the initial denial were incorrect and that there had been recent subsidence of the pool. Whilst the insurer was still entitled to deny the claim, that denial was on a completely different basis to its initial position on the claim. The report from Y was necessary to ensure the claim was properly considered. The insurer should pay for its cost in the sum of $660. 2.3 Is the insurer liable to compensate the complainant for non-financial loss? Yes. There were both acknowledged and unacknowledged failings in the insurer’s handling of the claim, causing significant stress to the complainants and compensation is justified. AFCA has power to award compensation for non-financial loss Under the AFCA Rules, we may award compensation (capped at $6,300) for non-financial loss. This is where complainants have suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind due to the insurer’s conduct. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer has acknowledged failings in clam handling and offered compensation On 2 June 2025, the complainants requested the insurer to communicate with them in writing only, due to medical treatment the male complainant was undergoing and the dangers of stress caused by the claim. The insurer did not acknowledge this request and contacted the male complainant by phone the following day. Despite being advised of the complainant’s vulnerability, the insurer did not take further steps to provide additional support. This is a breach of section 97 of the General Insurance Code of Practice (GICOP). On 7 October 2025, the complainants requested access to information the insurer relied on when assessing the claim, including reports, file notes and a phone call from 30 September 2025. The insurer did not appropriately respond to this request. It did not confirm receipt or provide an outcome, resulting in a further breach of the GICOP under section 161. The insurer has acknowledged these failings and offered the complainants $2,000 in non-financial loss compensation. The complainants have raised additional concerns with claim handling The complainants have raised additional concerns with the handling of the claim. These are centred on the insurer having initially denied the claim based on incorrect and inadequate reports. Further, basing its subsequent denial of the claim on selective reading and quoting of the comprehensive report obtained from F. These concerns are justified. The initial reports relied upon by the insurer were inadequate. They concluded that the pool had been out of level by 50 millimetres since construction 40 years ago. This is inherently unlikely. If true it means that the complainants had either not noticed the pool being out of level for such a long period, or that they had lied about it changing recently. As T reported that it would have been obvious once the pool was filled, the implication was that the complainants had made up the story about recent subsidence. All of the experts that subsequently examined the pool accepted that recent subsidence had occurred and A explained why the pool walls structure could manage some subsidence without distortion of the pool liner. The description of the pools structure in the early reports of T and C was, at best, oversimplified when they referred to it as a concrete pool. This suggests that they either did not spend enough time examining the pool or on the detail or their reports or that they did not have experience of this type of pool structure. These were failings of the insurer’s experts rather than the insurer. However, the insurer is responsible for its agents. More accurate and detailed reports based on testing at that stage, might have made the position clearer and avoided the long-term dispute that has occurred. The insurer in its denial and submissions relied on quotes from F’s comprehensive report which were selective but presented them as the reports conclusions. For example, it quoted A’s conclusion about the timeframe of settlement being more likely long term. The insurer did not mention or address A’s qualifying phrase that A was happy to defer to geotechnical colleagues on that point. Similarly, the insurer quoted F’s statement about the poorly controlled fill settling overtime. It did not acknowledge or address F’s subsequent statement that pool’s foundation movement was likely triggered by excessive rainfall and reference to that as a single event. This involved oversimplifying the findings of the report. It is not surprising that the dispute continued in the face of the discrepancies involved. Compensation is justified Taking into account both the acknowledged and unacknowledged failings in complaint handling and the male complainant’s vulnerability, it is clear that more care was needed. This has caused significant stress for the complainants. The insurer must pay a total of $4,000 in compensation for non-financial loss. 2.4 Why is the outcome fair? This outcome is fair. Whilst the complainants’ pool has been damaged the dominant cause was long term processes of soil saturation and settlement. Those processes are not covered by the policy, and it is fair that the insurer be able to rely on the policy terms to deny the claim. It is also fair that the complainants be reimbursed for the cost of obtaining the report from Y as it was necessary for the proper consideration of the claim. Finally, it is fair that the complainants be compensated for clear failings of the insurer in its handling of the claim. They have caused the complainants significant stress. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.