Insurer declined balcony and subfloor damage as pre-existing progressive water ingress; complainant also disputed claim handling
Text of the determination
Determination
|
Case number
|
12-25-318703
|
Financial firm
|
Youi Pty Ltd
Case number: 12-25-318703 27 May 2026
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under his home insurance policy. This is for the damage sustained to his property following Cyclone Alfred.
The insurer accepted the damage sustained to the garage ceiling and denied liability for the balcony and the subfloor on the basis that the water ingress has been ongoing and due to factors, which fall outside the scope of cover.
The complainant disagrees and maintains that the cyclone has caused the disputed damage. Further, the complainant is dissatisfied with the insurer’s claim handling.
1.2 Issues and key findings
Is the insurer liable for the disputed damage?
No. On balance, the disputed damage was not caused by a storm event but instead arose from pre-existing defects and the progressive ingress of water over time. The evidence does not establish that water entered the property through a storm-created opening, as required under the policy.
Is the insurer liable for compensation?
The insurer is required to pay the complainant $3,000 compensation.
Why is the outcome fair?
The parties are bound by the terms and conditions of the policy. The policy covers damage caused by a single insured event, not damage resulting from ongoing or progressive conditions.
The exchanged expert evidence indicates that the damage is consistent with long-term water ingress, which is excluded under the policy. The insurer is therefore entitled to rely on the terms and conditions of the policy in declining liability for the disputed damage.
That said, the insurer is required to compensate the complainant for its poor claims handling.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is not liable for the disputed damage. However, it is required to settle the complainant for the garage ceiling and front entry in the manner outlined in Section 2.1 of the determination.
Further, the insurer is required to pay the complainant $3,000 compensation for his non-financial loss.
2 Reasons for determination
2.1 Is the insurer liable for the disputed damage?
No. On balance, the disputed damage was not caused by a storm event but instead arose from pre-existing defects and the progressive ingress of water over time. The evidence does not establish that water entered the property through a storm-created opening, as required under the policy.
Complainant has initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the terms of the policy. This is known as a valid claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline the claim under the policy.
The complainant’s policy covers loss or damage to the property caused by several insured events, including ‘Storm’. The policy states:
Loss or damage to the insured property caused by:
• storm, lightning, wind, hail, snow and storm water overflow from roof gutters and their downpipes or from the area immediately around the premises. This includes instances where the storm causes mechanical, electrical or electronic (including computer software) breakdown or failure;
There is no dispute that:
· water entered the property during Cyclone Alfred
· the insurer accepted the internal water damage to the collapsed garage ceiling.
The insurer denied the claim for the subfloor structure and the balcony which is located above the garage on the basis the water entered due to excluded factors rather than a storm created opening.
The complainant disagrees and maintains that the storm water caused the water and subsequent mould damage.
On balance, there was pre-existing water and mould damage prior to the event
The insurer’s builder (KB) assessed the property on several occasions.
In his report dated 27 March 2025, KB states that the waterproofing membrane has failed with further seals to the balcony missing causing water ingress during heavy rainfall. KB states that the leaks appear to be occurring over a period of time, however, the recent event has resulted in the collapse of this section of the ceiling.
KB noted mould damage to the timber joist during this assessment. The photographs show black staining evident to the timber members as well as black mould on the garage ceiling.
In his June 2025 report, KB states the tiled balcony waterproofing has failed prior to the cyclone, with the subfloor damage occurring over multiple rainfall events. During this assessment, KB conducted a flood test which showed that the water drained off the side of the balcony and water entered the area below. KB concluded that the cyclone event forced excessive water into this area exacerbating existing vulnerabilities causing the ceiling to collapse.
In August 2025, KB attended the property and conducted further testing. KB states that the non-compliant roof flashing beneath the rendered wall allowed water ingress.
In his assessment conducted on 8 September 2025, KB observed gaps in the grout between the tiles directly above the affected area. KB concludes during this assessment that water seeped through the tiles into the below ceiling cavity causing the resultant damage and that there is no cyclone related damage evident to the balcony.
