Settlement of building, contents and temporary accommodation claim after burst pipe and restorer-caused contamination, plus consequential losses and compensation
Text of the determination
Determination
|
Case number
|
12-25-320390
|
Financial firm
|
RACQ Insurance Limited
Case number: 12-25-320390 4 May 2026
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under her home and contents insurance policy. A burst pipe had damaged the building and contents on 31 July 2025.
The insurer accepted the claim and appointed restorers to remediate the property before repairs. It accepts their works have resulted in significant additional damage and mould contamination to the property and contents. The insurer requires access to the property to determine the extent of its liability for the claim.
The complainant seeks the insurer to pay the contents claim as agreed, cash settle her to demolish and rebuild the property as recommended by her experts, pay for suitable temporary accommodation for the repair period and compensation for its claim handling.
1.2 Issues and key findings
Is the insurer’s settlement offer fair?
Yes, partially. The insurer accepts liability for the damage from the claimed event and any additional damage caused by its restorers. The insurer is entitled to assess the damage and determine the extent of its liability. The complainant is entitled to the reasonable cost of temporary accommodation for the period of remediation and repairs until re-occupancy.
Is the insurer required to pay consequential losses?
Mostly, no. The complainant is entitled to increased living expenses pursuant to the policy terms and conditions. She is not entitled to the various other costs claimed. The policy excludes cover for consequential losses.
Is the insurer required to pay compensation?
Yes. The relationship between the parties broke down during the claim and complaint process. The parties could have worked together to resolve the claim. The insurer’s overall claim handling caused significant stress, inconvenience and frustration to the complainant.
Why is the outcome fair?
The parties are bound by the policy terms and conditions. It is fair the insurer is held liable for loss caused by the claimed event and any additional damage caused by its restorer.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to settle the claim as detailed section 2.1 and 2.2 and pay $5,000 non-financial loss compensation.
2 Reasons for determination
2.1 Is the insurer’s settlement offer fair?
Yes, partially. The insurer accepts liability for the damage from the claimed event and any additional damage caused by its restorers. The insurer is entitled to assess the damage and determine the extent of its liability. The complainant is entitled to the reasonable cost of temporary accommodation for the period of remediation and repairs until re-occupancy.
Experts say building requires extensive remediation and repairs
The parties accept the complainant has established a claimable loss under the policy. The insurer is therefore liable for the insured event related repairs pursuant to the policy terms and conditions. This includes any applicable additional benefits offered under the policy.
The complainant says the restorer HR caused extensive cross contamination within the property by:
· using drying equipment without containment,
· moving contaminated contents into clean zones,
· applying containment with gaps, and
· failing to seal the primary area of damage.
She seeks the insurer to cash settle the building sum insured of $682,000 plus $305,091 for the additional damage caused.
Restorer SZ’s report dated 26 January 2026 said limiting demolition and remediation works to selected or isolated areas presents a material risk. Concealed contamination will remain within inaccessible building cavities, including but not limited to subfloor voids, wall cavities, flooring interfaces, and roof spaces.
The presence of interconnected cavities, shared air pathways, and previously inadequate containment increases the likelihood that contamination has spread beyond the originally identified areas. SZ did not consider a partial or selective demolition approach could reliably ensure that all mould sources have been identified and removed. Further, this carries an ongoing risk of occupant exposure following reinstatement.
The panel acknowledges the complainant’s submission that the property requires significant restoration works prior to commencing repair or rebuild works.
While the insurer’s hygienist RI had conducted preliminary sampling, the panel is not satisfied RI’s findings were comprehensive or complete. The panel notes the complainant’s expert NS’s report dated 17 April listed the following observations:
· inspection of the subfloor identified conditions consistent with persistent moisture and fungal colonisation of structural elements. Microscopy from samples collected internally identified fungal structures, including hyphal fragments, indicative of active growth
· airborne sampling identified elevated to very high concentrations of fungal spores and hyphal fragments within internal living areas, exceeding thresholds associated with active indoor mould presence
· surface sampling identified very high levels of fungal structures on building materials, including structural elements such as a baseplate
· Basidiospores were also identified within internal samples, which are commonly associated with wood decay fungi and moisture-affected timber environments. Their presence supports the likelihood of involvement of structural or concealed timber elements within the contamination profile.
