Claim declined for water leak and subfloor mould on the basis of no resultant damage and pre-existing moisture conditions
Text of the determination
Determination
|
Case number
|
12-25-308365
|
Financial firm
|
AAI Limited
Case number: 12-25-308365 25 June 2026
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy with the financial firm (insurer). He made a claim after discovering a concealed leak at his property, which he says resulted in significant water beneath the home and widespread mould growth throughout the subfloor.
The insurer accepts that a water leak occurred but declined the claim saying there was no resultant damage at the property and the elevated moisture and mould in the subfloor was attributable to long term moisture conditions, rather than the leak.
The complainant disagrees and says the subfloor mould was caused by the leak, and the insurer prematurely declined the claim. He wants the insurer to accept the claim, appoint an independent expert, and pay compensation for non-financial loss.
1.2 Issues and key findings
Is the insurer required to accept the claim?
Not yet. The proximate cause of the damage has not been established, and it would be unfair to require the insurer to pay the claim when relevant information is outstanding. The insurer is to engage an independent expert to report on the cause and extent of the damage before making a final decision. The complainant is to cooperate with the insurer to facilitate this.
Is the insurer required to pay compensation for non-financial loss?
Yes. The insurer declined the claim without adequately considering its own restoration reports or appointing an expert to determine the cause of the mould and moisture damage. It is fair for the insurer to pay $1,000 compensation for non-financial loss.
Why is the outcome fair?
The insurer’s liability is determined by the terms and conditions of the policy. Although the complainant bears the onus of establishing a claimable loss under the policy, it is reasonable to expect that the insurer will also adequately investigate the claim. It is fair for the insurer to obtain a further expert report on causation and pay compensation for its poor claim handling.
1.3 Determination
This determination is partially in favour of the insurer.
Within 14 days of acceptance of this determination, the insurer is required to:
· pay the complainant $1,000 compensation for non-financial loss
· appoint a plumber other than RC to complete further leak detection testing
· provide the complainant with the names of two qualified independent indoor environmental experts or hygienists capable of reporting on the cause and extent of the damage.
The parties are to work together to finalise the assessment as follows:
· the complainant is to provide the unredacted pre-purchase pest report to the insurer and any pre-purchase building report (if one was obtained)
· the complainant is to nominate one of the experts to report on the cause and extent of the moisture and mould damage
· the insurer is to provide the complainant with written notice of its position on indemnity within 14 days of receiving the expert reports.
2 Reasons for determination
2.1 Is the insurer required to accept the claim?
Not yet. The proximate cause of the damage has not been established, and it would be unfair to require the insurer to pay the claim when relevant information is outstanding. The insurer is to engage an independent expert to report on the cause and extent of the damage before making a final decision. The complainant is to cooperate with the insurer to facilitate this.
Complainant has the onus to establish a claimable loss
It is accepted insurance law that an insured person has the initial onus to establish, on the balance of probabilities (that is more likely than not), that the loss or damage claimed falls within cover provided under the policy. Where this is established, the onus then shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
There is no dispute that the complainant was provided with the policy documents so the insurer may rely on them.
The terms and conditions of the policy are set out in the product disclosure statement (PDS). The PDS relevantly states that the policy covers sudden and unexpected loss or damage caused by escape of liquid (page 51) and accidental damage at home (page 70).
The PDS includes the following definitions:
· ‘Accidental loss or damage’ means sudden loss or damage that you didn’t intend or expect to happen (page 98)
· ‘Loss or damage’ means physical loss or physical damage, unless stated otherwise in your policy (page 101).
On 17 August 2025, the complainant lodged a claim for a concealed leak at the property after he received an email advising of unusually high-water usage and observed the meter was advancing with all taps turned off. At the time of claim lodgement, he advised the insurer:
I then inspected under the house and found substantial water running and pooling beneath the property, with mould beginning to occur. Conditions outside were dry, so this appears to be a concealed leak.
The insurer arranged for leak detection testing which confirmed there was a water leak at the property. The complainant arranged for the leak to be repaired on 21 August 2025.
The insurer declined the claim saying there was no resultant damage and the cost of repairing the leak is not covered under the policy.
