Partial decline of storm damage claim (roof and electrical) after Tropical Cyclone Alfred and claim mishandling
Text of the determination
Determination
|
Case number
|
12-25-308000
|
Financial firm
|
Defence Service Homes Insurance Scheme
Case number: 12-25-308000 19 May 2026
1 Determination overview
1.1 Complaint
The complainant held home building insurance with the financial firm (insurer) and lodged a claim for damage following Tropical Cyclone Alfred in March 2025. The insurer accepted the resultant internal water damage. The parties dispute the extent of the insurer’s liability for damage caused by the storm, mainly to the roof. The complainant also says the insurer mishandled the claim, for which he seeks compensation.
1.2 Issues and key findings
Is the insurer liable for the disputed roof damage?
The complainant has established a valid claim for damage to the guttering and fascia on the west side of the house, flashing between the upper and lower levels and the sheets with raised screws, as photographed in his plumber’s report. However, the rest of the damage is more consistent with wear and tear or lack of maintenance, which is not covered.
Should the insurer increase its cash settlement for the internal damage?
No. The complainant has not shown the insurer’s scope of works for internal damage is unfair.
Is the insurer liable for electrical damage?
The evidence establishes storm water may have affected the electrical system, but the extent of any damage is unclear. The insurer is to pay for a comprehensive assessment.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer mishandled the claim, particularly in relation to the assessment of the electrical system. This caused the complainant undue stress and inconvenience.
Why is the outcome fair?
The evidence mostly supports the insurer’s position, although it warrants the inclusion of some additional roof system items, as well as a further inspection of the electrical system.
1.3 Determination
This determination is partially in favour of the complainant. If the complainant accepts the determination, then within 14 days of being notified, the insurer must:
· accept and settle the damage to the guttering and fascia on the west side of the house, flashing between the upper and lower levels and the sheets with raised screws, as photographed in the complainant’s plumber’s report
· arrange and pay for a comprehensive causation assessment of any damage to the electrical system. If that reveals storm-related damage, the insurer is to accept this under the claim. It is also fair the insurer pays for a replacement door to the meter box
· pay the complainant $1,500 in compensation for non-financial loss.
2 Reasons for determination
2.1 Is the insurer liable for the disputed roof damage?
The complainant has established a valid claim for damage to the guttering and fascia on the west side of the house, flashing between the upper and lower levels and the sheets with raised screws, as photographed in his plumber’s report. However, the rest of the damage is more consistent with wear and tear or lack of maintenance, which is not covered.
Complainant must show damage caused by storm
The complainant has the onus to establish a valid claim for the disputed damage. This means he needs to establish, on the balance of probabilities, that the storm was the cause.
Insurer must establish exclusions
The insurer carries the onus to prove, on balance, any exclusions relied upon. The key exclusions relied upon are for wear and tear and gradual deterioration.
The insurer’s experts AC and EZ are generally consistent in their views that the main causes of the roof damage were deterioration and lack of maintenance.
Storm was severe
The storm was severe, with significant volumes of rain falling between 7 and 10 March 2025 and, on 7 March 2025, winds of 107km/h were recorded at a nearby weather station.
None of the experts engages very directly with the nature and causal role of the storm event, but they all agree it was significant.
Roof was old and deteriorated, but still serviceable
The certificate of insurance says the property was built around 1965. The insurer says the roof is over 60 years old. The weight of the expert evidence suggests the roof is old and has various instances of age-related deterioration / wear and tear and maintenance repairs.
The complainant has not refuted this persuasively, although he disputes EZ’s claim about the extent of the issues.
I do not accept the assertion by the insurer and its experts that the roof had passed its serviceable lifespan. The evidence in this respect is not persuasive. The fact the roof is aged and worn is not enough to establish this is the dominant cause of all the damage.
However, these matters are still highly relevant to my assessment of proximate cause. Insurance is not designed to cover deterioration or maintenance issues on an old roof. The question is how dominant these factors were in the noted roof damage.
Storm damaged some roofing components
The complainant provided a report from his roof plumber, AP, which noted:
· deformation to gutters, flashings, cladding and steel trays, including creasing and buckling
· impact-related distortion consistent with debris in high winds, and separation of gutters from the fascia on the west side only
· water ingress would have occurred in four identified locations
· repairs are needed to the steel trays, fixings and flashings
· further investigation will be needed after affected sections are removed.
I place weight on the roof plumber’s report because he is appropriately qualified, physically inspected the roof, and supports his conclusions with photographs. He also describes localised damage, which is more consistent with storm impact than uniform age-related deterioration.
The photographs of the guttering and fascia on the west side of the house are clear and support AP’s conclusions. They show damage to these components consistent with debris impact and strong wind. The gutter is split, the fascia has pulled away. There are also clear photographs of a few roof sheets with raised screws and a gap / separation in the flashing between the upper and lower levels.
I am satisfied these instances are consistent with severe wind damage, as AP says.
The insurer has not shown this damage is more consistent with excluded causes, in the context of the severity of the storm. The insurer did not provide expert evidence in reply to AP’s report. The insurer’s experts AC and EZ (who completed their reports before AP) did not:
· conduct as thorough a physical inspection as AP. Their assessments were limited by access issues
· analyse the causal role of the storm closely enough for me to be satisfied the dominant cause of damage to the areas in question was wear and tear or lack of maintenance.
I also acknowledge the complainant’s criticisms of EZ’s report. These suggest comments about patch repairs / maintenance are inaccurate, given the historical removal of machinery from the roof.
