The insurer declined a storm claim for a collapsed garage ceiling, saying it resulted from gradual deterioration. AFCA found the storm was the proximate cause, ordered the claim accepted and repaired or cash-settled, and ordered reimbursement of $770 report costs plus interest, but no non-financial loss.

The complainant established a valid storm claim on the balance of probabilities, and the insurer did not show that the deterioration, workmanship or maintenance exclusions were the proximate cause.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestrefund fees or chargesrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-25-296843 | Financial firm | Allianz Australia Insurance Limited Case number: 12-25-296843 30 April 2026 1 Determination overview 1.1 Complaint The complainant (jointly) held a home building insurance policy issued by the financial firm (the insurer) for his house occupied by tenants. The policy covered loss or damage caused by defined events, including storm and rainwater. The complainant says that during a storm on 27 July 2025, the garage ceiling of the house collapsed overnight. He lodged a claim with the insurer the following morning. The insurer denied the claim. It says the ceiling collapse was caused by gradual deterioration over time, rather than the storm, and is therefore excluded from cover. The complainant disagrees. He says the ceiling was in good condition before the storm and the rain and wind from the storm caused it to collapse. He also says that the insurer’s handling of the claim and complaint has caused him stress and inconvenience. 1.2 Issues and key findings Is the insurer required to pay the claim? Yes. I am satisfied, on balance, that the ceiling collapse was caused by the storm. The insurer has not persuasively shown that it is entitled to rely on the policy exclusions to deny the claim. Should the insurer pay the complainant’s professional costs? Yes. The insurer must reimburse the complainant for the full cost of his independent building report, which was $770. Should the insurer pay compensation for non-financial loss? No. Whilst I accept that the incorrect claim decision caused stress for the complainant, I am not satisfied that the insurer otherwise mismanaged or delayed the claim. Why is the outcome fair? I am satisfied the complainant has established a valid claim under the policy, and the insurer has not shown that any policy exclusions apply. It is therefore fair in the circumstances that the insurer covers the claim. 1.3 Determination This determination is in favour of the complainant. Within 14 days of being notified of the complainant’s acceptance of the determination, the insurer is required to accept the claim and either arrange repairs to the garage ceiling or cash-settle the complainant, in accordance with the process and timeframe set out at 2.1 of this determination. The insurer must also pay the complainant $770 to cover the cost of his independent building report, plus interest. 2 Reasons for determination 2.1 Is the insurer required to pay the claim? Yes. I am satisfied, on balance, that the ceiling collapse was caused by the storm. The insurer has not persuasively shown that it is entitled to rely on the policy exclusions to deny the claim. The garage ceiling collapsed on 27 July 2025 The insured property is a residential house owned by the complainant and was occupied by tenants at the time of the garage ceiling collapse. The garage forms part of the insured building cover under the home building policy held with the insurer. The complainant says that during a storm involving heavy rain and wind in the early hours of 27 July 2025, a significant portion of the garage ceiling collapsed overnight. The tenants reported hearing a loud noise at approximately 2:30 am and discovered that the ceiling had failed and fallen into the garage. The complainant says the ceiling had been intact before the storm and there had been no signs of any issues with it. Complainant has onus to establish a valid claim It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning it is more likely than not. This is sometimes called a valid claim. If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. Policy covers loss or damage caused by storm, cyclone or rainwater The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The policy covers loss or damage to the insured property caused by storm or rainwater. However, this excludes (at page 18 of the PDS): Loss or damage caused by rainwater, hail, wind or water that enters your buildings: -through an open door, window or other opening (this exclusion does not apply to openings made by the storm or cyclone), -due to gradual deterioration, wear and tear and where you could reasonably be expected to have been aware of the deterioration or wear and tear. -due to faulty design or materials, structural defects or poor workmanship that you could reasonably be expected to have been aware of. -due to lack of maintenance or poor housekeeping. The complainant says that the damage to the garage ceiling was caused by the storm on 27 July 2025. He says that: · the garage ceiling collapsed suddenly overnight, at around 2:30 am, during the storm which involved heavy rain and wind. He says the timing of the collapse shows this is storm‑related damage · before the storm, the ceiling had been intact, and there had been no indication of failure · the insurer’s assessors when they attended in the days after the collapse observed water pooling and overflow, and water tracking down the internal garage wall · the collapse would not have occurred ‘but for’ the storm The insurer accepts that there was a storm and has not disputed that this involved heavy rain and gusty winds. However, it says the complainant has not shown that the storm caused the damage. It relies on reports from its appointed assessors, which conclude that the ceiling collapse was due to fixing failure and gradual deterioration over time, rather than the storm. The insurer says that any water ingress to the garage was minor and not linked to