1 Determination overview
1.1 Complaint
The complainant holds a landlord buildings and contents policy covering listed events (policy) with the financial firm (insurer). On 31 March 2025, she lodged a claim for damage to the insured property caused by ex-Tropical Cyclone Alfred (cyclone) with a recorded date of loss of 8 March 2025.
The insurer accepts the cyclone caused the landslip and some property damage, including to stormwater infrastructure, fencing, hardscaping and external improvements. It says the policy does not cover broader land stabilisation, embankment remediation or geotechnical works.
The insurer says its settlement offer is adequate for the covered damage. It disputes the further engineering works sought.
The complainant says the damage cannot be safely reinstated without those works, so the settlement does not provide practical indemnity.
She wants the insurer to fund a proper reinstatement solution, reimburse expert and related costs, and pay compensation for non-financial loss (NFL).
1.2 Issues and key findings
Is the proposed settlement sufficient to reinstate the insured damage?
No. This is because I am not satisfied the insurer has shown its settlement is sufficient to reinstate the insured damage caused by the cyclone.
Is the complainant entitled to costs?
Yes. The complainant is entitled to expert report costs, capped at $5,000, and reimbursement of any further proven reasonable make-safe costs.
Did the insurer mishandle the claim?
Yes. I am satisfied the insurer’s claim handling caused significant stress, inconvenience and disruption, warranting $4,500 for NFL.
Why is the outcome fair?
The outcome is fair because it requires practical reinstatement of the insured damage and compensates the complainant for reasonable costs and claim handling impacts.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of being notified the complainant accepts this determination, the insurer must comply with sections 2.1, 2.2 and 2.3 below.
2 Reasons for determination
2.1 Is the proposed settlement sufficient to reinstate the insured damage?
No. This is because I am not satisfied the insurer has shown its settlement is sufficient to reinstate the insured damage caused by the cyclone.
Policy cover is subject to terms, conditions, and exclusions
The policy covers the period from 7 July 2024 to 7 July 2025. Coverage is defined in the product disclosure statement (PDS) and schedule of insurance (SOI), which must be read together. Relevant policy terms are listed in section 3.2 below.
There is no dispute the complainant received a copy of the policy documents. The insurer is entitled to rely on the policy terms in assessing the claim.
Policy covers listed events
The policy covers listed events. This means that not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to the exclusions, is covered. The building is insured for $700,000.
One of the listed events covered under the policy is ‘storm’ including cyclone. The policy extends cover to landslip damage occurring within 72 hours of, and directly because of, a storm.
The policy excludes storm damage to retaining walls. However, the exclusion only applies if it is established the insured knew, or a reasonable person would have known, the retaining wall, was already in a poor condition, incorrectly constructed or non-compliant before the insured event.
The policy defines buildings to include retaining walls, fences, gates and service infrastructure. The definition excludes soil, gravel, rocks and unpaved surface.
The property was owner-occupied at the time of the loss. However, the policy is a landlord policy and does not provide an owner with a temporary accommodation benefit.
The parties agree the cyclone occurred and caused damage to insured property. The dispute is about whether the insurer’s proposed settlement:
· adequately reinstates the insured cyclone damage
· fairly compensates the complainant for the consequences of the claim and its handling.
Insurer says settlement proposal is adequate
The insurer says the policy only responds to insured property. It does not cover broader land reinstatement, slope stabilisation or geotechnical remediation.
The policy definition of buildings includes retaining walls and service infrastructure, including water services. However, it excludes soil and other ground materials.
Landslip damage to insured property is covered when caused by the insured event. The insurer does not dispute the landslip occurred within 72 hours of, and directly because of, the cyclone.
The insurer says its engineer (SW) prepared a scope identifying the works required to reinstate the insured damage. Its assessor (PC) considers the scope accurately reflects the works required to return the site to its pre-loss condition.
PC reviewed a repair estimate from a builder (SL) prepared based on SW’s scope of works. PC considered both the scope and pricing to be fair and reasonable, notwithstanding the difficult site access.
PC recommended settlement in line with the SL estimate, on the basis the insured damage could be repaired once the slipped land had been separately reinstated. It says any land reinstatement or stabilisation works fell outside the policy terms.
The policy provides for payment of a cash settlement value, being the fair and reasonable value for which the insured property can be reinstated, replaced or repaired. The insurer says its proposed settlement (in the amount of $161,128) reflects that value.
