Insurer's make safe works after storm damage allegedly delayed and inadequate, causing additional damage and financial loss
Summary
A landlord insurance policyholder said the insurer's make safe contractor delayed adequate roof tarping after storm damage, causing further damage and lost bookings (over $100,000). AFCA found the insurer was not liable for the additional loss.
Make safe works are temporary, and the complainant did not show with persuasive evidence that the contractor was negligent or reckless or that its actions caused identifiable additional damage.
Issues
- Repairs or contractors primary · not upheld“The exchanged information does not show the insurer's conduct has been negligent, reckless or careless with respect to the make safe works.”
- Claim denial secondary · unclear“Claim decline and policy cancellation were no longer in dispute after the complainant settled with its broker.”
- Delay secondary · not upheld“M did not replace the original tarping with heavy duty tarping until around three weeks after loss; not shown to be reckless or negligent.”
Subjects and remedies
business interruptionhome or building damagenatural disastersmall businesstravel or overseasno remedy
Related
Text of the determination
Determination
|
Case number
|
12-25-312584
|
Financial firm
|
Blue Zebra Insurance Pty Ltd
Case number: 12-25-312584 11 May 2026
1 Determination overview
1.1 Complaint
The complainant is a company and is represented by its sole director ‘D’. Reference to the complainant will include D for the purpose of this determination.
The complainant holds a Landlord (SCTP) insurance policy (policy) with the financial firm (insurer). On 29 August 2025, a claim was lodged for storm damage to the insured property. The insurer has declined the claim.
The complainant says the insurer’s failure to complete adequate make safe works has resulted in additional damage to the property and other financial loss. It seeks for the insurer to reimburse/cover it for the claimed additional damage and associated financial loss.
1.2 Issues and key findings
Is the insurer required to cover the claimed additional damage and financial loss?
No. The exchanged information does not show the insurer’s conduct has been negligent, reckless or careless with respect to the make safe works. It would not be reasonable to hold the insurer liable for the claimed additional damage and financial loss in these circumstances.
Why is the outcome fair?
The outcome is fair as it based on the exchanged information. It is clear the complainant’s property did suffer further damage after the original storm event. However, without persuasive evidence of this being due to the insurer’s actions being reckless or negligent, it would be unfair to hold it liable for the additional loss and damage.
Make safe works by their very nature are temporary measures put in place in an attempt to prevent further loss or damage. They cannot be expected to meet the levels of protection provided by extensive professional repairs.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to cover the claimed additional loss and damage.
2 Reasons for determination
The exchanged information shows at the time this complaint was brought before AFCA, the complainant was disputing the insurer’s decision to decline the claim and cancel the policy.
However, since then these are no longer matters in dispute between the parties. The complainant came to an agreed settlement with its broker which was responsible for setting up and managing the policy.
The parties have been informed (and accept) that consideration of this complaint will be limited to the issue of whether the complainant has shown it is more likely than not that the insurer is liable for the claimed additional damage and financial loss.
2.1 Is the insurer liable for the claimed loss and damage?
No. The exchanged information does not show the insurer’s conduct has been negligent, reckless or careless with respect to the make safe works. It would not be reasonable to hold the insurer liable for the claimed additional damage and financial loss in these circumstances.
Complainant says the insurer’s make safe works were delayed and inadequate
The complainant says the additional loss and damage claimed is entirely unrelated to the insurer’s decision to deny the claim and cancel the policy. It maintains this additional damage is the result of negligence and inadequate make safe works by the insurer’s appointed consultants ‘M’.
The complainant says M did not erect an adequate tarpaulin (tarp) for three weeks after the date of loss. The complainant says this is despite M being aware of the potential of further bad weather in the near future. The complainant says adequate tarping was not installed until D returned from overseas and contacted M to advise the roof is still leaking and allowing water to pour down from the top floor to the lower floor.
This, the complainant says, resulted in two more bedrooms being damaged and could not be booked out to guests, causing further financial loss. The complainant refutes the insurer’s assertion that it had its own consultants attend the insured property to complete repairs. It is accepted that on being advised of the initial stormwater ingress, the complainant arranged for a plumber to attend and install a temporary tarp and a couple of beams to stablise the damaged roof.
However, although the complainant did arrange for its preferred carpenter ‘B’ to attend on 4 September 2025 to commence repairs, this was subsequently cancelled. The complainant says this was cancelled on advice from M that such repairs may impact its entitlements/cover under the policy. The complainant says it had to go through M and the insurer.
The complainant says it was not until around the 18 or 19 September 2025 that M actually installed an appropriate tarp to the roof. This resulted in additional damage and financial loss which the complainant estimates to be in excess of $100,000 at latest estimate. The complainant has provided photos, videos and screens shots of communications with M in support its position.
