Text of the determination
Determination
|
Case number
|
12-25-306996
|
Financial firm
|
Hollard Insurance Partners Limited
Case number: 12-25-306996 12 May 2026
1 Determination overview
1.1 Complaint
The complainant held a home and contents policy with the financial firm (insurer) in Queensland. The policy period was from 25 February 2025 to 25 February 2026. The building was insured for $790,793.00 and the contents for $79,266. The policy excess was $500.
The complainant lodged a claim on 5 May 2025 for extensive water damage to his home which occurred on 3 May 2025.
The insurer appointed assessors and accepted the claim and made a cash settlement offer. The complainant disputed the insurer’s cash settlement offer and engaged his own repairer, JB. The parties remain in dispute regarding the amount of the cash settlement to be paid by the insurer.
The complainant also sought non-financial loss compensation.
1.2 Issues and key findings
Has the insurer correctly assessed the claim?
No. The insurer’s cash settlement offers were not fair. The insurer should include an uplift on the cash settlement and should also pay interest.
Is the complainant entitled to non-financial loss compensation?
Yes. The complainant is entitled to an award of non-financial loss compensation.
Why is the outcome fair?
The outcome is fair because the resolution of the claim should be determined based upon the terms of the policy. It is fair for there to be an award of non-financial loss compensation.
1.3 Determination
The determination is in favour of the complainant. Within 28 days of the insurer receiving written notice of the complainant’s acceptance of this determination, the insurer shall pay to the complainant:
· a cash settlement for the repairs in the amount of $17,125.93 (being $24,532.75 (JB’s quote plus a 25% uplift) minus the $7,406.82 which the insurer has already paid on 2 October 2025). If the insurer has paid further amounts for repairs to the property (but not payments already made related to carpet replacement ($2,775.26), temporary accommodation ($4,970.00) or the complainant’s plumber’s invoice ($275.00)) then those further repair payments should be deducted from that amount
· pay interest under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act):
> from 1 August 2025 until 2 October 2025 on $24,532.75
> from 3 October 2025 on $17,125.93 (being $24,532.75 less $7,406.82) until the date that amount is paid by the insurer
· $3,000 for non-financial loss compensation.
2 Reasons for determination
2.1 Has the insurer correctly assessed the claim?
No. The insurer’s cash settlement offers were not fair. The insurer should include an uplift on the cash settlement and should also pay interest.
Complainant has the initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a valid (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Policy provided cover for sudden escape of liquid subject to exclusions
The policy provided cover (page 35) for sudden and unexpected escape of liquid from a water pipe. The cover contained an exclusion:
What is not covered
There is no cover under this Insured Event for:
…
· loss or damage resulting from a leaking or faulty shower recess or shower base
· loss or damage where a General Exclusion applies
The policy contained general exclusions (page 53):
Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with:
..
4. wear and tear, rust, corrosion and /or deterioration (except in some instances relating to ‘Sudden escape of liquid’ and ‘Legal liability’ Claims), but we will only apply this exclusion if the loss or damage is directly caused by one or more of these factors’
5. you not maintaining your building and/or contents in reasonably good repair and condition
Proximate cause
When establishing the cause of the damage to the property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the damage is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common sense approach is taken to determine proximate cause.
Uplift to be added to cash settlement
When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. There may also be additional works identified once repairs begin. When the insurer settles a claim by paying the cost of repairs, it transfers these risks to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power.
AFCA considers that if an insurer cash settles a claim, it should generally pay an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
Complainant engaged a plumber to repair the damaged pipe
The complainant engaged a plumber, DL, to repair the damaged pipe on 6 May 2025. DL provided an invoice for $275.00 and report in which DL concluded:
[DL] attended the property to investigate reports of a water leak. Upon inspection, [DL] identified a split pipe located within the ceiling space. The pipe had failed at an undetermined time prior to our arrival, resulting in a substantial water leak. The ceiling ha[d] sustained significant water damage, and a large volume of water has run down the internal walls, causing extensive flooding throughout the main bedroom and bathroom areas. Due to the severity of the water ingress, the carpet and underlay in the main bedroom were fully saturated and have been removed to aid in drying and to prevent further damage or potential mould growth. At this stage, it is unknown how long the pipe had been compromised.
Insurer assessed the claim
The insurer engaged AC, builder, to prepare a series of reports.
