Partial claim denial for storm damage on roof design grounds, damage to stairs by make-safe trades and scope of repair, and poor claim handling
Text of the determination
Determination
|
Case number
|
12-25-301850
|
Financial firm
|
Auto & General Services Pty Ltd
Case number: 12-25-301850 31 March 2026
1 Determination overview
1.1 Complaint
The complainant holds an events-based home building policy with the financial firm (the insurer) for his home in northern New South Wales (the property). He lodged a claim for damage to the property on 7 March 2025. The complainant says the damage was caused by Cyclone Alfred (the storm).
The insurer inspected the property and assessed the damage and loss. It accepted part of the building damage claim. However, despite investigations, assessments and the procurement of expert opinion, there remains some ambiguity about what building damage has, in fact, been accepted by the insurer and how the claim should be resolved overall.
Indeed, a dispute remains about the proximate cause of some of the claimed building damage and the nature and magnitude of that damage. Most significantly, the complainant says the insurer’s trades damaged custom-built stairs when they were conducting make safe works shortly after the storm occurred. Whilst the insurer agrees their trades damaged the stairs, it initially told the complainant the issues regarding repair of the stairs would have to be addressed directly to the builders. The insurer later accepted it was responsible for the damage to the stairs, but the parties still disagree about the way in which the damage should be remediated.
The parties also disagree about the extent of the scope of works (SOW) required to remediate some of the other building damage.
In addition, the complainant says he has experienced a poor claim experience.
1.2 Issues and key findings
Should the insurer accept the claim for storm damage?
Yes. The exchanged material shows the insurer must accept the claim for the building damage caused by the storm. The extent of the damage that must be accepted by the insurer is set out below.
Did the insurer’s trades damage the property?
Yes. The exchanged material shows the insurer’s trades damaged the property, in particular, the stairs. This damage should be remediated by the insurer in accordance with section 2.4, below, and the matters set out in this determination.
Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay the complainant the sum of $2,000 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainant has established a valid claim for the building damage
· the exchanged material shows the insurer is not entitled to rely upon a policy exclusion to deny the claim for the building damage
· the insurer is responsible for damage caused by its trades during make safe works
· such damage should be remediated so as not to leave inconsistencies in appearance and finish, wherever practically possible
· an award of non-financial loss compensation is fair and reasonable in this particular instance.
1.3 Determination
This determination is in favour of the complainant.
The complaint should be resolved in accordance with section 2.4, below, and the matters set out in this determination.
2 Reasons for determination
2.1 Should the insurer accept the claim for the storm damage?
Yes. The exchanged material shows the insurer must accept the claim for the building damage caused by the storm. The extent of the damage that must be accepted by the insurer is set out below.
Complainant says storm damaged the property
The property includes two semi-detached, two-storey, rendered masonry units (unit 1 and unit 2) that were built in 2023. There are two custom built timber staircases in each unit, one spanning from the ground floor to the first floor, and the other connecting the first floor to a deck above. The dwellings sit atop a concrete slab foundation. They have flat, skillion metal roofs supported by timber trusses.
When he lodged the claim, the complainant told the insurer:
High winds blew antenna from mounting cause holes in roof iron, leaking rain into both ceilings.
Mould has accumulated already; blew excess debris into pool clogging up filter causing pump to burn out.
RH, builders, attended the property on 17 March 2025 on behalf of the insurer. They conducted make-safe repairs. Regarding the claimed damage, RH noted:
· high winds during the storm blew the TV antenna from its mounting on the roof, causing it to puncture the roof sheeting
· as a result, rainwater entered the dwelling through the holes, leading to leaks in two separate ceiling areas, where mould has already begun to develop
· ceiling mould was present on inspection
· areas of concern also include mould growth and damage to skirting boards and timber flooring located beneath the balconies
· the rear cedar balcony ceiling shows mould staining and cupping
· wind driven rain is entering between the top of the gutter and under the ribs of the roof sheets. The Anticon roofing blanket (a form of insulation) is soaking up the water and it is tracking back to leak in the stairwell
· the complainant also reported the storm brought excessive debris into the pool, which clogged the filter system and caused the pool pump to burn out
· in addition, two Colorbond fence panels (2.4m each) were blown over during the storm.
RH also says:
The insured reported that water was running down internal walls, but is unsure how far the water travelled through the 3-storey structure…
Kitchen joinery: Swollen gable-end kitchen panels near the fridge were noted.