· the environment of the property is classified as Condition 3 – Active Fungal Growth under AS-IICRC S520 (Australia, 2025), reflecting contamination not consistent with normal fungal ecology and requiring remediation
· re-occupancy should only occur following compliant remediation and independent Post Remediation Verification (PRV), demonstrating a return to Condition 1.
NS concluded that remediation may be technically achievable only if undertaken as a comprehensive whole-of-structure intervention. Partial or selective approaches introduce a high risk of residual contamination and failure to achieve PRV clearance and are not consistent with accepted standards. This is because the above findings demonstrate a coherent and internally consistent pattern of:
· moisture ingress and accumulation within building elements
· microbial amplification within structural and concealed spaces
· distribution of contamination via interconnected building cavities.
The above views were also shared by the complainant’s two builders C and G who suggested it would be economical to demolish and rebuild the damaged property rather than restore and repair. The complainant’s safe removal of hazardous or prescribed materials waste amounts to $41,650 excl GST.
The insurer accepts liability for any additional damage caused by restoration works arranged by it. However, it says the cost estimates from the complainant’s builders are not acceptable as they are not based on a real scope of works. Further, the costings are vague, without any itemisation. The insurer is willing to cash settle the complainant for the full remediation and repair costs with a margin to resolve the claim regarding building damage.
The panel acknowledges the above submissions. This includes the fact the restoration needs to be holistic, followed by the PRV clearance certificate. The panel accepts NS’s report does not detail the scope of works required for the property’s complete remediation. Further, the complainant’s builders’ quotes do not provide detailed itemised costing of the works required in reinstating and repairing the property.
Given the above, the panel is satisfied the insurer is entitled to appoint a new independent specialist to determine the extent of its liability for the claim. The complainant sought details of and the extent of the insurer’s hygienist’s investigation. The insurer has shared basic details of investigation. This is because the extent of this investigation would be determined after its hygienist attends the property.
The panel accepts the insurer is entitled to appoint a new independent hygienist to conduct independent investigations and prepare a detailed scope of works to determine the cash settlement that is to be offered to the complainant for property damage.
Given the damage to the property was caused by the insurer’s appointed representatives’ actions, the panel is satisfied the insurer’s liability for the damage will not be limited by the building sum insured specified under the policy.
How the insurer should settle the building claim
Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to provide a list of three experts (hygienists) and three (building consultants/engineers) who are independent and who have not previously been involved with the complaint, to the complainant.
Within 7 days of receiving the list of experts, the complainant is required to communicate their choice to the insurer.
Within 14 days of being notified of the complainant’s chosen experts, the insurer is required to engage them to provide a scope of works.
Within 14 days of receiving the scope of works, the insurer is required to engage a restorer and builder who have not been previously involved with the claim and complaint to provide an actionable quote based on this scope of works.
Given the parties are in agreement to settle the claim by way of cash settlement, within 14 days of receiving the quote, the insurer is required to cash settle the complainant with a 20% uplift for contingencies and the loss of a guarantee on repairs.
The complainant should allow reasonable access to the property so that the insurer’s appointed representatives may complete their assessment.
The panel accepts re-occupancy should only occur following compliant remediation and independent PRV. This cost should be added to the settlement including any other expert fees relating to remediating and repairing or rebuilding the damaged building.
The insurer should also settle the complainant for any additional benefits she may be entitled to under the policy.