The complainant requested a reassessment of the claim on the basis there was mould growth in the subfloor. The insurer maintained its denial saying that the elevated moisture readings and mould in the subfloor were caused by pre-existing issues rather than the water leak.
Insurer says the claim is not covered under the policy
The insurer accepts that an escape of liquid occurred during the period of insurance but says the complainant has not established the claimed damage was caused by that event.
The key question for determination is whether the proximate cause of the damage was the water leak or pre-existing issues. The proximate cause is the real, dominant, or effective cause; it is not necessarily the cause that most immediately preceded the damage.
The insurer also contends that the complainant failed to comply with his obligations under the policy by refusing to provide a complete copy of a pre-purchase inspection report.
The complainant has provided a heavily redacted copy of a pre-purchase pest inspection report dated 8 November 2021, which the insurer says is inadequate.
Insurer’s evidence regarding the cause of the damage
The insurer engaged multiple experts including a builder/restorer (BB) and a plumber (RC). Their reports are summarised in section 3.2 below.
BB attended on 18 August 2025 and conducted moisture mapping. BB found water in the subfloor and high moisture readings but was unsure if it was related to the leaking pipe.
RC attended on 19 August 2025 and engaged plumber? OS to complete a leak detection test. RC located a leaking pipe in the garden and observed water pooling under the floor but reported the property shows no resultant damage from the escape of liquid.
BB reattended on 20 August 2025 and reported there was mould present, but it was unknown if it was due to the leak?. BB believed the mould was more likely related to pre-existing conditions under the home.
On 25 August 2025, the insurer’s assessor provided a desktop report which concluded:
the proximate cause of the escape of liquid is confirmed to be a leak in what appears to be a main water line, which has been reasonably located under the garden areas to the left-hand side of the property by audible equipment, which has not caused any resultant damages.
On 9 September 2025, the assessor provided a further report with recommendations to:
· engage a restorer (RI) to determine the dominant cause of mould growth
· obtain the building and pest inspection report to assist with the restoration inspection
· RC to conduct a leak location test throughout the property to rule out contributing factors
· complete a dual assessment alongside RI.
These steps were not completed because the complainant objected to allowing RC to attend the property again on the basis that their initial report was flawed.
The complainant wants the insurer to cover the cost of engaging an independent expert to determine whether the leak caused mould, microbial activity and elevated moisture, and assess the extent of resultant damage and required remediation. The insurer says it is unable to agree to conditions imposed by the complainant regarding a further inspection.
Complainant’s evidence and submissions regarding the damage
The complainant says the leak occurred under the house, not in the garden. He has provided photos taken when the leak was discovered which he says show fresh mould and microbial growth consistent with recent moisture exposure.
He has also provided the following documents:
· invoice from plumber OM dated 21 August 2025 for repairs to the pipe ($535.04)
· extracts from a pre-purchase pest inspection report by builder GP dated 8 November 2021
· invoice dated 15 December 2022 for subfloor ventilation works ($9,877.12).
The unredacted sections of the pre-purchase report relevantly state:
· at the time of inspection, moisture readings were normal
· sub floor ventilation is considered to be poor
· mould was not found at the time of inspection.
However, the pre-purchase report has been heavily redacted, and the surrounding commentary relates to the both the interior and the subfloor. It is unclear whether moisture readings and mould samples were taken in the subfloor of the property.
The complainant says he installed a subfloor ventilation fan system because the house has an enclosed, raised subfloor cavity with limited natural airflow, which increases the risk of condensation and mould growth over time. He says the installation was purely preventative and there were no signs of moisture, mould or water pooling at the time of installation.
