Whether insurer's cash settlement complied with prior determination; additional cash settlement, temporary accommodation, costs
Text of the determination
Determination
|
Case number
|
12-25-334709
|
Financial firm
|
Strata Community Insurance Agencies Pty Ltd
Case number: 12-25-334709 29 June 2026
1 Determination overview
1.1 Complaint
The complainant is a beneficiary under a strata insurance policy that provides cover for her property provided by the financial firm (the insurer).
AFCA issued a determination (12-00-1036889) which was accepted by the complainant on 18 August 2025.
The determination required the insurer to:
· obtain new scope of works (SOW) for the remediation and reinstatement of the property
· cash settle the complainant based on an actionable quote
· pay temporary accommodation (TA); and
· non-financial loss compensation.
The complainant says that the insurer’s settlement is not consistent with the determination and seeks an additional cash settlement and TA.
1.2 Issues and key findings
Is the insurer required to pay an additional cash settlement?
Yes. The insurer is to increase its mould remediation quote to ensure its compliance with the SOW prepared by KE. This includes remediation as a fungal condition three environment. The insurer is to include a builders’ margin on PB’s quote.
Is the complainant entitled to additional TA?
No. The determination made an allowance for TA while the repairs were completed. The complainant has elected not to commence the repairs despite receiving the cash settlement from the insurer. The insurer is not responsible for these delays in commencing repairs.
Is the insurer required to pay the complainant’s professional costs?
No. The insurer is not required to contribute to the complainant’s professional costs.
Is the insurer required to reimburse the complainant’s financial losses?
No. The determination made no further provision for payment of any other financial losses incurred by the complainant.
Is the complainant entitled to non-financial loss compensation?
No. The insurer has appropriately implemented the determination and there are no additional circumstances that warrant a further award of non-financial loss compensation.
Why is the outcome fair?
The outcome is fair as the complainant has not shown that the insurer’s SOW and quotes were wholly inadequate. It is fair that the insurer increases its quote for mould remediation to correctly reflect the SOW and for PB’s quote to include a builder’s margin. It would not be fair to require the insurer to pay professional costs when they were not reasonably necessary.
1.3 Determination
This determination is substantially in favour of the insurer.
Should the complainant accept the determination, within 21 days of being notified of her acceptance, the insurer is to:
· engage OR to amend its quote to ensure it includes re-remediation as a fungal condition three environment including air cleaning and cash settle the complainant the difference in this amount, together with interest pursuant to s 57 of the Insurance Contracts Act 1987 (Cth) from 17 October 2025 until payment made to the complainant.
· pay the complainant $31,771.27, together with interest pursuant to s 57 of the Insurance Contracts Act 1987 (Cth) from 17 October 2025 until payment to the complainant.
2 Reasons for determination
2.1 Is the insurer required to pay an additional cash settlement?
Yes. The insurer is to increase its mould remediation quote to ensure its compliance with the SOW prepared by KE. This includes remediation as a fungal condition three environment. The insurer is to include a builders’ margin on PB’s quote.
Determination 12-00-1036889
The determination related to an escape of liquid (EOL) event where a burst flexi hose burst causing damage. The complainant sought a cash settlement of $748,445.52 which consisted of building repairs, remediation costs and professional costs. She also sought TA and compensation for her poor claims experience.
It was determined that the insurer had omitted several claim related losses and consequential damage in its SOW including:
· electrical make safe works
· the mould on the lounge-room ceiling trusses
· sufficient TA costs.
It was also determined that the complainant had not shown her claim in her SOW for the following:
· there was no need to replace the living room ceiling trusses- remediation should first be attempted
· there was no need to strip the upstairs level of the property to the extent listed in the complainant’s SOW
· there was no need to replace the timber floorboards as this was pre-existing damage
· the insurer is not required to cover the costs regarding the firewall partition between the property and the adjoining building as these are not related to the insured event.
