Home / Allianz Australia / Determination 12-25-305772

Determination 12-25-305772

Dispute over cash settlement for escape of liquid damage (rebuild vs repair), temporary accommodation limits, and claim handling

FirmAllianz Australia
Decided2026-08-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$331,708
Non-financial loss$2,000
Amount claimed$800,000
SourceAFCA PDF

Summary

The complainant sought a full rebuild (about $800,000) and uncapped temporary accommodation after an escape of liquid event. AFCA found the building repairable, increased the cash settlement by 15%, required temporary accommodation at $1,500 per week, and awarded $2,000 non-financial loss and expenses.

The insurer's engineering and geotechnical evidence was more persuasive than the complainant's, so a rebuild was not established; the TA policy limit applied, but poor claim handling warranted additional payments and non-financial loss compensation.

Issues

Subjects and remedies

health or medicalhome or building damagepay claimpay compensationpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-305772 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-25-305772 7 August 2026 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy (policy) with the financial firm (insurer). On 13 December 2024, the complainant lodged a claim for storm damage to the insured property. Investigations into the damage found it was not storm related damage but a significant escape of liquid event involving a burst pipe under the building. The insurer has accepted the claim. However, the complainant is not satisfied with the insurer’s assessment of its liability under the policy. The complainant brought a previous complainant before AFCA which was settled between the parties through a preliminary assessment issued by AFCA on 8 August 2025. The complainant says the insurer has failed to meet its obligations in line with AFCA preliminary assessment. The complainant says the building requires a complete rebuild and the insurer’s position regarding temporary accommodation (TA) cover is unreasonable. The complainant is also seeking reimbursement of out of pocket expenses and non-financial loss compensation (NFL). 1.2 Issues and key findings Is the insurer’s assessment of the building damage fair? Yes. The information exchanged does not show, on the balance of probabilities, that the building requires a complete rebuild. The insurer’s cash settlement offer for the building repairs should be increased by a further 15% in line with this determination. Is the insurer’s position regarding TA fair? Yes. The insurer’s position regarding the complainant’s TA entitlements under the policy is fair. The insurer is to pay the complainant for further TA in line with this determination. Is the complainant entitled to compensation? Yes. The insurer is to pay the complainant $2,000 in NFL. It is also required to reimburse the complainant’s professional expenses of $2,970 and utility bills. Why is the outcome fair? The outcome is fair because it is based on the exchanged information and the policy. It would not be fair to require the insurer to cover the cost of a complete rebuild where the more persuasive expert evidence does not support this. It is also fair that the insurer be permitted to limit its liability regarding the TA benefit. 1.3 Determination This determination is substantially in favour of the insurer. Subject to the complainant accepting this determination, the insurer is to settle the claim as outlined in sections 2.1, 2.2 and 2.3 of this determination. 2 Reasons for determination The panel notes both parties to this complaint have provided a significant amount of information in support of their positions. The panel has considered all of this information and is satisfied the information has been exchanged with the parties, with each party having had the opportunity to respond. Whilst the parties have raised numerous issues, the panel does not intend on reiterating or referring to each concern, expert or piece of evidence provided by the parties in this determination. Further, the panel notes that some issues including the complainant’s entitlements for damage to his contents have been resolved between the parties. Consideration of this complaint is limited to the parties’ positions regarding: · the building damage · TA cover · the parties’ conduct since the AFCA preliminary assessment was issued · the complainant’s claimed expenses; and · NFL. 2.1 Is the insurer’s assessment of the building damage fair? Yes. The information exchanged does not show, on the balance of probabilities, that the building requires a complete rebuild. The insurer’s cash settlement offer for the building repairs should be increased by a further 15% in line with this determination. The policy covers the insured property against accidental loss or damage The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by the listed insured events. The complainant also added the optional policy benefit covering accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. This means that not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events or accidental loss or damage occurring during the period of insurance and not subject to the exclusions, is covered. Complainant has onus to show the damage triggers cover under the policy When making a claim, the complainant has the initial onus of establishing they suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on