Home / Allianz Australia / Determination 12-25-324558
Determination 12-25-324558
Cash settlement for water damage repairs did not include contingency for benchtop damage or mould remediation
Summary
The insurer accepted a water damage claim and cash settled it but made no contingency for benchtop damage on removal. AFCA partly upheld the complaint, letting the complainant return funds for the insurer to repair, or keep the cash with a 25% contingency uplift, and rejected the mould complaint.
A cash settlement without a contingency uplift and without clear explanation of risks and loss of lifetime guarantee was unfair, though no evidence showed mould or that the benchtop must be replaced.
Issues
- Claim amount dispute primary · upheld
“the insurer did not include a contingency uplift; must pay 25% on total settlement of $16,421.62”
- Inadequate claim investigation secondary · not upheld
“no persuasive evidence to show there is mould contamination; remediation settlement not unfair”
- Failure to disclose secondary · unclear
“not clear whether the insurer adequately informed her of the risks of a cash settlement”
- Repairs or contractors secondary · upheld
“complainant should be given option to return funds and have the insurer undertake the repairs with lifetime guarantee”
Subjects and remedies
home or building damagepay compensationrepair or rectify
Text of the determination
Determination
|
Case number
|
12-25-324558
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-25-324558 2 July 2026
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy underwritten by the financial firm (insurer). She lodged a claim on 23 September 2025 for damage caused in the kitchen due to a leaking pipe behind the dishwasher.
The insurer accepted the claim. However, the kitchen benchtop must be removed to facilitate repairs to the kitchen cabinets. The complainant says removing the benchtop will damage it so it should be replaced. The insurer is not persuaded this damage will necessarily occur and will not pre-emptively provide cover for this.
The insurer cash settled the complainant for the cost of the repairs it says are fair. It proposes that the complainant undertakes the necessary work and says if the benchtop is damaged, it will consider an additional claim. The complainant is unhappy with this outcome. She also raised issues about mould remediation in the kitchen.
1.2 Issues and key findings
Is the insurer’s proposed settlement fair?
No. Whilst the complainant opted to receive a cash settlement, the insurer did not include a contingency uplift. Further, it is not clear whether the insurer adequately informed her of the risks of doing so. It is fair that the complainant be given the option to return the settlement funds and have the insurer undertake the repairs.
However, there is no persuasive evidence the settlement for mould remediation was unfair or unreasonable.
Why is the outcome fair?
The complainant should be permitted the option to have the insurer repair the damage. However, if she insists on undertaking the repairs herself, the insurer is required to pay a contingency uplift for the relied-upon quotes.
1.3 Determination
This determination is partially in favour of the complainant.
The complainant must be given the opportunity to have the insurer undertake the repairs. Therefore, she can:
· refund the money paid for the kitchen damage and the insurer can then undertake this work, subject a lifetime guarantee under the policy, or
· retain the money received, with the insurer to also pay a contingency uplift of 25% for the kitchen repairs, with the option for the complainant to return if the benchtop is damaged.
Either way, the insurer is not required to undertake any mould remediation, though it is required to pay a contingency uplift of 25% for the $4,580.40 paid for the remediation costs.
2 Reasons for determination
2.1 Is the insurer’s proposed settlement fair?
No. Whilst the complainant opted to receive a cash settlement, the insurer did not include a contingency uplift. Further, it is not clear whether the insurer adequately informed her of the risks of doing so. It is fair that the complainant be given the option to return the settlement funds and have the insurer undertake the repairs.
However, there is no persuasive evidence the settlement for mould remediation was unfair or unreasonable.
Complainant unhappy with the insurer’s resolution of the matter
The complainant says she went away for a few days and put her dishwasher on before she left. She returned to find part of the home flooded.
Water pooled in the kitchen cabinets. This was caused by a burst pipe in a wall behind the sink. Whilst the insurer agreed to cover the resultant damage, the parties disagree on some aspects of how this should be done.
The key concerns for the complainant are:
· the replacement the benchtop, noting it was not damaged by event (but might be when being moved) – the insurer has made no allowance for it
· the time necessary for the proposed repairs to settle, and
· mould treatment within the kitchen area.
The parties both agree the benchtop might be damaged when being moved to facilitate the necessary repairs to the cabinets. The insurer is of the view that the benchtop can potentially be removed without any ill effects. If this is done, it says there is no need to replace it.
The insurer paid the complainant $11,841.22 to for the kitchen damage. She elected to receive a cash settlement, rather than have the insurer do the work. The insurer says:
· as the benchtop is not damaged, it cannot settle the complainant for the replacement of it
· it will reconsider a claim for benchtop damage, should it occur during the removal process to facilitate the claim-related repairs
· any work done will need to be documented, with photos, and will be dependent on the work being assessed as fair and reasonable
· a ‘drying period’ for the restoration work to take will be required after the repairs are done.
Policy covers water damage resulting from a broken pipe
The policy comprises the policy schedule and the Product Disclosure Statement (PDS). The complainant does not dispute receiving these documents. Cover is limited to damage caused by specified insured events and does not extend to all damage.
Amongst these events is cover for ‘Water or other liquid damage’. This involves loss or damage ‘resulting directly from bursting, leaking, discharging or overflowing’ of certain items, including fixed pipes and domestic home appliances.
There is no dispute the claimed loss was caused by a sudden escape of liquid from a pipe servicing the dishwasher. The insurer agrees this is covered by the policy.
Experts acknowledge risk to benchtop with proposed removal
The insurer initially appointed builder WB to attend the home and quote the damage. It says WB provided an ‘unreasonably expensive scope of works’ (which was not provided to AFCA), so the insurer opted to involve a new repairer instead.