The insured is unsure whether this damage was caused by the storm or unrelated.
Skirting and wall damage on the ground floor, reportedly caused by water running down from upper levels.
Top floor skirting also shows moisture-related damage.
Restoration works are required to determine the full extent of internal water ingress and associated damage.
Complainant has the onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim, either wholly or in part.
Policy provides cover damaged caused by insured events
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the policy.
The policy provides cover for damage caused by various insured events, including ‘Storms and rainwater’. Page 37 of the PDS states:
Storms and rainwater
You are covered for
Loss or damage caused by storms and rainwater, including from:
[…]
· the escape of rainwater from any water pipe, drain, or gutter
· wind damage caused by storms or heavy rain.
‘Storm’ is defined on page 76 of the PDFS as:
A weather event, including cyclones, that may be accompanied by strong winds, rain, lightning, hail, snow, or dust.
Complainant has established a valid claim
I am satisfied the complainant has established a valid claim for storm-related building damage to the following:
· internal plaster, walls and ceilings
· the balconies
· the antenna
· skirting boards
· the roof penetrations caused by the antenna
· the kitchen and any damaged cabinetry and joinery
· the exterior fence.
Details about the storm-related damage to each of these items is set out below.
I am of this opinion because:
· the units were constructed in 2023 and were in a generally good, well-maintained condition prior to the insured event
· the insurer accepts the storm occurred and that it was severe in nature
· the claimed damage was first observed by the complainant immediately after the storm occurred
· the claimed damage is of a type commonly associated with claims involving building damage caused by storms and rainwater ingress.
As mentioned, the onus now shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim, either wholly or in part. In this regard, the insurer relies upon the following policy exclusion to deny the claim for the building damage.
Policy cover is subject to limitations, conditions and exclusions
The insurer says it is entitled to partly deny the claim for some of the building damage because:
· as set out in RH’s report, the roof system does not contain eave infill strips as per the manufacturer’s recommendations for installation
· moreover, the roof lacks the appropriate overhang as per Australian Design Standards
· these design flaws in the roof system of the property caused the water ingress damage.
The insurer says that if the roof was compliant and without defects, at least some of the claimed building damage caused by water ingress would not have occurred.
In this regard, the insurer relies upon specific policy exclusions that are set out on page 37 of the PDS as follows:
Storms and rainwater
You are not covered for
Loss or damage caused by:
[…]
· rain, hail, wind, snow, or dust due to:
- an opening that was not created by the storm or any other insured event
- defects in design, structure, materials, workmanship, or construction that you knew about or should reasonably have known about
[…]
- the home not being in good condition, including guttering and drain pipes.
Insurer’s trades and experts inspected the property
Following RH’s inspection, MS, plumbers, inspected the property on behalf of the insurer on 27 May 2025. MS conducted flood tests of the rear balconies and found, ‘No signs of water ingress’ during testing and reported, ‘All tested areas remained dry’.
MS also inspected the property for ‘internal moisture damage’ and found:
Areas of concern include mould growth and damage to skirting boards and timber flooring beneath the balconies. Upon investigation, it was determined that this damage likely resulted from wind-driven rain during Cyclone Alfred, which produced extreme weather conditions not replicable during standard testing.
QT, builders, inspected the property on behalf of the insurer on 28 August 2025. QT made the following conclusions:
· a roof sheet was impacted and damaged during the storm and should be replaced
· the stairwell wall (the upper common wall area) had been repainted prior to inspection but, whilst the finish to the repainted wall surface is acceptable, it does display a different sheen to the adjacent wall surfaces when viewed in ‘glancing‘ light. Therefore, the painting of the wall surface should be extended to an architectural break
· damage to the ground floor skirtings and cabinet panels is consistent with water ingress during the insured event. To repair the damaged items, the timber skirtings should be resealed and painted. The affected kitchen cabinet panels should be replaced
· damage to the timber lining boards installed to the soffit linings of the rear verandas is consistent with the timber lining boards being exposed to wind driven moisture during the insured event. The timber lining boards, being a Class 4 timber with no Hazard rating, are not able to resist exposure to moisture
· damage to the fence is consistent with lateral wind forces imposed on it during the storm.
In addition, based on visual observations, QT saw no evidence of mould growth or moisture related deterioration of the internal plasterboard wall surfaces. However, QT suggested:
… given the [insured] event occurred approximately 6 months prior to my inspection, small inspection holes could be cut into the lower section of the common wall, whereby an independent hygienist could provide an assessment of the actual condition of the wall cavity.