balance, the application of any exclusion it relies on to reduce its liability or deny the claim. No dispute the complainant has established a valid claim There is no dispute that the complainant has established a valid claim. This is for damage to the insured building and contents caused by the escape of liquid event and associated mould infestation within the home. Following an AFCA preliminary assessment the parties agreed that the insurer would: · within seven days pay the complainant $2,000 in non-financial loss compensation · within seven days appoint an expert to inspect the property and provide a scope of works for mould remediation works · cover TA for the duration of mould remediation works · cover the repair of cracks throughout the property, excluding only the garage, entry hallway, bedroom two ensuite and separation (not cracking) of external brickwork. The complainant says the insurer failed to meet its obligations in line with the above agreement, particularly in relation to TA and appointment of loss adjusting firm ‘C’. The insurer refutes the complainant’s position. It says it made reasonable attempts to meet its obligations agreed to after the preliminary assessment, it says: · it paid the complainant $2,000 in compensation within the seven days · it appointed consultants ‘LX’ to provide a scope of works for mould remediation works · given the complexity of the claim, it appointed C to assist with confirming the adequacy of LX’s scope of works and remediation costs · offered to arrange TA for the complainant via its agents HR. The insurer says the complainant failed to reasonably cooperate with its claims area which prevented it from implementing their agreement after the preliminary assessment. The insurer notes LX provided the remediation (building and contents) scopes of works on 27 August 2025 which were approved in October 2025. This is because the complainant refused C access to the property for all of September 2025. Regarding TA, the insurer says it was not able to approve TA before LX’s scopes of works were validated and approved. This is because it was not able to confirm the estimated time the remediation works would require so to determine the extent of TA that would be required. The panel accepts the parties differ in their positions regarding the issue of meeting the obligations agreed to after the AFCA preliminary assessment. The panel accepts the insurer paid the said compensation and appointed LX in line with its obligations. With respect to the matter of TA and finalising matters relating to the building damage, the panel is satisfied it is fair to conclude both parties have contributed to the delays experienced. Complainant says the insured building requires a complete rebuild The complainant has provided expert reports from consultants he appointed to support his concerns about the insurer’s assessment of its liability for the building damage. The complainant has provided a report from engineers ‘RB’ dated 9 January 2025, which provides: · the property is over 20 years old and any settlement expected would have occurred within the first two years following construction · any signs of untreated settlement cracks or movement damage would have been noted in the pre-purchase building report in or around 2016 · the building had not undergone any structural alterations in recent years. Therefore, no new settlement cracking would be expected beyond those noted in the pre-purchase report · the pre-purchase report noted some minor movement cracking and classified it as cosmetic rather than of structural significance · the cracks noted in January 2025 were widespread and suggest structural movement in various areas of the building (internal and external) · the new driveway cracking was not due to typical shrinkage cracks but is due to external stress factors · separation between the floor level and skirting in the garage can only be due to structural movement of the slab · although the current size of cracks fall within acceptable tolerances, they are expected to widen and deteriorate further in the coming months once the water is fully pumped out. The complainant has also provided reports from engineer ‘ES’ dated 27 March 2026 and 24 April 2026. ES attended the insured property on 24 March 2026 to investigate the cause and extent of the damage to the building. In its report dated 27 March 2026, ES says: · results from surveyors show a level difference of 50-60mm across the buildings concrete slab, which is significant · there was significant presence of water and wet very loose silty sand noted during the process of bore drilling · it noted doors sticking, external cracks to masonry, settlement of the foundations and the internal roof truss chords had bowed · since the ‘Fill’ soils are non-cohesive, it is expected that settlement manifested immediately (due to the escape of liquid event) · the recent cracking noted is consistent with the escape of liquid event · the building is considered structurally inadequate and in danger of collapse due to the bowed roof truss cords · the bowing of the roof trusses is because settlement has caused upward thrust on the truss bottom chord and therefore the internal chords. The internal chords should be in tension but are now in compression causing the bowing · water issues arising from the burst pipe have been repaired and further damage from the escape of liquid is unlikely · there is no way to restore the building without complete demolition and rebuild, which it estimates will cost approximately $800,000 In its report dated 24 April 2025, ES’s focus is on refuting information from the insurer’s appointed engineers ‘V’ and to reiterate its findings provided in the above noted report. ES says: · even if a nominal 15mm floor finish allowance is conservatively deducted as suggested by V, the remaining slab level differential is still approximately 53 mm, which remains materially significant and consistent with differential slab/foundation movement · such a level differential is not adequately explained by ordinary cosmetic floor finish variation and warrants serious engineering consideration as evidence of non-uniform slab support · the significance of the escape of water event is shown by the fact it took three weeks to pump out the water · given the extent of water and prolonged duration it remained beneath the building, it is evident that this under-slab inundation has materially contributed to differential foundation settlement and structural damage · the escape of liquid event constitutes an abnormal and significant geotechnical disturbance resulting in slumping and settlement of the building sub-surface soils · for the building to have incurred defects this late in its life indicates it has experienced a catastrophic event · if the trusses were a building defect surely they would have defected within six years from construction. The bowed trusses with the difference in slab levels are recent and highly indicative of structural movement due to a catastrophic event · the structure has been severely affected likely to include the plumbing and electrics as well · the building needs to be demolished and reconstructed. The complainant has provided information from the insurer’s own website indicating an estimated rebuild cost of $1,092,000. Insurer says the building is repairable and a complete rebuild is not required The panel has considered the information provided by the insurer which includes several reports from the various consultants appointed to the claim. The following is not in dispute: · a burst pipe was found which has leaked a significant amount of water into the foundations of the building · this resulted in mould infestation of the property, and which has since been remediated by LX · the complainant has been paid his maximum entitlement ($84,042.97) for contents loss or damage under the policy. The insurer has also agreed to cover the cost to return the complainant’s undamaged contents back to the home once repairs are finalised. The panel is satisfied that the information from structural engineer V and the geotechnical expert ‘PG’ is the more persuasive evidence relied on by the insurer. In its reports dated 4 February 2026 V says: · the observed gaps between brick walls and the wall junction are due to original workmanship with the intention to form a control joint. It noted ableflex had been placed at the wall junction · some ground movement is expected when a large quantity of water is introduced beneath a building. However, there was no clear evidence suggesting ground movement had occurred at the reported source of the burst pipe · roof trusses are expected to be installed with vertically slotted brackets to all for vertical movement · this would allow the trusses to sag freely when loaded and during thermal expansion or contraction of the roof · without the brackets, truss members will be subject to additional stresses due to the restrained movement causing any compressive members to buckle such as the bowed diagonals of the trusses · the bowed trusses are classified as a major defect according to AS4349 and rectification is required · the floor level survey indicates no significant level differences throughout the building except between bedroom three and bedroom four which exceeds the recommended 20mm across a building footprint in line with the QBCC Standards and Tolerance guide. However, the deviation does not adversely affect the safe use or reasonable amenity of the building · generally minor cracks to the internal slab were observed (with the exception of a crack in bedroom four) and categorised as very slight and non-structural in accordance with AS2870-2011 · there is no indication that the escape of liquid event has resulted in structural damage to the building. In its geotechnical engineering report dated 20 March 2026 PG says: · it was appointed to investigate the distressed residence · ground penetrating radar scanning was used at the request of the complainant. This was to identify any potential underslab voids that may have been present due to the escape of liquid event · it also drilled two boreholes with dynamic cone penetrometer testing (DCT) adjacent to the boreholes · no voids under the slab were detected through the ground penetrating scans. One area around one meter in length under the alfresco slab near bedroom four showed some inconsistency under the slab · dynamic cone penetrometer testing was recommended but the complainant did not provide permission to do so · laboratory test results indicate the site is classified as ‘Class P’, in accordance with AS 2870-2011 due to the depth of fill onsite. From a reactivity perspective, the site could be considered ‘Class S’, slightly reactive, with a potential surface movement of less than 20mm i.e. low chance of significant movement · concludes: > there were no negative impacts of water penetration detected under the structure > the leaking service is not considered to have negatively affected the integrity of the ground slab > the subsurface materials profile is relatively non-responsive to changes in moisture variation > the potential for ground surface movement due to the leak is considered low. In its report dated 24 April 2026, V says: · evidence from recent inspections some 12 months after RB’s assessment do not support the view that the present cracking will widen and deteriorate further over time · a typical floor tile and mortar combined depth is approximately 15mm. Subtracting this value from the highlighted areas in the survey markup demonstrates that the maximum level difference across the entire slab is better estimated to be 38mm · the rooms immediately adjacent bedroom two (lowest value recorded) also correspond well to this tile + mortar depth assessment with level 9.979m being reduced to 9.964m (top of slab) which closely aligns with bedroom two readings · the external apron slab levels appear to be consistent around the perimeter of the building with the northwest levels ranging from 9.844m to 9.877m representing a 33mm level difference. It is noted that the highest level was recorded at the location of the pipe leak which does not support that subsidence has occurred in this area · no significant or irreparable damage exists to support the recommendation to demolish and rebuild the home. The building is generally in sound condition, noting the roof truss members, deemed an original build issue, require rectification by a suitably qualified consultant. Information from the insurer is more persuasive The panel has carefully considered the information from the various consultants appointed by the parties. The panel finds the information from V and PG to be most persuasive. The panel is not satisfied it has been shown, on balance, that the building needs to be demolished and rebuilt due to the escape of liquid event or otherwise. The panel accepts the exchanged information shows a significant escape of liquid event has taken place. Further, that this event introduced a substantial amount of water into the foundation soils beneath the slab. Further, that this has resulted in damage and mould infestation. However, the panel is satisfied the building remains repairable. The panel has considered the reports from RB and more particularly ES relied on by the complainant. However, as stated, the panel finds the investigations, reports and supporting information from V and PB to be more persuasive. This is because although ES says the building is beyond repair and needs to be rebuilt, it has not provided compelling explanation, testing, measurements or supporting information. ES’s reference to concerns with the bowed roof trusses and difference in levels across the slab are more persuasively addressed by V and PG. The panel considered the results of the ground penetrating radar scans and DCP testing by PG compelling. The scans show, on balance, there were no voids under the slab caused by the escape of liquid event or otherwise. Further, the geotechnical lab testing confirms the foundation soils to be slightly reactive only with no negative impacts from the escape of liquid event detected under the structure. The panel believes V’s reports include persuasive and detailed explanations in support of its findings. Also, that these findings are further supported by detailed explanations, site measurements and extensive photographic evidence with commentary. The panel prefers V’s opinions and assessment of the internal and external areas of the building. This information supports V’s view that the building structure is reasonably stable with internal and external walls, doors and windows found to be plumb. There is an absence of persuasive information to show the escape of liquid event has resulted in structural damage. V, prior to and similar to ES, identified the bowed trusses as a major structural issue. However, V says this is due to incorrect bracket installed as part of the original construction. V says the bowing of the trusses is not due to the escape of liquid event. ES has not provided any persuasive supporting information in the form of testing or measurements linking the bowing trusses to pressures from below. There is an absence of any measurements or testing linking this bowing to the slab. There is no persuasive information that addresses the issue of incorrect brackets being used at original construction or showing this to be a more recent issue. Similarly, the panel accepts slab survey results show a difference in levels across the slab. However, having regard to the explanations from V, PB’s GDR and DCP testing, the foundation soils classification and the nature of cracking the panel: · is not persuaded the difference in levels across the slab is due to the escape of liquid event · is not satisfied it has been established, on balance, that the slab presents with structural damage · is not satisfied it has been established, on balance, that the bowed roof trusses are the result of slab movement · is not satisfied it has been established, on balance, that the building requires a complete rebuild arising from issues with the slab. Finally, in the absence of persuasive information showing the building structure is in an unrepairable and unstable condition or that the issue with