AC provided a Restoration Report (prepared by XC, restorer, based on an inspection on 8 May 2025) which recorded:
· ceiling, floors and walls were holding elevated moisture levels
· visible microbial growth was observed
· long term water damage around the shower to skirting boards was due to ‘possible secondary leak occurring’ as no moisture level was found in the ceiling leading to affected wall or moisture in top of the affected wall
· it recommended further testing (a Leak Location Report) to the affected area
· skirting boards pulled back to assist in the drying process
· it recommended further testing be carried out to the shower due to possible secondary leak as long term water damage had been observed.
AC prepared a Leak Location Report (based on an inspection on 12 May 2025) which recorded that the flood test to the shower base failed, that the grouting condition of the shower area was good, that the condition of the silicone seal was poor and that no thermal imaging was carried out. In the Leak Location Report, AC recorded:
· the cause of the leak:
> a burst water pipe in the ceiling occurred on 3 May 2025
> no current leaks in the ceiling
> during leak location, a small leak occurred when the shower base was filled during the flood test
> ‘small amounts of water were present at the front side of screen and the wall adjoining the toilet’
· a brief detail of the damage:
> water damage to bathroom walls and flooring
> water damage to main bedroom walls and flooring
> water damage to ceiling area above bathroom, bedroom and toilet
> water leak in ceiling had been repaired
> a small leak from shower base occurred during flood test but was not consistent with the water damage to ceiling or bedroom.
A photograph of the water present at the front side of the screen showed a small area of water sitting on top of the tiles and grout. The Leak Location Report did not provide any measurement of the water.
AC prepared an EOL (Escape of Liquid) Assessment Report dated 12 May 2025 in which AC’s Builder’s Observations recorded:
· damage at the property as a result of a burst pipe within the roof cavity
· the complainant returned to the property to find the carpet in the main bedroom was soaked
· the complainant then identified that water had spread through to the adjoining bathroom and toilet
· the carpets in the bedroom were removed to assist with the drying process
· the skirting boards in the bathroom were removed to assist with the drying process
· the timber skirting boards were not designed to be used in wet areas as they did not comply with waterproofing requirements
· for this reason, the installation and painting of the new skirting boards had been provided as a cash settlement
· a Leak Location Report found that the event was the result of the burst pipe in the ceiling, however the shower was also found to be leaking and the leak had caused the resultant damage to the skirting boards and wall lining in the toilet.
In the EOL Assessment Report, AC concluded that:
· the damage was consistent with a sudden and unexpected escape of liquid event caused by a burst pipe within the roof cavity
· the Leak Location Report had observed a secondary leak coming from the shower cubicle which had caused resultant damage to the toilet area and skirting boards
· AC referred the matter to the insurer for ‘policy determination due to the second observed leak that ha[d] caused overlapping resultant damage’.
AC prepared a scope of works (SOW) dated 12 May 2025 for Cash Settlement of the bathroom repairs in the amount of $795.61. AC also prepared a ‘Scope of Repairs’ for the bathroom, main bathroom, toilet and preliminaries which totalled $4,817.63.
On 30 May 2025 the insurer advised the complainant:
[AC] ha[d] advised there [was] water damage to [the complainant’s] bathroom and toilet. [AC] ha[d] also advised cause of damage was the result of the burst pipe in the ceiling, however the shower was also found to be leaking. The leak has caused the resultant damages to the skirting boards and wall lining in the toilet.
The damage to [the] toilet ha[d] been denied due to policy not covering [the complainant] for loss or damage caused by leaking or faulty shower recess or base. This is outlined under the insured event Escape of Liquid in [the policy] and further explained below. However, [the insurer was] accepting damage to the bathroom which [was] caused by the burst pipe in the ceiling.
In reference to page 2 of the assessment report from [AC] there was maintenance identified directly relating to the claim. It is recommended that [the complainant] engage a licensed trade to engage a licensed builder fix the water proofing in the shower to ensure it is watertight.
On 30 May 2025 the insurer provided to the complainant a cash settlement offer for bathroom skirting only in the amount of $795.61.
In practical terms, the insurer accepted that the complainant had made a valid claim for water damage but sought to limit the claim under the policy. As referred to above, the onus was on the insurer to establish its entitlement to limit the claim.