Proximate cause of damage needs to be assessed
Damage can have more than one cause. For instance, in this matter the complainant says all the claimed building damage (apart from the damage to the stairs) was caused by the storm. In contrast, the insurer says some of the building damage was caused by water ingress that is attributed to design flaws in the roof system of the property. The insurer says that damage caused in this manner is excluded from cover under the terms and conditions of the policy.
In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.
Storm is the proximate cause of the damage
In all the circumstances, I am of the opinion the storm is the predominant and active cause of the claimed damage. Indeed, I am satisfied the exchanged material clearly demonstrates the insured event is the proximate cause of the building damage.
This is because of the following considerations.
I acknowledge the insufficient roof overhang and missing eave infill strips may have rendered the property vulnerable to, and/or contributed to, the building damage, at least to some extent. However, I am not convinced those factors are the dominant and operative cause of the damage.
I note all trades and experts who inspected the property concluded the storm played a causative role in the damage, and that some (for example, MS) thought the storm ‘likely’ was the sole cause of damage.
Moreover, the storm was severe. The claimed building damage was first observed immediately afterwards. If the insufficient roof overhang and missing eave infill strips were the proximate cause of the claimed damage, as submitted by the insurer, one would reasonably have expected the property to have been similarly damaged during high wind and severe rain events that happened during the two years prior to insured event. Yet the complainant reported no such damage has occurred and the exchanged material is consistent throughout in respect of the ‘good’ condition of the property prior to Cyclone Alfred.
RH’s conclusion is flawed in this regard. RH concludes that the insufficient overhang of roof sheets to the gutter in areas, together with the absence of eave infill strips:
… left [the property] vulnerable to water ingress during any wind-driven rain event.
However, use of the word ‘any’ is misplaced. This is a gross over-statement. As indicated, there likely were storms with high winds that occurred during the period between the completion of the complainant’s home and the insured event, yet no damage was reportedly caused by those previous storms. The roof performed adequately until the insured event occurred.
Further, it is important to note the complainant maintains that, two years or so prior to the insured event, the design of the roof system was certified compliant by local authorities. The insurer has presented no persuasive evidence to displace that submission.
Finally, the insurer accepts the antenna punctured the roof of the property.
In conclusion, I am satisfied a combination of factors, including the displaced antenna, the penetrations of the roof sheet caused by the antenna, the wind‑driven moisture findings and the absence of pre-existing damage shows, on balance, the storm was the proximate cause of the claimed building damage.
2.2 Did the insurer’s trades damage the property?
Yes. The exchanged material shows the insurer’s trades damaged the property, in particular, the stairs. This damage should be remediated by the insurer in accordance with section 2.4, below, and the matters set out in this determination.
Experts reported on damage to the stairs
When he lodged his complaint with AFCA the complainant said:
[The insurer] arranged “make safe” repairs. The contractors they appointed caused additional damage to my property, including dropping equipment, failing to use floor protection, and wedging ladders into my mono-stringer stairs…
The stairs, originally in sound condition, were damaged by the appointed contractors.
Independent builders have confirmed that repairing only one or three treads will not achieve a proper or matching result. Full replacement of 52 treads is required, at an estimated cost of approximately $20,000.
[The insurer] has attempted to deny responsibility, instead directing me to seek compensation directly from their contractor, who has only offered $550.
In its report dated 21 March 2025, RH says:
Staircase & Wall Damage
16 internal stair treads – 3 to 4 treads chipped, reportedly during trade access.
Wall surfaces show scuffing and contact marks from ladders. Insured noted these areas would likely need painting regardless.
As indicated, the insurer now says it accepts its contractor caused the damage during its attendance at the property. However, earlier, and despite RH’s evidence, the insurer said it was only responsible for one chipped tread and minor wall markings. The insurer maintained other chips were normal wear and tear. It said limited refinishing was adequate and it relied upon matching clauses in the policy to avoid broader restoration.
Discussions between the parties continued. Subsequently, after inspecting the property in August 2025, QT concluded:
· damage to some of the stair treads in each unit is consistent with the complainant’s allegations that:
> a ‘builder’s level’ was dropped on a stair during make safe repairs;
> a ladder was used on the unprotected surface of the treads during the make safe works.
In response material dated 19 November 2025, the insurer says:
… the Insurer notes the recommendations of the [QT] report are that the stairs are substantially refinished around the replaced treads and it considers a difference in appearance unlikely.
