Determination 12-25-326793

Insurer declined most of an earthquake damage claim (cracking, water ingress, mould, loss of rent) as caused by pre-existing and uninsured causes

FirmSuncorp Group
Decided2026-09-25
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A landlord policyholder claimed for cracking, water ingress, mould and loss of rent after an earthquake; the insurer accepted limited damage and declined the rest. AFCA found for the insurer and ordered nothing.

The complainant did not establish that the earthquake was the proximate cause of the disputed damage, and unchallenged expert evidence attributed it to excluded pre-existing causes.

Issues

Subjects and remedies

home or building damagemental healthnatural disasterno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-326793 | Financial firm | AAI Limited Case number: 12-25-326793 25 September 2026 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under her landlord insurance policy. This for the cracking and damage throughout the property, including water ingress, mould and loss of rent. While the insurer accepted liability for limited earthquake-related damage, it declined the remainder of the claim on the basis that the disputed damage was caused by pre-existing conditions, long-term ground movement, moisture ingress, drainage issues, thermal shrinkage, and normal building settlement. The complainant disagrees with the insurer’s decision. The complainant also says the insurer mishandled the claim, including missing appointments and causing delays in the assessment process. 1.2 Issues and key findings Is the insurer liable for the disputed damage? On balance, there is no persuasive evidence to establish a causal link between the earthquake and the disputed damage. The exchanged expert evidence attributes the damage to pre-existing conditions and other uninsured causes which fall outside the scope of the policy. Is compensation warranted in the circumstances? No. The insurer handled the claim reasonably overall. Why is the outcome fair? The insurer accepted liability for the damage which was caused by the March 2025 earthquake and relied on expert evidence to assess the extent of its liability. The insurer was entitled to rely on that expert evidence, together with the policy terms and conditions, in determining its position regarding the claim 1.3 Determination This determination is in favour of the insurer. The insurer is not liable for the disputed damage and is not required to take any further action. 2 Reasons for determination 2.1 Is the insurer liable for the disputed damage? On balance, there is no persuasive evidence to establish a causal link between the earthquake and the disputed damage. The exchanged expert evidence attributes the damage to pre-existing conditions and other uninsured causes which fall outside the scope of the policy. Complainant has initial onus to establish a valid claim The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid claim. Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy. The complainant’s policy covers loss or damage to the building as a result of several insured events, including an earthquake. The complainant says that the March 2025 earthquake has caused cracking throughout the property. The insurer accepted that the earthquake has damaged the timber mouldings at the front elevation exterior wall and ceilings in both the kitchen and hallway. The insurer says the damage to the letterbox, exterior walls and the displacement of the footings were caused by long term ground movement which is excluded under the policy. The insurer’s liability depends on the proximate cause of the damage. The proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. Damage may have multiple causes. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. The exchanged information shows that the complainant has lodged two other claims, ending in 721 and 457, relating to cyclone and storm damage respectively. Those claims are the subject of a separate AFCA complaint ending in 408. Accordingly, this determination is confined to the complainant's earthquake claim ending in 861 and does not consider issues under the cyclone and storm damage claims or the related AFCA complaint. No causal link between an insured event and the disputed damage The insurer’s engineer (CR) says on 1 March 2025, a magnitude 4.5 earthquake occurred in Townsville at a depth of 8 km. CR says: · Geoscience Australia isoseismal mapping indicates that the equivalent Modified Mercalli Intensity (MMI) within around 10 km of the epic centre was less than MMI 4.5 · for MMI 5, there may be isolated instances of cracked plaster and broken windows; however, structural damage to buildings is unlikely · the complainant’s property is located within a MMI 4.5 range, therefore structural damage from the earthquake is unlikely. CR observed separations and cracking damage to walls, ceiling lining and floor slabs. However, CR says the cracking to the external blockwork corresponds with the minor differential level changes observed at the property. CR identified several categories of damage and assessed their causes: · damage caused by the earthquake, which the insurer accepted as insured damage, including the front elevation timber mouldings and cracking to the hallway and kitchen ceilings · pre-existing damage exacerbated by the earthquake, such as the cracking to the masonry letterbox · damage attributed to long-term ground movement and inherent construction issues, including the external cracking beneath windows on the front, left, right and rear elevations · damage attributed to thermal shrinkage and normal building settlement, including cracking to the master bedroom floor slab and separations to architraves and cornices · moisture-related damage, such as the separation of skirting boards and door jambs in the master bedroom · washout and drainage-related issues, including erosion beneath downpipes on the front and left elevations. In identifying earthquake-related damage, CR noted fresh and sharp cracking, which he considered consistent with recent movement caused by earthquake vibrations. In contrast, when assessing the remaining cracking, CR noted: · aged and dulled crack edges · evidence of previous repairs and fillers; · deterioration of sealant, particularly around the entry posts, which he considered indicative of long-term movement and cracking. CR also observed washout of material beneath the downpipes at the front and left elevations and attributed this to the cumulative effects of multiple storm events over an extended period. Further, CR attributed the moisture damage and associated separations, including the damage observed in the master bedroom, to long-term moisture ingress rather than the earthquake. CR says the seismic vibrations were not sufficient to cause structural damage to the property. Instead, he concludes the movement within the footing system and the subsequent cracking in the external blockwork has occurred primarily from long term ground movement. This movement is caused by poor drainage conditions. In support of this conclusion, CR noted: · stormwater pipes discharging directly onto the ground causing saturation of the foundation soil · poor surface water drainage conditions to the perimeter of the residence. CR noted that the external