Denial of storm damage claim; inadequate make safe works causing additional water and mould damage; claim mismanagement
Text of the determination
Determination
|
Case number
|
12-25-308785
|
Financial firm
|
Auto & General Services Pty Ltd
Case number: 12-25-308785 4 September 2026
1 Determination overview
1.1 Complaint
The complainants held an insured events building and contents policy with the financial firm (insurer) for their home in Victoria (property). On 25 June 2025, they lodged a claim for damage to their home. They say the damage happened when water entered the dwelling during a storm that hit the local area the evening prior.
The insurer initially accepted the claim and agreed to undertake repairs after maintenance works had been completed by the complainants. However, it later began an investigation and subsequently withdrew its acceptance of the claim. The insurer now says the claimed damage is not the result of an insured event (that is, the storm). Rather, it says the proximate cause of the claimed damage is wear and tear and the fact the property was not maintained in ‘good condition’. Damage caused in this manner is excluded from cover under the terms and conditions of the policy.
The complainants disagree. They say, amongst other things:
· the insurer should accept their claim in full because the proximate cause of the building damage is an insured event
· in the alternative, the insurer should accept their claim in full because they relied upon the insurer’s initial acceptance of the claim, before it decided to investigate matters and then deny it.
The complainants also say that, during the second half of 2025, the insurer failed to complete urgent make safe and remediation works in a timely manner. This failure led to additional water ingress damage, including mould damage. They say that, regardless of the insurer’s decision about the original claim, it should cover the costs to repair the new damage, and also pay for temporary accommodation that will be required when the repairs are undertaken.
The complainants stress the insurer’s unreasonable insistence that they sign a ‘waiver’ before make safe and remediation works could be undertaken was a primary cause of the delay which led to the additional water and mould damage.
Finally, the complainants say the insurer mismanaged the claim process and, in doing so, breached its duty of the utmost good faith pursuant to section 13 of the Insurance Contracts Act 1984 (the Act), as well as the provisions of the General Insurance Code of Practice (GICOP). The complainants say they have suffered serious inconvenience, anxiety, upset, reputational harm and physical illness as result. They say the insurer should pay each of them $6,300 in non-financial loss compensation.
1.2 Issues and key findings
Should the insurer accept the original claim on the basis the damage was caused by an insured event?
No. There is no dispute the storm occurred, and stormwater entered the property. However, the exchanged material shows the proximate cause of the damage is long-term deterioration, wear and tear and a failure to maintain the property in good condition. It follows the insurer is entitled to deny the original claim on the basis the damage is not caused by an insured event.
Should the insurer be compelled to honour its initial acceptance of the claim?
No. The insurer’s reversal of its initial decision to accept the claim is unfortunate. However, it was entitled to investigate the circumstances of the loss and damage and ultimately change its claim decision. Any prejudice or loss suffered by the complainants because of their reliance upon the insurer’s initial claim acceptance can be addressed via an award of non-financial loss compensation.
Were the insurer’s make safe arrangements adequate?
No. The exchanged material shows the insurer’s make safe arrangements were inadequate and were a cause of the additional damage and the spread of mould. It follows the insurer should accept liability for this additional damage, including the damage related to the mould.
Should the insurer pay non-financial compensation?
Yes. The insurer should pay each complainant $6,000 non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainants have not established a valid claim for the original building damage
· the exchanged material shows the proximate cause of the original building damage is wear and tear and gradual deterioration over time, as well a failure to maintain the property in good condition
· it follows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim for the original building damage
· the insurer was entitled to investigate the claim and, ultimately, decide to deny it
· the insurer unreasonably delayed urgent make safe and remediation works
· the insurer’s insistence that the complainants sign a waiver was unfair and unreasonable
· the insurer’s failings regarding make safe works were a cause of additional damage, including mould damage. It follows the insurer should accept liability for this damage
· awards of non-financial loss compensation are appropriate and reasonable in this particular instance.
1.3 Determination
This determination is in mostly in favour of the complainants.
The complaint should be resolved in accordance with section 2.5 below, and the matters set out in this determination.
2 Reasons for determination
2.1 Should the insurer accept the original claim on the basis the damage was caused by an insured event?
No. There is no dispute the storm occurred, and stormwater entered the property. However, the exchanged material shows the proximate cause of the damage is long-term deterioration, wear and tear and a failure to maintain the property in good condition. It follows the insurer is entitled to deny the original claim on the basis the damage is not caused by an insured event.
Complainants say the storm caused the building damage
The property includes a two-storey (split level), five-bedroom, brick-veneer dwelling situated on a sloping block of land. The dwelling has a pitched tiled roof and a large rear balcony. The exchanged material shows it was built in about 1980. The complainants have owned the property since late 2024.