Later, in an email dated 13 January 2026, the insurer advised:
The insurer will be accepting rectification to all three flights of stairs per the [QT] report.
The insurer then provided an additional response dated 16 February 2026, stating its cash settlement offer for the stairs is $5,481, including a 20% ‘margin’. The offer includes the replacement of one tread and the sanding, restraining and repainting of all 16 ground floor steps in unit 1. In unit 2, the offer includes the sanding, restraining and repainting of all 16 lower-level treads and all 16 upper-level treads.
Finally, the insurer says care must be taken not to conflate ‘restore’ and ‘replace’.
Complainant maintains stairs should be replaced
The complainant provided a ‘Professional Statement’ from BT, timber floor specialist. BT says single‑tread repairs will not produce a uniform finish on the custom-built stairs. The statement includes the following opinion:
As a professional with over 45 years’ experience in the installation, sanding, and varnishing of timber floors, and consistent with the opinions provided by two other qualified builders, I confirm that it is not possible to repair, re-sand, and re-varnish a single tread on a set of mono stringer stairs without visible colour variation.
Over time, existing floors and varnish naturally fade and age. If a single tread were sanded and re-varnished in isolation, it would appear significantly different in colour, tone, and finish, making it stand out and look clearly out of place…
Therefore, to restore the stairs to the same condition and appearance as originally installed, all treads would need to be re-sanded and re-varnished, not just one.
Neither BT nor the complainant say whether BT inspected the stairs.
The complainant also provided a quotation from NX, builders, dated 26 August 2025. The quotation includes the following details regarding remediation of the stairs:
· remove all internal treads and install temporary treads for duration of repairs
· supply and replace treads as required (48)
· sand, prepare and stain all treads (Japanese Black) to match existing finish as close as practical and apply anti slip
· refit treads as per original design and layout as required
· all stair treads will require full restoration to ensure a consistent and perfect match throughout.
Whilst it contains descriptions of work items, NX has not costed the individual work items or the total cost of the stair repairs.
I have reviewed all the exchanged material in detail. Based upon that review, I am of the opinion that:
· the damage to the stairs occurred during the make safe attendance shortly after the insured event
· RH’s observations, supported by QT’s assessment of causation, show a clear link between the actions of the insurer’s trades during make safe works and the pattern of impact damage on the stairs
· because the damage arises from contractor negligence, not an insured event, policy matching clauses do not limit the scope of rectification
· BT’s evidence is persuasive. Its description of how colour, grain and varnish respond to localised repair supports the conclusion that a piecemeal approach will not replicate the pre‑loss uniform presentation of the custom-built stairs.
One aspect of the assessment of fairness involves the aim of returning a damaged property (and an insured) to their pre‑existing condition and position, as far as is reasonably practical considering all the circumstances. It follows that the insurer should fund remediation of the stairs so as to restore a consistent finish across the stair flights. The insurer should also fund the repainting of the damaged wall so that it accords with its pre-event condition.
I acknowledge some marks may relate to ordinary wear and that RH considers limited repair to be adequate. However, expert opinions outweigh this, and I am of the opinion that a limited, piecemeal approach would not produce a fair or consistent result.
In summary, I am of the opinion the fair and reasonable resolution of this aspect of the overall claim is that the insurer should be liable for the costs associated with the repair or replacement of the damaged treads (using the same type of wood that was used originally), as well as the re-sanding, re-straining and re-varnishing of every stair tread, including those that have been replaced.
This is because the expert opinion, that repair and re-sanding and re-varnishing of only the damaged treads would likely lead to an inconsistent finish, is persuasive.
Moreover, whilst the complainant says all treads should be replaced, BT says, ‘… to restore the stairs to the same condition and appearance as originally installed, all treads would need to be re-sanded and re-varnished, not just one’. That is, BT does not say all treads need to be replaced.
In addition, NX is also of the opinion the stairs can be remediated without having to replace every tread. Relevantly, NX’s quotation includes the following:
· supply and replace treads as required
· sand, prepare and stain all treads (Japanese Black) to match existing finish as close as practical and apply anti slip
· all stair treads will require full restoration to ensure a consistent and perfect match throughout.
Finally, RN, builders, also provided a quotation that appears to be consistent with other evidence. RN quotes for:
· remove all 48 custom stair treads
· sand back, apply 3 coats of Japan Black stain, and finish with anti-slip coating
· spot repairs not possible, paint finish will not match.
RN does not say that all treads need to be replaced.