The determination prescribed how the claim was to be settled
The determination set out the prescribed process as to how the complaint was to be settled. It provided:
· the insurer to pay $1,000 in non-financial loss compensation
· the insurer to pay $5,000 for reimbursement of professional costs
· the insurer to engage the following trades (who have not previously inspected the property) to attend and inspect the property:
> builder
> electrician
> mould specialist
· these trades are then required to prepare a SOW (together or separately), covering the necessary repairs and associated works required to repair the claimed damage
· after receipt of the SOW(s), the insurer must then obtain at least one actionable quote which complies with all current and applicable Commonwealth and Queensland building related, safety related and health related laws, regulations and codes
· within seven (7) days of the associated quotations, the insurer must pay the complainant a cash settlement based upon the quotations and the policy, with a 20% contingency uplift
· the insurer must increase its offer regarding TA to reflect a repair and remediation period of 10 weeks. This is in addition to covering the costs of the TA in which the complainant currently resides.
The insurer has paid the complainant $203,492.48 based on quotes obtained
The insurer has provided information that shows that it paid the complainant $203,492.48.48 based on quotes from:
· PB, builder in the amount of $139,347.73
· OR, mould specialist in the amount of $30,646.00.
The insurer included a 20% contingency uplift as required by the determination.
The insurer has provided a copy of a report from AC, an electrician. AC tested the electrical work in the property and found the circuits met the adequate levels for testing standards.
The complainant disagrees with the insurer’s SOW
The complainant has raised a few concerns in relation to the insurer’s settlement.
Mould
· OR engaged KE who undertook non-invasive testing and failed to verify the extent of the water damage behind the linings in the upstairs bedrooms and bathrooms
· the complainant has engaged her own mould specialist HE who found high levels of mould.
The complainant says that if she accepted the SOW from OR that even with the contingency uplift, she would have a considerable financial liability.
Actionable quotes and compliance with Commonwealth and Queensland regulations
The complainant says:
· the quotes from PB omit various items and SOW required to comply with Queensland building laws, regulations and codes
· the quotes are not actionable as both PB and OR declined to do the works when the complainant sought to engage them. Further, that they do not reflect actual market prices and lack transparency regarding margins, overheads and profit allowances.
The complainant says that the PB’s SOW proposes to reinstate toilets, mirrors, sinks and existing contaminated cabinetry. She says that her builder FC has strongly advised her against using these items because they are unable to warrant them and their reinstallation will degrade the material/products appearance and function.
The complainant also says that the SOW proposes to reinstall kitchen fixtures and electrical items previously identified as contaminated.
The complainant seeks in resolution of this complaint that:
· the insurer obtains a quote for the remediation and reinstatement of the property from an independent contractor agreed by the complainant and based in Brisbane
· this contractor is to provide a compliant contract, be licensed and comply with all the relevant building laws in Queensland. The contractor is to be responsible for the quality of their building work and provide a warranty in accordance with domestic building work laws
· alternatively, the insurer accepts the quotes from her builder FC in the amount of $377,820.60 and NL, restorer, in the amount of $75,328 and pay her the difference being $250,156.12
· additional TA while the claim is being considered and up until the work is completed.
The complainant says if PB is willing to provide a complete warranty, then the complainant would find it as acceptable.
Insurer says that it has complied with determination
The insurer says that it paid the complainant non-financial loss compensation and professional costs on 19 August 2025.
It says that it engaged suitably qualified independent service providers to produce a SOW and actionable quotes. KE conducted mould and moisture testing and prepared a SOW. OR, a remediation specialist, provided a quote based on KE’s SOW. The insurer refutes that that the report was incomplete. It says that it was a comprehensive report, reflective of the works required to have the property restored back to its pre-loss condition, and to address the matters set out in the determination.
PB, a builder, prepared a SOW and quote for the repairs.