The complainants incepted the policy in May 2025. They lodged the claim shortly afterwards, on 25 June 2025. They told the insurer:
Last night there was a heavy storm at the property, and I noticed that the kitchen floor was wet during this time. I looked up and saw cracks in the ceiling so went upstairs to check the upstairs area and noticed one of the windows had water pooling on the window frame near it.
Very soon after the claim was lodged the insurer arranged for a PB, builder, to attend the property. He saw an upstairs bedroom window frame (window) had water damage and applied flashing tape to the outer timber bottom of the window frame as a temporary measure. The make safe report says:
To ensure the immediate safety and integrity of the structure, we applied flashing tape to the bottom of the [upper level bedroom] window frame. This temporary measure is designed to prevent any further water entry until permanent repairs can be conducted. The flashing tape will act as a barrier, providing protection against water infiltration and minimizing the risk of additional damage.
The complainants say the building damage caused during the storm primarily involves the kitchen on the lower level of their home and the spare bedroom (especially the window) on the upper level.
The complainants say the dwelling was watertight before the storm. They also say that, since purchasing the property, they have completed extensive maintenance and improvements, including installing a full security alarm system, cameras, intercom, locks and blinds, as well as repainting and extensive gardening.
Insurer says the claimed damage is excluded from cover
The insurer says it is entitled to deny the claim because the damage was not caused by the storm. It says the proximate cause of the claimed damage is pre-existing, long-term deterioration and wear and tear that has worsened over time. The insurer also says the damage is a result of the home not being maintained in good condition. It says damage caused in this manner is excluded from cover under the terms and conditions of the policy.
Complainants have the onus to establish a valid claim
It is established insurance law that the complainants first have the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainants are able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim, either wholly or in part.
Policy provides cover for damage caused by various insured events, including ‘Storms and rainwater’
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the policy.
The policy provides cover for specified insured events, including ‘Storms and rainwater’. Page 37 of the PDS says:
Storms and rainwater
You are covered for
Loss or damage caused by storms and rainwater….
Page 76 of the PDS defines a ‘Storm’ as:
A weather event, including cyclones, that may be accompanied by strong winds, rain, lightning, hail, snow, or dust.
This definition is not controversial, and the insurer accepts the storm occurred.
Policy cover is subject to limitation and exclusions
The cover provided by the policy is subject to limitations, conditions and exclusions.
Policy exclusions specifically related to the insured event ‘Storms and rainwater’ are set out at page 37 of the PDS and, relevantly, include the following:
Storms and rainwater
You are not covered for
Loss or damage caused by:
[…]
· rain, hail, wind, snow, or dust due to:
- […]
- the home not being in good condition, including guttering and drain pipes. See conditions of your cover on page 15.
As set out above, the insurer relies upon these specific policy exclusions to deny the claim.
General policy exclusions that relate to all insured events are also set out at pages 61 to 65 of the PDS. Relevantly, these include:
General Exclusions:
What this policy will never cover
Some events and causes are never covered by this policy. These are known as ‘General Exclusions’ and apply to the whole policy. You are not covered for any loss, damage, or legal liability you incur resulting directly or indirectly from events and causes listed below.
· Not in good condition
You are not covered for loss or damage you incur because:
- you have not kept the home or contents in good condition, or
- existing defects or faults contributed to or caused the loss or damage….
[…]
· Gradual deterioration
You are not covered for loss or damage caused by any gradual deterioration to the extent that the gradual deterioration contributed to or caused the loss or damage. Some examples of gradual deterioration are things like rust, corrosion, rot, mould, rising damp, mildew, wear, tear, or fading.
· When your claim involves gradual deterioration
We will not repair or replace parts of your home or contents that have suffered loss or damage as a result of gradual deterioration. In the instance where there are multiple causes or areas of loss or damage to your home or contents, we will cover the part of the loss or damage caused by an insured event or optional cover.
The insurer also relies upon these general policy exclusions to deny the claim.
Experts inspected the property
The insurer arranged for PB to conduct a full inspection the property on 26 June 2025. Upon inspection, PB recorded the window make safe completed shortly beforehand. It also observed water ingress due to deteriorated window frames and seals. There was also evidence of previous attempts to patch or repair. PB concluded the window damage appeared to be long-term in nature. PB says:
The window frame appeared to show long term wood rot from rainwater impact over the years, resulting in the water ingress occurring.
In addition, PB observed multiple previous water damage patch marks throughout the ceiling of the kitchen and lounge area. PB says this makes it difficult to distinguish between recent, pre-existing and recurring damage.
PB concluded:
The damages appear to be long-term and existing before the customer had purchased the property. Viewing the above window frame area, we noticed the [roof] tiles in close proximity had sealant applied between the lapping joints. This indicates that this issue has occurred in the past and the previous owners had applied this sealant as an attempt of a solution to the damages. It is likely the previous owners had patched over and hidden these issues prior to selling the property, to which [sic] they have since resurfaced.