I also acknowledge the insurer says care must be taken not to conflate ‘restore’ and ‘replace’. The term ‘conflate’ refers to the merging of two or more sets of information, texts, ideas or opinions into one, often in error.
I do not accept that the concepts of ‘restore’ and ‘replace’ have been conflated in the exchanged material. Indeed, I am satisfied those concepts have been adequately identified and dealt with separately, as and when necessary.
NX’s quotation may be used as a guide
The insurer’s cash settlement offer includes an allowance for single‑tread repairs. In contrast, NX’s quotation provides a detailed description of the work items required to achieve the desired and fair result. This is set out above.
It follows the insurer should obtain a SOW and actionable quotation consistent with, but not necessarily limited to, the details set out in NX’s quotation as soon as possible. This SOW should be used as the basis for a cash settlement offer regarding the stairs. Further details about the process to resolve this part of the claim (and the complaint) are set out in section 2.4, below.
2.3 Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay the complainant the sum of $2,000 in non-financial loss compensation.
AFCA can award non-financial loss compensation in certain circumstances
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
However, complainants should note that non-financial loss is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer.
Award of non-financial loss compensation is reasonable and appropriate in this instance
I accept the complainant in this matter has suffered an unusual degree of physical inconvenience and interference with his expectation of enjoyment and peace of mind.
When he lodged his complaint with AFCA, the complainant said:
[The insurer] has repeatedly failed to respond to emails and has not provided response timeframes. On more than 10 occasions I was told I would be called back by close of business, but I received no contact.
Attempts to lodge a separate claim have been blocked, with [the insurer] stating the matter was “with their writing team,” but no resolution or communication followed.
Financial and emotional impact have already repaired the water damage at my own cost due to delays.
In an accompanying email the complainant states:
Claim handling and communication
I reported the incident immediately and have provided documentation and quotes throughout…
Financial and emotional impact
I have already repaired the water damage at my own cost due to delays.
The outstanding cost to restore the stairs and related damage is approximately $40,000.
Despite paying premiums continuously, this is my first claim, yet I have been treated dismissively and, in effect, accused of dishonesty.
In an undated email, the complainant summarised the insurer’s claim management as follows:
I submit… that this claim has been handled:
· Poorly
· With excessive delays
· With incorrect technical assumptions
· Without proper consideration of storm-related damage
· Without any offer or pathway to resolution.
A timeline provided by the insurer shows activity, but also extended periods of delay, including significant gaps between March 2025 and September 2025, during which time the complainant repeatedly followed-up, but no final scope or offer was produced.
For example, after the claim was lodged in early March 2025, the insurer was still waiting on builder’s reports throughout April and May of 2025, despite multiple chases.
The exchanged material also shows the complainant making follow‑up enquiries on 28 April, 1 May, 7 May, 1 July, 2 July when he lodged a complaint, 11 August when a further complaint was made, and further inbound calls on 5 August and 11 August to the insurer’s Complex Investigations Unit seeking updates. These entries reflect that months passed without clear answers.
In my review of the exchanged material, I have found that, although the insurer undertook several investigative steps, the pattern of delay, inconsistency and lack of timely communication means the claim was not managed in a way that meets accepted industry standards.
The insurer recorded long periods waiting for builders, investigators and internal units from March 2025 through November 2025, yet did not keep the complainant adequately informed of progress or expected timeframes. This resulted in the claim remaining unresolved for months, despite the insurer’s early recognition in April 2025 that the make‑safe contractor damaged the stairs, and that storm‑related roof damage required proper scoping.
This indicates the insurer did not manage the evidence or communication with the clarity required. The complainant’s repeated emails and calls seeking updates between March 2025 and August 2025 show the insurer did not meet reasonable expectations of timely and transparent service.
Given the prolonged uncertainty, inconsistent explanations and the absence of a final scope or offer many months after claim lodgement, I am satisfied the insurer’s conduct had a meaningful negative impact upon the complainant’s claim experience.
I acknowledge the claim involved genuine complexity, including competing assessments about roof design, the need for external experts, and delays from third‑party suppliers. I also accept the insurer complied with formal internal dispute resolution requirements, including issuing a written decision and signposting the complainant’s right to approach AFCA.
However, these factors do not outweigh the overall pattern of delay, inconsistency and fragmented communication. Even allowing for the challenges of coordinating builders and investigators, the insurer remained responsible for managing its agents and keeping the complainant informed in a timely and transparent manner.