The insurer says that the quotations for repairs and remedial works are sufficient to comply with all current and applicable Commonwealth and Queensland building related, safety related and health related laws, regulations and codes.
This determination is unable to reconsider prior issues
The determination, accepted by the complainant, set out a prescribed process about how the insurer should settle the claim, including undertaking building and mould remediation. This determination is limited to reviewing if the insurer’s settlement is consistent with this accepted determination.
It is not now appropriate to reconsider the issue again and determine if a different outcome should now be appropriate. Instead, the panel is to assess whether the insurer’s settlement is consistent with the determination and to the extent it is not, seek to determine a remedy that is.
The determination does not prescribe the acceptance of the complainant’s quotes
The complainant submitted quotes with her previous determination. The determination did not prescribe the insurer to accept these quotes.
The panel is satisfied that the determination clearly contemplated the agreed process that would be done in full and final settlement of the issues, as evident by the 20% contingency uplift that was awarded for such a risk. The determination did not require the complainant’s quotes to be accepted.
The insurer was not required to consult with the complainant
The complainant says that the insurer did not engage with her to ensure that she was happy with its selection of contractors. She says that the insurer’s contractors refused to work with her. She says that this contravenes the intent of the determination.
The panel disagrees. The determination did not require the insurer to consult with her in relation to its choice of contractors to prepare a SOW. Rather, it specified that the contractors appointed by the insurer must not have previously inspected the property.
The contractors were independent
The complainant says that the service providers were not independent. She says that the hygienist engaged by the insurer was not independent of the test results as it owned both the testing and the laboratory business.
The panel is also satisfied that the appointed hygienist was independent and that the insurer appropriately engaged OR and KE.
Actionable quotes were required
The determination required the insurer to obtain an actionable quote and cash settle the complainant based on this quote. It did not require the complainant to be presented with building contracts to be accepted by the complainant. The reference to an ‘actionable quote’ means that it is capable of being accepted by a retail customer.
The complainant can engage her own contractors to undertake the work. The unavailability of the insurer’s contractors to perform the work does not make the quotes non-compliant with the determination. The insurer has provided information that confirms that the contractors are able to complete the works for the quoted amounts.
The insurer cash settled the complainant. The fact that prices have now increased does not change the determination or require the insurer to increase its cash settlement based on this alone.
Quotes comply with relevant legislations
The determination also required the quotes to comply with all current and applicable Commonwealth and Queensland building related, safety related and health related laws, regulations and codes. The panel accepts the intent of this was to ensure that the quote included the costings for the builder to comply with its obligations under Commonwealth and Queensland law.
The reference to the incorrect building legislation does not establish non-compliance. PB has corrected this error in subsequent correspondence. As noted above, the determination did not require the complainant to be provided with building contracts that complied with the relevant legislation. Rather, it was required to provide an actionable quote.
PB has included the cost of home warranty insurance in the amount of $1,275.90. The complainant says that she estimates it to be $2,224. However, the complainant has not otherwise provided evidence in support of this claim. PB has confirmed the adequacy of this allowance.
OR has confirmed that it is not required to be licensed to undertake the quoted works.
The panel accepts that the quotes provided by the insurer comply with the relevant Commonwealth and Queensland laws, regulations and codes.
The complainant disputes the insurer’s mould testing and SOW
The complainant says that the mould testing was inadequate. She says that the insurer’s hygienist did not undertake the camera inspection/tests from the ensuite and the main bathroom and from the wall cavities from the upper lever of the property.
The complainant obtained her own mould analytical report dated 24 October 2024 from IE. IE performed air and surface sampling, including from wall cavities in the upstairs area. IE says the test results showed elevated mould levels in both bedrooms and (to a lesser extent) in the bedroom wall cavities.