the collapse of the ceiling. Complainant has established a valid claim I am satisfied the complainant has established a valid claim under the policy’s storm cover. Damage can have more than one cause. When deciding whether the policy responds, I need to identify what the proximate cause of the damage was. This is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. I acknowledge the complainant and the insurer have different views about whether the storm was the direct and proximate cause of the garage ceiling collapse. I also acknowledge the insurer accepts that a storm occurred, but says the complainant has not shown that it caused the damage. After careful consideration of the exchanged material, I am satisfied, on the balance of probabilities, that the storm was the proximate cause of the garage ceiling collapse. The ceiling, which was intact beforehand, failed suddenly overnight at around 2:30 am, during a period of heavy rain and wind. The timing of the collapse is consistent with storm‑related damage. In addition to this, the insurer’s appointed experts (builder CA and plumber NO) observed blocked gutters and valleys, water pooling and overflow, and water tracking down the internal garage wall. This persuades me further that rainwater entered the garage during the storm. I also accept that gusty winds occurred during the storm. Neither CA nor NO addressed the impact or potential impact of the wind. I accept the finding of the complainant’s appointed expert, builder JB, that the wind gusts may have imposed additional stresses on the garage ceiling at the time of the collapse. While I accept that any existing deterioration may have increased the vulnerability of the ceiling at the time of the storm, I am satisfied that the storm imposed additional and abnormal stresses that ultimately caused the failure. In these circumstances, the complainant has established a valid claim under the policy. Policy exclusions do not apply Having found that the complainant has established a valid claim, the onus shifts to the insurer to show that a policy exclusion applies. The insurer says the ceiling damage and collapse was caused by fixing failure (for example, of the screws and glues holding up the ceiling) and gradual deterioration over time, which it says are excluded from cover under the policy. The insurer relies on the policy exclusions for wear and tear, gradual deterioration, faulty workmanship, and lack of maintenance, as outlined above. The insurer engaged a builder, CA, and plumber, NO, both of whom attended the property shortly after the collapse. They reported as follows: · CA concluded that the garage ceiling had dropped over time due to gradual deterioration of the plasterboard fixings. In forming this view, CA said the failure was due to a combination of factors, including: > long‑term exposure to moisture in the air > ongoing vibration over the life of the building > historical installation practices that were compliant at the time of construction, but which have since been improved · CA also relied on an earlier photograph of the house taken by the complainant’s property manager (for the purposes of rental inspections), which showed sagging or drooping of ceiling panels prior to the storm. CA said that this further supported its conclusion that the ceiling had been deteriorating over time. · NO similarly concluded that the ceiling collapse was the result of fixing failure. While NO observed minor signs of water entry, including dampness in some areas, NO stated that this water ingress would have been insufficient to have caused the collapse. In considering whether these policy exclusions apply, I have also reviewed the report obtained by the complainant from JB. JB concluded that: · the garage ceiling collapse was consistent with storm-related failure · the timing of the collapse occurred suddenly during a period of heavy wind and rain · water entered the roof system during the storm · this water together with wind pressure is likely to have imposed abnormal stresses on the garage ceiling · while some fixing deterioration may have made the ceiling more vulnerable, it did not alone explain the timing of the collapse, meaning that the storm was the cause of the collapse. I acknowledge that there was some deterioration and fixing failure, identified by all of CA, NO and JB. I accept the existence of this deterioration may explain why the ceiling was vulnerable, but it does not persuasively explain why the ceiling failed at that particular time. The ceiling collapsed suddenly overnight during a period of heavy rain and wind. While the insurer has referred to a single photograph taken several months earlier by the property manager which it says shows sagging, that image is distant and provides little detail as to the condition or integrity of the ceiling at that time. There is otherwise no information in the material before me indicating any prior partial failure or an imminent risk of collapse. In my view, the sudden failure during a severe weather event weighs against a conclusion that the damage arose primarily from a long‑term deterioration process. Further, the insurer’s experts recorded blocked gutters and roof valleys, water pooling and overflow, and water tracking down the internal garage wall. These observations are consistent with water entering the building during the storm. I also note that the storm involved strong and gusty winds, which I accept may have imposed additional pressure on the garage structure and ceiling at the time of the collapse. Taken together, these conditions support a finding that the storm subjected the garage ceiling to abnormal stresses at the time it failed. Lastly, I have considered the information in JB’s report referring to the possibility that the rear sliding door of the garage may have been open at the time of the storm. I note there is a policy exclusion for damage caused by wind or water entering the building through an open door. However, the reference in JB’s report is expressed in tentative terms only and not supported by any other