Insurer relies on expert evidence
The insurer relies on several reports its PC, SW, a builder assessment from JL, and a repair quote from SL based on SW’s scope of works.
The reports say:
· JL assessment report (19 June 2025):
> damage is consistent with the cyclone
> rainfall caused soil saturation and ground movement
> property remained habitable
> no building or design defects identified
> recommended geotechnical or structural assessment of:
‒ slope stability
‒ subsurface conditions
‒ drainage.
· PC assessment report (15 July 2025):
> cyclone caused landslip
> retaining structures, fencing and plumbing infrastructure were damaged
> stormwater and sewer lines were compromised
> septic plumbing would be included in the reinstatement scope
> no evidence the dwelling had subsided.
· SW engineering report (22 April 2025):
> landslip damaged stormwater infrastructure, fencing, retaining structures and external improvements
> the dwelling had no structural damage
> permanent repairs required ground conditions to be addressed first
> make-safe measures were recommended to reduce erosion and potential foundation damage
> exploratory works were recommended to confirm whether bored piers supported the northeast corner foundation.
· SW scope of works (6 January 2026):
> repair scope for:
‒ stormwater drainage
‒ retaining wall/hardscape elements
‒ fencing
‒ balustrading
‒ associated external improvements.
> sewer, broader slope stabilisation or land remediation works omitted
> intended to return the damaged insured property to its pre-loss condition.
· PC’s fourth report (16 January 2026):
> PC considered SW’s scope accurately reflects pre-loss reinstatement works
> slipped land had to be reinstated before repairs can proceed
> land reinstatement and stabilisation were outside cover
> SL’s scope and pricing were reasonable
> settlement based on SL’s estimate of about $140,111.83, less excess.
Settlement offer based on SW’s scope and SL’s estimate
SL prepared an estimate of approximately $140,111 (including GST) based on SW’s scope of works. PC considered the scope and pricing fair and reasonable, having regard to the site constraints and access issues.
PC treated the SL estimate as an ‘actionable quotation’ for settlement purposes, even though it assumed the slipped land would first be reinstated. PC also considered those land reinstatement and stabilisation works fell outside the policy response and did not quantify them.
Consistent with SW’s scope of works, the estimate provides for stormwater drainage repairs. However, it does not clearly include sewer infrastructure, potable water services or power supply to the biocycle.
The estimate also does not quantify broader land reinstatement, slope stabilisation or geotechnical remediation works, which the insurer says are not covered under the policy.
Complainant says the settlement offer is inadequate
The complainant says the proposed settlement does not provide practical indemnity. This is because it has not established a workable, construction-ready pathway to reinstate the insured damage caused by the cyclone and resulting landslip.
The complainant says:
· the settlement relies on a theoretical repair method and does not show how repairs can be safely completed and certified
· the insurer’s experts accept repairs cannot proceed until ground conditions are addressed
· the final scope does not clearly address all earlier recognised damage, including sewer, potable water and associated services
· SL’s quotation assumes the land is already reinstated and omits disputed service and enabling works
· her experts say further geotechnical, stability and engineering input is needed before repairs are finalised
· the insurer has separated insured damage from the support works needed for practical reinstatement.
Complainant relies on expert evidence
The complainant relies on one geotechnical report and two engineering reports from an engineer (ES) to support her position.
The reports say:
· ES engineering report (3 May 2025):
> cyclone rainfall overwhelmed the stormwater system, saturated fill material and caused earthworks movement that damaged plumbing and drainage infrastructure
> the dwelling was safe at that time
> soil testing, geotechnical design and repair works were required to restore the damaged infrastructure.
· ES engineering report (10 January 2026):
> there was no evidence of recent movement in the dwelling and considered it structurally adequate at that stage
> the landslide was likely to regress upslope over time and could undermine the dwelling if left untreated
> sandbags inadequate as a remediation solution
> permanent engineered solution, such as a certified retaining wall, together with site stability assessment and drainage remediation, was required.
· ES stability report (3 February 2026):
> slope instability risk was very high and required remediation
> failure was caused by rainfall saturation, overloaded drainage and steep fill
> dwelling was stable for now but at risk if failure moved upslope
> recommended checking sewer and stormwater services and improving drainage
> sandbags were ineffective and reduced stability
> existing factor of safety was unacceptable, especially when saturated
> recommended drainage, regrading, soil reinforcement and retaining works.