The complainant provided a mould assessment and testing invoice from NL, a restorer. NL conducted eight Air-O-Cell air samples from the property. NL found the indoor airborne fungal levels greatly exceeded the outdoor reference levels. NL says that this confirms active indoor mould amplification within the structure. NL says that the presence of fungal levels greatly in multiple cavity samples, including bedroom two wall cavity, foyer wall cavity and bedroom one wall cavity, confirms recent or ongoing biological activity consistent with active mould growth.
NL concludes that the moisture intrusion and inadequate stabilisation controls have allowed colonisation within the wall voids. NL recommended removing all mould-effected plasterboard from the upper level walls in bedrooms one and two, bathroom, ensuite, and foyer which all showed elevated spore counts.
NL provided a further report dated 4 November 2025. NL, following a review of KE’s report, recommended that:
· a full strip out is required on both levels, excluding the upper-level ceiling and wall cavity
· the removal of full wall linings on the upper level (floor to ceiling) to access the hidden mould contamination
· removing all wall linings and flooring in the ensuite bathroom.
Insurer says that SOW from KE and quote from OR complies with determination
KE provided a SOW following an inspection of the property and mould and moisture investigation. The report was dated 3 September 2025. KE performed volumetric air sampling and direct microscopy surface sampling for mould as well as moisture testing throughout the property.
KE recommended the stripping the wall linings of the upstairs area to a minimum of 600mm from the floor as a conservative measure to allow full access to further assess and then remediate. KE also recommended the rear wall of bedroom 1 would be removed as it presented with wicking of its bracing ply.
KE notes that it used the multiple holes in the firewall to conduct a visual inspection and sampling. KE recommended a removal of the gypsum on the fire rated wall as it was porous material and therefore vulnerable. KE says that it was not investigated further as it noted that it should be removed and could not be remediated even if exposed.
KE recommended complete removal and replacement of the particleboard flooring in the laundry and WC in the downstairs area.
KE provided an additional report dated 24 March 2026. KE says a review of recent test results obtained by the complainant shows the indoor environment has measurably improved since its last attendance.
KE says that NL’s recommendations for an additional strip-out cannot be justified based on air samples alone and must be supported by a physical inspection, and where appropriate, surface sampling.
OR also confirmed in its additional report that the mould contamination levels had improved since KE’s assessment on 30 August 2025. OR noted that there was a second EOL event which may also be contributing to the mould contamination levels.
The insurer says that the complainant has not provided any new information or substantiated any need to expand the SOWs upon which the cash settlements were based.
Insurer’s mould testing and assessment was adequate
The determination found there was no need to strip the upstairs level of the property to the extent listed in the complainant’s SOW which was for the upstairs area to a height of 1200mm from the floor and the wet rooms to be stripped from ceiling to floor.
The determination also did not prescribe the hygienist to undertake invasive testing using cameras.
The panel is satisfied that the insurer’s mould testing was adequate. While the determination considered there may be additional mould, it recommended further review. The insurer acknowledges that following the further assessment undertaken by KE, the insurer cash settled the complainant an increased amount which included these additional expenses.
The increased SOW includes all the remaining skirting and plaster wall linings up to 600mm to be removed. It allows for further remediation works including drying, HEPA vacuum and mould remediation treatment. It includes fogging/vaporisation treatment to the indoor environment. The SOW includes the costs associated with the remediation of mould on the ceiling joists as required by the determination.
The complainant has provided additional commentary from NL dated 2 February 2026. NL acknowledges that its proposed methodology is intentionally conservative and is intended to minimise the likelihood of future remediation failure. However, the insurer is not required to adopt the most conservative approach but one that restores the property to its pre-loss condition. Further, the panel accepts the comments from KE that NL has not supported its recommendation of a complete strip out based on the air sampling assessment which it utilised. The panel is satisfied that KE’s SOW complies with the determination and is adequate in returning the property to its pre-loss condition.