The complainant has provided numerous submissions to AFCA which I have considered. Amongst other things, he says:
· the leak was operating for up to three months as estimated by the insurer’s contractors
· water travelled beneath the home and saturated the soil with pooling documented
· mould and microbial activity formed in the subfloor directly above and adjacent to the leak
· the duration and scale of the leak provide a sufficient explanation for the mould observed
· no other plausible cause exists as it was an unusually dry winter
· the insurer relies on hypothetical possibilities rather than evidence of a competing cause
· the appearance of the mould cannot be explained by any long-term or unrelated cause
· he should not be required to provide an expert report or fund specialist investigations
· he cooperated with all qualified assessors and only declined a repeat attendance by RC
· a 2021 building and pest report cannot meaningfully address microbial activity in 2025
· extracts confirm moisture readings were normal, and mould was not identified in 2021
· the existence of a subfloor ventilation system does not indicate any prior issues but shows he was acting responsibly to maintain the property
· there is no evidence of pre-existing mould, and the leak is the only probable explanation.
Proximate cause of the damage has not been established
There is no dispute that an escape of liquid event occurred at the property. While there is conflicting information about the precise location of the leak, I am satisfied that water from the burst mains pipe saturated the soil under the house. The exchanged material shows that water was flowing and pooling under the subfloor in August 2025, and mould growth was observed in the subfloor cavity around the same time.
I accept that mould growth amounts to ‘loss or damage’ within the meaning of the policy. However, the complainant must establish that it occurred suddenly and unexpectedly for the policy to respond under either ‘escape of liquid’ or ‘accidental damage at home’.
I have carefully considered the evidence, and the cause and timing of the mould growth is not clear. While it is well known that elevated moisture levels within building cavities can cause mould growth, there is no currently persuasive evidence establishing a direct causal link between the claimed damage and the water leak.
RC reported that there was no resultant damage to the property, but they have not explained how they reached this conclusion. I do not consider their findings persuasive.
BB found water in the subfloor and high moisture readings but was unsure if it was related to the leaking pipe. BB could not connect the elevated moisture readings or observed mould to the leak and speculated that the property had long-term moisture issues due to the presence of a mechanical ventilation system and a prior sump. However, BB did not reach a concluded view and recommended that an indoor environmental expert be appointed to report on causation.
I acknowledge the complainant says there is no evidence of pre-existing issues. However, I am not persuaded he has shown that the water leak was the proximate cause of the damage. While he has provided photos from August 2025 which show mould growth, there are no photos showing the condition of the subfloor prior to the leak. It is not possible to establish the cause or timing of the mould growth based on the exchanged photos.
The redacted pre-purchase inspection report by GP is also of little assistance. It is unclear from the GP report whether there was any mould in the subfloor at the time of inspection or between 2021 and 2025. The GP report does indicate poor ventilation in the subfloor, which supports BB’s comments about potential long-term issues. However, the complainant has shown he took steps to improve the ventilation in 2022.
The fact the complainant installed subfloor ventilation alone does not establish that the claimed damage was pre-existing. However, it does raise questions regarding causation and his awareness of potential moisture issues in the subfloor.
Based on the available evidence, I am unable to reach a concluded view on the proximate cause of the damage. While the water leak clearly impacted the subfloor, the exchanged material raises concerns about pre-existing issues with moisture and ventilation in that area.
I consider it plausible that the water leak contributed to the damage, but it is unclear from the exchanged material whether this was the operative or effective cause of damage. It is also unclear whether the mould damage occurred suddenly or over time. The complainant therefore has not yet established a claimable loss based on the present information.
Insurer says it needs to complete further assessments
The insurer says that the initial decision to decline the claim was made by its home claims department and does not represent the final claim outcome decision. The insurer says it is unable to make a final decision on coverage until further assessments have been conducted.
The insurer has requested information from the complainant and offered to undertake further investigations including:
· asking the complainant to provide an unredacted pre-purchase building and pest inspection report
· comprehensive leak detection testing across the rest of the property to determine whether additional leaks may be contributing to the moisture and mould issues
· engaging restorer RI to conduct a specialist assessment to determine the dominant cause of mould growth in the affected areas and attend a dual assessment.
The complainant says further leak detection testing is unwarranted and he does not want RC to reattend given issues with its prior reports. He has also only provided a redacted version of the pre-purchase report and stated that the expert appointed to report on causation ‘must not stray into speculative commentary about unrelated maintenance, ventilation history, or pre-purchase conditions.’
Insurer is entitled to assess the claim and request information
The policy details that the complainant must cooperate with the insurer and provide all relevant information and documents necessary to help the insurer deal with the claim.