Given the additional damage caused by the insurer’s restorers, the panel is satisfied the insurer should not apply the policy limits for clean-up costs and cost of demolition and removal of debris. The removal of debris should include the removal of damaged contents. A separate allowance for the removal of damaged contents is therefore not required as requested by the complainant.
The complainant seeks the insurer to appoint a single contact to manage the claim moving forward. While the panel acknowledges a single contact may not be practical, the panel encourages the insurer to limit the number of staff working on this claim so that there is consistency and to avoid any miscommunication.
The panel acknowledged the complainant’s request for interest to be awarded on the cash settlement for the building damage. She also seeks an allowance for increase in building costs. Given the cash settlement is based on current rates and quotes, the panel is not satisfied the complainant is entitled to interest or increased building costs on the settlement.
How the insurer should settle the contents claim
The parties agreed the insurer should settle $75,842 for contents damage. While the damage caused by the claimed event can be limited to the contents sum insured, the insurer agreed to settle the total amount claimed as above. This is because of the additional damage caused by cross contamination at the property.
While the parties agreed on the settlement amount, the insurer did not release the payment because the complainant refused to sign the insurer’s cash settlement fact sheet (CSFC). She does not agree the insurer should classify part of the damage as an ex-gratia settlement. She also seeks the insurer to pay interest on the settlement from the date of the loss until the payment date.
The insurer agreed to pay interest on the contents settlement from the date of hygienist BH’s report on 6 December 2025 until 27 March 2026, utilising a rate of 7.25%. This was an additional $1,642.03 bringing the total settlement to $77,484.03.
The complainant says the rate applied by the insurer in calculating the interest component of the settlement is incorrect. She argues the legislatively prescribed rate under Regulation 38 of the Insurance Contracts Regulations 2017 is the 10-year treasury bond rate plus 3%. She also says the insurer’s response records interest awarded as an ex-gratia payment whereas this is a statutory obligation and cannot be classified as an ex-gratia payment.
The insurer provided the following confirmation:
[insurer] confirm the offered amount of $75,842.00 represents contents only and does not prejudice the remaining aspects of your claim for remediation/reinstatement to the insured building or any other matters not involving the contents which is subject of the settlement including interest, building remediation, reinstatement, temporary accommodation, non-financial loss compensation, ICA s57 interest, or the $1,000 excess refund.
The complainant seeks the insurer to release the contents settlement without a CSFC. Given the above provided in writing confirming the settlement terms, the insurer says it is legally obligated to issue a cash settlement fact sheet when proposing or offering cash settlement any part of a claim.
As the payment exceeds the remaining contents sum insured available, the insurer explains its systems treat that payment as being made outside of the cover provided by the policy, hence it is categorised by its systems as ex-gratia. As the letter is system generated, it is unable to alter the wording to meet the complainant’s preference.
The insurer also agreed to not deduct a previous contents settlement amounting to $9,957.13 in an attempt to resolve this part of the complaint.
Given the above, while the panel acknowledges the complainant’s concerns and agrees with her interpretation of the issues, the panel is satisfied the insurer has reasonably explained its system limitations. Given the assurances provided by the insurer, the panel agrees the complainant should complete the CSFC so that the insurer may release the payment.
Further, the panel does not accept the complainant is entitled to interest on the settlement from the date of the loss. The panel is satisfied the insurer’s offer of interest is fair given BH’s report confirmed the extent of contamination to the contents and that they should be discarded. The interest is awarded only from the date the insurer should have settled the contents claim, not from the date of the loss.
As the complainant has not cooperated with the insurer’s efforts to finalising this part of the claim since the cash settlement for contents was offered, the panel does not agree the insurer unreasonably withheld the funds. The complainant is therefore not entitled for an award of additional interest on the settlement past 27 March 2026. It is fair the insurer calculates the interest that is to be awarded following the guidelines published on the AFCA website which supports the legislative requirements.