Insurer to include limited additional re-remediation costs
However, KE in its SOW recommended that the entire property undergo re-remediation as a fungal condition three (3) environment including air cleaning. The quote from OR provides:
· a condition three mould remediation to affected surfaces/materials on identified materials on upper and lower levels following strip out
· condition two mould clean to balance of surfaces/materials/fixtures/cabling, etc on upper and lower levels
The panel is not satisfied that this is consistent with the SOW from KE. The insurer is to have OR update its quote to ensure consistency with KE’s SOW and cash settle the complainant the difference in this amount, together with interest pursuant to s 57 of the Insurance Contracts Act 1987 (Cth) from 17 November 2025 until payment made to the complainant.
SOW from PB is adequate but should allow for a builders’ margin
The complainant seeks the inclusion of repairs to the firewall. However, the determination found:
Finally, the insurer has established there is a pre-existing defect in the firewall partition between the property and the adjoining building which is not related to the insured event. The exchanged material shows the firewall does not meet current standards and must be corrected while the property is repaired. The panel is of the opinion the insurer should not be compelled to cover the costs of these repairs.
While the SOW from KE includes the removal of the gypsum to facilitate the mould remediation, the insurer is not required to include the costs to repair the firewall. The complainant’s quote from FC includes costs to repair the firewall.
The complainant also says that the quote from PB allows for reinstatement of the existing fittings in the laundry/toilet downstairs. She disputes this and says that new fittings should be provided.
The panel is satisfied that it is appropriate to reinstate these fittings. The SOW from KE provided for:
The entire laundry and WC be stripped and have materials replaced to facilitate this.
However, the panel is satisfied that this is in reference to the ‘flooring of the laundry and WC’ only which is the title for the relevant paragraph. The panel is satisfied that this does not mean that the fittings in the laundry and WC are required to be replaced. The insurer is required to return the property to its pre-loss condition. It is not required to better the appearance. The panel does not accept the complainant’s submission that the reinstallation of the products will degrade the material/products appearance and function. Any builders warranty relates to their re-installation and not the product itself.
The complainant says:
· PB has allowed for an inspection to the framework and subfloor inspections but has not allowed for risk of latent conditions
· the quote from PB has a lack of transparency regarding preliminaries (fencing, toilet, management, profiles etc).
The panel acknowledges there may be additional costs during the repairs which are unknown and therefore the determination provided for a 20% contingency uplift to reflect this. The panel does not accept that PB’s quote is inadequate based on this.
The panel notes that the SOW includes allowance for electrical work. The panel is not satisfied that the complainant has shown that this allowance is inadequate.
The complainant is also critical that there is insufficient allowance for the replacement of kitchen cabinetry which she says were damaged when dismantled. The quote from PB provides $12,500 as a provisional sum for:
· an allowance for inspection of existing cabinetry
· reinstating all undamaged components of cabinetry and allowing for new fixings
· manufacture, supply and install new kickboards, gables and panels
· allowance to apply paint to the cabinetry in order to match the existing colour and sheen.
The panel is satisfied that this, together with the contingency uplift sufficiently compensates the complainant for any damage to her kitchen cabinetry.
The complainant says PB’s quote is well below market rates and makes no allowances for risk, profit margins or labour/material shortages.
The insurer has provided confirmation from PB that the quote is actionable and allows for:
· a reasonable profit margin
· potential labour shortages
· material costs increase
· general project risks.
However, the panel is not satisfied that PB has shown this. Most building contracts provide for a builders’ margin typically of 18-19%. The panel accepts the genuine concerns that PB has not shown that the quote provides for this builders’ margin in the absence of any specific provision in the quote.
The panel is satisfied that the insurer should allow for a 19% builders’ margin in PB’s quote in the amount of $26,476.06. A contingency uplift should also apply to this amount, resulting in total amount of $31,771.27. The insurer should pay the complainant $31,771.27, together with interest pursuant to s 57 of the Insurance Contracts Act 1987 (Cth) from 17 October 2025 until payment to the complaint.