The insurer then arranged for MR, roofing specialist, to inspect the property on 10 July 2025. Upon inspection MR observed broken tiles on the roof above the kitchen area, as well as an overflowing gutter holding water. MR concluded:
· the cause of the water ingress into the property is wear and tear and lack of maintenance
· there is a roof leak into the kitchen area caused by broken tiles and an overflowing gutter
· the gutter in this area is also overflowing onto the window below which is rotting, and then entering the building in this area as well
· the gutter is holding water at this spot which will be the main point of overflow.
MR also noted:
· superfluous silicone on tile laps
· rusting gutters
· rusting flashings
· rotten timbers.
MS says that, although these additional defects may not be leaking currently, they will cause problems in the future. He recommended all defects be rectified including replacement of the:
· rusted gutters, ensuring correct grade
· broken roof tiles
· defective timbers and flashings.
Proximate cause of damage needs to be assessed
Damage can have more than one cause. For instance, in this matter the complainant says the claimed building damage was caused by the storm. In contrast, the insurer says the damage was caused by a combination of factors, including gradual deterioration, wear and tear, and a failure to maintain the dwelling in good condition, all of which are excluded under the terms and conditions of the policy.
In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.
Storm was not the proximate cause of the building damage
In all the circumstances, I am of the view the exchanged material shows the storm was not the proximate cause of the claimed building damage. Indeed, I am satisfied the proximate, dominant and effective cause of the damage is long-term gradual deterioration and wear and tear, as well as the fact that parts of the dwelling were not in good condition when the storm occurred. It follows the complainants have failed to establish a valid claim for the building damage. The insurer is, therefore, entitled to deny the claim.
This is because of the following considerations.
First, the opinions and conclusions of PB and MR are broadly consistent, logical and well-reasoned. Whilst the evidence shows rainwater entered the complainants’ home through the window above the kitchen and caused damage, the insurer’s experts agree that the proximate cause of that damage is long-term wear and tear and deterioration over time. In particular, the exchanged material shows pre-existing damage of a long-term nature to the window and the guttering, as well as parts of the roof above the kitchen.
PB described the mechanism of damage as rainwater flowing from the roof and gutters onto the timber window below. The window frame is rotting, and this allows rainwater into the dwelling.
The reports of PB and MR also include illustrative photographs depicting some of the pre-existing problems and defects, as well as prior repair and patching attempts.
Second, I accept the complainants say that, prior to the storm of June 2025, their home was watertight and well maintained. They also say that, since purchasing the property about six months beforehand, they had completed extensive maintenance and improvements. I have no doubt this is true. However, the exchanged material does not include evidence about roof or gutter repairs having been completed by the complainants, or repairs of the window frame. Also, I note there is no pre-purchase inspection report in the exchanged material.
Third, even if I found the complainants had established a valid claim for the building damage (which I have not), I would also find the exchanged material clearly shows the proximate cause of the building damage (that is, wear and tear and gradual deterioration) is excluded from cover under the terms of the policy.
Fourth, I also accept the complainants may not have been aware of the extent of the roof and window problems prior to the storm or, at least, they may not have appreciated the risk that damage might result because of the pre-exiting roof and window defects. However, knowledge of pre-existing damage and defects is not a consideration taken into account when determining whether the general policy exclusion related to ‘Gradual deterioration’ applies.
In conclusion, I am of the opinion the complainants have failed to show the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. In other words, they have failed to establish a valid claim for the building damage. It follows the insurer is entitled to deny the claim.
2.2 Should the insurer be compelled to honour its initial acceptance of the claim?
No. The insurer’s reversal of its initial decision to accept the claim is unfortunate. However, it was entitled to investigate the circumstances of the loss and damage and ultimately change its claim decision. Any prejudice or loss suffered by the complainants because of their reliance upon the insurer’s initial claim acceptance can be addressed via an award of non-financial loss compensation.
Complainants say insurer should honour its initial claim acceptance
As set out above, the storm occurred on about 24 June 2025, and the complainants lodged the claim the following day. Shortly afterwards, a make safe to the window was completed.
PB inspected the property on 26 June 2025 and, several weeks later, MR inspected the roof. Both MR and PB provided reports after their inspections.
The insurer then accepted the claim on 21 July 2025, subject to the complainants completing maintenance work on the roof, gutters and rotted timbers.
Around this time the complainants advised the insurer that the window make safe had failed and, as a result, rainwater had entered the property again during further storms. They said the new damage included mould.
The insurer says it then became concerned about the likely repair costs, and the fact the complainants did not arrange for a pre-purchase report to be completed before they bought the property. The insurer also noted the policy was only 27 days old when the storm occurred. It therefore commenced an investigation of the claim in August 2025.
