Home / Allianz Australia / Determination 12-25-324069

Determination 12-25-324069

Water damage claim: inadequate drying and mould remediation, cost of repairs and benefits payable

FirmAllianz Australia
Decided2026-05-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$29,761
Non-financial loss$6,300
Amount claimed—
SourceAFCA PDF

Summary

The insured's home was damaged by a burst hose and mould developed after inadequate drying by the insurer's repairers, making it uninhabitable. AFCA found for the complainant, ordering independent remediation, a builder's SOW with repair or cash settlement plus 20% uplift, accommodation, reimbursements, contents, interest and $6,300 non-financial loss.

The insurer's repairers inadequately dried and assessed the property and the insurer mishandled the claim, so fairness requires independent remediation, repair or cash settlement with uplift, reimbursement of costs and non-financial loss compensation.

Issues

Subjects and remedies

health or medicalhome or building damagethird party authoritypay claimpay compensationpay interestpay non financial lossreassess claimrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-324069 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-324069 7 May 2026 1 Determination overview 1.1 Complaint The complainant held a home and contents policy with the financial firm (insurer) in Victoria. The policy period was from 30 November 2024 to 30 October 2025. The buildings were insured for $850,000 (with an excess of $1,000) and contents were insured for $183,355 (with an excess of $1,000). The complainant lodged a claim for water damage which occurred on 4 September 2025. The water damage was the subject of initial inspections and some remediation by the insurer’s repairers, but the property was adversely affected by mould and became uninhabitable. The claims history since September 2025 is highly complex and the communications between the complainant and the insurer have been extensive. At the time of the claim, the complainant had a pre-existing medical condition for asthma and was under the care of a respiratory physician. According to reports from both his specialist and his general practitioner, the complainant was diagnosed with cancer in November 2025, has subsequently undergone chemotherapy and has a prognosis which is terminal within two years. In the circumstances, this determination has been expedited by the Australian Financial Complaints Authority (AFCA) and it is fair and appropriate for the claim to be resolved without further delay. The complainant authorised his sister to act on his behalf with the insurer regarding the claim and with AFCA regarding the complaint. For ease of reference, in this complaint the complainant and his sister are both referred to as the complainant. 1.2 Issues and key findings Has the insurer correctly assessed the claim? No. It is fair that the complainant’s claim be resolved on the basis set out in this determination and in accordance with the policy. Is the complainant entitled to non-financial loss compensation? Yes. It is fair for there to be an award of non-financial loss compensation. Why is the outcome fair? The outcome is fair because the complainant should have the option to choose whether the insurer repairs the property or pays him a cash settlement together with an uplift. An award of non-financial loss is also fair in the circumstances. 1.3 Determination The determination is in favour of the complainant. Within 28 days of receiving notice of the complainant’s acceptance of the determination, the insurer shall: · appoint an independent mould remediation specialist: > to inspect the property and prepare a report for the full remediation of the property together with sample testing from a NATA-accredited (National Association of Testing Authorities, Australia) laboratory > to engage the independent mould remediation specialist to perform a full mould remediation of the property > upon completion of the mould remediation, appoint the independent mould remediation specialist to prepare a second report together with further sample testing from a NATA-accredited laboratory to certify the property is safe for the commencement of repair works and human habitation · provide the names of three independent builders to the complainant · upon the provision of the names of the three independent builders, the complainant is to choose one builder and communicate his selection to the insurer in writing · within 14 days of receiving notice of the builder selected by the complainant, the insurer is to make suitable arrangements for the appointment of the builder to prepare a Statement of Works (SOW) > the new builder shall provide an estimate of the repair period > the new builder’s SOW shall include an actionable quote and detailed costing for all necessary repairs to the complainant’s property, including the cost of the replacement of: ‒ the vinyl floor ‒ the kitchen bench ‒ the replacement carpet ‒ the window furnishings > upon receipt of the new, independent builder’s SOW the insurer shall provide it to the complainant within seven days > upon receipt of the independent builder’s SOW, the complainant is to choose whether he wishes the insurer (at its cost) to engage the new, independent builder or to receive a cash settlement together with a 20% uplift and to communicate his choice to the insurer in writing ‒ dependent upon the complainant’s election, the insurer shall either: > engage (at its cost) the new, independent builder to complete the repairs works based upon the new builder’s SOW > or, alternatively, cash settle the complainant for the cost of the repair works based on the new builder’s SOW plus a 20% uplift for contingencies and the loss of the lifetime guarantee within seven days of receiving notice of the