The complainant’s plumber (LF) stated that the tiled deck above the garage space shows signs of failure and that water has entered through this deck causing damage to the structural subfloor underneath. I note that LF did not provide any comments regarding the cause of the deck’s failure. However, LF stated that the subfloor damage is a result of prolonged water exposure through the tiled deck.
I have carefully considered the exchanged evidence and the parties’ arguments. On balance, I accept water ingress has been occurring over a long period of time and predate the cyclone event.
In KB’s assessment, conducted approximately three weeks after the cyclone event, black mould was evident on parts of the garage ceiling and the sub floor structure. On balance, the presence of mould at that stage is consistent with prolonged exposure arising from historic water ingress, rather than being caused by the storm. This is consistent with the report from complainant’s plumber LF as well as KB.
KB’s assessment highlights several issues with the deck, including the water flow and drainage problems. Further, there is no evidence that the water entered the property from a storm created opening.
On balance, I am not satisfied that the proximate cause of the damage was the storm event. Rather, I accept that the storm exposed pre-existing issues with the deck and exacerbated the existing damage.
The insurer is not liable for the subfloor or balcony damage
The complainant’s policy defines ‘Insured Event’ as an event that is described in the Insured Events section. I accept the policy clearly contemplates a single event, rather than damage resulting from ongoing or progressive conditions. I do not accept the progressive entry of rainwater over a period of time constitute a ‘Storm’ for the purposes of the policy.
There is no dispute that the water entered the property during the cyclone event, resulting in the collapse of the garage ceiling, and that the insurer agreed to cover this damage.
However, having regard to the black mould and staining evident in the property three weeks after the event, I am not satisfied that the timber has suffered additional damage attributable to the cyclone event, as distinct from the deterioration already caused by prolonged moisture exposure. In other words, the timber structure required rectification even in the absence of any new water damage.
Relevantly, water entered the garage during KB’s flood testing in his June 2025 assessment. On balance, the volume of water used during the flood testing was minimal compared to the storm water entering. Accordingly, I am not persuaded the volume of the storm water would have solely caused the damage given that a small amount of water has still entered the property. In other words, this test supports progressive water entry during ongoing rain events.
I am satisfied the deterioration of the timber structure is consistent with wear, tear and deterioration which is expressly excluded under the policy. Further, the policy expressly excludes rain entering the building unless through an opening that was created by the storm. There is no persuasive evidence of a storm created opening but rather pre-existing issues with this area.
Further, there is no causal link between the balcony’s condition, including the damaged grout and the storm event. I accept the cracked grout is indicative of an underlying issue with the deck. The insurer is not liable for this damage.
There is no dispute that the insurer initially accepted liability for the claimed damage on 10 October 2025, before reversing that decision three days later and denying the claim. The insurer attributes the initial acceptance to human error and has acknowledged and apologised for that mistake.
An insurer is not necessarily bound by an earlier acceptance where that acceptance was made in error, particularly where it is promptly identified, communicated, and corrected.
In this case, the insurer reversed its decision within three days and provided an explanation that the acceptance arose from human error. There is no evidence that the complainant materially relied on the initial acceptance to his detriment in that short intervening period.
Further, the available evidence, including the expert assessments, supports the insurer’s substantive position that the damage predominantly arose from longstanding water ingress and deterioration, rather than a single insured storm event. In those circumstances, it would not be appropriate to hold the insurer to an acceptance that is inconsistent with the terms and conditions of the policy.
Considering the evidence as a whole, I am not satisfied that the insurer is liable for the disputed damage.
The complainants’ arguments do not advance his position
Amongst other things, the complainant states:
· the insurer provided a series of changing and inconsistent explanations for the cause of the damage throughout the claim process
· there were no signs of mould prior to the event
· he was not aware of any defects prior to the event
· the insurer’s flood testing caused further damage making it difficult to differentiate between pre-existing and new damage
· the insurer has accepted the damage to the ceiling and that acceptance should extent to the remainder of the damage.
I accept amongst the causes KB identified was a defect in the roof which LF refuted. I accept KB’s multiple assessments were confusing at times. However, the exchanged evidence as a whole showed that the storm water entered due to several issues with the property and not a storm created opening. There is sufficient evidence to establish pre-existing damage, including mould that solely would trigger significant rectification even in the absence of the storm.
