Insurer declined claim for additional water damage and retaining wall works as not shown to be caused by the insured leaking pipe
Text of the determination
Determination
|
Case number
|
12-25-327715
|
Financial firm
|
AAI Limited
Case number: 12-25-327715 6 July 2026
1 Determination overview
1.1 Complaint
The complainant held a home building and contents insurance policy underwritten by the financial firm (the insurer). This policy covered loss or damage to his home caused by insured events, including escape of liquid.
On 1 January 2025, the complainant lodged a claim for water damage to the upstairs laundry, and the downstairs theatre room, following a leak from a water pipe. The insurer partially accepted the claim, and provided a cash settlement for repairs.
On 9 June 2025, the complainant told the insurer that he had identified additional damage to the left-hand side wall in the theatre room. The complainant said this wall was damp and arranged for urgent works, including building a retaining wall behind the plaster wall to the theatre room. A further claim was submitted for these costs, but the insurer declined this claim.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The exchanged information does not establish that the additional damage was caused by an insured event (such as the leaking pipe). As a result, the complainant has not established a valid claim under the policy.
Why is the outcome fair?
I am not satisfied the complainant has established a valid claim under the policy. In these circumstances, it would not be fair to require the insurer to cover the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline the claim for additional damage and is not required to take any further action.
2 Reasons for the determination
2.1 Is the insurer entitled to decline the claim?
Yes. The exchanged information does not establish that the additional damage was caused by an insured event (such as the leaking pipe). As a result, the complainant has not established a valid claim under the policy.
The property suffered damage
The insured property is a two-storey house built in approximately 1976. On 31 December 2024, the complainant identified water damage caused by a leaking pipe. The parties do not dispute that this event caused damage, and the initial claim was accepted.
This dispute relates to additional damage reported in early June 2025, approximately six months later. The complainant noticed dampness in the left-hand side wall of the theatre room where the keyboard piano was situated. The complainant engaged a local builder who removed sections of the wall and discovered damp and muddy soil behind it. The soil was excavated, and works were carried out including installing metal posts and constructing a new retaining wall. The complainant says this work was urgent to prevent soil collapse and further damage.
The current claim is for the cost of these works.
The complainant has the onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not.
While the insurer has accepted that an insured event (escape of liquid from the burst pipe) occurred and this resulted in damage to some areas of the home, the onus is on the complainant to show that the proximate cause of the additional claimed damage was the insured event. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
If the complainant is able to establish that the cause of the additional damage was water from the burst pipe, then the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
Policy cover is subject to terms, conditions and exclusions
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Policy Schedule.
The policy covers loss or damage to the insured property caused by an insured event, which includes liquid leaking, overflowing or bursting from water pipes. However, the policy does not cover:
· loss or damage caused by subsidence, landslip, landslide, or any other earth movement unless it occurred within 72 hours of, and directly because of, escape of liquid and not because of erosion, structural fault or design fault
· wear, tear and gradual deterioration or loss or damage by the escape of liquid occurring as a result of a gradual process of leaking
· costs if you repair or renovate a damaged area of the building before we can inspect it and find the cause
· loss or damage caused by the wear, tear and gradual deterioration, rising damp, mould, mildew, and corrosion.
The relevant provisions of the policy are set out at section 3.2 of this determination.
Parties do not agree on the cause of the damage
The insurer does not accept that the additional damage and resultant building costs were caused by the leaking pipe.
The insurer relies on assessment reports prepared by its internal assessor, IA, dated 23 June 2025 and 27 August 2025, to support the decision. These reports note:
· the insured property is constructed on a sloped block of land, and the house is built into the slope
· the rear paved area of the house slopes downwards towards the house where the concrete steps down and a pit has been constructed to house the hot water system
· there are no drains in the sump pit, and there is only one storm water drain located on the pavement extension. The assessor considers this drainage to be inadequate.
· there is symptomatic moisture damage, and patterns visible when looking down the right-hand subfloor and brick wall, which indicates moisture pathing in towards the subfloor space.
The IA concluded:
· moisture build-up is likely due to site conditions and drainage issues
· the damage is consistent with long-term moisture ingress rather than a sudden leak
· some of the damage appears pre-existing or due to gradual deterioration.