The complainant’s engineering evidence consistently says the cyclone caused slope failure and the site remains unstable. It also says safe reinstatement requires stabilisation, drainage and associated support works.
Insurer’s evidence is not persuasive on adequacy of scope
I have carefully considered the exchanged information. I am not persuaded by the insurer’s expert evidence.
This is because the insurer’s material engages with the complainant’s evidence at a high level. However, it does not directly address the key parts of the complainant’s expert case, such as ES’s stability analysis and the practical feasibility of reinstating services.
SW’s April 2025 report attributes the damage to a cyclone-related landslip. It identifies damage to stormwater infrastructure and external improvements. SW records land stabilisation is required before stormwater repairs can proceed.
SW's January 2026 scope identifies the repairs it considered necessary to reinstate the damaged property. However, it was prepared before ES's later stability analysis and does not address those findings.
PC accepted the slipped land would need to be reinstated before the repair scope could be carried out. However, it says land reinstatement and stabilisation fell outside the policy response.
SL’s estimate was prepared from the SW scope and assumes the site conditions have first been addressed. It does not clearly include sewer, potable water or associated service infrastructure.
The insurer responded to ES’s stability report conclusions by submitting they relate to non-covered land stabilisation works. However, the insurer did not obtain any independent geotechnical evidence to directly address or rebut ES’s geotechnical findings.
I acknowledge the insurer’s submission explain why it considers stabilisation works fall outside cover. However, on the policy wording, I am not satisfied that position fairly or reasonably reflects the intended scope of cover in the circumstances of this claim.
The policy excludes loss or damage caused by landslide or subsidence, and soil is not included in the definition of buildings. However, the policy also extends cover to loss or damage caused by landslide or subsidence if it occurs within 72 hours of, and directly because of, a storm.
I consider this extension of cover is intended to include the fair and reasonable cost of reinstating insured property damaged by an insured storm-related landslip to its pre-loss condition.
I am satisfied this extends to works and associated costs reasonably necessary to enable the repair and/or reinstatement of the damaged insured property. This is different from requiring the insurer to pay for unrelated land improvement or slope stabilisation works that are not connected to insured damage.
Here, the available evidence shows the support and enabling works are integral to reinstating the accepted cyclone damage. There is no persuasive evidence of pre-existing slope instability, wear and tear or lack of maintenance. Therefore, the costs associated with the lost support and instability are not independent of, or unrelated to, the insured loss.
I am satisfied the insured property cannot be reinstated to its pre-loss condition without this work. For this reason, I am satisfied it is fair that the insurer must accept responsibility for the extent of works reasonably necessary to restore the insured building and associated insured property damaged by the cyclone.
Settlement proposal is inadequate
I have carefully considered the exchanged information. I do not consider the insurer’s proposed settlement is sufficient to reinstate the insured damage caused by the cyclone.
This is because the exchanged information shows that, before the insured event, the property and slope had remained stable and usable for a prolonged period. There is no evidence the slope failure was caused by poor maintenance or any other action or inaction by the complainant.
Following the event:
· ES found the slope is unstable and requires remediation
· ground conditions have changed materially in the affected area
· the landslip created constraints on access and excavation for repair work
· the insurer has not demonstrated how the affected services can be safely and certifiably reinstated under its proposed settlement.
The insurer relies on the SW’s scope, SL’s estimate and PC’s assessment. These documents acknowledge the slipped land must first be reinstated before the identified repair works can proceed.
However, the insurer has treated those prerequisite works as outside the policy response. I am not satisfied it has demonstrated how the insured damage can be safely, lawfully and adequately repaired.
I also place weight on the complainant's geotechnical evidence from ES. ES identifies:
· ongoing instability
· inadequate factors of safety
· drainage deficiencies
· the need for remediation works before permanent reinstatement can occur.
I acknowledge the insurer disputes the policy response to those works. However, it did not obtain competing geotechnical evidence directly addressing or rebutting ES’ findings.
I am not satisfied the insurer’s final repair scope and pricing clearly address all affected service infrastructure. Earlier claim documentation referred to damage to stormwater, sewer and potable water services.
The final SW scope and SL estimate mainly address stormwater infrastructure. They do not clearly include sewer, potable water or biocycle power services, and SL’s estimate assumes the site conditions have already been addressed.
In these circumstances, I am not satisfied the insurer has shown its proposed settlement reflects a fair and reasonable cash settlement value. It has not shown the insured damage can be reinstated, replaced or repaired for that amount as required by the policy.