complainant’s election for a cash settlement > arrange and pay for temporary accommodation as close as possible to the complainant’s property: > from the date of the complainant’s acceptance of this determination (including the estimated repair period by the new builder) until the repair works are completed · pay the complainant for: > MP’s report in the amount of $6,710.00 > AS’s invoice in the amount of $2,024.00 · pay the complainant electricity expenses in the amount of $377.61 · pay the complainant: > for storage boxes in the amount of $97.15 > for a water vacuum cleaner in the amount of $265.14 · pay the complainant for the cost of the replacement of the: > lounge suite in the amount of $5,499.00 > dining suite in the amount of $4,732.00 > main queen mattress in the amount of $2,879.55 > bed 2 double mattress in the amount of $2,591.55 > bed 3 double mattress in the amount of $2,591.55 · engage removalists and a storage facility to remove and pay for the removal and storage and return of the complainant’s contents from the date of the complainant’s acceptance of this determination (including the estimated repair period by the new builder) until the repair works are completed · pay the complainant interest under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) on the cost MP’s report in the amount of $6,710.00 and AS’s invoice in the amount of $2,024 from 1 December 2025 until those amounts are paid by the insurer > pay the complainant $6,300 for non-financial loss compensation. The complainant shall provide access to his property to the insurer’s representatives, the independent mould remediation specialist, and the independent builder to conduct the necessary inspections, testing and repair and rebuilding works until their completion. 2 Reasons for determination 2.1 Has the insurer correctly assessed the claim? No. It is fair that the complainant’s claim be resolved on the basis set out in this determination and in accordance with the policy. Complainant had cover for water damage It is established insurance law that the complainant has the onus to establish the claimed loss is a result of an event covered under the policy during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. The terms and conditions of the policy are set out in the Products Disclosure Statement (PDS) and the Policy Schedule (the Schedule) (the policy). I am satisfied that the insurer provided the policy to the complainant. If the complainant establishes a valid claim, the onus shifts to the insurer to establish, on balance, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. The complainant had cover for water or other liquid damage (page 18). The policy provided a lifetime guarantee Under the General Insurance Code of Practice, where an insurer has selected and directly authorised a repairer to repair damaged property, the insurer must accept responsibility for the quality of their work and the materials they use. Policy provided cover for alternative accommodation The policy provided cover for alternative accommodation (page 28) where the damage caused by an insured event was such that the property could not be lived in. The benefit was based on weekly rental costs equivalent to the complainant’s property’s rentable value prior to the damage up to 10% of the building sum insured – an amount of $85,000 up to a maximum of 12 months. Policy provided cover for contents The policy provided cover for contents damaged by an insured event. For the purposes of the policy, carpets and loose floor coverings were defined as contents (page 33). Policy provided contents storage The policy provided a benefit for contents storage when the building was damaged by an insured event and could not be lived in (page 39). The insurer was obliged to pay the reasonable costs to move and store contents while the building was repaired for the time necessary to repair up to a maximum of 12 months. Policy provided how the claim was to be settled The policy provided (page 61) that the insurer was to settle the claim based on the reasonable cost of repairing or rebuilding the damaged parts of the building to the same condition as when it was new. Complaint relates to cost of repairs and benefits to be paid The complainant’s home was damaged by water escaping from a hose in a bathroom cabinet on 4 September 2025. The insurer has not disputed that the complainant has made a valid claim for water damage under the policy. The complainant and the insurer are in dispute regarding the cost of repair works and the benefits to be paid. The following summary is provided to explain the further steps to be taken and provide relevant background to those steps and the terms of this determination. As referred to in section 3.1 of this determination in more detail, there has been a full exchange of relevant information by both parties. Each party has had the opportunity to address any issues raised and all the information the parties have provided has been reviewed and considered. This determination is restricted to the issues that are relevant to the outcome. Insurer’s repairers did not adequately dry out the property After the claim was made the insurer engaged AC, restoration technician, and EC, restoration technician, to perform repairs and prepare reports. On 17 April 2026 the insurer acknowledged that: [AC] and [EC were] restoration technicians whose primary role involve[d] conducting moisture readings and performing restoration tasks. While they [were] experienced in restoration work, their qualifications [were] limited to general moisture assessments and basic remediation processes. AC’s Inspection Report (based on an inspection on 5 September 2025) recorded: · a hot water flexi hose burst under the vanity of the rear bathroom · the hot water had flooded through every room of the house