How the insurer should settle the claim for temporary accommodation
Given the issues discussed above, the panel is satisfied the insurer’s liability for temporary accommodation is not limited by the sum insured. The complainant is entitled to reasonable costs of temporary accommodation until the estimated date of re-occupancy after repairs/rebuild.
The complainant is currently residing in a temporary accommodation for which the insurer has been directly paying the weekly rent. The complainant seeks the insurer to extend the current accommodation at the rate of $2,870 per week for the period until 1 December 2026.
The complainant also raised concerns about the medical condition of her son, and the impact previous relocations into different properties has had on him. Her son has had the longest medical condition free period at the current temporary accommodation. She says a fourth forced relocation creates documented and foreseeable medical risk confirmed by her treating doctor.
She has since agreed to move into long term accommodation, provided it meets some requirements relating to size, location, being furnished and pet friendly. The complainant has previously rejected properties sourced by the insurer because they did not meet these requirements.
While the insurer initially refused to extend the current temporary accommodation arrangement past 30 April 2026, it has since agreed to extend the current accommodation for a period of 30 days. The panel considers the insurer should pay for temporary accommodation at the current accommodation until the sooner of the following:
· a week after the due date has lapsed for the complainant to accept this determination, or
· a week after the insurer receives notice the complainant accepts this determination.
The panel acknowledges the complainant’s personal circumstances and notes parties have been unable to work together in sourcing suitable temporary accommodation for the estimated period of remediation and repairs until re-occupancy.
The panel is satisfied the insurer’s request that the complainant is named in the lease is fair. Further, it has offered to cover any financial aspects associated with securing a suitable rental property. This includes weekly rental payments, bonds amounts, application fees, bond cleaning costs, and utility connection fees. The insurer however refused to assist further in managing a rental if the complainant seeks a cash settlement towards temporary accommodation and chooses to source the temporary accommodation privately. The panel considers this decision to be fair.
The panel acknowledges the complainant prefers to remain at the current property. The panel also notes that the rent is much higher at the current property than other acceptable options, and that the complainant has indicated she is open to move her family to a longer-term lease option.
The insurer offered various rental options. The insurer’s final settlement offer was based on a furnished property available for rent at $1,500 per week. The link provided by the insurer showed the property was available at the time of the offer. The panel acknowledged the complainant’s various personal requirements and unfortunately it could not be met.
Given the above, the panel considers the offer of $1,500 per week is fair given the circumstances. The insurer’s settlement for temporary accommodation should be from the date the current tenancy expires as extended by the panel above until the estimated date of re-occupancy provided by the contractors issuing the quotes.
2.2 Is the insurer required to pay consequential losses?
Mostly, no. The complainant is entitled to increased living expenses pursuant to the policy terms and conditions. She is not entitled to the various other costs claimed. The policy excludes cover for consequential losses.
Complainant entitled for some of the costs additional costs claimed
The complainant seeks the insurer to reimburse the mortgage repayment of $45,474 plus the mortgage interest in the amount of $32,649. This is because while repaying the mortgage to her financier, she was unable to occupy the property.
The panel is satisfied the insurer is not obliged to reimburse this because this is an agreement between the complainant and her financier. While the complainant could not occupy the insured property, the insurer had arranged temporary accommodation for the subject period. This is not a loss caused by the insurer’s claims handling.
The complainant seeks the insurer to reimburse $17,849 in extra living expenses. The policy covers extra living expenses for the following:
The costs for extra living expenses while the home that your contents are kept in is being rebuilt or repaired after an insured event, for example:
• connection fees for electricity, gas, telephone services,
• temporary fencing for pets/animals.
While the policy covers extra living expenses arising from the insured event, the panel accepts the complainant would not have had to pay additional utility costs at the insured property had the claimed damage had been repaired in a timely manner. Further, the panel assumes the utility costs incurred would most likely have been incurred by the experts who attended to remediate the property.