Complainant provided additional information to the insurer
On 18 June 2025 the complainant provided to the insurer:
· an ‘Inspection Report’ from JB, licensed builder, together with a quotation from JB for bathroom repairs
· a quote from JW for replacement carpet dated 16 June 2025 for $2,866.00.
JB’s Inspection Report recorded (based on an inspection on 5 June 2025):
· issues that were observed due to the burst water pipe in the ceiling:
> the bathroom ceiling, external bathroom wall and bathroom-main bedroom wall had mould visible
> the wall and ceiling sheeting set joints had started to peak
> the vanity was swollen
> the linen and main bedroom – bathroom doors were swollen and were not shutting properly
> the skirting was falling off (which was removed by the restorers, when trying to dry the walls)
> more insulation batts needed to be removed
> the bathroom external wall and main bedroom – bathroom wall sheeting would need to be removed to dry and clean properly
· what was not checked during the inspection
> the plumbing
> the electrical
> anything behind the wall sheeting
· JW’s conclusions were:
> the bathroom/ main bedroom at the property in JB’s opinion had been affected by the burst water pipe in the ceiling
> to properly fix these issues, JB would also be submitting a quote covering everything that needed to be rectified.
The quote from JB dated 12 June 2025 provided a detailed description of the quantity and unit price of the necessary repairs:
· preliminaries - $1,622.00
· remove bathroom ceiling and 2 Walls (4 Hrs) - $680.00
· remove bathroom Vanity/ mirror/ linen cupboard doors/ main door to bedroom (4 Hrs) - $680.00
· clean and dry wall cavity - $300.00
· remove floor tiles, to main bathroom floor only (not including shower) (4 Hrs) - $680.00
· supply and install new wall sheeting and ceiling sheeting - $1,180.00
· set and sand bathroom ceiling and damaged bedroom plasterboard - $850.00
· supply and install new Insulation - $850.00
· install new waterproofing to main bathroom floor $750.00
· supply and install new bathroom floor tiles (PC amount $60.00) - $1,350.00
· plumber disconnect and fit off - $1,200.00
· electrician disconnect/ fit off/ supply of materials - $1,500.00
· supply and install new linen cupboard doors/ main door to bedroom/ architraves - $1,000.00
· supply and install new vanity and mirror - $1,000.00
· prepare & paint all new surfaces, paint main bedroom ceiling and walls - $1,850.00
· supervision of works (20 hours) - $2,000.00
· QBCC (Queensland Building and Construction Commission) insurance - $350.00
· subtotal $17,842.00 plus GST (10%) $1,784.20
· total $19,626.20.
On 19 June 2025 AC provided a Variation Quote (Variation 1) to the insurer in the amount of $3,301.77. The report recorded that Variation 1 together with its earlier Scope of Repairs quote totalled $8,119.40.
On 23 July 2025 the insurer said to the complainant:
· a 20% contingency would be applied to the cash settlement for the bathroom skirting bringing the total payable amount to $954.73
· its new cash settlement proposal was:
> building repairs - $7,906.82
> contents (carpet replacement) - $1,167.31
· its total settlement proposal for the claim was $8,574.13 which included the deduction of the excess of $500.00
· the complainant’s quotes had been referred to AC who had deemed the quotes to be excessive and above industry standards
· there were several items that were not associated with the claim:
> remove bathroom vanity/ mirror/ linen cupboard doors/ main door to bedroom
> remove floor tiles, to main bathroom floor only (not including shower)
> install new waterproofing to main bathroom floor
> supply and install new bathroom floor tiles
> supply and install new linen cupboard doors/ main door to bedroom
> supply and install new vanity and mirror
· the repairs to the bathroom skirting boards could not be warranted as timber was not designed to be used in wet areas
· all remainder repairs could be warranted and a cash uplift was not applied
· the total settlement payable was $9,074.13 less the excess of $500, a total of $8,574.13.