Page 74 of the PDS states under the heading ‘Making a claim’:
What you must do
· provide us with any inspection report you might have obtained prior to purchasing the building
Page 75 of the PDS states:
If you don’t comply with ‘What you must do’ and ‘What you must not do’ or what you must do under ‘Legal liability claims’ we can do either or both of the following:
· reduce or refuse to pay your claim (see page 12)
It is settled insurance practice that an insurer is entitled to assess and investigate a claim to determine its liability. This includes reasonable requests for information. When determining if the insurer is entitled to request the information, AFCA considers whether:
· the information requested from the complainant was necessary for the investigation of the claim circumstances
· the insurer’s request was reasonable
· the complainant has done everything in their power to comply.
Additionally, section 13 of the Insurance Contracts Act 1984 (the Act), requires each party to act towards the other party with the utmost good faith, in respect of any matter arising under or in relation to the contract. The duty of utmost good faith obliges the complainant to provide reasonable assistance to the insurer to enable it to assess the claim.
Insurer’s request for information is reasonable
The insurer says the complainant failed to cooperate with the further assessment and supply all relevant information to validate the circumstances of the claim. The insurer wrote to the complainant on 29 September 2025 explaining the reasons for its requests. The complainant has since provided a heavily redacted copy of the pre-purchase report.
I am satisfied the complainant has failed to provide all information requested by the insurer and the outstanding documents and assessments are reasonably required to enable the insurer to assess its liability for the claim.
I acknowledge the pre-purchase report by GP does not address microbial activity in 2025. However, it is relevant to the assessment of the claim because it provides useful information regarding the pre-existing condition of the subfloor, including ventilation, drainage and any historical issues with mould and moisture.
While the unredacted sections of the report state that no mould or moisture was detected, it is unclear precisely which areas were inspected and what testing was conducted (if any).
GP identified concerns with the subfloor ventilation and recommended the complainant seek further advice. When this is considered together with BB’s findings about potential long-term moisture issues, the GP report is clearly relevant to the question of causation. I consider the insurer’s request for the complainant to provide the unredacted document reasonable and consistent with his policy obligations.
I also consider it reasonable for the insurer to conduct further leak detection testing at the property to determine whether additional water sources may be contributing to the moisture and mould issues. The insurer’s proposal demonstrates a thorough approach to assessing the claim. However, the complainant does not want RC to attend. I am satisfied that the initial report by RC did not adequately address whether the water leak caused damage to the property and the location of the leak is disputed. In the circumstances, it is fair for the insurer to engage another leak detection plumber to complete the further testing.
Fair for insurer to engage an independent expert to report on causation
Based on the available information, I am unable to conclude that the claimed damage occurred suddenly due to the water leak or any other unexpected cause. However, I also am not currently persuaded that the damage was pre-existing as suggested by the insurer.
Although the complainant bears the onus of proving a claimable loss, it is reasonable to expect that an insurer will properly investigate the cause of the damage. I consider it unsatisfactory that the insurer declined the claim without engaging an indoor environmental expert or hygienist to report on the cause and extent of the mould damage. The insurer appears to acknowledge this as it has proposed further assessments.
The complainant initially wanted the insurer to engage an independent expert to report on whether the water leak caused or materially contributed to the mould damage. However, he now says the insurer should engage an independent expert to map moisture migration, confirm microbial contamination, assess health and structural risk, determine the full extent of damage and outline correct remediation (with no mention of causation). Given inconsistencies in the insurer’s initial assessment, the complainant wants to select the expert.
For the reasons outlined above, it is necessary for the expert to report on causation.
I consider it fair for the parties to work together to arrange a further assessment as follows:
· insurer is to provide the complainant with the names of two qualified independent indoor environmental experts or hygienists to choose from
· the complainant is to nominate which of these two experts he would prefer to be used
· the insurer is to engage the nominated expert to report on the cause and extent of the mould and moisture damage and to cover the cost including for any further investigations
· the insurer is to provide the complainant with written notice of its position on indemnity within 14 days of receiving the expert report.
