Home / IAG / Determination 12-25-305344
Determination 12-25-305344
Denial of storm/rainwater run-off foundation damage claim on grounds of gradual erosion and exclusions
Summary
The complainant's claim for foundation damage after a storm on 23 May 2025 was denied by the insurer as gradual erosion. AFCA found the loss covered, ordered the insurer to repair (or reimburse with interest) and pay $2,000 for non-financial loss.
The complainant established a covered loss from storm rainwater run-off, the insurer failed to show the exclusions applied, and its poor handling caused unusual stress.
Issues
- Claim denial primary · upheld“The insurer has not shown any of the cited exclusions apply to the event.”
- Poor claim handling secondary · upheld“The insurer's handling of the claim was poor; it changed its reason for denying the claim on more than one occasion.”
- Inadequate claim investigation secondary · upheld“Did not seek further input from WW and chose to rely exclusively on CE's opinion.”
- Delay secondary · upheld“unreasonable and avoidable delays with the resolution of the claim”
- Poor communication secondary · upheld“clearly miscommunicated the purpose of CE's attendance”
Subjects and remedies
home or building damagenatural disasterpay claimpay interestpay non financial lossrepair or rectify
Related
Text of the determination
Determination
|
Case number
|
12-25-305344
|
Financial firm
|
Insurance Australia Limited
Case number: 12-25-305344 7 May 2026
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy underwritten by the financial firm (insurer). He lodged a claim after a storm event on 23 May 2025, which he says caused sudden soil displacement beneath the home. He says the event compromised the stability of the building’s footings and foundations, causing damage.
The insurer denied the claim. It says the damage was due to gradual erosion and deterioration, which the policy does not cover.
The complainant disagrees and refers to the insurer’s experts to support his view. He also seeks compensation for non-financial loss, due to the insurer’s poor handling of the matter.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
No. The complainant established a claimable loss occurred. The insurer has not shown any of the cited exclusions apply to the event.
Is an award of compensation warranted?
Yes. The insurer’s handling of the claim caused unnecessary stress, frustration, and inconvenience to the complainant.
Why is the outcome fair?
Based on the exchanged material, the loss is covered under the policy. It is fair that the insurer repairs the claimed damage (if it has not already been done) and that it pays compensation for the effect its poor handling of the matter had.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of the complainant’s acceptance of this determination, the insurer must:
· begin the process to undertake repairs, including the appointment of a suitable expert(s) to review, quote, oversee and conduct the required work, or
· if this has already been done, pay the reasonable amount incurred by the complainant to repair the damage. If the insurer is paying out the claim, it must pay interest on any unpaid amount, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from the date of any invoice until the date of settlement, and
· pay compensation for non-financial loss of $2,000.
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
No. The complainant established a claimable loss occurred. The insurer has not shown any of the cited exclusions apply to the event.
Complainant seeks cover for foundation movement damage
The complainant owns a split-level home, constructed on raised concrete footings over steep sloping ground. According to the policy documents, the home was built in 1979 and the complainant purchased it in or about 2015.
There is no dispute:
· a storm occurred on or about 23 May 2025
· some of the soil around the foundations of the complainant’s home have washed away
· whilst the foundations have moved slightly, the home itself was not physically damaged.
The complainant says the soil foundations were washed away in a rainwater run-off event which the policy covers. He says this event reduced footing stability, meaning the home was compromised. He seeks cover for the repair of the foundations. He is not seeking cover for soil replacement.
The insurer offered several different views of the loss. Alternately, it said:
· there was no building damage caused by the claimed event
· any damage was due to ‘gradual erosion’ and deterioration of the soil over time, which the policy excludes
· any event damage was not the primary cause of any issue with the footings
· the policy only covers building damage, not soil damage.
Onus on complainant to establish claimable loss
The complainant bears the onus of establishing, on balance, that he suffered a loss caused by an event covered under the policy. If the complainant establishes a claimable loss, the onus then shifts to the insurer to demonstrate, on balance, that it is entitled to:
· rely on a policy exclusion, or
· otherwise reduce its liability or decline the claim.
The reference to establishing issues ‘on balance’ means the relevant party must show it is more likely than not.
Policy covers listed events and accidental damage
The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the complainant.