On 18 September 2025 the insurer said:
· it accepted the complainant’s quote for replacement carpet from FW for $2,755.46
· it declined to accept JB’s quote in the amount of $19,626.20 on the basis that it was excessive and included items that were not claimable under the policy:
> remove bathroom vanity/ mirror/ linen cupboard doors/ main door to bedroom
> remove floor tiles, to main bathroom floor only
> install new waterproofing to main bathroom floor
> supply and install new bathroom floor tiles
> supply and install new linen cupboard doors/ main door to bedroom
> supply & install new vanity and mirror
· it offered a cash settlement inclusive of the replacement carpet of $10,182.28:
> replacement carpet (FW) - $2,775.26
> timber skirting (repairs could not be warranted) - $795.61 plus 20% uplift, a total of $954.73
> initial AC SOW - $3,650.33
> variation to AC SOW - $3,301.76
> less the excess of $500.00
· it confirmed that, based on AC’s report, two weeks temporary accommodation was necessary to complete the rectification works.
The insurer provided a cash settlement offer dated 25 September 2025 to the complainant for the above amounts together with two weeks’ temporary accommodation in the amount of $4,970.00, totalling $15,152.28.
On 26 September 2025 the complainant accepted the insurer’s cash settlement offer. However, he said he did this under protest.
Based on the exchanged information, the insurer paid the following amounts on the specified dates:
· carpet replacement (FW quote) - $2,775.26 - on 2 October 2025
· cash settlement for repairs (less $500 policy excess) - $7,406.82 - on 2 October 2025
· temporary accommodation for rectification works for two weeks - $4,970.00 - on 2 October 2025
· plumber’s invoice - $275.00 - on 17 October 2025.
On 13 October 2025 the insurer said:
A flood test to the shower recess base failed, this is due to poor grout and is a maintenance requirement, rather than an insured event. This has caused damage to the toilet area and skirting boards in the bathroom, this is not a result of the ceiling burst, rather long-term water damage from the leaking shower recess. ..
Poor condition of the shower recess – this is maintenance and not related to the leak in the ceiling.
On 3 November 2025 the insurer said:
· it had removed the following from JB’s quote (which it said were not covered under the policy):
> remove floor tiles to main bathroom floor (not including shower) – $680.00
> install new waterproofing to main bathroom floor – $750.00
> supply and install new bathroom floor tiles – $1,350.00
> total of $2,780.00 was removed from the complainant’s builder’s quote
· the complainant had previously been paid the following amounts based on AC’s scope of works:
> variation for main bedroom repairs – $3,301.76
> scope of works – $3,650.33
· to make up the difference following removal of non-covered items, the payable amount to the complainant was $8,109.91
· the insurer would refund the $500 excess, bringing the total payment to $8,609.91.
· the complainant’s initial quote (including carpet) totalled $22,401.66, less the $500 excess equalled $21,901.66
· with the proposed offer, the total payment would be $19,292.19:
> timber skirting - $954.73
> scope of works - $3,650.33
> variation repairs - $3,301.76
> carpet replacement - $2,775.46
> total paid to date - $10,682.28
> additional offer (including $500 excess refund) - $8,609.91.
On 4 November 2025 the complainant accepted the insurer’s offer of a further payment of $8,609.91 but maintained his dispute regarding the insurer’s denial of the damage to the wall between the bathroom and the toilet.
On 9 January 2026 the insurer said:
· a ‘leak detection and flood test were conducted, which confirmed that the shower recess base failed due to deteriorated/poor grouting, which [was] a maintenance requirement rather than an insured event. This secondary leak has caused damage to the toilet area and bathroom skirting boards. Clear evidence of long-term water damage and deterioration [was] noted on the vanity and shower recess. The shower showed signs of significant rust and wear, indicating a long-term issue unrelated to the ceiling burst pipe’.
On 2 February 2026 the insurer said:
· the total removed for non-covered items was $2,780.00. Paying for these works would be contrary to the policy terms and conditions and would result in accepting pre-existing damage and maintenance as insured losses. Under the policy, the complainant had a contractual obligation to maintain the property in good repair and the insurer insured the complainant for sudden and accidental insured events, not gradual deterioration or maintenance issues.
Insurer should have accepted complainant’s quote and added an uplift
Based on the exchanged information, the insurer has not established that it was entitled to limit the amount to be paid to the complainant and should have accepted the complainant’s repairer’s quote.
The complainant’s reports from DL and JB and JB’s quotation for the repair works were persuasive. The complainant’s plumber’s report from DL reported, days after the damage, that the pipe had failed and resulted in a substantial water leak which caused significant water damage to the ceiling and that a large volume of water had run down the internal walls, causing extensive flooding throughout the main bedroom and bathroom areas.