That investigation concluded in about mid-October 2025. The insurer then conveyed its revised decision to deny the claim.
In the meantime, the complainants spent considerable effort and expense completing the maintenance works.
They say the insurer should honour its original decision to accept the claim because:
· they relied upon the insurer’s initial claim acceptance in several ways, including completing maintenance works as soon as their financial resources allowed
· their maintenance did not include the window in the upstairs bedroom, as they assumed it was covered as part of the insurer’s claim acceptance
· the insurer’s subsequent claim denial has led to an unfair and unreasonable outcome.
The insurer says it reversed its initial claim decision because:
· new damages occurred in July 2025 which required assessment. As mentioned, the new damages were reported by the complainants after the insurer’s window make safe failed
· it discovered the estimated cost of repairs was significant.
Insurer was entitled to investigate circumstances of damage and loss
It is unfortunate that the insurer reversed its decision and denied the claim. Ideally, this should not have occurred. Such conduct no doubt creates expectations and a false sense of hope and anticipation in the minds of the complainants which is inevitably dashed.
Nevertheless, in this particular instance, I am satisfied the insurer was entitled to further investigate the circumstances of the loss and damage and ultimately reverse its claim decision. This is because the circumstances of the overall claim changed, especially regarding the new damage reported in July 2025.
I am also satisfied that any prejudice suffered by the complainants because of their reliance upon the insurer’s initial claim acceptance can be addressed via an award of non-financial loss compensation.
2.3 Were the insurer’s make safe arrangements adequate?
No. The exchanged material shows the insurer’s make safe arrangements were inadequate and were a cause of the additional damage and the spread of mould. It follows the insurer should accept liability for this additional damage, including the damage related to the mould.
Insurer made further make safe and remediation works dependent upon a waiver
Less than a month after PB completed the window make safe, it failed. On 21 July 2025, the complainants informed the insurer about the failure, and said that further rainwater ingress had caused (and was continuing to cause) additional damage. They also say that a significant mould problem later developed and became severe. The mould problem mainly affects the lower level of their home.
Between the end of June 2025 and 21 July 2025, no additional make safe works were completed by the insurer. The insurer also failed to instal dryers. However, by about mid-July 2025, the complainants had begun the maintenance advised by the insurer, including repairs to the roof and gutters and the replacement of defective flashings. (The complainants then told the insurer the maintenance works were completed in the second half of August 2025).
The insurer arranged for PB to inspect the property again on 24 July 2025. PB’s report written pursuant to that inspection says, amongst other things:
The customer advised that they have discovered additional water damages to the kitchen area they suspect to be the result of resultant rainwater ingress damage.
The customer advised that after the initial Make Safe [flashing] was completed to the window frame above the kitchen, this had temporarily stopped water ingress during rainstorms, however, water ingress had begun to reoccur after several rainstorm events days after our initial attendance
PB reported the following additional damage during this second inspection:
· additional damage to the kitchen ceiling panels
· laminate benchtop swelled at joint lines
· floating floors swelling in multiple seam line areas
· side cabinetry panels along oven and microwave section swelled
· a raised floor of the living area adjacent to the kitchen wall (although PB thought this did not look to be water damage and was probably a pre-existing condition)
· water damage to ceiling of living area along with multiple patch parks.
PB was hesitant to comment on the cause of the additional damage and recommended a restorer inspect the property.
Accordingly, the insurer arranged for DS, restoration specialist, to inspect the property on 6 August 2025. At this stage, the insurer was still investigating the original claim and had not yet delivered its claim denial.
DS found significant mould and water damage, primarily affecting the ground floor. DS observed multiple rooms (including a bedroom, the kitchen, the meals/family area, and the loungeroom) had mould-affected materials, including insulation, wall linings, cabinetry, and hybrid floating flooring. DS says these rooms that were visibly affected by mould and moisture which has been caused by water ingress through the window in the upstairs bedroom.
DS said a strip out of the kitchen was required.
PB then provided a Scope of Works (SOW) and quotation to undertake additional make safe and remediation works, including works related to the mould damage. The SOW is dated 11 August 2025 and includes installing dryers and HEPA air scrubbers.
The parties remained in dispute about several issues. However, the insurer eventually agreed to pay for additional make safe and remediation works (presumably in accordance with PB’s SOW), but only on the condition the complainants sign what it described as a ‘waiver’. The waiver states the insurer would not be liable for the costs of the works if the claim was ultimately denied. The means, if the works are undertaken before a claim decision is delivered, and the insurer ultimately decides to deny the claim, the complainants would incur significant costs.
In an email dated 18 September 2025 the insurer told the complainants:
I will also reach out to the claims team to arrange an urgent make safe to have trades attend to search, confirm and treat any mold [sic] that is present, drying needed or any other urgent works needed.