WB provided a report about the damage dated 9 October 2025. This acknowledged the water leak event but contained no specific commentary about what should be done. It also did not include a repair estimate. The complainant says WB informed her that the benchtop would need to be replaced as part of the required repair work.
The insurer chose to involve a new builder, MK. MK provided a report dated 28 October 2025, noting three kitchen cabinet doors and an oven drawer were damaged. It also wrote that other areas were damaged.
MK later prepared a report dated 11 November 2025, reviewing the benchtop. It agreed the ‘internal corner cabinet and sink cabinet is a one-piece unit’ and must be removed to undertake repairs. It acknowledged there was a ‘risk’ that the benchtop could be damaged in the process of it being removed. MK recommended a repair attempt be made and undertook to re-scope the work if the benchtop is damaged during its removal.
MK provided three repair quotes. The first two, dated 28 October 2025, totalled $11,841.22. These were to address the kitchen damage. The third quote, dated 5 November 2025, was for remediation costs totalling $4,580.40.
An undated letter from the complainant’s cabinet maker RK, noted that pulling out cabinets from under a benchtop ‘can cause all sorts of problems’. RK wrote that joins often break and can no longer be re-sealed properly, which can lead to future water damage. The splashback is also at risk. RK concluded:
once those joins are cracked, they’re never quite right again.
MK’s cabinet maker confirmed there was a ‘risk’ that the necessary removal of the benchtop to undertake repairs would mean it will be damaged.
Notwithstanding this, the insurer considers the benchtop can be safely removed and returned whilst other repairs are done. It did not quote for its replacement.
MK provided further reports dated 26 May 2026 and 9 June 2026 to assess the impact of any mould contamination. MK found no mould present and applied an ‘anti-microbial treatment to the affected areas’. It noted no further restoration work was necessary.
Not satisfied cash settlement option was appropriate in the circumstances
The insurer paid the complainant $11,841.22 for the kitchen damage on 1 November 2025. It later paid a further $4,580.40 for remediation costs on 5 November 2025.
Whilst the insurer informed the complainant it would consider any reasonable additional costs that would arise (including for replacing the benchtop), these were not included in the settlement. No contingency was made for any additional costs. The insurer says it is not required to pay for items which are not damaged.
I consider this approach problematic. It requires the complainant to undertake the work but does not guarantee that she will be reimbursed if the failure of the benchtop (or another problem) arises. The insurer has simply agreed to review it.
The complainant reportedly opted to accept the cash settlement. It is not clear why or what information she was provided about the ramifications of a cash settlement.
The policy gives the insurer the discretion to ‘reasonably’ determine when a cash settlement is paid. However, I am of the view a firm and acceptable scope of work should be established before this is done. I am not satisfied this was necessarily the case here.
In this instance, I note:
· the complainant expressed concerns about the removal of the benchtop and whether it can be done safely
· she says these concerns were shared by WB (though no written opinion on this was obtained)
· RK also considers the benchtop will likely be damaged, and
· MK’s cabinet maker acknowledged this was a ‘risk’.
The complainant has not suggested she has a preferred repairer to undertake the necessary work. She is also reluctant to do the work as she says she cannot afford to underwrite any additional costs which arise if the benchtop is damaged.
Given this, I consider a rethink of the settlement terms is warranted.
Fair that the complainant has option to get insurer to do the work
To resolve the matter, I consider it is fair that the complainant be given the option to return the settlement funds for the kitchen repairs ($11,841.22) to the insurer. The insurer can then arrange for MK (or another builder of its choice) to undertake this work.
This permits the complainant to have the security of being covered if the repairs ultimately require the replacement of the benchtop.
Should she elect not to permit the insurer to do the work, the complainant will then have to undertake this work at her own risk. In this situation, I am not persuaded the insurer is required to include the cost to replace the benchtop. As it has promised, it can review any such damage if it arises.
However, the insurer should have paid a contingency uplift as part of its cash settlement. Should the complainant elect not to have the insurer do the work, the insurer must pay a contingency uplift of 25% on the total settlement of $16,421.62. This is to reflect the transfer of risk and the loss of the lifetime guarantee under the policy.
It is not clear if these risks were explained to the complainant as part of accepting a cash settlement. Given the concerns over the method of repair, I consider they should have been.
Not satisfied the insurer is required to increase the restoration costs
The complainant raised concerns about a ‘mould and odour’ related issue in the kitchen. She has not shown there is mould damage. The complainant says MK took:
initial moisture readings when [it] first attended, however the actual drying process and follow-up monitoring didn’t occur at that time, and the cupboards and wall remained damp for weeks which is when the mould and odour developed. Because of that, I’m concerned [the insurer] is relying on a day-5 review process that wasn’t practically followed during the delays.
She later noted the insurer sent someone to review the mould issue about seven months after the claim. MK noted it found no mould issues and treated the relevant surfaces as a precaution. The complainant says the cupboards had dried out by this stage, so there was ‘no active mould to properly assess or treat’. She says MK ‘wiped down visible surfaces’ but did not inspect inside areas, such as the cupboards or behind the dishwasher.
As it stands, there is no persuasive evidence to show there is mould contamination in the home. The onus rests with the complainant to show there is damage present.
Even so, $4,580.40 was paid to her to attend to this work. I am satisfied the insurer must add a contingency uplift to its settlement for the remediation costs, as detailed above. I consider this is a fair settlement and the complainant can have any remaining concerns addressed privately.
2.2 Why is the outcome fair?
Should the insurer be able to repair the kitchen damage caused without damaging the benchtop, that will be a fair resolution of the claim. However, if the complainant insists on undertaking the repairs herself, the insurer is only required to pay a contingency uplift for the relied-upon quotes.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.