However, I do not accept the rest of the damage noted by AP was caused by storm. This is because:
· AP does not consider in detail the potential causal role that the pre-existing condition of the roof played. This is a material omission given the age and condition of the roof, and the fact that some of the noted damage occurred in areas of previous repairs
· his reasoning on these items does not clearly explain why the damage is more consistent with storm than other causes
· the photographs do not show damage which is clearly more consistent with the storm than with deterioration, lack of maintenance or the age of the roof
· the photographs do not clearly support the asserted deformation damage to the wall / cladding and steel trays, including creasing and buckling and impact-related distortion.
AP’s report is the most persuasive information the complainant has provided. The complainant has provided some other information, including submissions, photographs and a report from builder JB. I have considered all of this carefully. It does not establish the storm caused roof damage which would warrant its replacement.
Insurer to accept certain roof damage
For these reasons, the insurer is to accept the claim for the storm-damaged roof components identified above. In doing so, it should scope the required works and either repair the damage or cash settle for the fair cost of doing so, in line with the policy terms.
If the insurer cash settles, it should include an uplift of 15% to account for the transfer of risk to the complainant. It should also pay interest in line with section 57 of the Insurance Contracts Act 1984 (Cth) from 11 November 2025 until the date of payment.
The insurer should also reimburse the complainant for the cost he incurred to obtain AP’s report, to the extent it has not already done so. Statutory interest applies to this amount as well, from the date of the invoice until the date of payment.
2.2 Should the insurer increase its cash settlement for the internal damage?
No. The complainant has not shown the insurer’s scope of works for internal damage is unreasonable.
Complainant has not shown insurer’s offer is unfair
On about 23 September 2025, the complainant accepted a cash settlement for internal resultant damage, without prejudice to his right to dispute other damage.
The complainant says the insurer’s scope of works and quote for this damage is too low. The insurer says the complainant’s quote is effectively for a refurbishment of the house, and the policy responds only to resultant damage caused by the storm.
The complainant’s painting quote is for $53,350 (inc GST). It is brief and lacks explanatory detail. It does not establish the additional areas of damage were caused by the storm. The rest of the complainant’s evidence, including AP’s report, is insufficient to establish this.
The complainant has mentioned other quotes but has not provided them, or any other persuasive information which would support his view about the proper scope of works.
Based on the available information, I am not satisfied the complainant has shown the insurer’s settlement is unfair.
However, I note AC’s email of 11 August 2025 expresses the following view about the scope for the electrical fittings:
The other concern is that the Scope of Works prepared by [EZ] allows for disconnect/test and commission downlights and ceiling fans – on past experience, if they have been wet with water running out of the fittings as stated by the Insured, these will not be successfully reused and replacement should have been allowed.
It is not entirely clear if the insurer’s cash settlement accounted for this. If it did not, the insurer is to review this matter and update its settlement accordingly.
2.3 Is the insurer liable for electrical damage?
The evidence establishes storm water may have affected the electrical system, but the extent of any damage is unclear. The insurer is to pay for a comprehensive assessment.
Complainant says the storm damaged the electrical system
The complainant says the storm likely damaged the electrical system and the roof needs to be removed to properly inspect it. He also says the storm blew off the external power board door and it needs replacement.
The insurer says its contractors completed two make-safe attendances. It says it explained to the complainant that any permanent works were his responsibility because there was no storm damage.
A further assessment is warranted
The available information supports the complainant’s position that further electrical assessment was needed. In an email dated 11 August 2025, AC told the insurer he was concerned about the electrical circuitry. AC noted the circuitry may be storm damaged and said a thorough electrical check, certification and make-safe should already have been undertaken. He noted difficulties with access. AC also raised a concern about possible damage to the external point of attachment.
EZ attended on 19 March 2025 and, in light of the access issues, re-attended on 19 August 2025 to complete make-safe works. EZ disconnected and tested fittings and tested the switchboard. EZ found no faults.
The complainant reports ongoing issues with the electrical system since the storm. Neither EZ nor any other expert conducted a comprehensive assessment. Despite the lack of faults found by EZ, the insurer has not conclusively ruled out storm damage to the system. Further, in its second make safe report, EZ says:
it is suspected that moisture ingress may be contributing to the intermittent fault, potentially through a join or similar point, although this could not be confirmed... Ongoing monitoring is recommended during periods of increased moisture or rainfall to determine if the fault reoccurs.
Given these matters and AC’s concerns, I consider it fair in the circumstances for the insurer to arrange and pay for a comprehensive assessment of the electrical system. If this reveals storm-related damage, the insurer is to accept this under the claim.
It is also fair the insurer pays for a replacement door to the meter box. The complainant says this was blown off during the cyclone and the insurer’s evidence does not refute this.
2.4 Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer mishandled the claim, particularly in relation to the assessment of the electrical system. This caused the complainant undue stress and inconvenience.
Compensation is warranted
As noted, in August 2025, AC found the make safe should have already been undertaken. I consider there was an undue delay in the make safe process.
In addition, despite AC’s comments and a lack of a thorough assessment, the insurer maintained that the electrical issues were entirely the complainant’s responsibility. Given the matters discussed under section 2.3 above, I do not consider the insurer’s position was reasonable.
I accept these matters led to avoidable delay, stress and inconvenience for the complainant. I also consider his reported vulnerability and family situation relevant factors in assessing the impact of the insurer’s conduct.
There were also other general delays between March and November 2025.
I consider it fair in the circumstances the insurer pays the complainant $1,500 in compensation for non-financial loss.
For completeness, I note that, apart from the matters discussed above, the complainant has raised other claims handling allegations (including allegations of deception and bad faith). I have considered them. They are either lack merit, are not made out with sufficient reliable evidence in support or, if they are, do not by themselves warrant compensation in the context of the overall picture of the claim.
2.5 Why is the outcome fair?
The evidence mostly supports the insurer’s position, although it warrants the inclusion of some additional roof system items, as well as a further inspection of the electrical system.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.