Please do not forget there will be a waiver involved depending on what works they will need to complete.
This shows the insurer was aware of the mould problem in mid-September 2025, yet it had tied competition of additional make safe works (including drying) to the requirement that the complainants would need to sign the waiver.
The complainants refused to sign the waiver, saying the policy does not compel them to sign such a document. They were also concerned PB’s SOW did not include reinstatement of the kitchen after the recommended strip out.
Complainants say insurer’s unreasonable demands and delays caused additional damage
The complainants say the insurer’s delay in carrying out additional make safe and remediation works has resulted in further damage to their home, including the spread of mould.
The insurer says:
· requiring the complainants to sign the waiver is reasonable
· the window make safe completed on 26 June 2025 was intended to be a temporary measure to prevent any further water entry into the dwelling until permanent repairs could be undertaken. Unfortunately, however, before those repairs were completed, additional water damage occurred
· works to repair the window are the responsibility of the complainants because the damage is pre-existing and the repairs required are maintenance works. This is consistent with the terms of the policy and the complainants’ obligation to maintain the property in good condition (see, for example, page 15 of the PDS).
Failure to arrange further make safe and remediation works was a cause of additional water and mould damage
In all the circumstances, I am satisfied the exchanged material shows the insurer’s failure to remedy the failed window make safe, and its failure to undertake further urgent make safe and remediation works in a timely manner, was a cause of the additional damage and spread of mould noted in DS’s report and in PB’s supplementary report dated 24 July 2025. It follows the insurer should accept liability for the additional damage caused by this failure.
This is because of the following considerations:
First, I note the insurer’s general policy obligation set out at page 41 of the PDS:
We will pay reasonable and necessary costs and fees to… perform any temporary work required to make the damaged or destroyed home and insured address safe.
I am satisfied the insurer failed to complete adequate and reasonable make safe works in a timely manner. This failure was a cause of the additional damage and spread of mould. The exchanged material shows that, to date, the insurer has failed to:
· deploy drying equipment
· perform dehumidification
· stop mould growth
· heed DS’s moisture readings and findings
· heed PB’s recommendations regarding a proper make safe.
Second, the amount of additional damage and mould spread is significant and constitutes the bulk of the damage now being claimed.
Third, the purpose of make-safe works is to protect the property and mitigate the risk of further loss while the insurer investigates and assesses the claim. The insurer’s window make safe failed less than a month after it was undertaken. There is no evidence which indicates the insurer fixed its defective make safe. It should have done so.
Fourth, I accept the complainants thought PB told them on 19 September 2025:
· PB had been authorised to commence make safe and restoration works (drying/treatment) but not repairs/reinstatement
· the scope of the works was extensive, requiring removal of flooring, joinery and subfloor, plus the installation of drying equipment
· PB’s evidence confirmed mould was present and there was a risk of further spread.
Urgent make safe and remediation works of this kind are temporary and preventative measures and do not constitute a final settlement of the parties' rights under the terms and conditions of the policy. In the circumstances, I do not consider it was reasonable for the insurer to require the complainants to sign a waiver as a condition of undertaking necessary and urgent make-safe and remediation works. To do so would effectively require the complainants to relinquish their rights in order to obtain emergency protection of the property, which is inconsistent with the purpose of make-safe works and the insurer's obligation to take reasonable steps to mitigate further loss. For instance, the complainants would have no say in the costs of such works or who completed them. This would result in an unfair outcome if they were ultimately required to pay for the works pursuant to the terms of the waiver.
Fifth, while most of the additional damage developed (including the spread of mould), the insurer was still in the process of investigating the claim. It had not yet made its final decision to deny the claim. It is therefore wrong for the insurer to say that, during the period of early July 2025 through to September 2025, it was the complainants’ responsibility to fix the window. At that stage, the complainants were still entitled to assume the window would likely be repaired by the insurer, especially considering its initial acceptance of the claim in July 2025.
Sixth, all insured’s have a general duty to mitigate loss and damage. However, in this particular instance, the insurer’s letter to the complainants outlining what maintenance was required was sent almost a month after the initial window make safe was completed by PB. The complainants then began to undertake the maintenance works as soon as practicable, and according to their available finances. Furthermore, as set out above, at that point in time they were still entitled to assume the damaged window would likely be repaired as part of an overall claim acceptance. The insurer did not convey its revised decision to deny the claim until about mid-October 2025. By that stage, most of the further damage had already occurred.
In conclusion, the insurer must accept liability for the additional water and mould damage caused by reason of its failure to arrange adequate make safe and remediation works in a timely manner. The additional damage should be dealt with in accordance with section 2.6 below, and the matters set out in this determination.
2.4 Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay each complainant $6,000 non-financial loss compensation.