JB’s inspection report was based on an inspection on 5 June 2025 and set out in detail the issues that were observed due to the burst water pipe in the ceiling which included that the vanity was swollen, the skirting was falling off after it had been removed by the restorers when trying to dry the walls, the bathroom had been affected by the burst water pipe in the ceiling and that to properly fix the issues the quote covered everything that needs to be rectified. The quote provided a detailed description of the quantity and unit price of the repairs, including three items which the insurer had declined:
· the removal of floor tiles, to main bathroom floor only (not including shower) - $680.00
· install new waterproofing to main bathroom floor - $750.00
· supply and install new bathroom floor tiles (PC amount $60.00) - $1,350.00.
By contrast, the report from AC in its Restoration Report (based on an inspection on 8 May 2025) recorded that the ceiling, floors and walls were holding elevated moisture levels but that long term water damage around shower to skirting boards was due to ‘possible secondary leak occurring’ and recommended further testing to the affected area. The restoration report therefore acknowledged that the floors were holding elevated moisture levels but identified a possible secondary leak which was an inconclusive finding and recommended further testing.
In AC’s leak location report (based on an inspection on 12 May 2025) it recorded that:
· the flood test to the shower base failed, that the grouting condition of the shower area was good and the condition of the silicone seal was poor but that no thermal imaging was carried out
· a small leak occurred when the shower base was filled during flood test in which ‘small amounts of water were present at the front side of screen and the wall adjoining the toilet’
· there was water damage to bathroom walls and flooring
· a photograph of the water present at the front side of the screen showed a small area of water sitting on top of the tiles and grout but the report did not provide any measurement of the water.
AC’s report therefore identified small, unquantified amounts of water present at the front side of the screen and wall adjoining the toilet. AC also concluded that there was water damage to the bathroom walls and flooring. This latter conclusion was consistent with JB’s quote which recorded and itemised that the floor tiles needed to be removed to the main bathroom floor, new waterproofing needed to be installed to the main bathroom floor and new bathroom floor tiles needed to be supplied and installed.
AC’s findings did not support the position of the insurer:
· on 9 January 2026 that AC’s testing confirmed that the shower recess base failed ‘due to deteriorated/ poor grouting’. Indeed, this assertion was contradictory to AC’s finding that the grouting condition of the shower area was good
· on 9 January 2026 that the secondary leak had caused damage to the toilet area and bathroom skirting boards
· on 2 February 2026 that the total removed for non-covered items was $2,780.00 which were pre-existing damage and maintenance issues.
Further, there was an inconsistency in the insurer’s position that it said, on the one hand, that the complainant’s expert’s quote from JB was excessive and above industry standards but then accepted most of the itemised amounts (with the exception of the bathroom floor and waterproofing amounts totalling $2,780.00). In any event, the insurer provided no supplementary reports from AC which set out the manner in which AC concluded that JB’s quotes were excessive or above industry standards.
Accordingly, the insurer has not established that it was entitled to limit the amount payable as it has not established that the exclusions applied to the amounts it sought to limit from JB’s quotation because it has not established that those amounts were:
· loss or damage which resulted from a leaking or faulty shower recess or shower base
· loss or damage which was caused directly by wear and tear, rust, corrosion and /or deterioration
· loss or damage due to the complainant not maintaining the building and/or contents in reasonably good repair and condition.
Based on the available information, the complainant’s property was located in regional Queensland. The quotation the complainant provided from JB was dated 12 June 2025 in the amount of $19,626.20. The quote is now dated. The insurer offered a 20% uplift on 23 July 2025 on only a minor sum (approximately 4%) of JB’s quotation. The insurer did not make an offer of any uplift regarding any other cash settlement offers it made. In the circumstances, based on the exchanged information it is fair that the insurer should pay a 25% uplift on JB’s quotation, a total amount of $24,532.75.
As referred to in this determination above, based on the information the insurer paid a cash settlement for repairs (less $500 policy excess) in the amount of $7,406.82 on 2 October 2025.
Accordingly, the insurer should pay the complainant a cash settlement for the repairs in the amount of $17,125.93 (being $24,532.75 minus the $7,406.82 which it has already paid on 2 October 2025). If the insurer has paid further amounts for repairs (but not payments already made related to carpet replacement ($2,775.26), temporary accommodation ($4,970.00) or the complainant’s plumber’s invoice ($275.00)) then those further repair payments should be deducted from that amount.