2.2 Is the complainant entitled to additional TA?
No. The determination made an allowance for TA while the repairs were completed. The complainant has elected not to commence the repairs despite receiving the cash settlement from the insurer. The insurer is not responsible for these delays in commencing repairs.
The insurer has cash settled the complainant for TA
The insurer says that it paid the complainant the following payments:
· $5,590 for the period 17/10/25 – 17/11/2025 paid on 13/10/2025
· $13,975 for 10 weeks TA paid on 17/10/2025.
Complainant has not shown an entitlement to further TA
The complainant says that the ten-week accommodation period was intended to cover reinstatement works and is consistent with policy terms. She says that the insurer’s refusal to continue payments is inconsistent with both the determination and the insurance contract.
The panel disagrees with the complainant’s claim that the insurer is required to continue to pay TA. The determination was in full and final settlement of the claim. It provided for an allowance of TA for a closed period, being an estimate of the repairs. Whether the complainant experiences delays in commencing repairs or that these repairs take longer is not the fault of the insurer. It is not liable to continue to pay TA in these circumstances. Further, the panel is satisfied that the increase in the mould remediation would not substantially increase the time to complete the repairs that require an additional amount of TA.
2.3 Is the insurer required to pay the complainant’s professional costs?
No. The insurer is not required to contribute to the complainant’s professional costs.
AFCA may require insurer to contribute to a complainant’s professional costs
The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA takes into account the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim.
The insurer is not required to reimburse the complainant’s professional costs
The complainant seeks to be reimbursed for costs she has incurred in obtaining legal advice. She has provided tax invoices in the amount of $5,775.00. She has also provided an invoice for the report from NL in the amount of $1,067.00.
Insurer is not required to pay for professional costs
The panel is not satisfied that a further contribution to the complainant’s professional costs is appropriate in this case because the present complaint is limited to whether the insurer has complied with the determination. It did not raise new or complex issues requiring additional legal or expert assistance.
AFCA’s process is designed to be accessible without the need for legal representation, and the complainant has not demonstrated that further professional assistance was necessary to understand or pursue this complaint.
2.4 Is the insurer required to reimburse the complainant for financial losses?
No. The determination made no further provision for payment of any other financial losses incurred by the complainant and the insurer is not required to reimburse the complainant for these.
Insurer not required to reimburse the complainant for her electricity costs
The complainant seeks reimbursement of her electricity consumption for two years plus interest. She says that dryers were used to facilitate the drying of the property.
The complainant has also provided a copy of a tax invoice from FE for electrical testing of the property.
The panel is not satisfied that the insurer is required to reimburse the complainant these costs as the previous determination did not make any allowances for them. The determination was in full and final satisfaction of the issues in dispute.
2.5 Is the complainant entitled to non-financial loss compensation?
No. The insurer has appropriately implemented the determination and there are no additional circumstances that warrant a further award of non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Non-financial loss compensation is not warranted
The panel has considered the complainant’s submission about the impact that the unresolved repairs and living conditions are having on her health and wellbeing, and whether this warrants a further award of non-financial loss compensation.
The panel is not satisfied that a further award of compensation for non-financial loss should be paid by the insurer in the circumstances.
The panel notes that non-financial loss was considered in the previous determination, which awarded compensation for the inconvenience and delay caused by the insurer’s handling of the original claim.
This present complaint, however, is limited to whether the insurer has complied with the previous determination. While the panel has increased the cash settlement amount, the panel is not satisfied that this was caused by the insurer’s claims handling. The panel is satisfied that the insurer has not caused any delay in its implementation of the determination or other circumstances warranting a further award of non-financial loss compensation.
2.6 Why is the outcome fair?
The outcome is fair as the complainant has not shown that the insurer’s SOW and quotes were wholly inadequate. It is fair that the insurer increases its quote for mould remediation to correctly reflect the SOW and for PB’s quote to include a builder’s margin. It would not be fair to require the insurer to pay professional costs when they were not reasonably necessary.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.