The IA also noted:
· significant works were completed without engineering advice, permits or geo-technical consideration
· no pre-work photographs or a builder’s report were provided to the IA or the insurer for consideration despite being requested
· the commissioned engineer’s report does not identify the source of the moisture, or why the maintenance works were necessary
Based on this information, the insurer has concluded:
· the retaining wall was built to mitigate future loss to the property, and it was not required to address damage arising directly from the insured event (the leaking pipe)
· the damages and required works beneath the recreational room are consistent with long-term moisture ingress and poor site drainage, not a sudden or accidental escape of liquid
· the property’s sloped terrain has contributed to groundwater and moisture accumulation against the subfloor walls, which is unrelated to the burst pipe incident previously claimed
· the complainant has not provided sufficient information to support that the damp soil and resultant damage is related to the insured event.
The complainant disagrees and says:
· the property has sufficient drainage and there are drainage pits alongside the high south side of the building that were installed more than 20 years ago
· the inspection of the property following the burst pipe did not include a sufficient inspection of the left-hand side wall of the theatre. The damage did not become evident until mould was sighted behind the piano several weeks later
· his engineer’s report prepared by GC, and dated 5 August 2025, supports the position that there is no evidence of any dampness or water entering the property
GC’s report notes:
· Groundwater was not encountered at depth, but the top 1000mm of soil was saturated
· The site was classified as problematic due to the abnormal moisture conditions
Complainant has not made a valid claim
Having read and considered all of the exchanged information provided by both parties to this dispute, on balance, I am not satisfied that the complainant has made a valid claim.
The information provided by the complainant has not been sufficient to establish:
· the damp soil behind the left-hand wall of theatre room that was identified in June 2025 (and required the maintenance works) was caused by the leaking pipe in January 2025 (that was repaired)
· the excavation and the construction of a retaining wall were necessary to address damage to the property arising from the leaking pipe.
In reaching this conclusion, I have considered the following:
· there was a six-month period between the leaking pipe event and the detection of damp soil in June 2026 which warranted the emergency maintenance work. I acknowledge that the complainant says that the initial inspection of the property was insufficient, and that the wall behind the piano was damp from the leaking pipe and went undetected. However, this is not the damage claimed. The claim relates to the excavation of ongoing damp soil and the construction of a retaining wall to stop soil subsidence
· the GC report confirms that the property was subject to abnormal moisture conditions, but it does not provide any commentary on the likely source for the moisture
· the IA’s reports indicate that the paved rear of the property slopes towards the house and that there was inadequate drainage in place to prevent water from penetrating into the subflooring of the house. The IA notes:
symptomatic moisture damage and patterns visible when looking down the right-hand subfloor and external wall, which indicates moisture pathing in towards the subfloor space.
I note the complainant has confirmed that there are drainage pits alongside the high south side of the building that were installed more than 20 years ago, but there has been no information provided to confirm that the drainage was in fact sufficient
· photographs in the IA’s Reinspection Report of 23 June 2025 show water stains and efflorescence on the internal side of the brick wall near the newly built retainer wall which indicate a longer-term moisture issue
· the insurer was not able to inspect the property before the maintenance works were carried out, and photographs of the condition of the property in June 2025 before these changes were made are not available
· the works performed were extensive and appear preventative rather than the correction of damage arising from a single leak.
Given I am not satisfied the complainant has made a valid claim, the insurer is not required to accept the claim and does not need to take any further action.
2.2 Why is the outcome fair?
I am not satisfied the complainant has established a valid claim under the policy. In these circumstances, it would not be fair to require the insurer to cover the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Policy terms and conditions
Page 47 and 48 of the PDS outlines the relevant escape of liquid cover (non-relevant clauses have not been included):
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:
• any drain, fixed pipes, drainage and sewage systems (not forming part of a shower cubicle wall, floor or base);
• tap spindles;
We don’t cover
• loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, escape of liquid and not because of erosion, structural fault or design fault;
• wear, tear and gradual deterioration or loss or damage by the escape of liquid occurring as a result of a gradual process of leaking, splashing, dripping or overflowing;
• loss or damage to retaining walls;
• costs if you repair or renovate a damaged area of the building before we can inspect it and find the cause;
• loss or damage caused by wear, tear and gradual deterioration, rust, fading, rising damp, mould, mildew, corrosion, rot;