information. Even if this was the case, the insurer has not shown that this caused the ceiling to collapse. Weighing up all this information, on the balance of probabilities, I am satisfied that the storm was the cause of the garage ceiling collapse. The insurer has not shown that the policy exclusions for gradual deterioration, faulty workmanship, or lack of maintenance were the proximate cause of the collapse. Insurer required to settle the claim Within14 days of being notified of the complainant’s acceptance of this determination, and subject to the complainant providing reasonable access to the property, the insurer must: · formally accept the claim, and · arrange for a suitably qualified building professional to prepare a comprehensive and up‑to‑date scope of works (SOW) addressing the repair or replacement of the garage ceiling. Within 21 days of finalising the SOW, the insurer must then, at its discretion and acting reasonably (in accordance with page 63 of the PDS), either: · arrange for suitably qualified repairers or builders to repair or rebuild the damaged garage ceiling in line with the SOW, to commence at the earliest available date, or · pay the complainant a cash settlement for the reasonable cost of the garage ceiling repair or rebuild. If the insurer elects to cash-settle the claim, it must be based on at least one current, quotation that is actionable for the complainant based on the SOW, ensuring that the builder providing the quotation attends the site and the quotation is fully itemised and reflects the practical costing for the required works. Any cash settlement must also have a 10% contingency applied on top of it, to factor in the risk of the works passing to the complainant. 2.2 Should the insurer pay the complainant’s professional costs? Yes. The insurer must reimburse the complainant for the full cost of his independent building report, which was $770. Complainant is seeking reimbursement of professional costs Under AFCA Rule D.5, AFCA can determine an insurer contribute up to $5,000 in professional costs reasonably incurred by a complainant in the course of a complaint. The complainant incurred a report fee of $770 for the independent building report obtained from JB. Compensation for the full cost of JB’s report is warranted I am satisfied the complainant reasonably needed to obtain JB’s report to respond to the insurer’s denial of the claim, given the technical nature of the dispute and the insurer’s reliance on its own expert reports. JB’s report assisted in addressing issues of causation and in assessing, on balance, whether the complainant had established a valid claim under the policy. JB’s report was taken into account in reaching this determination. In particular, it provided an alternative expert opinion on the role of the storm, including rain and wind conditions, in the failure of the garage ceiling. I am also satisfied the cost of JB’s report, being $770, is reasonable and proportionate to the issues in dispute, and that the report contributed to the fair resolution of the complaint. In these circumstances, it is fair that the complainant not be left out of pocket for these necessarily incurred costs. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer must reimburse the complainant $770 for the cost of JB’s report, subject to being provided with evidence of payment. The insurer must also pay the complainant interest on this amount, calculated pursuant to section 57 of the Insurance Contracts Act 1984 from 17 November 2025 (14 days after the insurer received JB’s report, after which time it became unreasonable for the insurer to withhold payment), until the date of settlement. 2.3 Should the insurer pay non-financial loss compensation? No. While I accept that the incorrect claim decision caused stress for the complainant, I am not satisfied that the insurer otherwise mismanaged or delayed the claim. AFCA can award compensation for non-financial loss Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. AFCA does not award non-financial loss in every complaint. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer. Compensation is not warranted in this particular instance I accept that the insurer’s decision to decline the claim, which I have found to be incorrect, caused stress and frustration to the complainant. However, AFCA does not award compensation for non‑financial loss just because an insurer’s claim decision is found to be incorrect, or because a complainant experiences the ordinary stress and inconvenience associated with a claim dispute. An award is only appropriate where there is evidence of poor claims handling, unreasonable delay, or other conduct by the insurer that goes beyond what would ordinarily be expected. From my review of the exchanged material, I am not satisfied that the insurer’s handling of the claim was poor. The claim was assessed and responded to within reasonable timeframes, expert reports were obtained shortly after notification, and when the complainant disputed the outcome, the insurer progressed the matter through its internal dispute resolution process and communicated its position in a timely manner. I acknowledge that the insurer previously offered the complainant $1,500 as a goodwill payment. I am satisfied this offer was made on an ex-gratia basis to resolve the complaint, rather than for non‑financial loss. The making of this offer does not establish that an award of non‑financial loss compensation is warranted. Having regard to all the circumstances, including the insurer’s claims handling and the nature of the dispute, I am not satisfied that the complainant suffered an unusual or exceptional degree of stress or inconvenience that would warrant an award of compensation for non‑financial loss. 2.4 Why is the outcome fair? I am satisfied the complainant has established a valid claim under the policy, and the insurer has not shown that any policy exclusions apply. It is therefore fair in the circumstances that the insurer covers the claim. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.