Given this, it is fair the complainant is reimbursed the reasonable costs of utilities incurred at the insured property after cross contamination was confirmed subject to the complainant providing invoices and payment receipts for the subject period. The insurer has already agreed to cover the utility connection costs at the rental property. The panel considers this to be fair.
The panel otherwise accepts the insurer is not obliged to reimburse any other costs associated with the use of utilities in addition to the scope of cover extended under the policy as above.
The complainant seeks the moving costs to be directly covered by the insurer. Given the move between rental properties is based on the insurer’s request, the insurer should cover the reasonable cost of these moves. The insurer is however not obliged to pay for moving costs of any contents at the subject property which are to be discarded due to mould contamination.
The panel is not satisfied the complainant is entitled to be reimbursed for additional transport expenses incurred due to displacement. These are additional costs that would normally be related to a claim of this nature, and although the panel accepts that additional costs may have extended beyond that normally expected, the complainant has not shown the nature of these costs or how they may be additional relative to her usual transport costs. In any event, insofar as these additional transport costs are consequential in nature, the policy excludes cover for consequential losses.
The panel is also satisfied the insurer is not obliged to reimburse the premium amounting to $3,000. This is because while the claim progressed, the property remained insured and was covered for all risks insured under the policy.
The complainant finally seeks the insurer to reimburse the cost of claim management including printing etc. These are general costs incurred as part of submitting a claim and the and the panel is satisfied the insurer is not obliged to reimburse these costs.
2.3 Is the insurer required to pay compensation?
Yes. The relationship between the parties broke down during the claim and complaint process. The parties could have worked together to resolve the claim. The insurer’s overall claim handling caused significant stress, inconvenience and frustration to the complainant.
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of:
· physical inconvenience
· time taken to resolve the situation
· interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events.
Insurer should pay non-financial loss compensation
The complainant seeks the insurer to pay $6,300 non-financial loss compensation. She says the ongoing delays and the insurer’s claim handling and procedural failures had a significant impact on her and her family. This included being displaced from her home and the effect the entire process has had on a vulnerable child. She says the extent of disruption, prolonged displacement, and unacknowledged correspondence has caused considerable distress and inconvenience.
The complainant has provided a timeline of events. The panel accepts the insurer’s trades’ actions have had a significant impact on her. The complainant had spent a considerable amount of time and effort in attempting substantiate her position and augments.
After receiving BH’s report, the insurer attempted to arrange make safe works with AR. The complainant declined this offer. The panel acknowledges the complainant had initially allowed the insurer’s expert to attend the property and arrange remediation or assess the condition of the property. She has however not allowed the insurer’s hygienist as she was not satisfied with the scope of their work.
While the panel understands the complainant’s position, allowing them would have expedited the outcome of the building damage.
The panel accepts the insurer’s mismanagement of the property has displaced the complainant from her home for a period in excess of the period required under the claimed event.
There was a breakdown in trust between the parties on the issue about the extent of contamination and suitable temporary accommodation. The panel accepts this has been particularly difficult given her son has a health condition.
The complainant’s family have also had some unfortunate experiences of theft in their temporary accommodation property, and squatters in their property. This has added to the stress and contributed to the breakdown in trust between the parties.
Overall, the insurer has acknowledged the ways the claim has been handled poorly has agreed to waive/refund the $1,000 excess to the complainant. It accepts this claim could have been handled better on a number of fronts, including management of initial remediation and repairs and their response when an issue was raised.
The panel considers the parties could have worked to together in resolving this claim and complaint at an earlier time.
Given the above, insurer’s agreement to refund the excess and having regard to AFCA’s conservative approach to awarding non-financial loss compensation, the panel is satisfied the insurer should pay $5,000 non-financial loss compensation for its overall claim handling.
2.4 Why is the outcome fair?
The parties are bound by the policy terms and conditions. It is fair the insurer is held liable for loss caused by the claimed event and any additional damage caused by its restorer.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive insurance industry experience.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.