Insurer to repair cyclone-related damage to insured property
I consider an insurer managed repair is a fair outcome. This is because the insurer has not demonstrated its proposed cash settlement is actionable and adequately addresses all the works required to repair the cyclone-related insured damage.
I am satisfied a repair outcome allows the scope of insured damage, any necessary enabling works, and the treatment of affected stormwater, sewer and water infrastructure to be properly identified and addressed through a clear and workable repair process.
This outcome does not require the insurer to fund broad slope remediation, land improvement or geotechnical works unrelated to the accepted insured damage. It requires the insurer to fund the support and enabling works reasonably necessary to reinstate the accepted insured damage in a lawful, safe and certifiable way.
Within 14 days of receiving notice the complainant accepts this determination, the insurer is required to commence the repair process by:
· confirming the accepted damage to be repaired, including whether the accepted scope includes (and is not necessarily limited to):
> sewer infrastructure;
> potable water supply;
> stormwater infrastructure;
> electrical/biocycle-related services, if damaged;
> fencing, balustrading, access structures and damaged external improvements.
· engaging an appropriately qualified and independent geotechnical and/or structural engineer who has had no previous involvement in this claim to:
> assess the insured damage
> prepare a clear and workable scope of works reasonably required to reinstate the insured damage.
· requiring the scope of works to include all works reasonably necessary to safely complete and certify the insured repairs, including any directly required temporary, access, support, drainage, approval or reinstatement works
· engaging independent, appropriately qualified contractors who have not previously been involved in the claim to perform and certify the works required to reinstate the insured damage, including any accepted sewer and potable water services
· arranging and managing the repairs, subject to the complainant paying any applicable excess and cooperating with reasonable access and construction requirements.
Following preparation of the scope of works and identification of the works required to reinstate the insured damage, the parties may agree to resolve the claim by cash settlement (subject to 15% uplift for the transfer of repair risk).
Failing mutual agreement, the insurer must arrange and complete the repairs required to reinstate the insured damage, subject to the policy terms.
Complainant concerned about further damage due to repair delay
The complainant is concerned the landslip may continue to regress and cause further damage to the property, services and surrounding infrastructure. This is because the claim has remained unresolved and the damaged area has not been properly reinstated.
I accept the policy does not cover speculative future damage. However, if further damage has occurred because the insured cyclone damage remained unrepaired, I am satisfied it should be assessed as part of this claim. This is because this damage may conceivably flow from the original insured event.
2.2 Is the complainant entitled to costs?
Yes. The complainant is entitled to expert report costs, capped at $5,000, and reimbursement of any further proven reasonable make-safe costs.
AFCA’s approach to professional fees
Under the AFCA Rules, we can require an insurer to contribute to legal costs, other professional costs, or travel costs a complainant incurred in making a complaint. AFCA cannot award professional costs of more than $5,000 unless there are special circumstances.
When considering whether to require the insurer to make a costs contribution, we consider the complexity of the complaint and whether the complainant needed to incur the costs to understand or establish their claim.
Complainant entitled to reimbursement of ES’s report fees
I am satisfied the complainant is entitled to reimbursement of her reasonable engineering report costs, subject to AFCA’s $5,000 limit. I am satisfied the reports were obtained to investigate the cause and extent of the cyclone damage and to respond to deficiencies in the insurer’s proposed settlement.
Within 14 days of receiving proof of payment, after being notified that the complainant accepts this determination, the insurer is required to reimburse the complainant ES’s report fees, subject to AFCA’s $5,000 limit.
Complainant entitled to reimbursement of make-safe costs
The insurer has agreed to reimburse certain make safe costs totalling $3,365.
If the complainant has incurred any other reasonable make-safe costs from the cyclone damage, she must provide proof to the insurer within 14 days of accepting this determination. The insurer must reimburse reasonable costs within 14 days of receiving that proof.
2.3 Did the insurer mishandle the claim?
Yes. I am satisfied the insurer’s claim handling caused significant stress, inconvenience and disruption, warranting $4,500 for NFL.
AFCA’s approach to non-financial loss
Under the AFCA Rules, AFCA can award up to $6,300 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim.
We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
We may reduce the amount of compensation we award if the loss was partially caused by the actions of the complainant, or by factors outside the insurer’s control.