Insurer refutes the complainant’s allegations
The insurer refutes the complainant's allegations and says its efforts in terms of make safe works were reasonable. It says it was proactive in its efforts and responded reasonably to the developing circumstances with respect to stormwater ingress due to the damaged roof. This it says is despite no contractual obligation to do so once its entitlement to decline the claim and cancel the policy was confirmed.
The insurer says make safe works are inherently temporary and not intended to provide a permanent or fail-proof solution while underlying roof defects remain. The insurer says there is no evidence to support the complainant’s claim that its trades caused additional damage or acted unreasonably. It maintains there is no independent expert evidence or otherwise that can reasonably be accepted to show the make safe works completed by M were below reasonable industry standard.
Further, that there is no evidence to show that any alternative action would have materially changed the outcome given the ongoing severe weather exposure and compromised roof structure. Also, the insurer notes it was the tarp installed by the complainant’s appointed consultant that first failed resulting in further stormwater ingress and associated damage.
The insurer has provided a detailed timeline in support of its position that it responded promptly and reasonably in the circumstances. The timeline has been provided in section 3.2 below.
The insurer says based on the reports from M, it completed extensive make safe works to the complainant’s property. These included make safe works to:
· Electricals: including isolating circuits to ensure safety
· Ceilings: trades responded to a bathroom ceiling collapse, removing wet insulation and damaged gyprock, propping unstable sections, and later removing the main-bedroom and walk-in- robe ceilings
· Roof areas: trades installed a spine wall, pumped out water, removed previously installed hold-downs, and applied new tarpaulins.
· Restoration technicians conducted moisture readings, documented water damage, and installed equipment to manage mould and moisture.
Available consultants’ reports and supporting information from the parties
I acknowledge D says that she has a building trades background. She says she has in depth knowledge of the requirements and processes M should have followed in undertaking the make safe works, and that it did not meet these requirements. The complainant has not provided any independent expert evidence in support of its position.
The insurer has provided two reports from M dated 11 September 2025 (Building Site Report) and 1 October 2025 (information on its make safe works), and tax invoice from M for make safe works completed and a detailed timeline. This information shows that:
· M’s first visit to the property took place on 3 September 2025
· the complainant advised that on 29 August 2025, its cleaner was getting the property ready for a wedding booking. The cleaner noted water dripping from the ceiling in the bridal suite after which suddenly the ceiling started to sag and split apart
· the complainant had a local carpenter attend who propped up the ceiling and installed a tarp over the roof
· on 5 September 2025 (after hours) M was informed that this tarp had failed allowing further significant water ingress
· on 6 September 2025, M arranged for electrical, ceiling and roof make safe works to be completed
· M noted the lower roof adjacent to the lounge room to the second floor was showing signs of panel separation and also in the stairwell to the second floor
· damage was noted in the bridal suite, landing, lower bedroom, bathroom, laundry, passageway and sunken lounge
· also noted was pre-existing cracking damage in the bathroom due to leaking balcony unrelated to the storm event
· on 8 September 2025, M sent the complainant an email with an update advising the make safe works were completed on 6 September 2025. Power had been restored in the morning (8 September 2025) (except for a second floor bedroom), and restoration works had also commenced which were expected to last three or four days
· over 9 September 2025 and 10 September 2025, M arranges for removal of wet insulation, damaged gyprock, clean-up of debris and removal of ceilings, including the bathroom ceiling which collapsed on or about 9 September 2025
· on 14 September 2025, M was informed of the existing roof tarp being affected by strong winds and the need for a heavier duty tarp to be installed
· on 16 September 2025, M built and installed a spine wall for added support and installed heavier tarps for full roof coverage.
I acknowledge the complainant says the heavier tarps were not installed on the 16 September 2025, but rather possibly this was completed on the 18th or 19th September 2025. The complainant however says she does not have any supporting information in this regard. This is because she says at this stage she was not aware a dispute would arise between the parties.
M’s actions have not been shown to be reckless or negligent
I empathise with the complainant’s position and accept this situation will have been stressful and inconvenient. This is especially given the fact D was overseas with work commitments at the time the storm damage originally occurred and ongoing issues continued to escalate. Unexpected damage to one’s property of itself is inconvenient let alone if one is overseas and needs to try and manage as best as possible for a few weeks before being able to return home.
In saying that, to accept the insurer is, on the balance or probabilities, liable for the claimed additional loss and damage, I must be persuaded that it acted in a reckless, careless or negligent manner. Further, that this conduct is most likely to have resulted in additional damage and associated financial loss.
