Home / Suncorp Group / Determination 12-25-330600

Determination 12-25-330600

Insurer refused to cover deterioration beneath the kitchen as part of an accepted escape of liquid claim; complainant sought additional repair cost, temporary accommodation and non-financial loss

FirmSuncorp Group
Decided2026-08-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed$89,480
SourceAFCA PDF

Summary

The insurer accepted an escape of liquid claim but refused to cover deterioration beneath the kitchen. AFCA found the insurer had not shown it was unrelated, required an independent engineering assessment and repair or cash settlement with TA if needed, and declined further NFL.

The insurer did not establish the kitchen deterioration was unrelated to the insured leak, but the complainant's quote was not a reliable basis for settlement, so independent assessment of the scope is required.

Issues

Subjects and remedies

home or building damagepay compensationpay non financial lossreassess claimrefund fees or chargesrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-330600 | Financial firm | AAI Limited Case number: 12-25-330600 27 August 2026 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy covering insured events (policy) with the financial firm (insurer). On 29 July 2025, she lodged a claim for damage to the property caused by escape of liquid (EOL) from the hydronic heating system. The insurer accepts the EOL claim. It paid $72,776 plus a 15% contingency for repairs to the dining/living area. However, it says the deterioration identified beneath the kitchen was caused by long-term external moisture ingress and building non-compliances, not the insured leak. The insurer approved $45,476 for an additional 90 days’ temporary accommodation (TA) outside the policy terms due to unforeseen delays. The insurer also agreed to pay $2,000 NFL and refund the $1,500 excess, which the complainant has accepted. The complainant says the kitchen deterioration forms part of the same insured event. She wants the insurer to pay $89,480 for the additional kitchen works. She also seeks further TA and compensation for non-financial loss (NFL). 1.2 Issues and key findings Is the accepted scope of works (SOW) adequate? No. I am not satisfied the insurer has established its accepted SOW fully addresses the damage identified beneath the kitchen. However, I am also not satisfied the complainant has established the full additional claimed SOW and cost are reasonably required. Is the complainant entitled to additional TA? Yes. The insurer must pay any further TA costs if additional insured repairs are required, and only for the reasonable period those repairs make TA necessary. Is the complainant entitled to additional NFL? No. The insurer has already agreed to pay $2,000 NFL and refund the excess to recognise claim handling delays. I am not persuaded the evidence supports any further award. Why is the outcome fair? The outcome is fair because the evidence does not establish that either party's position should be accepted in full. The insurer has already agreed to additional TA and NFL for delay. Any further TA can be considered if additional insured repairs are required. 1.3 Determination This determination is substantially in favour of the complainant. Within 14 days of receiving notice that the complainant accepts this determination, the insurer is required to act in accordance with 2.1 and 2.2 below. 2 Reasons for determination 2.1 Is the accepted SOW adequate? No. I am not satisfied the insurer has established its accepted SOW fully addresses the damage identified beneath the kitchen. However, I am also not satisfied the complainant has established the full additional claimed SOW and cost are reasonably required. Policy cover is subject to terms, conditions, and exclusions The policy covers the period 3 October 2024 to 3 October 2025. Coverage is defined in the product disclosure statement (PDS) and certificate of insurance (COI), which must be read together. There is no dispute the complainant received a copy of the policy documents. The insurer is entitled to rely on the policy terms in assessing the claim. Accepted damage and remaining dispute The complainant lodged a home building insurance claim after a leaking hydronic heating pipe caused: · subfloor moisture · timber deterioration · movement to flooring and joinery. The insurer: · accepted the EOL claim · paid for repairs to the dining/living area · agreed to additional TA and compensation for the delays experienced. However, it later disputed whether deterioration identified beneath the kitchen by a borescope investigation formed part of the same insured event. The insurer says the deterioration is instead attributable to long-term moisture ingress arising from drainage, ventilation and construction defects. It says no further repair payment is required. The complainant says the additional deterioration beneath the kitchen forms part of the accepted EOL damage. She seeks the reasonable cost of rectifying the damage and any necessary additional TA arising from these works. Complainant seeks an expanded SOW The complainant says the hydronic leak caused damage extending beyond the area accepted by the insurer in the living/dining area. The complainant relies on the parties’ expert evidence and a later borescope inspection, which identified deterioration beneath the kitchen. The complainant says the insurer has not established the damage identified in this area is unrelated to the accepted EOL event. She says the additional deterioration beneath the kitchen forms part of the accepted EOL damage. The complainant says the insurer should pay the reasonable cost of the associated access, repair and reinstatement works required to restore the property to its pre-loss condition. Insurer says no further payment required The insurer says the accepted EOL event caused the damage already allowed for and cash settled. However, the additional deterioration later identified beneath the kitchen is not related to the leak. The insurer says this deterioration was caused by long-term moisture ingress associated with: · non-compliant external ground levels · drainage · ventilation · landscaping · subfloor construction. Parties rely on expert evidence The parties rely on expert evidence about the cause and extent of the damage and the repair works required. The expert evidence records: · Complainant's experts: > AA leak detection report (July 2025): ‒ identified damage to the hydronic heating pipe and an active leak beneath the property. > RG building consultant report (July 2025): ‒ concluded the observed damage was primarily the result of a concealed plumbing leak and identified timber deterioration, moisture damage and floor movement. > DE engineering report (September 2025): ‒ concluded the hydronic leak caused the observed structural deterioration and movement to the flooring, cabinetry and finishes ‒ recommended a broader reinstatement scope. · Insurer's experts: > GM leak detection report (July 2025): ‒ identified rodent damage to the hydronic pipework ‒ confirmed escape of liquid within the subfloor. > AP assessment report (August 2025): ‒ attributed the observed damage to the hydronic leak ‒ recommended an engineering assessment to determine the required repairs. > GD engineering reports (September 2025 and October 2025): ‒ concluded the observed timber floor-framing deterioration resulted from the EOL event ‒ identified drainage, ventilation, clearance and moisture conditions as contributing factors ‒ considered the full extent of damage could only be confirmed once concealed areas were exposed and inspected ‒ GD later reaffirmed its conclusions after reviewing the geotechnical evidence. > ST geotechnical report (October 2025): ‒ identified elevated moisture conditions and reactive soils and recommended a drying period prior to major repairs. Complainant says borescope inspection confirms additional EOL damage The parties agree the dispute is about whether damage extended beyond the insurer's accepted repair SOW. To investigate this issue, the parties agreed to a non-invasive borescope inspection of the concealed subfloor areas beneath the kitchen. RG considered the bore-camera imagery obtained from previously inaccessible areas beneath the kitchen. RG reported timber deterioration was present beyond the previously exposed dining/living area and extended beneath the kitchen footprint, including areas concealed by fixed joinery. RG recommended access be obtained to the concealed subfloor areas beneath the kitchen to enable inspection, repair or replacement of the affected structural members. This would require removal of overlying cabinetry and flooring finishes. The complainant says the borescope report confirms further leak-related damage beyond the accepted SOW. She submitted a quote for the additional kitchen repairs and sought payment of those costs. Insurer says kitchen damage unrelated to EOL event The insurer relies on subsequent internal assessor (IA) and building technical assessor (BA) reviews to dispute the kitchen damage was caused by the EOL event. The IA considered the deterioration identified by the borescope was concentrated towards the external perimeter of the dwelling. It considered this was consistent with previously identified site conditions, including: · drainage · ventilation · subfloor defects. The IA also reviewed the complainant's additional repair quote. It identified items considered duplicated or unsupported, such as the undamaged island benchtop replacement. The BA reviewed the borescope imagery. It concluded the deterioration to the timber support ends and waling plate adjacent to the external brickwork was consistent with long-term moisture ingress. The BA identified: · external ground levels · drainage · ventilation · landscaping · subfloor clearance issues. The insurer places significant weight on the absence of visible ponding in the bore-scope imagery. It relies on this, together with the identified drainage, ventilation and ground level issues, to conclude the deterioration beneath the kitchen was unrelated to the EOL event On balance, insurer’s evidence is not persuasive I have carefully considered the exchanged information. On balance, I am not satisfied the insurer has shown the kitchen deterioration is unrelated to the EOL event. This is because the leak was located close to the boundary between the accepted and disputed area. RG’s July 2025 floor level survey records up to 30 mm of variation across the kitchen and dining area, with the lowest levels occurring around the kitchen/dining junction. GD recorded floor variation in the living room and kitchen, possibly due to soil movement, rotten timber, or both. The complainant's marked-up plans show floor drop, joinery separation and misalignment beyond the accepted repair area. I accept the floor-level evidence does not establish the path taken by water or the precise cause of the recorded movement. However, it does indicate the effects of the deterioration were not confined to the area accepted by the insurer. Earlier RG and GD evidence also contemplated further exposure was needed to determine the full extent of concealed damage. Therefore, I am not persuaded the evidence shows leak-related deterioration stopped at the insurer's accepted repair boundary. The borescope inspection occurred in April 2026, about nine months after the leak was identified and isolated. I am not satisfied the absence of visible ponding in later imagery shows water had not previously reached the disputed area. The borescope imagery shows timber deterioration continuing beneath the kitchen. RG reported deterioration extending beyond the exposed dining area into concealed areas beneath the kitchen. RG observed the deterioration was more severe closer to the leak. However, it remained evident in the further areas inspected beneath the kitchen. The October 2025 soil testing occurred before the site had fully dried. GD recorded above-normal moisture levels in all three boreholes. The highest moisture readings occurred in the borehole closest to the primary leak location. GD recommended a nine-month drying period followed by further testing. However, GD reaffirmed its earlier conclusion the observed timber floor-framing deterioration resulted from the EOL event after a review of the geotechnical findings. The BA report identifies a plausible alternative cause, being long-term perimeter moisture ingress. However, it was based on a desktop review of the later imagery. I am not satisfied the BA report explains why leak-related damage would have stopped at the accepted scope boundary. I am not satisfied it distinguishes any leak-related deterioration from deterioration caused by the identified site conditions. On balance, I am not satisfied the insurer has established its accepted SOW fully addresses the damage required to return the property