Complainants say insurer’s claim management was poor and inadequate
The complainants are dissatisfied with how the claim was handled by the insurer. They have raised numerous concerns including, but not limited to, the following:
· the claim was initially accepted, and they incurred considerable maintenance expenses, prior to the commencement of the investigation and subsequent claim denial. Although they accept they would have needed to complete the maintenance in any event, the complainants say they expended a great deal of energy and incurred financial pressure to complete the maintenance as quickly as possible
· significant avoidable claim delays were caused by the insurer
· the insurer’s insistence on a waiver was unreasonable
· the conduct of some of the insurer’s staff was less than ideal
· the insurer’s efforts to cash settle the claim were poorly managed
· the insurer misinterpreted comments made by one of the complainants and escalated concerns to third parties (including the police and his employer), thereby causing reputational harm and disturbing his peace of mind
· the insurer unreasonably requested the complainants attend a formal interview, despite them saying they did not feel comfortable with the proposed interviewer’s conduct
· the insurer breached the GICOP and section 13 of the Act.
They say the insurer should therefore pay them non-financial loss compensation.
AFCA can award non-financial loss compensation in certain circumstances
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
However, complainants should note that non-financial loss is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
Award of non-financial loss compensation is reasonable and appropriate in this instance
I accept the complainants in this matter have suffered significant upset, an unusual degree of physical inconvenience and interference with their expectation of enjoyment and peace of mind. I am also satisfied much of this upset, inconvenience and interference with their peace of mind has been caused by the insurer, primarily in the following ways.
Insurer caused avoidable delays claim delays
The insurer caused avoidable delays during the claim process. For instance, by about mid-September 2025, the complainants had clearly conveyed to the insurer the urgency of the necessary make-safe and remediation works. The complainants told the insurer:
· [PB has] been authorised to commence restoration works (drying/treatment) but not repairs/reinstatement
· the scope of the restoration works is extensive, requiring removal of flooring, joinery and subfloor, plus drying equipment
· [PB’s] report confirms mould is present and there is a risk of further spread.
In addition, in an email dated 19 September 2025, one of the complainants told the insurer:
· he was unwell and off work for an entire week in July 2025 as well as several days in mid July 2025, which was out of character for him. This coincides with [PB’s] confirmation of mould at the property
· he required five consecutive days off work due to a severe respiratory infection which his General Practitioner treated with two full courses of antibiotics. He believes there is a strong possibility this was caused by preparing and consuming meals three times daily in a damp kitchen with mould spores present
· his wife suffered from swollen lymph nodes and fatigue, for which she attended her GP. She has since left the property as she is no longer comfortable residing in what she reasonably believes to be a hazardous environment.
Nevertheless, despite the urgency, the insurer maintained its insistence on the waiver being signed before the additional make-safe and remediation works could be commenced. This caused an unnecessary significant claim delay.
Insistence on the waiver was unreasonable and unfair
In an email dated 7 October 2025, the insurer told the complainants:
We are more than happy to complete remediation works. However, due to the status of the claim, we cannot confirm if the replacement flooring and walls will be covered or not.
This is why the waiver is required. The waiver notes that any works completed is to address the wetness and mould concerns and if the claim is not accepted, the trades and the insurance company are not responsible for the replacement costs.
The trades cannot and will not completed [sic] any works without the waiver signed.
If you continue to chose [sic] to not sign the waiver, and the damages get worse, further damages MAY not be covered. It is unclear if they will or will not be covered because it will depend on the damages and outcome of the claim [emphasis added].
The complainants immediately raised concerns about being forced to sign a waiver to enable the insurer to complete make safe works ‘to address the wetness and mould’. Then, in another email sent about an hour later on 7 October 2025, the insurer confirmed the requirement to sign a waiver was not a term of the policy. It said:
I can confirm the PDS does not outline the requirements of the waiver that is required to be signed in your case.
I am of the view these communications, and the insistence of a signed waiver in the first place, is an example of very poor claim management.
Insurer’s cash settlement offer was poorly managed
As progress stalled and the parties remained in dispute, the complainants arranged for SP, another specialist restorer, to assess the extent of mould contamination on 1 December 2025. Upon inspection SP observed:
· clear indications of organic activity (early-stage fungal growth)
· significant swelling and deterioration of kitchen joinery and floor coverings
· rot and degradation of ceiling and wall linings
· historical moisture staining in the crawl space beneath the kitchen
· microbial contamination consistent with Category 3 stormwater ingress.
SP said the dwelling had remained in a compromised state for an extended period since the insured event, with no drying systems installed.
SP recommended:
Due to the duration, moisture load, and visible organic growth, we conclude that harmful microbial amplification may be present within concealed voids and materials that appear superficially dry.