The policy covers damage caused by one of the listed events. It also provides a policy option to select cover for ‘Accidental damage’. The complainant chose this option. The COI also notes the ‘Slope of the land’ where the home is situated is ‘Severe’.
Amongst the events the policy covers are loss or damage caused by ‘Storm’ and ‘Flood and rainwater run-off’. Both events include loss or damage caused by:
landslide or subsidence that happens within 72 hours of, and as a direct result of, [the respective events].
The PDS defines a ‘Storm’ as:
– rain, thunderstorm, hail or snow; or
– violent wind, cyclone or tornado.
There is no suggestion the loss was caused by riverine flooding. However, the PDS defines ‘Rainwater run-off’ as:
water that flows over the ground, or backs-up, as a result of a Storm.
The selected optional benefit for ‘Accidental damage’ covers loss or damage caused by an ‘Accident’. ‘Accident or Accidental’ is defined in the PDS as:
a sudden, unexpected and unintended event which was not intended or expected by You or anyone else insured under this Policy.
This cover does not apply if the damage is ‘covered under a Listed Event’ in the PDS. This means if the claimed loss was caused by a storm and/or by rainwater run-off, the accidental damage provision does not apply.
The insurer says the loss was not accidental as it had ‘more than likely been occurring for over a period of time prior to the period of insurance’. It also says it is not storm or rainwater run-off damage as the loss was predominantly due to site erosion over time, not from the claimed event.
Any cover provided by the policy is subject to its terms, conditions and exclusions.
Insurer’s experts had differing views about the cause of the loss
The insurer arranged for two experts to attend the property and assess the claimed damage to the home.
Builder WW attended on 25 June 2025. It found:
· there was resultant damage to the home from the claimed storm event
· the concrete piers/footings/foundations were ‘compromised from the sheer volume of water during the recent weather event’
· some of the ground had been ‘washed away, exposing the concrete footings’
· whilst there was ‘no visible movement’, the integrity of the footings had been compromised
· there were ‘no contributing maintenance issues’ to the claimed loss.
Engineer CE attended the property later. Its report of 22 July 2025 found:
· whilst ‘some scouring of the topsoil during the claimed event was probable’, there was no ‘recent or abrupt structural damage’ caused by the event
· surface flow over soil will occur during every period of ‘sufficient rainfall’ and this ‘gradually’ eroded the topsoil
· there was no clear evidence of an ‘abrupt or sudden bulk soil movement’ consistent with the claimed event, the loss was more consistent with ‘incremental erosion’
· there is soil loss around the footings which will continue to increase with normal rainfall and consolidation settlement
· historic internal crack repairs and paint covering damage attests to long-term movement-related damage
· a local weather gauge, situated about 9km from the home recorded 148.0mm of rain on the date of the loss, with 178.8mm recorded three days earlier.
After the complainant raised concerns about the findings, the insurer asked CE to provide a further opinion on the loss. In its second report dated 22 September 2025, CE found:
· there was soil loss around the concrete footings, however it was not exposed at the base
· the risk of damage ‘will continue to increase due to normal rainfall and consolidation settlement’
· there was ‘no clear evidence’ the loss was caused by a ‘single defined event’
· whilst there is a ‘reduction in stability’, this is minor and ‘does not currently pose a structural risk’.
CE also wrote that the:
ground within the subfloor has inadequate batter slopes in some locations to facilitate a more trafficable path under the house. These will tend to increase the risk of soil displacement.
Satisfied there was a claimable loss under the policy
The insurer agrees there is damage to the property. It merely says that this damage was not caused by a single event (such as accidental damage, rainwater run-off or the storm). It also says the damage was due to erosion of the soils under the home over time, which the policy does not cover.
However, I am persuaded by the evidence of WW, which was the first expert to inspect the damage soon after the event. WW accepted the damage found under the home and around the foundations was from the claimed event.
The complainant says he believed (based on a conversation with the insurer) that CE’s involvement was to assess the repair approach. As he believed the claim was accepted, he cleared some of the soil under the home to make assessment easier. He says this work:
materially altered [the] site and [CE] did not see the full storm related evidence that [WW] observed immediately after the event. Although [CE] saw the pit that remained, [it] did not see the displaced soil, the scouring pattern, the storm deposited material or the sunken items that had been present before the site was cleaned.
