Home / IAG / Determination 12-25-323350

Determination 12-25-323350

Claim denial for earthquake and flood damage to a rental property, insurer said damage was long-term and excluded

FirmIAG
Decided2026-04-28
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded—
Non-financial loss$3,000
Amount claimed$161,000
SourceAFCA PDF

Summary

Landlords' claim for earthquake and flood damage to their rental property was denied as long-term damage. AFCA found the flood was the dominant cause, required the insurer to settle the claim by repair or cash settlement with a 20% uplift, reimburse makesafe costs with interest, and pay $3,000 non-financial loss.

On the balance of probabilities the flood caused the damage, and the insurer did not establish that any exclusion applied.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-323350 | Financial firm | Insurance Australia Limited Case number: 12-25-323350 27 April 2026 1 Determination overview 1.1 Complaint The complainants lodged a claim with the financial firm (insurer) under their landlord insurance policy. The property had sustained damage from an earthquake in April 2025 and flood after heavy rains in May 2025. The insurer denied the claim on the basis the damage was not caused by an insured event. It says the damage had been occurring over a long period by causes excluded under the policy. The complainants seek the insurer to accept the claim and pay compensation for its claim handling. 1.2 Issues and key findings Is the insurer entitled to deny the claim? No. The complainants have established a claimable loss under the policy. On the balance of probabilities, the damage was caused by the flood. The insurer has not shown the claimed damage had been occurring over a period or that an exclusion applies to deny the claim. Is the insurer required pay compensation? Yes. The insurer’s claim handling caused stress and inconvenience to the complainants. The complainants had to arrange additional makesafe to protect the property and the tenant’s young family because the insurer failed to arrange the required makesafe in a timely manner. Why is the outcome fair? The parties are bound by the policy terms and conditions. It is fair the insurer is held liable to cover a loss which falls within the scope of the policy. 1.3 Determination This determination is in favour of the complainants. Within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to settle the claim as detailed in section 2.1 and pay $3,000 non-financial loss compensation. 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? No. The complainants have established a claimable loss under the policy. On the balance of probabilities, the damage was caused by the flood. The insurer has not shown the claimed damage had been occurring over a period or that an exclusion applies to deny the claim. Complainants must establish a claimable loss When making a claim, the complainants have the initial onus of establishing they suffered a loss for which the insurance policy provides cover. The complainants must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim. Policy cover is subject to terms and conditions The policy covers loss or damage caused by an earthquake, storm, rainwater runoff and flood. The policy also covers landslide or subsidence that happens within 72 hours of a storm, flood or rainwater runoff. The policy excludes cover for loss, damage, liability, injury or death caused by or arising from: · erosion, deterioration, collapse, shrinkage or earth movement · rust, corrosion, gradual deterioration, depreciation, wear or tear · previous damage that has not been repaired · the complainants not maintaining the rental property in good repair and condition including not ensuring the rental property is watertight, structurally sound, secure and well- maintained · for the settling, shrinkage or expansion in any buildings, foundations, walls or pavements. The policy also excludes cover for any loss, damage, liability, injury, or death caused by or arising from mould (except as a direct result of water damage covered under insured events), fungi, mildew, change in colour, dampness, variations in temperature, evaporation, disease, inherent vice or latent defect, loss of weight, or change in texture or finish. Parties provided different views on the cause of the loss The complainants say: · the current tenants only moved into the property in March 2025. At this time, there was no evidence of any spongy effect and movement to the flooring, popping tiles or waterproofing issues · they strongly disagree the damage to the property has been occurring over a long period · their builder SS and quote from a pier specialist have confirmed the damage caused to the property is a direct result of the recent storm events and the existing drainage is adequate · the pier specialist also mentioned that the make safe works that were completed underneath the bathtub area was unsatisfactory. The insurer’s failure to arrange necessary makesafe works to the home resulted in further damages that could have been prevented · the insurer did not formally respond to her request for the claim to be considered under the insured event earthquake that hit the area on 23 April 2025 followed by the torrential rain and flooding events. The insurer says: · its engineer SC reported that the claimed damages did not arise from any listed event (ie flood). SC’s supplementary report concluded the claimed damages did not arise from the earthquake · the reporting shows the damage arose from the ground under the home being lower than the surrounds, allowing water to pool under the house. As there was excessive moisture under the house, the particle board flooring (which does not have a waterproof membrane) has deteriorated and lost some of its strength. There is also mould grown on the underside of the home · the available evidence demonstrates the damage arose from excessive moisture in the subfloor ground. Further, the dampness of the subfloor area documented strongly suggests the drainage issues raised are valid and causative of the loss, as opposed to the storm the complainants are claiming for · a makesafe cannot be expected to install timbers to support particleboard that is degrading, given this issue extends throughout the home. The carpenters placed additional timbers in to support the bathroom, which was a concern the tenant raised when they were present. Insurer not entitled to deny the claim On 10 June 2025, the complainants lodged the claim with the insurer: REA advised after recent flooding approx. two weeks ago floors in loungeroom and kitchen was spongey. Over the weekend the issue seems to have gotten worse as bathroom floor is now sinking as well as previous spongey rooms. Believes whole house flooring may be effected. OI is on a pier, water was pooling