A full end-to-end Category 3 remediation and reinstatement scope is therefore mandatory.
The recommended remediation includes, but is not limited to, a strip out of the kitchen and disposal of unsalvageable contents.
Subsequently, on 12 December 2025, the insurer conveyed a further claim decision to accept the costs associated with mould restoration, as well temporary accommodation for the duration of the repair works (albeit the claim would ‘remain formally declined’). The insurer wrote to AFCA and advised:
Acceptance of mould restoration costs and temporary accommodation whilst the restoration is completed should be provided to the customer under the claim. As discussed, the Insurer is reviewing the compensation offer and will advise the revised amount next week.
The insurer then arranged for DS and PB to attend at the property again for a further inspection and to complete a SOW on 23 December 2025. A representative of the insurer, PT, also attended. An ‘Internal Site Report’ related to the inspection was then produced by the insurer.
The report does not assist. It appears to have been written by PT and does not mention specific opinions or conclusions expressed by DS or PB. The report does not reveal PT’s expertise or qualifications. It is of little benefit.
In addition, the complainants raised serious concerns about PT’s behaviour during the inspection. They said PT’s conduct was ‘intimidating, dismissive, and inconsistent with good faith claims handling’. The complainants asked the insurer to arrange for a different person to inspect their property. The complainants told the insurer:
The site visit conducted on 23 December 2025 was expressly arranged for a single purpose: to assess further deterioration and to finalise a comprehensive scope of works following prolonged delay and the absence of effective water management. It was not presented to me as a causation or coverage investigation, and acceptance of remediation had already been communicated.
Despite this:
• no full scope of works has been provided;
• the insurer committed to providing the scope by 5 January 2026 and failed to do so;
• AFCA granted additional time, yet no compliant scope has been delivered; and
• the insurer has now ceased responding, including failing to respond to AFCA….
I remain living in a property confirmed by detailed [DS] reports to be uninhabitable due to Category 3 mould contamination. This was first identified over six months ago and was again confirmed during the December [2025] site attendance, including mould present in the kitchen where food is prepared. This presents an ongoing and serious health risk.
I also wish to highlight that no water management has ever been implemented at the property. The home continues to emit a strong, foul moisture odour consistent with ongoing dampness and mould activity
PB also produced a supplementary report dated 29 December 2025 pursuant to its inspection earlier that month. The report adds little new information about the condition of the property at that time or the cause of the additional water and mould damage.
The insurer did not produce a SOW or quotation in accordance with its additional claim decision dated 12 December 2025. However, on 20 May 2026 it belatedly made a cash settlement offer which appears to be based upon PB’s old SOW dated 11 August 2025. I am of the view this SOW does not include all works that would be necessary to repair the additional damage outlined in DS’s report and in PB’s second report dated 24 July 2025. The SOW is of little use.
The insurer also included a 20% uplift on this SOW in its cash settlement offer, together with $15,000 to cover temporary accommodation expenses.
Having examined the timeline of events which led to the insurer’s cash settlement offer, I am of the view that, during the period December 2025 to about mid-2026, the insurer again failed to effectively manage the claim or complete the urgent make safe and remedial works required to repair the additional damage caused by reason of its earlier claim management failures.
Insurer incorrectly sought a welfare check
On 4 September 2025, one of the complainants called the insurer and expressed dissatisfaction with the handling of their claim. In a later call with CU of the insurer that day, the complainants were formally notified the claim was under investigation. One of the complainants then questioned the insurer’s assertion it received new information when no trades had attended his property. The complainant said he was concerned about his health because he is an electrician and may have an incident at work. Additionally, he said he was being treated as a criminal and was shaking all over. The insurer subsequently called the police to do a welfare check. A written Notice of Investigation was also sent to the complainants.
I acknowledge the insurer’s concern for this complainant’s safety. However, I am not satisfied the complainant expressed any intent to self-harm or any evidence of any immediate psychological crisis to warrant a welfare check. I am persuaded the insurer’s actions caused the complainant reputation harm leading him to require additional clearances prior to being reinstated back at work. It also affected his peace of mind.
Insurer’s investigation requirements were excessive and unreasonable
The complainants say the insurer breached the GICOP. They refer to several provisions regarding claims handling, information requests and management, and complaint handling. In particular, the complainants are concerned the insurer prematurely concluded its investigations and temporarily closed their claim in October 2025 because they did not want to participate in an interview with CC, the insurer’s agent.
The complainant’s say they were upset after telephone calls with CC. They say CC acted unprofessionally and was accusatory and, therefore, they did not feel comfortable attending an interview with him.
The insurer is entitled to make reasonable enquiries and conduct investigations to clarify the circumstances surrounding the claim. It should, however, confine its enquiries to information which it reasonably needs to make a claim decision, and should endeavour to finalise the claim within a reasonable period of time.