The insurer acknowledged it had told the complainant that CE’s involvement was to assess how the damage should be repaired.
I am not satisfied the evidence from CE should be preferred, as:
· CE did not inspect the home immediately after the event and the complainant altered the surface before its assessment, noting he had been informed the loss would be covered
· WW inspected the home sooner after the event and was able to discuss the issues with the complainant (which CE did not)
· whilst the insurer says CE had access to WW’s photos, I am not persuaded this is relevant – CE cited no differences between the condition of the home in the photos and when it conducted its inspection.
CE cited rainfall records from around the time of the loss. Not only was there an extreme amount of rainfall recorded on the date of the loss, but there was an even higher amount just three days before this. Over 320mm was recorded across those two days and 415.2mm recorded over the course of four days.
On balance, I accept this rainfall caused significant rainwater run-off to affect the home. This included causing movement damage to the foundations. The rainwater ran down the slope and compromised the foundations.
Whilst the nature of the home’s construction (built on a steep slope) likely made it vulnerable to such damage, the insurer was aware of this. The COI clearly noted the slope housing the home was ‘Severe’. Therefore, I am satisfied the insurer was aware of the risk presented by the home and still insured it.
Exclusions cited by the insurer do not apply
The insurer relied on several policy exclusions to deny the claim. These include that the policy does not cover loss or damage caused by or arising from:
- erosion, deterioration, collapse, shrinkage or earth movement;
- landslide or subsidence unless it happens within 72 hours of, and as a direct result of:
o …
o Rainwater Run-off;
o Storm…
- rust, corrosion, gradual deterioration, depreciation, wear or tear;
…
- for the settling, shrinkage or expansion in any buildings, foundations, walls or pavements.
I am not satisfied any of the above exclusions apply.
Whilst there was earth movement and (arguably) erosion of the soil, this occurred directly due to a claimed event (rainwater run-off), which the policy covers. It would not be fair to permit the insurer to rely on an exclusion for an event it specifically covers.
Based on the complainant’s evidence the damage was present within 72 hours of the loss, and the insurer has not challenged this.
I acknowledge gradual deterioration and wear and tear was present. The home was more than 45 years old. There was evidence of prior repair work inside the home. I do not consider any of this damage is related to the claimed event. The damage was limited to new movement of the foundations. It is not related to the historical movement, which necessitated minor building work within the home.
I do not consider the damage is related to settlement, it is related to a storm and the associated rainwater run-off from this event.
Insurer is to repair the foundations to the home if it has not already been done
As I am not satisfied the insurer has grounds to deny the claim, I accept it is liable to repair the damage caused to the home.
In this instance, the damage appears to be limited to the foundations. There was no claim or documented evidence of event related damage to the structure of the home, or inside it.
Therefore, the insurer’s obligation is limited to securing and solidifying the foundations which were moved in the event and any resultant damage directly resulting from this movement. It will need to arrange for an expert to attend the home to establish the extent of this damage.
2.2 Is an award of compensation warranted?
Yes. The insurer’s handling of the claim caused unnecessary stress, frustration, and inconvenience to the complainant.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Insurer’s poor claim handling caused an unusual degree of stress
The complainant was frustrated with the denial of the claim and the uncertainty of what it meant for his home as it remained on unstable foundations.
The insurer cited several differing and sometimes conflicting reasons for not paying the claim.
I accept this caused and later exacerbated the complainant’s frustration. It led to unreasonable and avoidable delays with the resolution of the claim. The insurer:
· clearly miscommunicated the purpose of CE’s attendance, informing the complainant it was to ascertain a way to repair the damage, when it was re-considering how it occurred
· caused delay when it adopted CE’s view and denied the claim
· did not seek further input from WW (which considered the loss was covered) and chose to rely exclusively on CE’s opinion
· changed its reason for denying the claim on more than one occasion.
Given these factors, I accept the insurer’s handling of the claim was poor. I am satisfied it should compensate the complainant for the level of stress, frustration and inconvenience caused. On balance, I am satisfied that payment of $2,000 is fair.
2.3 Why is the outcome fair?
Based on the exchanged material, the loss is covered under the policy. It is fair that the insurer repairs the claimed damage (if it has not already been done) and that it pays compensation for the effect its poor handling of the matter had.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.