The complainant is to cooperate with the insurer to facilitate the necessary inspections.
2.2 Is the insurer required to pay compensation?
Yes. The insurer declined the claim without adequately considering its own restoration reports or appointing an expert to determine the cause of the mould and moisture damage. It is fair for the insurer to pay $1,000 compensation for non-financial loss.
AFCA can award compensation for non-financial loss
Under AFCA’s Rules, AFCA may award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind.
In assessing whether to award compensation, AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs. AFCA considers the severity and impact of the insurer’s conduct on the particular complainant.
Complainant seeks compensation for non-financial loss
The complainant says the insurer’s claim handling has caused significant stress, time burden, and frustration, including due to:
· repeated mischaracterisations
· procedural failures
· shifting narratives
· reliance on irrelevant or speculative evidence.
The complainant says the insurer denied the claim in August 2025 on the basis there was ‘no resultant damage’ without reviewing the restoration reports and other relevant information. He also says there are multiple factual inaccuracies, unsupported assumptions and issues in the evidence relied on by the insurer, and there has been bias and conflict of interest.
Insurer declined the claim prematurely
The claim was made on 17 August 2025, and the complainant notified the insurer of mould growth. The insurer engaged experts who attended the property and provided reports within days of claim lodgement.
The insurer issued a decline letter on 22 August 2025 stating there was no resultant damage.
BB provided two restoration reports which identified moisture and mould at the property, but the insurer did not refer to BB’s findings in its initial decline letter. On 20 August 2025, BB had recommended the appointment of a suitably qualified indoor environmental professional to undertake an assessment to determine causation. However, the insurer did not engage a hygienist to report on the cause or extent of the damage prior to denying the claim.
The complainant says the insurer admitted on 3 September 2025 that the restoration reports showing mould and microbial activity had not been reviewed when the denial was made. He says this is a serious procedural failing and inconsistent with the duty of utmost good faith.
I am satisfied the initial decision to decline the claim was made without full consideration of all relevant expert evidence and prior to the insurer completing a full causation assessment. This was unsatisfactory.
The insurer reviewed the claim at the complainant’s request and proposed further steps which included engaging a restorer, having RC undertake further leak detection testing, and completing a dual inspection. This did not proceed due to disagreement between the parties.
The insurer provided a final decision letter on 29 September 2025 which outlines the further information requested by the insurer and explains why it is relevant. It also states that the initial assessment found that the mould in the affected area was due to pre-existing issues.
I do not consider the insurer had sufficient information to decline the claim based on pre-existing issues as the reports by BB were speculative and did not reach a concluded view on causation. The insurer should have completed its assessment and engaged another expert to determine the proximate cause of the damage before making a final decision on indemnity.
Fair for insurer to pay compensation for non-financial loss
There were no delays by the insurer assessing the claim and the insurer is entitled to rely on the information provided by its experts. However, I am satisfied the insurer declined the claim prematurely without adequately assessing the cause of the claimed damage.
I consider the insurer’s conduct was unreasonable. However, this does not mean the insurer is required to pay the claim. The insurer sought to correct its error by proposing further assessments which the complainant has not agreed to. It is well established that an insurer is entitled to change its position if further information comes to light.
I am satisfied the way the insurer handled the claim (including the initial assessment and decline) caused the complainant to suffer an unusual degree of stress and inconvenience. This can be fairly dealt with by an award of compensation for non-financial loss.
To the extent there have been delays reassessing and finalising the claim since September 2025, I consider the complainant contributed by failing to provide a complete copy of the pre-purchase report and imposing unreasonable conditions on any further inspection. The parties have also been engaged in the AFCA process, and I do not consider that the insurer has acted unreasonably during this process.
Overall, I consider it fair for the insurer to pay $1,000 compensation for non-financial loss.
Duty of utmost good faith does not entitle complainant to a remedy
The complainant submits that the insurer’s conduct in this claim amounts to a breach of its duty of utmost good under section 13 of the Act.
The insurer appointed experts to assess the damage and relied on the opinions provided by those experts. I do not accept there was any bias. While the insurer initially overlooked the restoration reports, there is no evidence that it acted improperly or capriciously when making its claim decision. I consider this was simply human error and the insurer sought to correct its mistake by offering to conduct further assessments and leak detection testing at the property.