On balance, I am satisfied the insurer did not handle the claim fairly, the lack of clear updates and inconsistencies in the insurer’s positions caused the complainant avoidable inconvenience, frustration and stress over many months.
Understandably, the complainant now feels aggrieved.
Given these considerations, the insurer should pay to the complainant the sum of $2,000 in non-financial loss compensation.
2.4 Complaint to be resolved in this way
Parties obtained several quotations for repair of the building damage
The parties provided the following quotations regarding the repair of the claimed building damage:
· RH dated 24 June 2025 in the total sum of $12,387.57 (excluding any costs for remediation of the stairs)
· RN, builders, dated 26 August 2025 in the total sum of $49,885 (includes $20,400 for repairs to the stairs)
· NX, builders, dated 26 August 2025 in the total sum of $60,809.03 (includes uncosted remedial work on the stairs).
In an undated email the complainant, who is a builder, set out his own itemised and detailed SOW which includes the following costs:
· Plaster repairs: $2,600
· Painting: $4,900
· Antenna replacement: $1,200
· Roof flashing replacement: $2,800
· Fence repairs: $1,350
· Kitchen repairs: $3,300
· Skirting replacement: $500
· Stair tread restoration: $19,200
· VJ ceiling replacement (rear Area): $6,300.
I understand the complainant has already completed, and paid for, some urgent repairs himself.
The quotations are out of date, most are insufficiently itemised and not all can be considered actionable.
Therefore, within 28 days’ notice that the complainant accepts this determination, the insurer must:
· formally accept the claim for the building damage and begin to process it in accordance with the terms and conditions of the policy
· pay the sum of $2,000 in non-financial loss compensation to the complainant
· engage a qualified builder, and/or other suitably qualified expert, to attend and inspect the property. This expert must draw up a detailed SOW regarding all necessary repairs and associated works required to remediate the building damage caused by the insured event. The SOW should include, but not necessarily be limited to, consideration of damage to the following:
> internal plaster, walls and ceilings
> the balconies
> the antenna
> the roof penetrations caused by the antenna
> skirting boards
> the kitchen and any damaged cabinetry, and the like
> the exterior fence.
In addition, the abovementioned expert or, if necessary, another suitably qualified builder or stair specialist, must inspect the property and draw up a detailed SOW regarding all necessary repairs and associated works required to remediate the stairs. This SOW should be based upon, but not necessarily limited to, the relevant works itemised in NX’s quotation dated 26 August 2025 and the matters set out in this determination.
Moreover, if one or other of the parties deem it necessary, an expert hygienist should also be engaged to inspect the property and report on the necessary works required to treat any persistent mould problems.
After receipt of the SOWs, the insurer must promptly obtain at least one actionable quotation based upon each SOW, either by way of a tender process or otherwise. All repairs and remedial works included in the SOWs and quotation(s) must also comply with all current and applicable Commonwealth and New South Wales building-related, safety-related and health-related laws, regulations and codes.
Within seven days of receipt of the associated quotations, the insurer must elect to either:
· agree to commence the necessary repairs and associated works as soon as possible, or
· offer a cash settlement to the complainant based upon the preferred actionable quotations, (less the cost of repairs already undertaken by the complainant), but in accordance with the terms and conditions of the policy, plus a 20% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required.
Moreover, within 28 days’ notice that the complainant accepts this determination, the insurer must, if the complainant requests, engage a suitably qualified expert to inspect the pool pump and provide an opinion as to the cause of its failure.
Finally, if the complainant has already repaired some of the building damage, he must provide evidence of the repairs and associated costs and charges to the insurer as soon as possible. The insurer is entitled to then assess and pay the reasonable costs of these repairs pursuant to the terms and conditions of the policy, together with interest on the settlement sum in accordance with section 57 of the Insurance Contracts Act 1984, payable from the date of the invoices until settlement is paid.
The insurer must also provide to the complainant an explanation, and breakdown, of how the interest has been calculated.
Finally, if the complainant requires temporary accommodation during the repair works, the insurer must assess this additional benefit in accordance with the terms and conditions of the policy.
2.5 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainant has established a valid claim for the building damage
· the exchanged material shows the insurer is not entitled to rely upon a policy exclusion to deny the claim for the building damage
· the insurer is responsible for damage caused by its trades during make safe works
· such damage should be remediated so as not to leave inconsistencies in appearance and finish, wherever practically possible
· an award of non-financial loss compensation is fair and reasonable in this particular instance.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.