to some degree except for the garage · as it was hot water the moisture had been able to permeate through the building materials faster creating more damage and wet walls · the hot water had destroyed the back of the vanity in the bathroom > it removed the wet carpet, underlay and smooth edge from the three bedrooms and the lounge that was non-restorable due to the damage · all other areas had a vinyl floor that had started to bubble in several areas · the vinyl floor was non-restorable due to the bubbling but as it was glued down and it would take some time to remove and would require specialised tools · the vinyl had been installed on top of another vinyl that may require additional time to remove the two layers of material · technicians would carry out a bulk dry and drying to the walls in the vinyl areas, but restorers would need to supply separate costings for the flooring removal and drying of the subfloor · any built-in cabinetry that had been affected would need the kickers cut into to ensure that any moisture under them can dry · the kitchen and bathroom vanities all had swollen timbers that a builder would need to assess · most contents were okay but technicians would need to re-assess them at the completion of the drying · as an example of the assessments made of the lounge, bedroom 2 and bedroom 3 and bedroom 1, these included: > moisture meter readings and photographs and thermal images being taken > furniture had been moved > non-restorable carpet had been removed > affected areas had been HEPA vacuumed (HEPA meaning High-Efficiency Particulate Air) > antimicrobial chemicals had been applied to affected areas > drying equipment had been installed to aid the drying process. AC’s Property Report (based on an inspection on 9 September 2025) recorded: > the damage was consistent with a sudden and unexpected burst in the bathroom sink from the flexible hose, resulting in damage to the property · water had spread from the bathroom to the rest of the house · the vinyl floor was damaged with moisture was trapped under the floor · carpet in all bedrooms and walk-in robes was water damaged > water had been running for about 45 minutes until the complainant noticed it. AC’s Leak Location Report (based on an inspection on 9 September 2025) recorded: · there was swelling and damage to cabinetry in the bathroom and kitchen and swelling and damage to skirting boards, architrave and door jams throughout the property > the cause of the damage was due to a burst hot water flexible hose underneath the basin vanity which ruptured causing water to spread throughout the property. According to the complainant’s diary notes, thirteen fans and three humidifiers were installed by the insurer’s repairers on 5 September 2025 and two extra fans were installed on 9 September 2025. On 12 September 2025 four fans were still running and those fans were removed on 15 September 2025. On 22 September 2025 the insurer offered a cash settlement by email from the insurer to the complainant (sent by the insurer at 10:31am) based on AC’s scope of works in the amount of $28,123.21 dated 11 September 2025 (less the policy excess). Alternatively, the insurer advised it could ask the builder if the builder could facilitate repairs. The complainant did not accept the cash settlement offer or accept the insurer’s offer for the builder to conduct the repairs. According to the complainant’s diary notes: · on 25 September 2025 he started to smell mould in the main bathroom, main toilet and ensuite · on 26 September 2025 the insurer arranged for EC to attend and two more fans were installed > on 9 October 2025 representatives from AC and EC attended and taped the main toilet door and EC advised that it would return to the property after obtaining approval from AC to perform further investigations. AC’s Restoration Report (based on an inspection on 26 September 2025) recorded: · the complainant had removed skirting boards prior to arrival · the complainant had discovered microbial growth on backing of skirting boards · AC removed affected skirting boards from site for disposal · it conducted invasive/non-invasive moisture readings to the area which concluded: > moisture readings taken to the plaster wall linings indicated the wall linings were within dry standards > moisture readings taken to the tiled flooring indicated the flooring was holding elevated moisture levels > drying equipment installed in neighbouring rooms would assist with the drying process > it treated this area with antimicrobials at completion of works · it recommended further actions: > XS to re-attend in three days to monitor drying equipment > inspection holes to be cut on the back wall of the toilet to assess the bath hob and complete SOW · it installed: > 1 dehumidifier to assist with the drying process in the bathroom > 1 AFD (Air Filtration Device) to assist with the drying process in the toilet · importantly, it concluded: Please note, although there [was] microbial growth present in the plaster walls in this area, it could not be contained as the entire room would require containment, however the [complainant needed] to use this ensuite as this [was] the only toilet he can currently have access to (other toilet area has been contained). Complainant engaged repairer to remove floor and own remediation specialist The complainant arranged (at his own cost) for the removal of vinyl floor (56 square metres) by a repairer, AS, on 19 October 2025 at the cost of $2,024.00. The complainant also engaged (at his own cost) a mould remediation specialist, MP, to prepare a report (16 pages, based on an inspection on 17 October 2025) and a scope of works. MP concluded: · the home required extensive, immediate remediation work · that the home should not be occupied until remediation was completed · temporary