underneath which may have contributed. Date of loss - 28 May 2025 Makesafe report dated 11 June 2025 states: Attended property. Found that the subfloor is dropping due to piers sinking from the heavy rain event. Further investigation under the bathroom and laundry found that waterproofing failure has occurred and water ingress has subsequently damaged the subfloor particle board flooring weakening the subfloor and popping tiles. Insurer’s builder R’s report after attendance on 16 June 2025 states: Inspection to externals of property, found the ground directly under the property is lower than the LHS & Front yard. Therefore, water would've had been pooling from storms underneath the property, visible missing brick to a pier & visible packing to piers. Inspection to the internals of property noted visible dips to flooring throughout the property, uneven kitchen cabinets, separation between benchtop and splashback tiles, cracking to floor tiles, gaps to bathtub grouting, WC being difficult to open & cracking to floor tiles. Tenant provided images of water pooling/ponding under the house during storm event. Damages noted during inspection are found to have been an ongoing issues and not from a once off event due to ground movement. Visible packing to piers were noted under the subfloor framing. Tenants provided images of water pooling/ponding under the house shows that this would be an ongoing issues during storm events. SC attended the property on 13 June 2025 and 24 June 2025 and observed: · the movement of the piers likely to be ongoing given the presence of moisture in the soils around the house foundations. Previous packing of the piers to the original/ front section of the dwelling was also noted throughout, further indicating the ongoing nature of the ground movements occurring with prolonged moisture presence · rising damp, mould and fretting was observed to the concrete piers in the subfloor area. The extent of the rising damp deterioration of the piers is indicative of ongoing groundwater and site drainage issues at the subject site · the thickness of the particle board flooring and over-spanning nature of the particleboard sheeting may be a contributing factor to the observed sponginess in the flooring · mould growth was observed to the underside of the particleboard flooring throughout the bathroom, toilet and laundry (mould presenting as areas of black staining and white mould growth) · the particleboard flooring had swelled where the mould growth was present · there was water staining of the particle board flooring surrounding floor penetrations, such as toilet waste pipe and the floor wastes to the wet areas · it is likely inadequacies in the site drainage and ventilation of the subfloor area is allowing an increase in the moisture levels to the subfloor, coupled with inadequacies in the waterproofing of the wet areas, to compromise the structural integrity of the sheet flooring · the high moisture content in the soils in the subfloor area is likely contributing to the high humidity and to the damage to the particle board flooring. During the insurer’s assessor’s visit, the tenant confirmed he has resided at the property since April 2025. The tenant advised that as a result of the flood events, the floor in a number of rooms has begun to sag, drop and become weak when standard weight is applied. This was specifically evident in the living room, kitchen and the bathroom. The assessor concluded the cause of the flooring to bow and become weaker was due to long term activity occurring underneath the property. There was mould on the back of the bathroom subfloor which is due to a potential leak from the bathroom. He concluded this was long term damage and unrelated to the flood event. While there was evidence of escape of liquid in the wet areas, the assessor did not arrange any leak detection or other investigations to determine the cause of this damage. The photos shared by the tenant with R showed flooding of the subfloor area. The photos do not have a date stamp. The exchanged information indicates these were taken during the storm event. The floodwaters had however receded by the time the insurer’s experts attended the property around two weeks of the date of the loss. Given the proximity of the water level to the subfloor and the absence of a report from a hydrologist, there is a lack of evidence on the direct impact of the flood water on the piers and subfloor flooring during the claimed event. The complainants’ builder SS report dated 18 November 2025 states: Due to the earthquake which hit the region back in April which I believe has caused house movement. Along with the excessive amount of ground moisture from the significant amount of rainfall and flooding, as noted on page 7 of the engineer report quoting (these soils are prone to expansion/contraction with changes in moisture content). There is clear evidence of tiles that have cracked in the wet areas, which are illustrated in (figure 15 and 14). Which I also believe is the root cause of the from the movement that has also damaged the waterproofing membrane, as quoted on page 17 (including the failure of any waterproofing). Therefore, the wet areas have leaked into the sub floor which has caused (the severely damaged areas of particle board) as quoted on page 17. The parties accept the dwelling is estimated to be over 70 years old. The original dwelling had alterations and additions made to the rear of the dwelling at a later time. SC states it had not relied on any other documents or information. It is unclear why the insurer did not share the routine property inspection reports from the complainants which showed the property was in good condition before it was tenanted. These photos do not show the property was suffering from ongoing movement before the tenancy on 1 April 2025. The complainants presented invoices of various works, including painting, that was completed before the property was tenanted. The insurer says the complainants’ carpet installer may have not noticed the issue with the particleboard flooring during carpet installation prior to tenancy. I am satisfied it is most likely than not the carpet installers would have noticed any issues with the flooring at the time of carpet installation. It would not have been worthwhile or practical to install the carpets if the flooring had a spongy effect or demonstrated long term moisture ingress damage. SC had relied on the tenant’s observations and comments. However, tenants had resided at the property for just over two months when the claim was lodged. While tenant’s observations and photos assist to determine the sequence of events at the time of the claimed event, they could not comment on the history of the property’s condition. The complainants say the stormwater drainage system could