I am not persuaded by the complainant’s argument that there was no evidence of pre-exiting damage or prior leaks when both KB and LF state the damage is consistent with long term and this is backed up BK’s assessment photographs, which show widespread mould.
I acknowledge the complainant’s argument that the insurer’s position has been confusing. However, the onus rests on the complainant to establish a loss to which the policy responds.
On balance, the exchanged evidence shows that water ingress has been occurring due to several factors all of which fall outside the terms and conditions of the policy.
Further, I do not accept that the insurer’s acceptance for the ceiling is binding or establishes that the damage to other areas fall within the scope of the policy.
Finally, given the extent of the pre-existing damage, I am not satisfied that the insurer’s flood testing has caused further loss.
In any event, the complainant is required to attend to the cause of, and the resultant damage from, the ongoing water ingress. I do not consider the investigations undertaken by the insurer caused further damage where water ingress and subsequent damage have been occurring over time.
I am not satisfied that the complainant’s arguments assist his position.
Insurer is required to settle complainant for garage ceiling and front entry
The complainant’s policy gives the insurer the discretion to either repair the damage of pay an amount equal to the reasonable costs of repairs. AFCA expects the insurer to exercise this discretion fairly.
The insurer says it is unable to warrant the repairs and offered a cash settlement. Given substantial repairs to the balcony are required to prevent further water ingress, I consider cash settlement to be a reasonable method of settlement.
In its September 2025 report, KB noted water damage to the front entry and attributed this damage to the cyclone. There is no dispute that the insurer will cover this damage.
KB provided a quote for the garage ceiling repairs totalling $5,357.74. I note this quote does not include the repairs to the front entry.
Therefore, within 14 days of receiving notice the complainant accepts this determination, the insurer is required to obtain a quote for the repairs of the resultant damage to the front entry and add this quote to the claim’s settlement. For clarity, the cash settlement should include:
· the repair amount for the front entry
· $5,357.74 for the garage ceiling repairs.
The insurer is required to add a 15% contingency to the final settlement amount for the transfer of risk as a contingency.
2.2 Is the insurer liable for compensation?
The insurer is required to pay the complainant $3,000 compensation.
AFCA may award compensation for non-financial loss
AFCA may award compensation for non-financial loss if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and delays. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation.
The complainant is dissatisfied with the insurer’s handling of the claim. Amongst other things, the complainant says:
· the insurer failed to provide to the complainant requested information relating to his claim
· there were delays in the insurer’s response to the claim
· the insurer handled the claim poorly.
The insurer is required to pay the complainant $3,000 compensation
Having considered the evidence as a whole, I accept the insurer handled the claim poorly and its handling of the claim has caused unnecessary delays.
Firstly, the insurer should have conducted a more effective and timely assessment. Rather than undertaking a comprehensive assessment at an early stage, the insurer carried out multiple assessments of different areas of damage at different times. There is no dispute that the complainant made the property available for all these assessments.
Secondly, I accept the insurer’s communications with the complainant was at times poor, vague and confusing in explaining the reasons for the claim’s denial. The exchanged information shows that through several discussions and correspondence the insurer was not consistent in outlining the policy terms in light of the expert reports.
I also accept that the insurer did not respond to the complainant’s correspondence in a timely manner.
Thirdly, I accept the insurer caused the complainant avoidable stress and inconvenience by incorrectly communicating an acceptance of the disputed damaged on 10 October 2025.
Accordingly, the insurer is required to pay the complainant $3,000 compensation for his non-financial loss caused by its poor handling of the claim.
2.3 Why is the outcome fair?
The parties are bound by the terms and conditions of the policy. The policy covers damage caused by a single insured event, not damage resulting from ongoing or progressive conditions.
The exchanged expert evidence indicates that the damage is consistent with long-term water ingress, which is excluded under the policy. The insurer is therefore entitled to rely on the terms and conditions of the policy in declining liability for the disputed damage.
That said, the insurer is required to compensate the complainant for its poor claims handling.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.