accommodation should be provided to the complainant > that its itemised breakdown of costs of the remediation works was $151,360. The report from MP was based on environment testing which had been performed by EU on 15 October 2025. The cost of MP’s report was inclusive on 20 air samples at $300/ sample plus an inspection fee of $100 – a total of $6,710.00. In recorded phone conversations between the insurer’s representative and the complainant: · on 20 October 2025 the complainant advised that: > despite 18 fans being installed, the drying of the property was not sufficient > the leaking hose had been fixed immediately > the insurer’s repairer, AC, was not a qualified mould specialist in the opinion of the complainant > mould was visible at the property · on 21 October 2025 the complainant advised that: > the property was now a ‘mould disaster’ and was uninhabitable. Insurer’s repairers concluded mould was visible but submitted final report On 24 October 2025 AC prepared a ‘Moisture – Certificate of Completion’ which: confirmed that the following works had been carried out at the affected property · the property was of a dry standard and the following moisture readings had been taken: > toilet 16.0 Protimeter Moisture Meter > ensuite 7.8 Protimeter Moisture Meter > bathroom 13.5 Protimeter Moisture Meter. On 24 October 2025 AC prepared a Post Remediation Evaluation Checklist which recorded: · ‘visible microbial growth (mould) through areas’ > the report was submitted ‘as a final as requested by supervisor as [complainant] is cash settling’. On 24 October 2025 AC completed a ‘Sanitation – Certificate of Completion’ which recorded that the property had been sanitised with antimicrobial sanitiser in the bathroom, ensuite and other locations. Complainant questioned adequacy of repairs and sought cost of remediation On 27 October 2025 the complainant informed the insurer: · the handling of the claim for damage had been unsatisfactory · of the non-attendances, significant delays, lack of communication and coordination of services and numerous errors in areas such as measuring dimensions · that there had ‘been a complete lack of thorough investigation of the [water] damage and potential development of mould. [The complainant had] questioned those who ha[d] attended his property about the removal of skirting boards to check for mould, the removal of vinyl flooring to check for mould along with appropriate wall plaster cuts in various affected rooms to assess for mould and water damage pertaining to the structural framing. This ha[d] not occurred despite his questioning and concerns’. · EC was not a professional and registered mould assessment, investigation and treatment company and that, as a result: > ‘other than some initial drying with fans in the early stages and inadequate assessment combined with lengthy delays in monitoring the property, it [was] not surprising that a high level of mould has developed in most of the home’ > ‘early professional mould assessment, investigation and treatment from the beginning of this event may have averted the extent of the damage that ha[d] now occurred due to significant mould levels in the property > the ‘lack of investigation and monitoring (with no formal air testing and laboratory testing of mould levels) ha[d] meant that [complainant] has had to reside in a home with significant odours coming from the high mould levels and therefore had] suffered considerable exposure to this for a number of weeks · the complainant suffered from severe asthma and was under the care of a respiratory physician prior to the event · the day after the event some carpet was partially removed from the bedrooms and lounge room but no vinyl flooring was removed (which constituted the majority of the home’s flooring area) where vinyl flooring was well known to harbour moisture and water · fans for drying commenced on 5 September 2025 but there was no assessment for the potential or existing mould that had gradually developed to very high levels rendering the property uninhabitable · seven days after the fans were removed a significant odour developed in the ensuite, main bathroom and main toilet · he sought reimbursement of the cost of both MP’s report and AS’s invoice > based on the report from MP, the extent of works required to repair the damage to the property was significantly more than allowed for in the settlement offer provided based on AC’s repair quote dated 11 September 2025. Insurer disputed MP’s quote in the absence of further inspection of the property On 4 November 2025 the insurer’s claim notes recorded that its internal assessor acknowledged the insurer was ‘not qualified to comment on works required... [it did] not have anyone in [the insurer’s] team who [could] validate the [complainant’s] quote accurately... [and it recommended that the insurer] engage a hygienist [as an] alternative option’. On 20 November 2025 the insurer advised the complainant that given the differing opinions between AC’s and MP’s report, the insurer had appointed a specialist hygienist to review all reports and attend the property to provide their own, independent report on the mould / restoration that may be required. On 20 November 2025 the complainant advised the insurer that access to the property for the insurer’s second hygienist to attend would not be provided until the accounts from AS and MP were paid by the insurer. On 21 November 2025 the insurer apologised for the complainant’s claims experience to that date. The insurer advised that it would appoint a suitably qualified hygienist to reinspect the property and provide a causation report and a detailed scope for the mould remediation. On 21 November 2025 the complainant advised that the investigation by MP should be sufficient. On 23 November 2025 the complainant said