not cope with the extent of rain fall and this had not previously occurred. SC said the tenants had reported there was water coming up through the floor waste in the bathroom, backflow of sewage coming up and out of the toilet pan and that the toilet was rocking at the base. This shows the significance of the floodwater damage to the property and the site around the claimed event. While SC referred to the various recommended standards applicable to the flooring, there was no information showing the property was not built to standards applicable at the time of the construction. I acknowledge SC attributed the subfloor damage to an ongoing issue due to inadequate site drainage and the resultant effect of increased moisture in the area. SC has not however explained how the slope would have assisted with drainage and how the property had survived the harsh weather conditions in the prior years. The weather data shared by SC clearly shows the area had experienced extensive higher rainfalls in the previous years. The routine inspection photos do not show the property was suffering from ongoing movement and flooring damage as suggested by SC. I accept packing of piers may have been part of the original construction, added during the construction of the extension or during any maintenance works. This does not necessarily mean the property had been suffering from ongoing moisture and movement issues, as suggested by the insurer. The insurer says the available evidence demonstrates the damage to the property arose from excessive moisture in the subfloor ground. I am however satisfied the exchanged information shows the dominant causes of the damage to the property were the heavy rains and the flood in May 2025 which are insured events listed under the policy. Given the above, I am satisfied the complainants have established a claimable loss under the policy. The onus then shifts to the insurer to establish an exclusion applies to deny the claim. While the insurer has referred to several policy exclusions, I am not satisfied it has clearly explained how these apply to the claimed damage, especially given my findings above. The insurer should therefore accept the claim pursuant to the policy terms and conditions. This also includes applicable policy benefits. How the insurer should settle the claim The complainants have presented a quote from SS for over $161,000. Given the property has sustained additional damage since the initial damage and the claim delays, it is unclear if this quote is complete and actionable. I am therefore satisfied the insurer should settle the claim as follows. Within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to provide a list of three experts, who are independent and who have not previously been involved with the complaint, to the complainant. Within 7 days of receiving the list of experts, the complainants are required to communicate their choice to the insurer. Within 14 days of being notified of the complainants’ chosen expert, the insurer is required to engage them to provide a scope of works. Within 14 days of receiving the scope of works, the insurer is required to engage a builder to provide an actionable quote. I consider it fair the insurer allows the complainants to choose between repairs or cash settlement given the time that has passed, its claim handling and the extent of original and additional damage that had occurred. If the complainants choose the cash settlement option, the settlement should include any additional benefits listed under the policy. Within 14 days of receiving the quote, the insurer is required to cash settle the complainant with a 20% uplift for contingencies and the loss of a lifetime guarantee on repairs. If the complainants choose the repair option, the insurer should arrange repairs within reasonable timeframes. If the parties are unable to settle on the quantum of the claim, the complainants are free to raise their concerns with the insurer first. If the matter remains unresolved, they may lodge a new complaint with AFCA. 2.2 Is the insurer required to pay compensation? Yes. The insurer’s claim handling caused stress and inconvenience to the complainants. The complainants had to arrange additional makesafe to protect the property and the tenant’s young family because the insurer failed to arrange the required makesafe in a timely manner. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of: · physical inconvenience · time taken to resolve the situation · interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events. Insurer should pay non-financial loss compensation The complainants raised concerns with the insurer’s claim handling. They say the insurer did not formally respond to their submission the damage may have been caused by an earthquake in April 2025. The insurer apologised for not sharing SC’s supplementary report with the complainants and for failing to provide a claim outcome with a denial letter. It is fair it agreed to accept the cost of glass replacement incurred in April 2025 after the earthquake. The complainants say the insurer delayed additional makesafe required to the property. This resulted in the property sustaining further damage, after the claimed event had occurred. The exchanged information shows the complainants followed up on the insurer’s claims decisions and issues with additional makesafe on several occasions. There was poor communication about makesafe works. While the insurer indicated it had approved additional makesafe, this never occurred. The complainants had to arrange makesafe themselves in fear of further damage to the property and having regard to the tenant and their young family. The insurer should reimburse the cost of makesafe arranged by the complainant. It should pay interest on this settlement pursuant to section 57 of the Insurance Contracts Act 1984 from the date the complainants settled this invoice until the date of the payment. The insurer apologised for the poor service the complainants had received. While maintaining the claim denial it offered $2,000 in an effort to resolve the claim and complaint. The complainants did not accept this offer. They sought the insurer to cash settle the claim as per SS’s repair quote. Given the above, AFCA’s conservative approach and the fact the property remains unrepaired for almost 12 months since the claimed event occurred, I am satisfied the insurer’s claim overall claim handling caused stress and inconvenience to the complainants. It is therefore fair in all the circumstances the insurer pays $3,000 non-financial loss compensation. 2.3 Why is the outcome fair? The parties are bound by the policy terms and conditions. It is fair the insurer is held liable to cover a loss which falls within the scope of the policy. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.