Having considered the exchanged information, I am not satisfied the complainant has been able to show, on balance, that the insurer or M can reasonably be held liable for the claimed additional damage. This is because of the following.
Make safe works cannot reasonably be expected to be a guaranteed solution
I am satisfied it is fair to accept that make safe works by their very nature are considered temporary measures in an attempt to mitigate further damage from occurring. These steps are by no means a guaranteed solution or expected to meet the level of effectiveness or efficiency of comprehensive and long lasting repairs.
The effectiveness of roofing make safe works can be impacted by a variety of factors including but not limited to continued deterioration of the roof and subsequent severe weather events. These are factors outside the control of the party undertaking make safe works and must be considered on a case by case basis.
I am satisfied the exchanged information shows the building was exposed to subsequent significant weather events and the external roof continued to progressively worsen and fail.
Fair to accept roof continued to deteriorate
There is no dispute the initial stormwater ingress event resulting in damage to the property was due to a failure of a section of the external roof. I am satisfied the exchanged information shows, on balance, that the initial make safe measures completed by the complainant’s appointed consultant failed under subsequent weather conditions resulting in further stormwater ingress and damage.
The exchanged information shows it is most likely that the conditions and issues with the external roof continued to deteriorate. This led not only to the failure of existing make safe measures but the complexity of ensuring the success of subsequent make safe measures. I accept it was not unreasonable for M to initially rely on and attempt to work with the original make safe works (tarping of the roof) by the complainant’s appointed consultants.
I accept the complainant’s view that M did not remove and replace the original tarping with heavy duty tarping until around three weeks after the date of loss. However, I am not satisfied this of itself establishes M’s actions were reckless, negligent or inconsistent with accepted industry practice.
The exchanged information shows M was responsive to contact and information from the complainant as well as the developing circumstances. As noted above, I am not satisfied M’s election to initially try and work with the existing make safe efforts in place was unreasonable.
With hindsight, it may well be that installing heavier tarping sooner may have been the better option. However, I am not satisfied this establish recklessness or negligence on the part of M. Further, there is also no evidence that establishes, on balance, that installation of heavier tarping would have successfully prevented any further instances of stormwater ingress.
Difficult to distinguish between nature and/or cause of damage
I am satisfied the exchanged information shows the building had suffered damage from at least two, if not more, significant stormwater ingress events before M’s involvement. The first being the original storm event and second due a failure of the complainant’s appointed consultant’s make safe works.
I am satisfied the exchanged information shows after these two events the building presented with signs of water ingress not only upstairs but also to areas downstairs. I accept damage caused by the introduction of water/moisture to a building does not always become apparent straight away. It is fair to accept that the full extent of such damage quite often takes some time to become apparent.
There is no dispute that damage to the building progressively worsened on both floors as well as the external roof. I have not been provided with persuasive evidence that can reasonably be relied on to differentiate between damage resulting from each instance of stormwater ingress. I am not satisfied there is any persuasive evidence that can reasonably be relied on to determine the full extent of damage caused by the first two stormwater ingress events.
Further, without persuasive information, I am not satisfied it can reasonably be determined if there exists separate and identifiable building damage claimed to be caused by M’s works. This is in addition to the fact I am not satisfied M’s works or actions have been shown to be reckless or negligent.
Exchanged information show continuous engagement and attempts to mitigate further loss
I am satisfied the exchanged information shows, on balance, that M was in continuous and regular communication with the complainant. Further, that on each occasion that a concern was raised or it was made aware of issues with the make safe works, M made reasonable attempts to address these concerns. This included arranging additional make safe measures both within and outside of normal business hours.
As noted, these steps taken by M may not meet the complainant’s expectations. However, this does not mean M was reckless, negligent or did not act in accordance with accepted industry practices. I accept given the complainant was overseas, this made communication more challenging. However, despite this, I am satisfied M made reasonable efforts to keep the complainant up to date and acted on concerns raised fairly quickly.
I acknowledge the complainant’s position that it had arranged for B to attend to the building damage, but which were cancelled on the advice of the insurer/M. I accept a screenshot provided by the complainant supports the position that M warned the complainant that going ahead with private works may affect the claim outcome.
However, this screenshot also shows that M suggested the complainant contact the insurer to discuss its options and that as the property owner the complainant was free to take any course of action it felt was needed in the circumstances. I have not been provided with any evidence of the complainant discussing this with the insurer or, more importantly, of the insurer refusing a request for the complainant to use its own preferred repairer for repairs/make safe works.
I am satisfied the exchanged information, including the timeline from the insurer, shows on balance M was very proactive over the period in question. From being appointed to the job on 2 September 2025 till around 18-19 September 2025, M consistently engaged with the complainant and attempted make safe works. Further, that the make safe works, both internal and external, were significant.