to its pre-loss condition. Complainant’s quote not reliable basis for cash settlement I am not satisfied the complainant's quote provides a reliable basis for a cash settlement. This is because the: · extent of any additional insured damage remains disputed · quote includes several access, reinstatement and consequential works, including replacement of the island benchtop. I am not satisfied it has been established the benchtop cannot reasonably be removed and reinstated, or replacement will necessarily be required. In addition, the SOW reasonably needed to return the property to its pre-loss condition has not been independently assessed following the borescope inspection. Assessment and rectification of additional damage Within 14 days of receiving notice that the complainant accepts the determination, the insurer must elect to either: · arrange repairs by: > obtaining an independent structural engineering assessment of the disputed subfloor area beneath the kitchen > completing the additional insured repairs identified; or · cash settle by: > obtaining an independent structural engineering assessment, repair scope and costing > paying the reasonable cost of additional insured repairs, less duplicated or previously settled amounts, plus a 15% contingency. For either option: · the engineer and builder, or quantity surveyor, must be suitably qualified and not previously involved in the claim or complaint · the assessment must determine the extent and cause of the kitchen subfloor deterioration, and identify works reasonably required to restore the property to its pre-loss condition · the SOW must include reasonable opening-up, access, facilitating and reinstatement works needed to assess and repair the additional insured damage · the insurer need not rectify pre-existing defects or non-compliant components, except where reasonably necessary to undertake or warrant insured repairs · if island benchtop removal is reasonably necessary: > the scope must include removal and reinstatement > replacement must be included if an independent stone specialist says it cannot reasonably be removed and reinstated without damage. 2.2 Is the complainant entitled to additional TA? Yes. The insurer must pay any further TA costs if additional insured repairs are required, and only for the reasonable period those repairs make TA necessary. Complainant claims additional TA The complainant says additional TA is required. This is because the property remains uninhabitable and the borescope investigation identified further damage requiring additional repairs. The complainant says the insurer should meet the reasonable TA costs incurred while those repairs are assessed and completed. The insurer says the complainant's entitlement to TA has been resolved because the policy benefit has been exhausted. However, it: · agreed to fund an additional 90 days of TA outside the policy terms · subsequently agreed to pay the complainant's quoted accommodation costs of $45,476. Complainant entitled to additional TA I acknowledge the insurer agreed to fund an additional 90 days of TA outside the policy terms and says that issue has been resolved. However, I am not satisfied this agreement was intended to determine any entitlement to TA which may arise if additional insured repairs are found to be required. If the insurer elects to undertake repairs, it must meet the complainant's reasonable TA costs for any period the additional insured repairs reasonably require her and her family to live elsewhere. If the insurer elects to cash settle, TA must be considered as part of the cash settlement. It is payable only if the independent scope and costing identify additional insured repairs that would reasonably require the complainant and her family to live elsewhere. It is limited to the reasonable period those repairs would take to complete. 2.3 Is the complainant entitled to additional NFL? No. The insurer has already agreed to pay $2,000 NFL and refund the excess to recognise claim handling delays. I am not persuaded the evidence supports any further award. AFCA’s approach to non-financial loss Under the AFCA Rules, AFCA can award up to $6,300 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim. We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim. We may reduce the amount of compensation we award if the loss was partially caused by the actions of the complainant, or by factors outside the insurer’s control. Complainant claims additional NFL The complainant says additional compensation for NFL should be awarded. This is because the: · claim has remained unresolved for a prolonged period · property has remained uninhabitable · the insurer's refusal to accept responsibility for the deterioration identified by the borescope has prolonged the dispute and delayed completion of the repairs. Insurer says no additional NFL is warranted The insurer says no further compensation for NFL is warranted. This is because it has already acknowledged delays in handling the claim by agreeing to refund the excess and pay $2,000 compensation. The insurer says these offers appropriately recognise any inconvenience caused by the handling of the claim. Additional NFL is not warranted I have carefully considered the exchanged information. I am not satisfied the complainant is entitled to additional compensation for NFL. I accept the claim has been lengthy, and the complainant has experienced ongoing inconvenience and disruption. However, the insurer has already acknowledged delays in its handling of the claim by agreeing to refund the excess and pay $2,000 compensation. The complainant’s claim for a further NFL award stems from the ongoing dispute about the extent of the damage and the repairs required. I am not satisfied the complainant has established any separate claim handling failure by the insurer. In the circumstances, I am not persuaded a further award for NFL is warranted. However, if the insurer has not already done so, it must refund the excess and pay the agreed $2,000 compensation within 14 days of receiving notice that the complainant has accepted this determination. 2.4 Why is the outcome fair? The outcome is fair because the evidence does not establish that either party's position should be accepted in full. The insurer has already agreed to additional TA and NFL for delay. Any further TA can be considered if additional insured repairs are required. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.