Home / Allianz Australia / Determination 12-25-321995

Determination 12-25-321995

Scope of covered storm damage and repairs following cyclone erosion; complainant sought stabilisation, drainage and retaining wall works

FirmAllianz Australia
Decided2026-06-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for cyclone damage to her home beyond the erosion repairs the insurer accepted, seeking drainage, retaining wall and stabilisation works. AFCA found in favour of the insurer as the extra works were not shown to be storm-caused.

The complainant bore the onus of proving the extent of storm damage and necessary repairs, and the engineer's evidence was more persuasive than her contractor's, so the disputed works were upgrades or maintenance and excluded.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-321995 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-321995 23 June 2026 1 Determination overview 1.1 Complaint The complainant held home insurance with the financial firm (insurer) and lodged a claim for cyclone damage. The insurer accepted erosion damage to a deck post footing and subfloor area. This dispute is about the extent of the storm-related damage and the insurer’s liability. The insurer seeks to limit its liability to repairs which address the erosion. It says this restores the property to its pre-loss condition. The complainant disputes this. She says the cyclone-related erosion caused a loss of support and instability in the under-house area. She says the covered repairs must include limited stabilisation works in that area, and that any broader drainage or improvement works can be separated. 1.2 Issues and key findings Is the claimed work covered? No. The available information suggests the storm-related damage can be remedied by local reconstruction of the eroded areas, as the engineer suggests. This mostly involves reinstating the eroded material. It does not establish the claimed works are necessary to remedy the storm damage. The claimed work is not covered. Why is the outcome fair? The complainant bears the onus to establish, on the balance of probabilities, the extent of the damage and necessary repairs. Persuasive evidence is needed to show this. The available information is not enough to do so. The insurer has fairly assessed its liability. 1.3 Determination This determination is in favour of the insurer. The insurer can limit its liability to the accepted damage, and is not responsible for the disputed works. 2 Reasons for determination 2.1 Is the claimed work covered? No. The available information suggests the storm-related damage can be remedied by local reconstruction of the eroded areas, as the engineer suggests. This mainly involves reinstating the eroded material. It does not establish the claimed works are necessary to remedy the storm damage. The claimed work is not covered. Complainant says claimed works are needed to address storm damage The insurer accepted storm-related erosion damage only. It offers a repair solution that is mainly confined to addressing the damaged deck post footing and the reinstatement of the eroded material. The complainant says: · the storm caused erosion · the erosion caused a loss of support / structural instability · the structural instability did not exist before the storm; the storm was its proximate cause · in order to remedy the structural instability, it is necessary to do the drainage and retaining wall works recommended by her contractor, EM; replacing eroded soil will not restore the property to its pre-loss, stable condition. Replacing soil will not fix the loss of support caused by the storm. The complainant says she is willing to accept: · a minimum subfloor stabilisation solution, addressing the event-related loss of support only, and · separation of any broader drainage or discretionary improvements. Insurer says claimed works are maintenance and upgrades At a high level, the insurer’s engineer, CE, separates out the event-related and excluded repairs as follows: · for event-related works: repairing the damaged deck post footing, reinstatement of eroded material beneath the strip footing using compacted fill and concrete to restore bearing capacity · for maintenance and upgrades: upgrading surface and subsurface drainage systems, installation of a formal retaining system, removal of garden beds adjacent to the rear brick wall and lowering/capping of ground levels and ongoing maintenance of gutters and site drainage. Complainant bears onus to establish extent of damage The complainant disputes the insurer's settlement position and expert evidence. Consistent with fairness and legal principle, the complainant bears the onus of proof to establish her position. The standard of proof is the balance of probabilities, that is, more likely than not. This requires evidence that her submissions on the extent of damage and proposed scope of works are, more likely than not, more reasonable and accurate than the insurer's material. In other words, she must show the insurer’s material does not fairly represent what is required to restore the property to its pre-loss condition. To the extent the information does not prove this, the complainant's claim will not succeed. The insurer bears the onus to prove the exclusions relied on. These are exclusions relating to retaining walls and anything not directly related to an insured event. This complaint does not turn on whether the cyclone caused some insured erosion. The insurer accepts storm-related erosion damage to