No evidence of defective workmanship or unreasonable conduct
I have not been provided with any persuasive information to show the make safe works completed by M were defective. I accept that initial make safe efforts by the complainant’s carpenter and M were impacted by subsequent weather conditions and required rectification and reinforcement. Alos, I accept that not all the works completed by M met the complainant’s expectations. However, this does not establish negligence or recklessness on the part of M.
I am satisfied the insurer has shown the extent of works completed by M were significant and done so to try to mitigate further loss or damage. I acknowledge the complainant feels some of the internal works such as removing complete ceilings, insulation and cutting of electrical wires was excessive. However, I am not satisfied this has been shown to be the case. This is because both the insurer and M have provided reasonable explanations for the extent and nature of the works completed in an effort to make the property safe.
It is not reasonable to expect that M would be aware of what was happening at the property at all times of the days and nights over the relevant period. It is fair to accept M took measures such as installing dryers and dehumidifiers and which were left on for extended periods in an attempt to dry the property. It is not reasonable to expect M to have maintained a presence at the property at all times so to monitor the make safe works or the property.
M was not to know that further sections of the property were going to collapse or their attempted make safe works would not stand up to subsequent weather events during periods it was not present at the property. I am satisfied that whenever any additional damage or issues with the make safe works were brought to M’s attention, it acted promptly and reasonable attempts were made to address the issue/concern identified.
As noted, with hindsight, it may have been better for M to have arranged the heavier tarping earlier. However, there is no evidence to show that M was required or that it is industry standard to expect the use of heavy tarping form the start. It is also fair to accept as the damage/deterioration of the external roof progressively increased, this impacted on the scope and requirements of the necessary make safe works over time.
Insurer not liable for the additional loss and damage claimed
Given the above, I am not satisfied it has been established, on balance, that the insurer is responsible for the additional loss and damage claimed. There is no dispute the condition of the building progressively worsened given the nature and cause of the damage. However, I am not satisfied this was due to recklessness or negligence on the part of the insurer or M.
I accept the circumstances relevant to the claim and complainant are unfortunate and empathise with the position the complainant finds itself in. However, for the reasons discussed, it would not be fair to require the insurer to accept liability for the claimed additional damage and associated financial loss.
2.2 Why is the outcome fair?
The outcome is fair as it based on the exchanged information. It is clear the complainant’s property did suffer further damage after the original storm event. However, without persuasive evidence of this being due to the insurer’s actions being reckless or negligent, it would be unfair to hold it liable for the additional loss and damage.
Make safe works by their very nature are temporary measures put in place in an attempt to prevent further loss or damage. They cannot be expected to meet the levels of protection provided by extensive professional repairs.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Insurer’s timeline for M’s make safe efforts
M Attendance & Actions – Timeline
|
Date
|
M Attendance / Activity
|
Details of What M Did
|
2/9/2025
|
Job received; contact attempt
|
Contacted insured; insured overseas; authority provided for lockbox access.
|
3/9/2025
|
M inspection completed
|
Identified ceiling failure; confirmed a private make-safe had already been done by local carpenter (propping ceiling & tarping roof).
|
5/9/2025
|
Insured reported further water ingress
|
M informed that the insured’s tarp failed, causing heavy water ingress.
|
5/9/2025
|
M makesafe arranged
|
Responded to after-hours incident and arranged M trades to attend.
|
6/9/2025
|
M makesafe completed
|
Re-tarped roof; isolated electrical circuits;
|
8/9/2025
|
Restorations commenced
|
Began restoration works to ground and second-floor bedrooms.
|
9/9/2025
|
Bathroom ceiling collapse reported
|
Insured notified M; M discussed bedroom access restrictions due to guests.
|
9/9/2025
|
Additional makesafe arranged and attended
|
Removed wet insulation, removed damaged gyprock, propped ceiling, cleaned debris, placed plastic sheeting for next-day ceiling removal.
|
10/9/2025
|
Ceiling removal works
|
Entire ceiling & insulation removed from main bedroom & WIR; cleaned floors in bedroom, hallway, bathroom. [
|
11/9/2025
|
M submitted assessment report
|
Report & estimate submitted to [insurer].
|
14/9/2025
|
M request for upgraded tarp
|
Reported existing tarp affected by strong winds; requested heavier-duty tarp installation.
|
15/9/2025
|
Approval received
|
Authority granted to install medium-weight tarp.
|
16/9/2025
|
M additional roof tarping completed
|
Built and installed spine wall for added support; installed heavier tarps for full coverage; photos provided in assessment.