that the insurer’s SOW did not include mould assessment, undermeasured the flooring area and did not include repairs to kitchen cabinetry. On 24 November 2025 the complainant advised the insurer that the insurer’s hygienist, RI, (who the complainant said had contacted the complainant) was not acceptable because it was not NATA registered. On 25 November 2025 the insurer advised the complainant that it would not be reimbursing the AS and MP invoices until it had completed its assessment and that RI had been engaged to prepare an independent hygienist report. On 13 January 2026 the insurer advised the complainant: · building repairs would cost: > $28,123.21 for building repairs (based on the SOW from AC) > $16,387.80 for restoration (based on a Scope of Restoration by AC) > it recommended RI to perform the mould remediation. The complainant said on 27 January 2026 that he disputed having received notification from the insurer of the quote for $16,387.80 for restoration until was provided on 13 January 2026. The Scope of Restoration was dated 22 September 2025 at 5:01pm. That time was after the cash settlement offer had been made by the insurer to the complainant in the insurer’s email sent on that day at 10:31am. In any event, the cash settlement offer dated 22 September 2025 did not expressly include that additional amount. Further, the complainant did not, and has not, accepted a cash settlement offer and has maintained that the cost of repairs was the amount recorded in MP’s Report. On 27 January 2026, and despite his earlier refusal to permit the insurer accessing the property from 20 November 2025, the complainant said that access would be granted to the insurer as soon as possible to a qualified independent hygienist. On 23 March 2026 the insurer advised that its builder was ready to commence repairs. On 17 April 2026 the insurer said that the quote from MP was excessive: · the use of 10 air scrubbers for 21 days at a cost of $25,200 (plus GST) was excessive for a residential property, especially given that the affected rooms were not particularly large or complex > the labour costs for HEPA vacuuming, quoted at $8,640 (plus GST) per session for three technicians working 48 hours appear were inflated · the anti-microbial application, quoted at $17,280 (plus GST) for the same labour setup, also raised questions, as applying anti-microbial chemicals typically did not require such extensive hours or multiple technicians · the cost for non-porous content treatment, quoted at $2,880 (plus GST), and timber treatment for microbial growth, quoted at $1,440 (plus GST), lacked clarity regarding the necessity and scope of these tasks · the bathroom rebuild cost quoted at $30,810 (plus GST) was excessive when compared to the AC quote. While MP included stripping the bathroom to the bare frame, waterproofing, and tiling, the cost was disproportionately high for a single bathroom rebuild · overall, the MP quote was expensive because it included excessive use of equipment, inflated labour costs, and tasks that may not be necessary or could be streamlined · it refused to provide a quote using MP’s scope of works > it also agreed to further mould assessment but wanted the samples sent to a NATA accredited laboratory for testing. Uplift to be added to cash settlement When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. There may also be additional works identified once repairs begin. When the insurer settles a claim by paying the cost of repairs, it transfers these risks to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power. AFCA considers that if an insurer cash settles a claim, it should generally pay an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs. Based on the available information, a reasonable allowance for the transfer of risk is 20%. Accordingly, based on the information it is fair that the insurer should pay a 20% uplift in the event that, at the complainant’s election, the insurer cash settles the complainant’s repairs. Independent mould specialist and builder to be appointed There is no dispute that the damage to the property was extensive. The remediation works conducted by the insurer’s technicians, AC and EC, did not adequately assess the extent of the damage or ensure that the property was remediated effectively. Based on the exchanged information, extensive mould developed after the accepted water damage which made the property uninhabitable. The complainant’s expert’s report from MP was detailed and persuasive that the property was uninhabitable by not later than 17 October 2025 and that the home required extensive, immediate remediation work. The complainant did not accept, and has not accepted, a cash settlement. The insurer’s repairers appear to have ceased further work on 24 October 2025 on the basis that a cash settlement had been agreed to (when it had not been accepted by the complainant). The property had visible microbial growth throughout on 24 October 2025 as recorded by the insurer’s own technicians. The complainant required medical treatment from 3 November 2025 and has not returned to live at the property since that time. The complainant and the insurer both agreed in 2026 that an independent mould remediation specialist should be engaged to investigate and report upon the necessary steps for a full remediation of the property together with sample testing from a NATA-accredited (National Association of Testing Authorities, Australia) laboratory. It is fair and appropriate that that occur without further delay. The complainant refused to provide access to the property from 20 November 2025 until 27 January 2026 unless payment of MP and AS’s accounts was paid by the insurer. Whilst the insurer should have paid those invoices, it was not appropriate for the complainant to refuse access to the property