the deck footing and subfloor area. The issue is whether the further drainage, retaining and stabilisation works have been shown to be necessary to repair that insured damage, rather than to address pre-existing site vulnerabilities and future risk. Complainant’s evidence is insufficient Having reviewed all the information, I consider the complainant’s evidence insufficient to discharge her onus of proof. I am not persuaded that the claimed works are covered. My main reasons are as follows. While the complainant refers to some of the insurer’s material to support her position, she relies mainly on lay submissions and the opinion of EM, a local earthmoving and retaining contractor with experience in stormwater management. I reviewed this material. EM’s report asserts, among other things, that the drainage performed fine for many years before this event and the storm destabilised an area of the subfloor, necessitating the disputed works. In my view, EM’s report is not persuasive. This is because: · it lacks supporting evidence, such as photographs · he does not provide detailed analysis to explain the nature of any specifically storm-related destabilisation, as distinct from the pre-existing structural vulnerability of the property · he refers to the “lost structural integrity” and “the destabilisation” but does not sufficiently explain what he means · he emphasises that the structure was stable enough for many years up until this storm event, but this does not address the point · he does not explain why the insurer’s proposed scope of works would not remedy the storm-specific damage · he does not explain why his suggested repairs are the only acceptable way to remedy the storm-specific damage. Given the drainage, shotcrete and retaining wall proposed were not there before the event, I would expect EM to explain exactly how the event changed the conditions such that these new features are now necessary to restore the property’s pre-loss stability and drainage performance. He does not. He mainly asserts that the proposed works are necessary to address the storm damage. The insurer’s engineer, CE, reviewed EM’s report and opined that: · the proposed works are upgrades to site design and drainage management, rather than direct repair of storm-related damage · despite the erosion, the footings are structurally sound and are not compromised. There is “no evidence of structural movement or failure” · there is “no evidence” the dwelling’s foundations are damaged · “there is no evidence of a loss of structural integrity requiring major reconstruction works” · event-related repairs are limited to reinstatement of eroded soils · the retaining wall and drainage system are considered maintenance and improvement works aimed at addressing pre-existing deficiencies and mitigating future risk. Having reviewed the engineer’s reports, I consider them reasonably supported by photographs and analysis. This is in contrast to EM’s report, as I have explained above. Also, I consider the engineer more qualified than the builder to provide views on causation in this context. Overall, CE’s report is more persuasive than EM’s. The complainant’s submissions, though well-considered, are not sufficient to establish her position. The matter in dispute revolves around the extent of damage and appropriate repair method, which is principally a question of expert evidence. I acknowledge the brick strip footing was partially exposed and that the reports identify an ongoing risk if the area is left untreated. But the engineering evidence is that the footing remains largely stable, with no evidence of structural movement or failure. Further, that event-related repair is limited to reconstructing the eroded area with compacted fill and concrete to restore bearing capacity. When read in context, the reports suggest that it is the pre-existing design of the property (subfloor, foundation and drainage) that is responsible for the main instability risk over time. The evidence as a whole does not establish that: · there is structural instability or an immediate, significant risk of instability, which was caused by the storm, or · that any loss of bearing capacity due to erosion cannot be remedied by reconstructing the eroded area with the relevant fill material, as CE suggests. On the balance of probabilities, I am not satisfied the complainant has established that: · the insured event caused the extent of damage and need for the repairs claimed · the insurer has incorrectly assessed its liability. The disputed works may be necessary for the long term health of the building. But, on the evidence before me, they go beyond what is needed to restore the property to its pre-loss condition. The insurer can limit its liability to the accepted damage, and is not responsible for the disputed works. This is based on the lack of storm-related causation, as well as the exclusions for retaining walls and damage not related to insured events. 2.2 Why is the outcome fair? The complainant bears the onus to establish, on the balance of probabilities, the extent of the damage and necessary repairs. Persuasive evidence is needed to show this. The available information is not enough to do so. The insurer has fairly assessed its liability. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues and arguments in their submissions and I have considered them all, I have restricted this determination to the issues and arguments that are most relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.