Determination 12-25-330826
Claim for storm water damage to garage declined on the basis of wear and tear/deterioration exclusion; make safe delay
Summary
The insurer declined a storm water damage claim for a garage, citing deteriorated sealant on the balcony above. AFCA found the decline was justified but awarded $500 for non-financial loss due to make safe delay and poor communication.
The damage was caused by worn and deteriorated sealant, excluded under the policy, but the make safe delay and communication deficiencies warranted $500 compensation.
Issues
- Claim denial primary · not upheld“The insurer has shown the damage to the balcony and the resulting water damage to the garage has been caused by excluded causes.”
- Delay secondary · upheld“there was a delay in completing a make safe to the balcony between 18 August and 8 September 2025”
- Misleading conduct secondary · not upheld“insufficient information to show the insurer promised to cover the resultant damage.”
- Poor communication secondary · upheld“there were deficiencies with the insurer's communication about the make safe”
- Repairs or contractors secondary · not upheld“I am not satisfied the insurer has caused further damage to the property or the complainant additional financial loss.”
Subjects and remedies
home or building damagepay non financial loss
Related
Text of the determination
Determination
|
Case number
|
12-25-330826
|
Financial firm
|
Youi Pty Ltd
Case number: 12-25-330826 28 June 2026
1 Determination overview
1.1 Complaint
The complainant holds a home building policy with the financial firm (insurer). The complainant lodged a claim for water damage to his garage following a storm on 23 July 2025.
The insurer has denied the claim because it says the damage has been caused by deteriorated sealant and grouting on the balcony which sits above the garage. The complainant says the insurer did not undertake proper make safe repairs to the property which caused further damage, including to the garage door.
1.2 Issues and key findings
Has the insurer correctly assessed its liability under the claim?
Yes. The insurer has shown the damage to the balcony and the resulting water damage to the garage has been caused by excluded causes. The insurer is entitled to decline the claim.
Did the insurer’s make safe cause additional damage?
No. While there was a small delay in completing a make safe to the balcony, I am not satisfied the insurer has caused further damage to the property or the complainant additional financial loss.
Did the insurer mislead the complainant?
No. Based upon the claim notes and call recordings provided, there is insufficient information to show the insurer promised to cover the resultant damage.
Has the insurer reasonably handled the claim?
Mostly. The claim assessment was completed in a reasonable time; however, I acknowledge there were deficiencies with the insurer’s communication about the make safe and some delay in carrying this out. The complainant is entitled to $500 in compensation for non-financial loss.
Is the insurer required to pay for the complainant’s report?
No. I am not satisfied the complainant’s report assisted his position and the insurer is not required to compensate the complainant for any cost associated with obtaining his report.
Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim.
1.3 Determination
This determination is in the insurer’s favour. The insurer is not required to take further action regarding the claim. Within 21 days of acceptance of this determination, the insurer is required to pay the complainant $500.
2 Reasons for determination
2.1 Has the insurer correctly assessed its liability under the claim?
Yes. The insurer has shown the damage to the balcony and the resulting water damage to the garage has been caused by excluded causes. The insurer is entitled to decline the claim.
Complainant must establish a claimable loss
When making a claim, the complainant has the initial onus of establishing they suffered a loss covered by the policy. The complainant must establish this on the balance of probabilities (that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim.
Policy covers storm damage, subject to exclusions
The policy is an ‘insured events’ policy, meaning it only covers damage caused by specific events. One of the insured events is ‘storm.’ The insurer offers optional additional cover for accidental damage, but the complainant did not select this option.
Storm is defined by the policy to mean:
violent atmospheric event which includes a thunderstorm, cyclone or strong wind with or without rain, hail or snow, but not rain showers alone.
There is no dispute a storm occurred and caused water damage to the garage; however, the insurer says water was able to enter the property due to deteriorated silicone on the balcony above which is excluded under the policy. The policy excludes loss or damage arising from:
...wear and tear, rust, corrosion, or deterioration.