the bowed roof trusses is due to an insured event, the panel is satisfied the building remains repairable. Insurer entitled to cash settle the claim The exchanged information shows the insurer’s builder is not able to warrant the repairs to the building. This is due to the noted pre-existing building damage and issues with the roof trusses, which is reasonable to accept. Given this and noting the significant breakdown in the parties’ relationship, the panel is satisfied that it is fair that the insurer settles the claim by way of a cash settlement. The panel acknowledges the complainant’s reference to the insurer not being able to complete the repairs as being concerning. However, as stated, the panel accepts this inability does not arise from the fact the repairs are not possible but rather arise from the pre-existing issues not covered under the policy. Also, the panel accepts the policy allows the insurer to decide whether to authorise repairs or cash settle the complainant under the claim. The insurer has provided a detailed scope of works and repair quote from BB which forms the basis for its final cash settlement offer of $308,442.09 which includes 20 weeks of TA at $1,000 per week and a 20% margin. However, given the time since the repair quote was prepared, the panel is satisfied that it is fair that the insurer be required to increase the building repair cash settlement by an additional $43,266.31. This being 15% of $288,442.09. Within 14 days of receiving notice of the complainant’s acceptance of this determination, the insurer is to pay him $331,708.40 for the cost to repair the building damage accepted under the policy. The insurer is to also pay interest on this cash settlement in line with section 57 of the Insurance Contracts Act 1984 (Act) from 8 May 2026. This being 14 days from receipt of the final expert reports and after which the panel believes it was reasonable for the insurer to arrange payment to the complainant. The panel will consider the insurer’s assessment of its liability for TA below, which will include the above noted offer of 20 weeks TA at $1,000 per week. 2.2 Is the insurer’s position regarding TA fair? Yes. The insurer’s position regarding the complainant’s TA entitlements under the policy is fair. The insurer is to pay the complainant for TA as set out below. Policy includes the TA benefit The policy says the insurer will pay TA costs for the time it reasonably takes to repair or rebuild the insured property. This is limited to the weekly rental equivalent of the property’s rentable value prior to the damage, up to 10% of the building sum insured, and for a maximum of 12 months. It will also pay up to $500 for temporary accommodation for pets in a commercial boarding establishment. The building sum insured is $526,654. This means, in line with the policy, the complainant is entitled to a maximum of $57,931.94 (including GST) in TA expenses. Insurer has paid the complainant more than his policy entitlement for TA The following is not in dispute: · the building has been (and remains) uninhabitable due to the damage and associated mould infestation (caused by the escape of liquid event) · the insurer has paid $98,149.10 towards the complainant’s TA expenses, which exceeds the maximum policy entitlement of $57,931.94 · the insurer has made payments towards the TA expenses (in excess of the policy limit) on the basis of commercial decisions/gestures of goodwill · the insurer stopped making any further payments towards TA from March 2026 but has offered to include an additional 20 weeks of TA cover as part of its final claim settlement payment at a rate of $1,000 per week. The complainant is dissatisfied with the insurer’s position and says the insurer was and remains obliged to cover him for TA expenses until the insured property is habitable. Further, that in line with commitments made by the insurer, it is obliged to pay him TA based on a rate of $557 per night i.e. $3,899 per week. Insurer’s communications regarding TA have been poor The panel has reviewed all the information relating to the issue of TA including the various communications (including part of a call recording) between the parties. The panel accepts both parties have made significant submissions setting out their concerns, opinions, dissatisfaction and position on the issue of TA. In the interest of brevity, the panel does not intend on referring to each of these submissions. The panel accepts the policy is clear in informing the parties of the limits that apply to the TA benefit. The panel is also satisfied that the insurer is entitled to rely on the policy to assess its liability under the claim. Further, that in its earlier communications the insurer reminded the complainant of the policy limit and the fact that arranging TA for a higher rate would only result in the benefit extending to a shorter timeframe. The panel is also mindful of the fact that offers to cover TA expenses beyond the policy limit are commercial offers which are made outside the terms of the policy. AFCA has limited jurisdiction in this respect with commercial offers being at the sole discretion of the insurer. In saying that, AFCA can consider the conduct, quality of communication and whether or not the insurer has caused and contributed to unreasonable delays. The panel is satisfied the exchanged information shows the insurer’s communications regarding TA (through different representatives