I am of the view the insurer failed to adequately explain the importance of an interview. By September/October 2025, the insurer had all necessary expert evidence. Furthermore, there is no suggestion of fraud or other nefarious activities on the part of the complainants. Indeed, the insurer had no persuasive evidence that called into question the credit of the complainants at that time.
Insurer failed in other ways
I am satisfied the insurer also failed in its claim management in other ways, including the following:
· its change in claim decision was likely frustrating and upsetting. It should not have occurred and the representations its extended to the complainants during the initial stages of the claim should not have been made
· the insurer’s mixed messages caused the complainants unnecessary stress and inconvenience. I consider the insurer should have been more proactive in identifying policy coverage issues and communicating with the complainants in a more effective manner
· the insurer failed to properly and reasonably manage the claim in the period December 2025 to mid-2026 after it decided to accept liability for ‘mould restoration costs and temporary accommodation whilst the restoration is completed’
· the insurer failed to heed the complainants’ persistent concerns. This is reflected in several documents in the exchanged material. For instance, in an email dated 3 October 2025, the complainants said:
I expressly asked that urgent remediation works proceed, but not under a waiver that would unlawfully limit reinstatement rights as this was not listed in my PDS….
I asked multiple times for drying and mould treatment to commence, citing [PB’s] urgent recommendations.
I stated clearly that my concern was insurer delay, not my willingness to cooperate.
Insurer must pay each complainant $6,000 non-financial loss compensation
In conclusion, I accept the insurer’s claim mismanagement caused significant stress, anxiety, upset and inconvenience for the complainants. In all the circumstances, I am satisfied the insurer should pay each complainant $6,000 non-financial loss compensation.
2.5 Complaint should be resolved in this way
Time is of the essence
Within 14 days’ notice that the complainants accept this determination, the insurer must:
· pay each complainant $6,000 non-financial loss compensation
· formally accept liability for all additional damage including, but not limited to, mould damage, which has been caused by its inadequate make-safe arrangements and the consequential unnecessary delays.
Much of the additional water and mould damage that must be accepted by the insurer is set out in the reports of DS and SP, as well as PB’s supplementary report dated 24 July 2025. The content of PB’s supplementary report also contrasts clearly with the limited damage set out in its first report dated 26 June 2025. When PB first inspected the property on 26 June 2025, it noted damage to the window and the kitchen ceiling. I am satisfied that any additional damage over and above that set out in PB’s first report is the damage which should now be covered by the insurer.
The evidence of PB, DS and SP should provide a guide for the assessment of additional water and mould damage caused by reason of the insurer’s failings. However, to ensure the entirety of the additional water and mould damage is accounted for, as soon as possible after receiving notice that the complainants accept this determination, the insurer must:
· arrange for qualified experts who have not previously inspected the property including, but not limited to, a builder, engineer, hygienist and restorer, to inspect the complainants’ home and either separately or jointly prepare a SOW regarding the additional damage (including the mould-related damage) which developed and occurred since PB’s first inspection on 26 June 2025
· after receipt of the SOW(s), the insurer must promptly obtain at least one actionable quotation based upon the SOW(s), either by way of a tender process or otherwise. All repairs and remedial works included in the SOW(s) and the quote(s) must also comply with all current and applicable Commonwealth and Victorian building-related, safety-related and health-related laws, regulations and codes.
Within seven days of receipt of the quote(s), the insurer must elect to either:
· agree to commence the necessary repairs and associated works as soon as possible, or
· offer a cash settlement to the complainants based upon the preferred actionable quotation, but in accordance with the terms and conditions of the policy, plus a 20% contingency on top of this to factor in the risk of the works passing to the complainants and the likely possibility that further works may be required.
The insurer must also fund the costs associated with the temporary accommodation that will be required by the complainants, and the storage of their contents, while the repairs and remedial works are being undertaken. These particular benefits should not be limited by the terms and conditions of the policy, as the need for them has been created by the insurer’s claim mismanagement.
Finally, the insurer should assess any claim for mould or water-damaged contents. Again, this assessment should not be limited by the terms and conditions of the policy.
2.6 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainants have not established a valid claim for the original building damage
· the exchanged material shows the proximate cause of the original building damage is wear and tear and gradual deterioration over time, as well a failure to maintain the property in good condition
· it follows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim for the original building damage
· the insurer was entitled to investigate the claim and, ultimately, decide to deny it
· the insurer unreasonably delayed urgent make safe and remediation works
· the insurer’s insistence that the complainants sign a waiver was unfair and unreasonable
· the insurer’s failings regarding make safe works were a cause of additional damage, including mould damage. It follows the insurer should accept liability for this damage
· awards of non-financial loss compensation are appropriate and reasonable in this particular instance.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
Whilst the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.