Reporting shows water entered between sliding door and hob tiles
The insurer engaged an assessor (M) to inspect the property and undertake a leak detection and spray test.
The plumbing report found the following:
· the balcony was in fair condition and located directly above the affected area
· separation between the sliding door frame and hob tiles on the balcony
· separation between the sliding door frame and rendered wall surface on the balcony
· flood testing of the balcony did not cause water to leak below
· spray testing to the separation between the sliding door frame and hob tiles caused water to leak into the garage ceiling below.
This report included thermal imaging and images of the separated sealant. It also provided photographs of the water leaking after the spray test to the sliding door frame. This plumbing report did not conclude what had caused the sealant to separate.
The building report also provided by M concludes the resultant damage is consistent with deteriorated grout and sealant to the first-floor balcony.
The report notes the balcony is exposed and the mineral build up on the concrete slab from the dripping water suggests that the balcony has been leaking for an extended period exceeding 12 months.
M also considered that the property had been relatively recently constructed and the issue may be covered under the builder’s warranty. The certificate of insurance indicates the property was constructed in 2017.
In the lodgement call recording, the complainant also confirms that he had a builder attend the property that agreed overtime and due to the weather, the waterproofing on the balcony had been compromised and worn because it was exposed without a roof covering.
The complainant’s report by his builder (BG), acknowledges the findings of the insurer’s reporting, that the sealant had ‘weathered’. BG did not offer any competing conclusions about what caused the initial water ingress, instead focusing on the failure of the insurer’s make safe.
Based upon the above, I am satisfied the damage to the balcony, and the cause of the water ingress is due to worn and deteriorated sealant between the sliding door and hob tiles, which is excluded under the policy.
2.2 Is the insurer responsible for additional damage?
No. While there was a small delay in completing a make safe to the balcony, I am not satisfied the insurer has caused further damage to the property or the complainant additional financial loss.
The parties disagree whether the insurer completed adequate make safe
The complainant says the insurer’s trade attended to complete a make-safe two days after lodgement of the claim. He says the trade came alone, cut a hole in the ceiling, and suggested to keep this uncovered and exposed so assessors could see where the water was coming from.
The complainant says the insurer failed to make-safe the balcony which caused further damage to his property, including the garage door which stopped working.
The complainant’s report from BG concluded:
· the area ultimately found to be leaking is a high-risk ingress point and should have reasonably been identified and sealed as part of the initial make-safe work
· additional damage after the initial event has been caused to the ceiling beams, ceiling, wall, skirting, floor and garage door due to a failure to seal the balcony sliding door hob.
The insurer says the water ingress has been occurring over a prolonged period, the complainant delayed in making the claim and that he requested the ceiling remain uncovered.
On this basis, the insurer says it is not responsible for further water ingress and damage.
Not satisfied the insurer has caused additional property damage or financial loss
While I acknowledge there is dispute about why the ceiling remained uncovered, I consider the below chronology important in establishing whether the insurer is responsible for further damage to the property:
· the storm occurred on 23 July 2025
· the claim was lodged on 6 August 2025
· the initial make safe attendance occurred on 8 August 2025
· the leak detection testing was carried out on 14 August 2025
· the insurer sent a request for make safe for the balcony and garage door on 18 August 2025
· the claim was declined on 8 September 2025
· make safe occurred to the balcony on 28 October 2025.
I understand the complainant believes the balcony should have been sealed upon the initial attendance; however, it is clear from the plumbing report that testing was required to locate the exact source of the leak on the balcony.
Additionally, I recognise the reporting is usually not available to the insurer immediately after attendance and this is reflected in the claim notes. I note the complainant telephoned on 18 August 2025 requesting the make safe to the balcony and garage.
It appears from the claim notes that the insurer did raise a request for this to be carried out, however, I understand from the complainant’s chronology and the subsequent reporting that a trade only attended to make safe the garage and it wasn’t until the end of October and after the claim was declined that a make safe to the balcony occurred.