The insurer’s request for the pre-purchase inspection report was reasonable because BB had identified potential long-term issues at the property and it was relevant to causation.
I acknowledge the insurer could have handled the claim better. However, I am not satisfied the insurer’s conduct amounts to a breach of the duty of utmost good faith. Even if it did, this does not of itself entitle the complainant to a remedy. I have already found that the insurer is to reassess the damage and pay compensation for non-financial loss. This is a fair outcome.
2.3 Why is the outcome fair?
The insurer’s liability is determined by the terms and conditions of the policy. Although the complainant bears the onus of establishing a claimable loss under the policy, it is reasonable to expect that the insurer will also adequately investigate the claim. It is fair for the insurer to obtain a further expert report on causation and pay compensation for its poor claim handling.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Summary of expert evidence
|
Record
|
Key points
|
Insurer’s restorer (BB)
Assessment report
18 August 2025
|
· leaking pipe under house - plumber unable to find the leak
· water was running down the ground under the house and pooling up at the end of the house
· subfloors damp and mouldy and had an elevated moisture reading - not sure if it is related to the leak
· hardwood floors in kitchen and dining room had elevated moisture readings
· possible that due to the house being on a hill the leak may be coming from the top of the hill and wetting the subfloors
· unsure if elevated moisture in subfloor is related to leaking pipe
· some of the subfloor is rotting but looks like it has happened over a long period of time and not related.
|
Insurer’s expert (RC/OS)
Make Safe Report
Plumbing specialist report
19 August 2025
|
· Used leak detection equipment to locate source of leak
· Location of leak on property is left hand side of house in little garden patch. Leak found under grass.
· Estimated timeframe of leak – weeks
· LDT photos with garden bed marked in red
|
Insurer’s expert (RC)
Building Assessment Report
19 August 2025
|
· water leak under the property believed to be mains to meter
· no resultant damage, leak is to pipe located in garden
· underfloor area showed pooling of water to the left side of the property on the ground
· property shows no resultant damage from the escape of liquid
· the area is just wet and moist to the ground and has not caused any damage
· LDT found leak to a pipe in the ground in left side garden bed
· RC believe this is a maintenance issue not a claimable event
· damage caused by gradual wear and tear of the pipe and gradual deterioration
|
Insurer’s builder (BB)
Reassessment report
20 August 2025
|
· there are signs of mould present – unknown if it is event related
· mechanical ventilation system located under the property – complainant confirmed they installed this to improve ventilation
· sump drain located at the low point of the flooring under property which was full of water – there was an electrical cable in the sump suggesting a submersible pump or similar may have previously been installed – complainant unaware of this
· moisture present under the property – speculated that the area underneath the house gets wet regularly because of rains which would explain the installation of mechanical ventilation by the complainant and the installation of a sump prior to ownership
· leak has been in situ for a maximum period of three months
· microbial contamination observed is a normal presentation for properties with subfloor areas where water flows following rain
· the set-up of the area with ventilation and sumps suggest water under the home is a long-term issue well prior to the leak event
· the humidity mould is more likely related to pre-existing conditions under the property as opposed to the claim event
· recommended a suitably qualified indoor environmental professional to undertake assessment to determine causation.
|
Complainant’s pest report
Pre-purchase Pest Inspection
8 November 2021
|
5.4 At the time of inspection moisture readings were normal.
…
Ventilation, particularly in the subfloor region is important in minimising the opportunity for Timber Pests to establish themselves within a property…
5.7 We claim no expertise in building, however the ventilation appears to be generally, inadequate. Where ventilation is considered inadequate a builder or other expert should be consulted. Sub floor ventilation is considered to be poor. High humidity creates an environment conducive to timber pest infestation and should be avoided. Remedial action may include the installation of mechanical ventilation.
5.8 Mould was not found at the time of inspection.
|
Complainant’s plumber (O)
Invoice dated 21 August 2025
|
· A water leak on the main line has been identified. The owner has excavated and pinpointed the leak.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.