by the insurer or its representatives. The complainant’s subsequent agreement to allow access was appropriate. The insurer should then have re-inspected the property. It was not appropriate for the insurer to seek to challenge the report from MP on 17 April 2026 (two and one half months after the complainant had agreed to provide access) when it had not re-attended the property and it had acknowledged that its internal assessors were not qualified to comment on the works required and it recognised in early November 2025 that a specialist hygienist should be engaged to be able to ‘validate’ the complainant’s expert’s quote. The insurer’s quote from AC was the basis upon which it offered to settle the claim on 22 September 2025 based on AC’s scope of works in the amount of $28,123.21 dated 11 September 2025 (less the policy excess). AC’s quote is now dated and the extent of the repairs was identified by the complainant’s technicians to be more extensive in reports prepared after 11 September 2025. Further, MP’s quote is now also dated and it is important that an actionable quote regarding the full cost of all necessary repairs is prepared to enable a fair assessment of the repairs to be performed or, alternatively, a cash settlement to be paid to the complainant. In the circumstances, it is fair that the insurer engage a new, independent builder at its cost to prepare a SOW, inclusive of an actionable quote. In the circumstances, it is fair for an independent mould remediation specialist to be engaged by the insurer (at its cost) and an independent builder to be engaged as follows: Within 28 days of receiving notice of the complainant’s acceptance of the determination, the insurer shall: > appoint an independent mould remediation specialist: > to inspect the property and prepare a report for the full remediation of the property together with sample testing from a NATA-accredited (National Association of Testing Authorities, Australia) laboratory > to engage the independent mould remediation specialist to perform a full mould remediation of the property > upon completion of the mould remediation, appoint the independent mould remediation specialist to prepare a second report together with further sample testing from a NATA-accredited laboratory to certify the property is safe for the commencement of repair works and human habitation · provide the names of three independent builders to the complainant · upon the provision of the names of the three independent builders, the complainant is to choose one builder and communicate his selection to the insurer in writing · within 14 days of receiving notice of the builder selected by the complainant, the insurer is to make suitable arrangements for the appointment of the builder to prepare a Statement of Works (SOW) > the new builder shall provide an estimate of the repair period > the new builder’s SOW shall include an actionable quote and detailed costing for all necessary repairs to the complainant’s property, including the cost of the replacement of: ‒ the vinyl floor ‒ the kitchen bench ‒ the replacement carpet ‒ the window furnishings > upon receipt of the new, independent builder’s SOW the insurer shall provide it to the complainant within seven days > upon receipt of the independent builder’s SOW, the complainant is to choose whether he wishes the insurer (at its cost) to engage the new, independent builder or to receive a cash settlement together with a 20% uplift and to communicate his choice to the insurer in writing ‒ dependent upon the complainant’s election, the insurer shall either: > engage (at its cost) the new, independent builder to complete the repairs works based upon the new builder’s SOW > or, alternatively, cash settle the complainant for the cost of the repair works based on the new builder’s SOW plus a 20% uplift for contingencies and the loss of the lifetime guarantee within seven days of receiving notice of the complainant’s election for a cash settlement The complainant shall provide access to his property to the insurer’s representatives, the independent mould remediation specialist, and the independent builder to conduct the necessary inspections, testing and repair and rebuilding works until their completion. Insurer to pay for complainant’s mould remediation specialist AFCA provides a no-cost dispute resolution service to complainants and they usually have responsibility for their own complaints and any claims handling costs. AFCA Rule D.5.1 provides that AFCA may decide that the insurer is to contribute to the legal or other professional costs or travel costs incurred by the complainant in the course of the complaint. AFCA Rule D.2 provides that unless special circumstances apply, AFCA will not require the insurer to contribute more than $5,000 to these costs. The complainant engaged MP on 20 October 2025. On 17 April 2026 the complainant said that he was forced to engage MP due to the inadequate mould assessment and remediation when the mould odour became unbearable and he developed throat irritation and aggravation of his pre-existing asthma. The insurer has at all times declined to pay for MP’s invoice. Based on the information provided, it is fair for the insurer to pay for the professional costs of the complainant obtaining MP’s Report. I am satisfied that there are exceptional circumstances for the full amount of the cost of MP’s Report to be paid (not limited to $5,000) because the comprehensive number of air samples taken and tested were appropriate given the extent of the water damage to the property and that MP’s conclusion that the property was uninhabitable was not disputed by the insurer. Accordingly, it is fair for the insurer to pay the complainant $6,710.00 for MP’s Report. Insurer to pay for removal of vinyl floor On 27 January 2026 the