cracking observed directly beneath the windows was also reflected internally. He explained that these areas lacked core filling and considered the cracking to be consistent with deficiencies in the original construction rather than earthquake-related damage. CR also concluded the primary cause of the damage to the master bedroom, garage floor slab and driveway slab is the long-term drying shrinkage of the concrete which initiated at the time of the construction. In relation to the letterbox, CR observed previous patch repairs and moisture staining to cracking and acrylic render finishes in the letterbox. CR provided a 2019 Google Streetview image showing pre-existing damage to the letter box. The complainant acknowledges that the letterbox has pre-existing cracks due to its age. However, she contends that after the earthquake, the letterbox is dysfunctional due to water ingress. On balance, I accept the earthquake highlighted the letter box’s deficiencies rather caused it.CR concluded that, apart from a limited number of fresh cracks and separations caused by the earthquake, the majority of the damage exhibited characteristics consistent with pre-existing conditions, long-term ground movement, thermal shrinkage, settlement, moisture ingress and drainage-related issues. Also, the complainant’s pre-purchase report notes cracking to the external walls prior to the earthquake. While the complainant disagrees with CR's findings, she has not provided any expert evidence to challenge or refute his conclusions. I acknowledge that CR referred to a different earthquake event in the Executive Summary of his report. However, having reviewed the report as a whole, I am satisfied this appears to be an administrative error. The remainder of the report, including the Geoscience Australia data relied upon to assess the magnitude and effects of the earthquake, refers to the correct event. Accordingly, I do not consider this error undermines the reliability of CR's overall conclusions. No causal link between water ingress and the earthquake The insurer engaged restorer (SM), who observed mould at different areas of the property. I note SM assessed the extent of the mould damage and provide a remediation scope of work. I am not satisfied that SM assessed the cause of the damage. The complainant says that water entered the main bedroom and caused ponding as a result of cracks in the concrete slab. The complainant also says the earthquake affected the roof structure resulting in water ingress. I do not find these arguments persuasive or supported by the available evidence. Even if water is entering through some of the cracks, I am not satisfied the evidence establishes that the earthquake caused those cracks or was the proximate cause of the moisture ingress. This conclusion is supported by contemporaneous evidence. In an email dated 5 January 2026, the property manager (CI) referred to ongoing water ingress through the slab since 31 January 2025, which predates the March 2025 earthquake. CI also noted that the ceiling damage and mould affecting the main bedroom had been evident since January 2025, before the earthquake occurred. For completeness, I note the insurer has arranged for its builder (AI) who assessed the roof and concluded that there is no earthquake damage to the roof structure. Having considered the evidence as a whole, I am not satisfied that the water ingress, moisture damage, or mould growth was caused by the March 2025 earthquake. The evidence instead indicates these issues pre-dated the earthquake and arose from causes unrelated to the insured event. The insurer is not liable for the disputed loss I have carefully considered the exchanged evidence and the parties’ submissions. I am not satisfied that the complainant has not discharged her onus to show a causal link between the earthquake and the disputed damage. I find CR’s findings persuasive and consistent with the rest of the available information. CR distinguished between damage that was caused by the earthquake and damage attributable to other causes, noting fresh and sharp cracking where earthquake-related movement was identified and aged cracking, previous repairs, long-term moisture issues and settlement-related damage elsewhere. On balance, I am satisfied that the disputed cracking and associated damage pre-dated the March 2025 earthquake and are attributable to factors that fall outside the scope of cover under the policy. The complainant says the tenant vacated the property due to the extent of the damage. There is no dispute that the policy provides cover for loss of rent where, as a result of an insured event, the property is unliveable or cannot be re-leased. Having considered the scope of earthquake-related repairs prepared by (RZ), I am not satisfied that the insured damage was sufficiently severe to render the property unliveable or incapable of being re-let. The repairs relate primarily to minor cracking and associated plastering works, and there is insufficient evidence to establish that these issues prevented the property from being occupied or leased. Therefore, I am not satisfied that the insurer is liable for the disputed loss, including the claim for loss of rent. 2.2 Is compensation warranted in the circumstances? No. The insurer handled the claim reasonably overall. AFCA may award compensation for non-financial loss AFCA may award compensation for non-financial loss if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and delays. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The complainant is dissatisfied with the insurer’s handling of the claim. Amongst other things, the complainant says: · the tenants vacated the property due to the condition of the property · the claim has impacted the mental health and wellbeing of the complainant · the insurer failed to attend several pre-booked appointments. No compensation is warranted in the circumstances I have carefully considered the exchanged evidence and the parties’ submissions. The exchanged evidence shows the complainant lodged the claim on 12 July 2025. I am satisfied that the insurer has engaged the relevant experts to assess the cause and the extent of the damage. RZ assessed the property on 29 July 2025 and CR in September 2025. I have also considered the complainant’s concerns regarding missed appointments. The exchanged evidence indicates that the majority of those appointments did not relate to the earthquake claim that is the subject of this complaint. The insurer issued its decision letter in October 2025. Having regard to the chronology of events and the investigations undertaken, I am satisfied that the insurer assessed the claim and determined the extent of its liability within a reasonable timeframe. Overall, I am not satisfied that the insurer erred in its assessment or handling of the claim. Accordingly, I do not consider that compensation for non-financial loss is warranted in the circumstances. Why is the outcome fair? The insurer accepted liability for the damage which was caused by the March 2025 earthquake and relied on expert evidence to assess the extent of its liability. The insurer was entitled to rely on that expert evidence, together with the policy terms and conditions, in determining its position regarding the claim. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.