A make safe is intended to be a temporary repair to protect property while the insurer decides on the claim. I agree there was a delay in completing a make safe to the balcony between 18 August and 8 September 2025 when the claim was declined and the insurer informed the complainant they would not undertake further a make safe. However, I am not satisfied these actions caused the complainant additional financial loss for the following reasons:
· the reporting suggests the leaking had been occurring through the ceiling for up to 12 months prior to the claim based upon the mineral build-up on the concrete slab
· there was a two-week delay in lodging the claim after the complainant noticed leaking into the ceiling during which time moisture continued to enter the property
· while the complainant’s report confirms additional water has entered and caused damage after this initial event this could have also occurred during the delay in claim lodgement or during the reasonable time taken to investigate the leak
· most areas affected already had water damage and there is no information to suggest additional financial impact has been caused to the complainant as these areas had to be repaired anyway
· while the garage door only stopped working later during the claim, it is likely it had been exposed to moisture for some time when considering the above factors and that rust was present.
Based upon the above, I am satisfied the insurer is not required to accept further damage.
2.3 Did the insurer mislead the complainant?
No. Based upon the claim notes and call recordings provided, there is insufficient information to show the insurer promised to cover the resultant damage.
Insufficient information to show the insurer agreed to accept the internal damage
We can consider a complaint about misleading conduct by an insurer. The complainant may be entitled to compensation if:
· the insurer gave them false or misleading information; and
· they suffered a loss because they relied on the information.
If the complainant says the insurer misled them, we will consider whether the evidence supports this. If we decide the insurer did mislead the complainant, we will consider what loss the complainant suffered as a result.
The complainant says the insurer informed him after the claim denial that they would cover the resultant damage to the garage after he completed the necessary work to the balcony. He says this occurred in a telephone conversation.
In support of his position, the complainant requested AFCA obtain the call recordings between him and the insurer. I have listened to the call recordings provided and they do not show the insurer agreed to cover the resultant damage. The claim notes also do not reflect this conversation took place.
Based upon the above, I am not satisfied the complainant has established the insurer misled him and he suffered a loss.
2.4 Did the insurer handle the claim reasonably?
Mostly. The claim assessment was completed in a reasonable time; however, I acknowledge there were deficiencies with the insurer’s communication about the make safe and some delay in carrying this out. The complainant is entitled to $500 in compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
In assessing whether to award compensation, AFCA expects complainants to:
· be moderately robust,
· bear the normal degree of inconvenience experienced when a problem occurs, and
· take reasonable steps to minimise the inconvenience suffered.
Make safe for the balcony was delayed
Upon review of the information provided, including the claim notes and the call recordings, I agree the insurer said on the 18 August 2025 that it would raise a make safe for the garage door and the balcony. Review of the subsequent reporting shows while there was attendance for the garage door, it does not appear the balcony make safe was carried out.
The call recording at the time of the claim denial on 8 September 2025, shows the insurer clearly stated that it would not be doing further make safe to the balcony and a claim decision had been made. The insurer did later attend in October to address the balcony as it appears the complainant requested this outcome to resolve his complaint.
Otherwise, the progression of the claim was reasonable, and an outcome was provided to the complainant in a reasonable timeframe.
Based upon the above, I am satisfied $500 is fair and reasonable compensation in the circumstances to reflect the make safe delay from 18th August 2025 until the claim denial on 8 September 2025.
2.5 Is the insurer required to pay for the complainant’s report?
No. I am not satisfied the complainant’s report assisted his position and the insurer is not required to compensate the complainant for any cost associated with obtaining his report.
AFCA can award up to $5,000 for the complainant’s costs in making the complaint
Under the AFCA Rules, AFCA can require an insurer to contribute to legal and other professional costs a complainant incurred in making a complaint.
In considering whether the insurer should contribute to the complainant's costs, AFCA considers the complexity of the complaint, whether the complainant needed to incur the costs to understand or establish their claim, and whether the costs are reasonable in the circumstances.
In this case, I am not satisfied the complainant’s report assisted his position for the reasons outlined in the determination. On that basis, the insurer is not required to compensate the complainant for the cost of his report.
2.6 Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.