complainant again sought the repayment of the cost of AS’s invoice for $2,024 dated 19 October 2025 for the removal of the vinyl floor. On 17 April 2026 the insurer advised AFCA that it was in the process of paying the invoice. If the insurer has not already done so, the insurer shall pay the complainant the amount of $2,024 for AS’s invoice for the cost of the removal of the vinyl floor. Temporary accommodation to be paid by the insurer The insurer has paid for some temporary accommodation since the claim was made. In a recorded phone conversation between the insurer’s representative and the complainant on 31 October 2025 the complainant advised that the temporary accommodation should cease from 3 November 2025 due to the complainant having medical surgery. The insurer agreed to the complainant’s request and the temporary accommodation was put on hold. The complainant has not returned to his home since 3 November 2025 and has resided, with the support of his sister, at her home. On 20 February 2026 the complainant said he needed to attend his property on a regular basis to do property maintenance and that he also had pet budgies at his property requiring ongoing care. The complainant said it was too much for him to drive one and a quarter hours each way from his sister’s home and return in a day. He said it was not possible for him to continue to be located at his sister’s home given his health issues and be expected to allow contractors into the property without being located in alternative accommodation near the property. The complainant said that on a very few occasions he had spent the night at a hotel to enable visits to the property for maintenance work to be undertaken and he requested reimbursement for travel between his sister’s home and the property. On 23 March 2026 the insurer: · requested invoices for nights spent by the complainant at a motel if they were not included in the temporary accommodation it had already paid · it requested invoices regarding fuel reimbursement for travel > it recommended that the complainant secure a rental agreement > it would not pay above the policy limit and that the remaining amount of the alternative accommodation benefit was $77,227.51 or 344 days (based on 21 days used). The damage occurred in September 2025. MP’s Report recorded that the property was uninhabitable in October 2025. The insurer has had the benefit of not paying temporary accommodation during the period after the complainant’s hospitalisation in November 2025 as a result of the complainant’s sister’s support. In the circumstances, the insurer should not be entitled to impose the policy limit (a further 344 days or a total of $77,227.51) if the inspections, remediation and repairs exceed that duration or total. It is fair in the circumstances for the insurer to arrange and pay for alternative accommodation close to the complainant’s property from the date of the complainant’s acceptance of this determination (including the estimated repair period by the new builder) until the repair works are completed. Electricity expenses to be paid by the insurer The complainant has requested that the insurer pay for additional electricity expenses (based on invoices provided by the complainant) totalling $377.61, principally due to the running of drying equipment. It is fair for the insurer to pay for the complainant’s additional electricity expenses in the amount of $377.61. Insurer to pay for cost of repair of vinyl floor On 25 January 2026 the complainant sought $5,380 for the cost of replacement of the vinyl floor. The cost sought was supported by a quote from CW dated 16 October 2025 but did not include floor preparation costs. The cost of the replacement of the vinyl floor is to be included in the new builder’s SOW and it is not appropriate for an amount to be paid in the absence of an assessment by the new builder. Insurer to pay for cost of repair of kitchen bench On 25 January 2026 the complainant sought $4,180 for the cost of replacement of the kitchen bench. The complainant also provided a report from CR, engineer, dated 21 January 2026 (based on an inspection on 6 November 2025) which recommended that the kickers and the kitchen bench top should be removed and replaced as part of the remedial works to the property but which had not been addressed in the MP report. The cost of the replacement of the kitchen bench is to be included in the new builder’s SOW and it is not appropriate for an amount to be paid in the absence of an assessment by the new builder. Insurer to pay for cost of replacement carpet On 25 January 2026 the complainant sought $4,658.00 for the cost of replacement of the replacement carpet. The quote from MP was inclusive of the cost of removing all floor coverings. The cost sought was supported by a quote from CW dated 16 October 2025. The cost of the replacement of the carpet is to be included in the new builder’s SOW and it is not appropriate for an amount to be paid in the absence of an assessment by the new builder. Insurer to pay for cost of repair of new window furnishings On 25 January 2026 the complainant sought $2,065 for the cost of replacement of new window furnishings. The quote from MP was inclusive of the cost of removing all window coverings. The cost sought was supported by a quote from DC dated 19 January 2026. The cost of the replacement of the window furnishings is to be included in the new builder’s SOW and it is not appropriate for an amount to be paid in the absence of an assessment by the new builder. Insurer to pay for some further items claimed On 27 January 2026 and 20 April 2026 the complainant sought reimbursement of the cost of additional items: · storage boxes for the removal of electrical goods subject to mould damage - $97.15 > a water vacuum cleaner - $265.14. The complainant