over the life of the claim) have at times been unclear and inconsistent. The panel is satisfied it is fair to accept the insurer’s inconsistent approach and poor communication has caused the complainant to form expectations that are not consistent with the policy or considered reasonable. The panel is satisfied that the insurer is liable and responsible for the payments it has chosen to make towards the complainant’s TA expenses thus far. It is not reasonable to require the insurer to pay $557 per night moving forward The panel notes the exchanged information shows the complainant has also contributed to the delays experienced and issues relating to TA cover. The exchanged information shows the complainant did not reasonably cooperate with the insurer’s appointed TA agents and his expectations were rigid and not entirely reasonable. This, as noted above, was only made worse by the insurer and its agents poor communications and delays caused in the assessment of the damage to the insured property. The exchanged information shows the insurer’s acknowledgement of some of these delays and associated extensions to the complainant’s TA entitlement under the policy. The main point in contention relates to the complainant’s expectation that he be paid TA at a rate of $557 per night. This is based on the insurer accepting to pay for TA arrangements at this rate for a limited period including around six weeks of accepted delays. Based on his conversation with a representative of the insurer on 6 November 2025 and subsequent email from her dated 12 November 2025, the complainant says the insurer agreed to pay TA at a rate of $557 moving forward. Further, that in making such commercial offers/gestures of good will, it is fair to form the view the insurer has chosen to waive its entitlement to rely on the policy’s TA limit. The panel has considered the exchange information including listening to the partial call recording and said email dated 12 November 2025. The panel is not satisfied the insurer’s representative makes a commitment to settle all and any future TA expenses at a rate of $557 per night. Rather, the commitment made was that the insurer would consider covering further TA, if required. Following these communications, the insurer paid the complainant $66,286 towards TA expenses. It appears this payment covered the complainant’s TA expenses till March 2026 (at $557 per night). The insurer has not made any further payments towards TA. However, the panel notes the insurer has offered to make additional payments at a rate of $1,000 per week and then $1,500 per week, which the complainant declined. The panel does not accept it is reasonable to conclude from the insurer’s commercial offers (made in good faith) that the insurer has waived it’s entitlement to rely on the policy limits. This is not consistent with the intention behind a gesture of good will nor what would be considered fair in the circumstances. Further, the panel notes despite the insurer making the offers, it continued to remind the complainant of the policy limits, that they were good will offers and that living in TA with such high nightly rates would only reduce the length of time the funds would last. Finally, the panel is not satisfied an expectation to be covered for TA at a rate of $557 per night is reasonable or representative of the complainant’s entitlement under the policy. Insurer to pay reasonable additional TA expenses The complainant says the insurer caused delays in the remediation process and should be responsible for covering all TA expenses until repairs are completed. The panel accepts the exchanged information supports it would be fair to require the insurer to cover reasonable TA expenses incurred by the complainant from March 2026 till the end of 8 May 2026. This is because it was not until April 2026 that the insurer received the final reports from its appointed engineer consultants. It was after having received this information that the panel believes it was fair and reasonable for the insurer to arrange payment of the final cash settlement offer to the complainant in line with BB’s scope of works and repair quote. Similarly, without persuasive information to the contrary, it was unreasonable for the complainant to refuse settlement of the claim after April 2026. This means the panel accepts the complainant is mostly responsible for the delay in bringing the claim to conclusion after April 2026. The panel notes however that the insurer has generously demonstrated its willingness to continue providing TA cover. The panel notes that the insurer has offered to pay additional TA cover at $1,000 per week. However, the panel is not satisfied this is fair given the insurer had clearly offered to increase its payment for TA cover to $1,500 per week. Therefore, in line with the exchanged information and considering what is fair, the panel is satisfied that: · subject to the complainant providing the insurer with persuasive information showing he has incurred TA expenses from March 2026 onwards, the insurer is to reimburse the complainant at the rate of $1,500 per week for each week the complainant has incurred TA expenses · however, where the complainant cannot show he has incurred additional TA expenses out since March 2026, the insurer is not required to make any payments towards TA for this period. Rather, the insurer is entitled to limit any further TA payment to the 20 weeks to be included in the final cash settlement offer; and · it is fair that the insurer increases the final cash settlement offer to include 20 weeks of TA at $1,500 per week as opposed to the current offer based on $1,000 per week · this is to be paid within 14 days of the insurer receiving notice of the complainant’s acceptance of this determination. 