Complainant says insurer mishandled the claim
The complainant cites several claim handling failures. She says:
· the insurer did not identify a clear, practical and certifiable repair pathway
· its settlement did not adequately address the required repair works
· its position on damaged services changed over time, including sewer and potable water
· it did not adequately address ES’s evidence about instability, drainage and required remediation
· the claim remained unresolved for an extended period while repair scope remained disputed
· it removed the temporary ensuite before the dispute was resolved or repairs completed.
As a result, the complainant says she experienced prolonged uncertainty, inconvenience and hardship.
Insurer says it did not mishandle the claim
The insurer says:
· it accepted the claim, obtained expert advice, scoped repairs and quantified the loss
· the dispute concerns whether stabilisation and geotechnical works are covered
· the SW scope, SL estimate and PC reports identify and cost the insured damage
· ES addressed long-term stability, while SW assessed insured damage and make-safe measures
· the landlord policy provides no owner-occupier temporary accommodation benefit. Nevertheless, it funded a temporary ensuite as a hardship measure until April 2026.
Overall, the insurer says it accepted the claim, obtained expert advice, provided temporary assistance and made a settlement offer consistent with the policy.
Complainant entitled to $4,500 NFL
I have carefully considered the exchanged information. I am satisfied the complainant is entitled to $4,500 NFL.
I accept the insurer was not required under the landlord policy to provide temporary accommodation. I acknowledge it funded a temporary ensuite for an extended period as a hardship measure.
However, I do not consider it was fair to remove this facility while the claim remained unresolved, and the parties were still in dispute about how the insured damage would be reinstated.
This is because the complainant was left for an extended period without clarity about:
· what damage was covered
· how the repairs would proceed
· when the claim would be resolved.
This was made worse by the:
· prolonged dispute
· lack of clarity about reinstating damaged services and infrastructure
· inconvenience of living with unresolved cyclone damage.
The insurer's changing position on sewer and potable water services prolonged uncertainty about what was covered and how the property would be reinstated.
Taken together, I am satisfied the insurer’s claim handling caused significant stress, inconvenience and disruption, warranting $4,500 NFL.
Within 14 days of receiving notice that the complainant accepts this determination, the insurer is to pay the complainant $4,500 NFL.
2.4 Why is the outcome fair?
The outcome is fair because it requires practical reinstatement of the insured damage and compensates the complainant for reasonable costs and claim handling impacts.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Policy terms
|
Page
|
Term
|
27
|
BUILDINGS COVER
What are buildings
Only the following items at the insured address are included in the definition of buildings:
…
· infrastructure for services, including infrastructure for the supply of electricity, gas, water, the internet and telephone;
…
· landscaping, paved terraces, paved pathways and paved driveways (excluding gravel driveways), retaining walls, fences and gates entirely or partly at the insured address;
…
· anything permanently built, permanently constructed or permanently installed on your property for domestic purposes, including in ground swimming pools and spas (and their fixed accessories), tennis courts, decks, pergolas, clothes lines, play equipment, and fixed rainwater tanks, solar panels or hot water systems.
|
28
|
What are not buildings
The following items at the insured address are not included in the definition of buildings:
…
· loose or compacted soil, lawn, grass, artificial grass, gravel, pebbles, rocks, unpaved paths, unpaved driveways or granular rubber;
…
|
31, 32
|
WHAT YOU ARE COVERD FOR
Listed events
…
Storm
What is covered
Loss or damage caused by storm.
Loss or damage caused by storm surge will also be covered but only if there is other damage as a result of the storm.
What is not covered
Loss or damage caused by:
…
· landslide or subsidence, but we will cover loss or damage caused by a landslide or subsidence if it occurs within 72 hours of, and directly because of, a storm; or
…
Loss or damage to:
· retaining walls, gates and fences that you were aware, or a reasonable person in the circumstances would have been aware, were:
> in a poor or damaged condition before the incident; or
> installed or constructed incorrectly; or
> not compliant with local government or other statutory requirements at the time of construction.
…
|
40
|
Prevention of further loss or damage
If your buildings or contents are lost or damaged and we have agreed that the loss or damage will be covered under this policy then we will pay the reasonable and necessary costs to protect your buildings or contents from further loss or damage until your claim is settled or this policy states otherwise.
|
63
|
DEFINITONS
…
Cash settlement value
Cash settlement value, in the circumstances explained in this policy in which we cash settle the claim, means the fair and reasonable value for which you or the funds recipient would be able to reinstate, replace or repair the insured property following the claim against this policy.
…
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.