incurred these costs at the time of the damage and in seeking to mitigate further damage. It is fair for the insurer to pay for those costs. The insurer shall pay the complainant: · for storage boxes in the amount of $97.15 · for a water vacuum cleaner in the amount of $265.14. Insurer to pay for damaged contents On 27 January 2026 the complainant sought the cost of damaged contents: · lounge suite - $5,499.00 – based on an email from LW dated 22 January 2026 · dining suite - $4,732.00 – based on a quote from DN dated 22 January 2026 · main queen mattress - $2,879.55 · bed 2 double mattress - $2,591.55 > bed 3 double mattress - $2,591.55. The complainant said that each of the mattresses had mould within them and that their replacement was recommended by MP. The policy provided (page 62) that ‘the reasonable cost of repair or replacement [was] the retail price of the item as if it were new’. In the circumstances, it is fair for the insurer to pay for the cost of the replacement of the: · lounge suite in the amount of $5,499.00 · dining suite in the amount of $4,732.00 · main queen mattress in the amount of $2,879.55 · bed 2 double mattress in the amount of $2,591.55 > bed 3 double mattress in the amount of $2,591.55. Insurer to pay for storage and removal On 27 January 2026 the complainant sought the costs of storage while the house was being repaired: · removalist ($220/ hour for 8 hours) $1,760.00 · storage unit (6m x 3m Unit - 6 months $600/ month) $3,600.00 > removalist ($220/ hour for 8 hours) $1,760.00. The policy provided a benefit for contents storage and the insurer is obliged to pay the reasonable costs to move and store undamaged contents while the property is repaired for the time necessary to repair up to a maximum of 12 months. It is fair for the insurer to engage removalists and a storage facility to remove and pay for the removal and storage and return of the complainant’s contents from the date of the complainant’s acceptance of this determination (including the estimated repair period by the new builder) until the repair works are completed. Interest is payable under section 57 of the Insurance Contracts Act Section 57 of the Act says that an insurer must pay interest on a benefit: commencing on the day as from which it was unreasonable for the insurer to have withheld payment AFCA has a published an Approach to Awarding Interest in Insurance, which says: Interest is payable from the date it was unreasonable for the financial firm to have withheld payment of the amount it was liable to pay. This will usually be: • the date the claim was denied • if there has been an unreasonable delay before the financial firm denied the claim – an earlier date that is considered reasonable; or • the date when the benefit was due to be paid under the policy (for example after the expiry of a waiting period in an income protection policy). AFCA may also take into account other factors, such as whether a consumer has unreasonably failed to provide information reasonably requested by the financial firm. In the circumstances, the insurer should have paid the cost of MP’s Report and AS’s invoice by 1 December 2025 and it was unreasonable for the insurer to have not made payment for those amounts at that time. Accordingly, the insurer should pay the complainant interest under section 57 of the Act on the cost on MP’s report in the amount of $6,710.00 and AS’s invoice in the amount of $2,024 from 1 December 2025 until those amounts are paid by the insurer. 2.2 Is the complainant entitled to non-financial loss compensation? Yes. It is fair for there to be an award of non-financial loss compensation. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss in relation to a complaint lodged after 1 January 2024. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer must pay non-financial loss compensation In the circumstances of the complaint, it is not productive, and not fair to the parties, to traverse each aspect of the protracted claims history and the extensive number of communications. It is fair and appropriate to seek to progress the resolution of the complaint and the claim, including a fair assessment of non-financial loss compensation, without further delay bearing in mind the complainant’s personal circumstances. As referred to in section 3.1 of this determination, all the information the parties have provided has been reviewed and considered On 21 November 2025 the insurer apologised for the complainant’s claims experience to that date. It did make, and has not made, any offer of non-financial loss compensation. However, the complainant has experienced extensive inconvenience due to the inadequacy of the initial repairs. Further, he has been delayed in his return to his home. He will also experience further inconvenience during the period in which the remediation and repair works are conducted. The complainant has been able to live with his sister for an extensive period. He will be required to live in alternative accommodation during a convalescent period whilst the remediation and repair work is completed. The complainant has had to, and will continue to, endure that experience and inconvenience, rather than the comfort of his own home. Based on the exchanged information, the complainant has suffered an extensive degree of stress, delay and inconvenience as a result of the insurer’s poor claims handling. In the circumstances, it is fair for the insurer to pay the complainant $6,300 in non-financial loss compensation. 2.3 Why is the outcome fair? The outcome is fair because the complainant should have the option to choose whether the insurer repairs the property or pays him a cash settlement together with an uplift. An award of non-financial loss is also fair in the circumstances. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.