2.3 Is the complainant entitled to compensation? Yes. The insurer is to pay the complainant $2,000 in NFL. It is also required to reimburse the complainant’s professional expenses of $2,970 and utility bills. AFCA Rules allow an award of NFL in certain circumstances The AFCA Rule D 3.3 allows for an award of up to $6,300 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. An award of non-financial loss compensation is based on an unusual degree or extent. This would not encompass the normal degree of inconvenience a person would suffer when lodging an insurance claim or in a dispute with their insurer. Insurer’s overall management of the claim has been poor The panel is satisfied the insurer’s overall management of the claim has been poor. Further, that this has caused the complainant to experience unreasonable levels of stress, anxiety, inconvenience and delays over the life of the claim. The panel accepts the exchanged information shows the insurer is responsible for delays caused in meeting some of its obligations under the AFCA preliminary assessment and in the time since. Also, that its appointment of C was not consistent with the parties’ agreement arising from the preliminary assessment and proved to be a cause for concern. In saying this, the exchanged information also shows it would be unfair to hold the insurer solely responsible for some delays and the breakdown in the relationship between the parties. The panel is satisfied it is fair to accept the complainant’s actions and expectations have also caused and contributed to delays and a failure to bring the claim to conclusion. As noted above, a significant issue relates to the insurer’s poor and at times confusing position and communication regarding TA. The panel accepts this has caused the complainant unreasonable and avoidable levels of stress and inconvenience. Insurer is to pay the complainant a further $2,000 in NFL The panel is satisfied that the insurer’s handling of the claim has been below an appropriate standard and has resulted in an unusual degree of inconvenience, delay, and distress to the complainant. In addition, the issues noted above, the panel notes: · the claim has been ongoing since December 2024, which is both unreasonable and unfair in the circumstances · the complainant has been left without access to his home for over a year and a half in an uncertain and difficult living situation · during an inspection, the insurer’s expert caused damage to the stormwater pipe (noting this was later rectified), which added to the complainant’s inconvenience · there is information that an expert attended the property without the complainant’s consent, contributing to the complainant’s frustration and distress · the complainant has provided medical information indicating that the claim experience has had an adverse impact on his wellbeing. Taking all of the above into account, the panel considers it fair and reasonable that the insurer pays the complainant $2,000 in NFL. This is to be paid within 14 days of receiving notice of the complainant’s acceptance of this determination. Insurer to reimburse professional fees and utility costs The panel notes the insurer has offered to reimburse the complainant’s professional fees totalling $2,970. Further, the insurer has confirmed it has reimbursed the complainant for all the utility bills that have been provided to it by the complainant. The insurer is to pay interest on the $2,970 in professional fees in line with section 57 of the Act, if the complainant has settled these fees. This is to be calculated from the date of payment by the complainant to the date on which payment is issued by the insurer. The panel is satisfied that it is fair that the insurer be required to reimburse the complainant for any further utility bills for the insured property up to the date final settlement is issued under the claim. This is subject to the complainant providing the insurer with evidence of the bill(s) or proof of payment. 2.4 Why is the outcome fair? The outcome is fair because it is based on the exchange information and the policy. It would not be fair to require the insurer to cover the cost of a complete rebuild where the more persuasive expert evidence does not support this. It is also fair that the insurer be permitted to limit its liability regarding the TA benefit. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: · an ombudsman · a member with significant experience in consumer and small business advocacy · a member with extensive experience as an industry representative. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 AFCA Rules D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate the Complainant for non-financial loss: a) for a complaint relating to an individual’s privacy rights - injury has occurred to the Complainant’s feelings or humiliation has been suffered by the Complainant; or b) for other complaints – an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Complainant’s expectation of enjoyment or peace of mind has occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.