Interest is payable under section 57 of the Insurance Contracts Act
Section 57 of the Act says that an insurer must pay interest on a benefit:
commencing on the day as from which it was unreasonable for the insurer to have withheld payment
AFCA has a published an Approach to Awarding Interest in Insurance, which says:
Interest is payable from the date it was unreasonable for the financial firm to have withheld payment of the amount it was liable to pay. This will usually be:
• the date the claim was denied
• if there has been an unreasonable delay before the financial firm denied the claim – an earlier date that is considered reasonable; or
• the date when the benefit was due to be paid under the policy (for example after the expiry of a waiting period in an income protection policy).
AFCA may also take into account other factors, such as whether a consumer has unreasonably failed to provide information reasonably requested by the financial firm.
In the circumstances, the insurer should have paid the cost of JB’s quote plus a 25% uplift in the amount of $24,532.75 by 1 August 2025 (six weeks after the receipt of JB’s quote from the complainant). From that date it was unreasonable for the insurer to have withheld that amount.
Accordingly, the insurer should pay the complainant interest under section 57 of the Act:
· interest from 1 August 2025 until 2 October 2025 on $24,532.75
· interest from 3 October 2025 on $17,125.93 (being $24,532.75 less $7,406.82) until the date that amount is paid by the insurer
2.2 Is the complainant entitled to non-financial loss compensation?
Yes. It is fair for there to be an award of non-financial loss compensation.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss in relation to a complaint lodged after 1 January 2024. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Insurer must pay non-financial loss compensation
In the circumstances of the complaint, it is not productive, and not fair to the parties, to traverse each aspect of the protracted claims history and the extensive number of communications. It is fair and appropriate to seek to progress the resolution of the complaint and the claim, including a fair assessment of non-financial loss compensation, without further delay.
As referred to in section 3.1 of this determination, all the information the parties have provided has been reviewed and considered.
On 3 November 2025 the insurer apologised for the standard of service the complainant had received from the insurer and for any inconvenience he had experienced. On 17 December 2025 the insurer offered $1,500 for the non-financial loss compensation. On 23 January 2026 it withdrew that offer.
On 2 February 2026 the insurer said that temporary accommodation was not required under the policy but was paid by the insurer as a matter of goodwill. That assertion by the insurer was not correct because the complainant held a Residential policy which provided alternative accommodation benefits.
During the course of the claim, the insurer also agreed belatedly to waive the excess of $500 and that was fair and appropriate. The temporary accommodation and the waiver of the excess were both fair and appropriate actions by the insurer. They are not, however, to be deducted from any non-financial loss compensation as they were actions which the insurer decided upon voluntarily during the course of the claim. It would be unfair on the complainant to deduct those amounts, which were not expressed by the insurer at the time they were made to be related to non-financial loss compensation. The only offer which the insurer has made for non-financial loss compensation was $1,500 and it subsequently withdrew that offer.
The complainant sought the maximum amount of non-financial loss compensation.
The complainant has experienced considerable stress, delay and inconvenience due to the insurer’s claims handling. The insurer provided cash settlement offers which commenced on 30 May 2025 in the amount of $795.61 and which were increased over time to a final offer (including payments it had made) on 3 November 2025 of $19,292.19 (which was inclusive of the cost of the replacement carpet in the amount of $2,775.46). The insurer’s cash settlement offers did not include any uplift, with the exception of a 20% uplift only on the initial $795.61 amount which was offered on 23 July 2025. Further, the complainant advised that his wife (who was also an insured under the policy) suffered from a severe neurological condition.
The complainant advised that he has corresponded with his local Federal Member of Parliament regarding the insurer’s claims handling and had received a response. The complainant also advised that he had corresponded with his bank regarding the insurer’s handling of his claim as the policy was a bank-branded policy. Those matters are for the Federal Member and the bank to respond to respectively.
In the circumstances, it is fair for the insurer to pay the complainant $3,000 in non-financial loss compensation.
2.3 Why is the outcome fair?
The outcome is fair because the resolution of the claim should be determined based upon the terms of the policy. It is fair for there to be an award of non-financial loss compensation.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.